SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon

Size: px
Start display at page:

Download "SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon"

Transcription

1 SR 53 Corridor Study Final Report Presentation Friday, October 3, :00 AM to noon

2 SR 53 Corridor Study Final Report Presentation Study Purpose: Investigate safety improvements along the SR 53 corridor from US 23/US 30 in Wyandot County to SR 2 in Ottawa County

3 SR 53 Corridor Study Purpose of this meeting Stakeholders Study Approach Overall Crash Information Hot Spot Information Sample Hot Spots Stakeholder Concerns Break Prioritization List Funding Q&A

4 Intended Outcome of Study Identify and prioritize improvement projects that can move forward pending funding Identify and prioritize long-term improvement goals Set up funding mechanics

5 Core stakeholder group Representatives from each county 1 Commissioner County engineer Sheriff Administrator 1 Other designated county representative 1 Representative each from Fremont and Tiffin Ohio State Highway Patrol ODOT

6 Stakeholder Public Meetings Kickoff Meeting January 31, 2014 Stakeholder Meeting April 25, 2014 Presentation of findings from existing data and preliminary analyses Stakeholder Meeting August 1, 2014 Presentation of draft recommendations Public Meeting October 3, 2014 Presentation of final report

7 Corridor study limits

8 Study Approach Develop questionnaire and compile results Analyze traffic and crash data Evaluate horizontal and vertical alignments and identify substandard locations Identify hot spots Identify potential environmental red flags

9 Study Approach Research corridor for: Number of lanes and shoulder widths Legal and posted speed limits Number and location of driveway access points Design vehicle to be used for intersections

10 Study Approach Compile safety study report that includes: Summary of data received Identifies and describes hot spots Developed countermeasures for each hot spot

11 Study Approach Develop conceptual cost estimates Develop Rate of Return Prioritize Countermeasures

12 Overall Crash Information 493 crashes over approximately 54.5 miles. 45 crashes were added (US 6 overlap) 9 crashes were added at US 224 and SR were removed due to occurring on a side street 12 crashes were revised to correct crash type 63% of crashes occurred on dry pavement 6 fatal crashes over the three year study period

13 2% (10 Crashes) 2% (11 Crashes) 2.5% (12 Crashes) 3% (15 Crashes) 6% (28 Crashes) 7% (33 Crashes) 7% (37 Crashes) 17% (84 Crashes) 20% (99 Crashes) 31% (151 crashes)

14 Wyandot County

15 Wyandot County 33 total crashes over 9.5 Miles Crashes by Year: (33%) (30%) 49% were Non- Intersection Related 42% of the crashes occurred on Dry Pavement (37%)

16 Seneca County

17 Seneca County 241 total crashes over 19 Miles Crashes by Year (32%) 68% of the crashes occurred on Dry Pavement 3 fatal crashes (41%) (27%) 51% were Non- Intersection Related

18 City of Tiffin

19 122 total crashes City of Tiffin (25%) over 3.5 miles 69% were Included in Intersection Related Seneca County 67% of the crashes crash totals occurred on Dry Crashes by Year: Pavement (30%) (45%)

20 Sandusky County

21 Sandusky County 200 total crashes over 14 Miles (does not include US 20 bypass) Crashes by Year: (33.5%) 54% were Non- Intersection Related 60% of the crashes occurred on Dry Pavement 1 fatal crash (33%) (33.5%)

22 Ottawa County

23 Ottawa County 19 total crashes over 12 Miles Crashes by Year: (47%) (37%) (16%) 74% were Non- Intersection Related 79% of the crashes occurred on Dry Pavement 2 fatal crashes

24 Hot Spot Locations

25 Definitions Hot Spot: 5 or more crashes over a 3 year period Intersection or short segment Crash Breakdown for Each Location (Collision Diagram) Cost Estimate: Construction cost only 15% inflation & 30-50% contingency Rate of Return Function of construction cost Relevant crash reductions factors (CRF s) Expected Service Life

26 Hot Spot Locations 1. Description 2. Crash Information 3. Field Observation 4. Countermeasures

27 Hot Spot Locations

28 Wyandot County Hot Spots Locations Sandusky County 1. SR 53 & US CR 41 (Buckland Ave.) Seneca County 12. US 6/CR 6 (Hayes Ave.) 2. CR CR 51 (Napoleon Rd.) 3. SR 53: SLM US 20 WB On/Off Ramp 4. US CR 166/TR 171 (Hagerty Dr.) 5. CR 605 (Ella St.) 16. Sean Drive 6. MR 233 (Clay St.) 17. SR 53: SLM CR 26 (Miami St.) 18. CR 53 (Port Clinton Rd.) 8. MR 309 (Hudson St.) 19. SR 53: SLM MR 290 (Hall St.) 20. SR 53: SLM SR 100 (N. Washington St.)

29 Overall Findings Majority of Hot Spots located at intersections and in incorporated areas (Tiffin & Fremont). Majority of signals are incandescent bulbs (LED is preferred). Several deficient vertical curves located in Wyandot and Seneca Counties. All horizontal curves meet current design standards. Several Areas have Utility Poles and Ditches within clear zone.

30 Wyandot County Hot Spots Locations Sandusky County 1. SR 53 & US CR 41 (Buckland Ave.) Seneca County 12. US 6/CR 6 (Hayes Ave.) 2. CR CR 51 (Napoleon Rd.) 3. SR 53: SLM US 20 WB On/Off Ramp 4. US CR 166/TR 171 (Hagerty Dr.) 5. CR 605 (Ella St.) 16. Sean Drive 6. MR 233 (Clay St.) 17. SR 53: SLM CR 26 (Miami St.) 18. CR 53 (Port Clinton Rd.) 8. MR 309 (Hudson St.) 19. SR 53: SLM MR 290 (Hall St.) 20. SR 53: SLM SR 100 (N. Washington St.)

31 Segment 1: US 30 (Wyandot County) to CR 52 (Seneca County)

32 CR 6 AND SR 53 (SLM 2.87) Located in Segment 1 (Seneca County) Speed Limit is 55 MPH Approximate ADT is 5,600 vehicles Skewed, 4-leg intersection Stop controlled Deficient vertical curve 175 south of intersection

33 CR 6: Crash Summary 10 Total Crashes 7 crashes resulted in injury (4 incapacitating) 6 angle crashes 4 of the angle crashes occurred between WB and NB Vehicles

34 CR 6: Field Observations Safety measures are currently in place at the intersection Dual stop signs are present on both sides SR 53, along CR 6 Rumble strips are located across CR 6 in advance of the stop signs for SR 53 Farm field on NE corner becomes sight obstruction when crops are mature due to poor intersection angle

35 CR 6: Countermeasures CM#1 Pull Back Planted Field Pull back field 15 to improve sight distance Estimated Cost: $2,600 Rate of Return: 1458%

36 CR 6: Countermeasures CM#2 Add Dual Intersection Warning Signs Add dual intersection warning signs along SR 53 to warn drivers of the intersection Estimated Cost: $1,000 Rate of Return: %

37 CR 6: Countermeasures CM# 3 - Flattening Crest Vertical Curve Eliminate deficient vertical curve located south of intersection Several structures south of intersection may be impacted by this work Estimated Cost: $535,300 Rate of Return: 17.59%

38 Segment 5: US 6/CR 6 to US 20 (Sandusky Co.)

39 SR 53 and US 6 (SLM 6.02) Located in Segment 5 (Sandusky County) Speed Limit 55 MPH Approximate ADT is 14,100 vehicles Signalized Intersection Horizontal Curve north of intersection; Very Flat Intersection Lighting is Present

40 US 6 US 6: Crash Summary 22 crashes over the 3 year study period 70% on dry pavement/property damage only 15 crashes during AM (6-8AM) and PM (3-6PM) rush hour 55% rear end crashes; 9 on NB SR 53; up to 750 south of the intersection 6 left turn crashes; 5 EB US 6 SR 53

41 US 6: Field Observations During the PM, NB SR 53 left turning caused a significant backup in the NB direction. Pavement markings at this intersection appear to be deteriorating. Tire tracks at the northeast corner of the intersection also show trucks making wide turns onto NB SR 53.

42 US 6: Countermeasures CM #1 Add Left Turn Lane Install left turn lanes on SR 53 Estimated Cost: $223,550 Rate of Return: 26.87%

43 US 6: Countermeasures CM #2 Retime Signal Adjust Signal Timings/ Add Detection Estimated Cost: $18,720 Rate of Return: % CM #3 Add Left Turn Phase Install 5 Section Heads on US 6/CR 6 and add left turn phase Estimated Cost: $10,010 Rate of Return: 312% CM #4 New Pavement Markings Restripe with Thermoplastic PM Estimated Cost: $8,400

44 Stakeholder Concerns Concerns of the stakeholders include: Congestion caused by seasonal traffic Lack of safe passing areas on SR 53 Increase in crashes that may coincide with seasonal increase in traffic

45 Passing Lanes Lack of comfortable passing areas can cause drivers to become trapped behind slower moving vehicles for long distances on SR 53. Minimal safe passing areas could be a safety issue. not reflected in the crash data for SR 53. Lack of passing lanes is more of a driver satisfaction or congestion issue. DLZ estimates the addition of a passing lane at approximately $1,120,000 per lane mile.

46 Super 2 Changes the typical cross section of the road to: One 12 foot travel lane in each direction Paved shoulders, 10 feet wide Passing lanes spaced every 8 to 10 miles. Left turn lanes at major intersections if not already present.

47 Super 2 Construction cost and rate of return was broken down into 4 segments: Upper Sandusky to Tiffin (SR 18); approximately 19 miles Tiffin (Northern Corporation limit) to SR 12; approximately 11 miles SR 12 to the US 6/US20 Bypass; approximately 5 miles Turnpike to SR 2; approximately 11 miles

48 Super 2 Estimated Cost: Upper Sandusky to Tiffin (SR 18) $35,246,200 Tiffin (Northern Corp. Limit) to SR 12 $18,410,034 SR 12 to US 20 $9,223,066 Turnpike to SR 2 $17,187,800 Rate of Return Upper Sandusky to Tiffin (SR 18) % Tiffin (Northern Corp. Limit) to SR % SR 12 to US % Turnpike to SR %

49 Break Time

50 Cost Estimate: Definitions Construction cost only 15% inflation & 30-50% contingency R/W Cost is land only (No structures/relocations) Rate of Return Can be positive or negative Function of construction cost Relevant crash reductions factors (CRF s) Expected Service Life

51 Rate of Return Summary Hotspot # County Intersection/ Segment SLM Countermeasure Estimated Cost Rate of Return 1 Wyandot US 23 / US Regrading Between Ramps $ 66, % 1 Wyandot US 23 / US Flattening the vertical curve over the bridge $ 5,371, % 2 Seneca CR Increase Sight Triangle $ 2, % 2 Seneca CR Adding Dual Signs in Advance of Intersection $ 1, % 2 Seneca CR Flattening Crest Vertical Curve $ 535, % 3 Seneca Segment Resurface Road $ 627, % 3 Seneca Segment Flattening Crest Vertical Curves and Install Edgeline Rumble Stripes $ 2,145, % 4 Seneca US Add Left Turn Phase for NB SR 53 $ 2, % 4 Seneca US Signal Timing Adjustments LC Seneca CR Move Stop Bar LC Seneca CR New LED Signal Heads $ 10, % 5 Seneca CR Signal Timing Adjustments LC Seneca CR Adding Signs in Advance of Curve on Ella Street $ % 6 Seneca MR Check Signal Warrant/ Remove Signal $ 2, % 6 Seneca MR New LED Signal Heads $ 8, % 7 Seneca CR Tree Pruning to Improve Signal Visibility LC Seneca CR New LED Signal Heads with Backplates $ 8, % 8 Seneca MR Tree Pruning to Improve Intersection Sight Distance LC Seneca MR Increase Law Enforcement LC Seneca MR Move Stop Bar back 10' LC Seneca MR Adjust Signal Heads $ 9, % 10 Seneca SR Reduce Access Points $ 40, % 10 Seneca SR New Traffic Signal Installation $ 362, % 11 Sandusky CR Reconfigure Intersection to Remove Median $ 714, % 11 Sandusky CR Adding Intersection Lighting $ 436, % 12 Sandusky US Add Left turn lane on SR 53 $ 223, % 12 Sandusky US Retime Signal and Add Detection $ 18, % 12 Sandusky US Add Left Turn Phase for US 6 $ 10, % 12 Sandusky US New Pavement Markings $ 8, Sandusky US 20 WB Ramps Shorten Median $ 5, Sandusky US 20 WB Ramps Improve Skid Resistance by Diamond Grinding $ 1, % 14 Sandusky US 20 WB Ramps Resurface Ramp $ 46, % 15 Sandusky CR Add Right Turn Signal $ 2, % 15 Sandusky CR New LED Signal Heads with Backplates $ 217, % 16 Sandusky Sean Add Advance Warning Signs for Signal $ 1, % 16 Sandusky Sean New LED Signal Heads with Backplates $ 217, % 17 Sandusky Segment Add Bridge Ices before Road Signs $ % 17 Sandusky Segment Improve Skid Resistance by Diamond Grinding $ 16, % 18 Sandusky CR Add Left Turn Phase for SR 53 NB $ 4, % 18 Sandusky CR Increase Turning Radii on NW Corner of Intersection $ 10, Sandusky Segment Add Advance Warning Signs for Intersection $ % 20 Sandusky Segment Add Advance warning Signs for Curve $ % 20 Sandusky Segment Restripe Centerline to Prohibit Passing on Left $ 1, Sandusky Segment Widen Shoulder/Regrade Ditches $ 361, %

52 Ranked By Rate of Return Hotspot # County Intersection/ Segment SLM Countermeasure Estimated Cost Rate of Return 2 Seneca CR Increase Sight Triangle $ 2, % 17 Sandusky Segment Add Bridge Ices before Road Signs $ % 15 Sandusky CR Add Right Turn Signal $ 2, % 6 Seneca MR Check Signal Warrant/ Remove Signal $ 2, % 4 Seneca US Add Left Turn Phase for NB SR 53 $ 2, % 12 Sandusky US Retime Signal and Add Detection $ 18, % 12 Sandusky US Add Left Turn Phase for US 6 $ 10, % 5 Seneca CR Adding Signs in Advance of Curve on Ella Street $ % 2 Seneca CR Adding Dual Signs in Advance of Intersection $ 1, % 9 Seneca MR Adjust Signal Heads $ 9, % 18 Sandusky CR Add Left Turn Phase for SR 53 NB $ 4, % 20 Sandusky Segment Add Advance warning Signs for Curve $ % 14 Sandusky US 20 WB Ramps Improve Skid Resistance by Diamond Grinding $ 1, % 7 Seneca CR New LED Signal Heads with Backplates $ 8, % 17 Sandusky Segment Improve Skid Resistance by Diamond Grinding $ 16, % 19 Sandusky Segment Add Advance Warning Signs for Intersection $ % 5 Seneca CR New LED Signal Heads $ 10, % 12 Sandusky US Add Left turn lane on SR 53 $ 223, % 15 Sandusky CR New LED Signal Heads with Backplates $ 217, % 2 Seneca CR Flattening Crest Vertical Curve $ 535, % 6 Seneca MR New LED Signal Heads $ 8, % 14 Sandusky US 20 WB Ramps Resurface Ramp $ 46, % 16 Sandusky Sean New LED Signal Heads with Backplates $ 217, % 3 Seneca Segment Flattening Crest Vertical Curves and Install Edgeline Rumble Stripes $ 2,145, % 11 Sandusky CR Reconfigure Intersection to Remove Median $ 714, % 3 Seneca Segment Resurface Road $ 627, % 10 Seneca SR Reduce Access Points $ 40, % 16 Sandusky Sean Add Advance Warning Signs for Signal $ 1, % 20 Sandusky Segment Widen Shoulder/Regrade Ditches $ 361, % 10 Seneca SR New Traffic Signal Installation $ 362, % 11 Sandusky CR Adding Intersection Lighting $ 436, % 1 Wyandot US 23 / US Flattening the vertical curve over the bridge $ 5,371, % 1 Wyandot US 23 / US Regrading Between Ramps $ 66, %

53 Group Rankings Rank Hotspot # County Intersection/ Segment SLM Countermeasure Estimated Cost Rate of Return 1 2 Seneca CR Increase Sight Triangle $ 2, % 2 17 Sandusky Segment Add Bridge Ices before Road Signs $ % 3 15 Sandusky CR Add Right Turn Signal $ 2, % 4 6 Seneca MR Check Signal Warrant/ Remove Signal $ 2, % 5 17 Sandusky Segment Improve Skid Resistance by Diamond Grinding $ 16, % 6 4 Seneca US Add Left Turn Phase for NB SR 53 $ 2, % 7 5 Seneca CR Adding Signs in Advance of Curve on Ella Street $ % 8 2 Seneca CR Adding Dual Signs in Advance of Intersection $ 1, % 9 9 Seneca MR Adjust Signal Heads $ 9, % Sandusky US Retime Signal and Add Detection $ 18, % Sandusky CR Add Left Turn Phase for SR 53 NB $ 4, % Sandusky US Add Left Turn Phase for US 6 $ 10, % Sandusky Segment Add Advance warning Signs for Curve $ % 14 3 Seneca Segment Flattening Crest Vertical Curves and Install Edgeline Rumble Stripes $ 2,145, % Sandusky US 20 WB Ramps Improve Skid Resistance by Diamond Grinding $ 1, % 16 7 Seneca CR New LED Signal Heads with Backplates $ 8, % Sandusky Segment Add Advance Warning Signs for Intersection $ % 18 5 Seneca CR New LED Signal Heads $ 10, % 19 2 Seneca CR Flattening Crest Vertical Curve $ 535, % Sandusky US Add Left turn lane on SR 53 $ 223, % Sandusky Sean New LED Signal Heads with Backplates $ 217, % Sandusky CR New LED Signal Heads with Backplates $ 217, % Seneca SR Reduce Access Points $ 40, % 24 6 Seneca MR New LED Signal Heads $ 8, % Seneca SR New Traffic Signal Installation $ 362, % Sandusky US 20 WB Ramps Resurface Ramp $ 46, % Sandusky Segment Widen Shoulder/Regrade Ditches $ 361, % Sandusky CR Reconfigure Intersection to Remove Median $ 714, % 29 3 Seneca Segment Resurface Road $ 627, % Sandusky Sean Add Advance Warning Signs for Signal $ 1, % Sandusky CR Adding Intersection Lighting $ 436, % 32 1 Wyandot US 23 / US Flattening the vertical curve over the bridge $ 5,371, % 33 1 Wyandot US 23 / US Regrading Between Ramps $ 66, %

54 Funding ODOT Safety Funding TRAC TID Local funds CMAQ Transportation Alternatives Program Small City Program Municipal Bridge Program

55 How do we move ahead?

56 Questions?

57 Contact Info Michael Stormer, P.E. (Ohio Department of Transportation) Phone: (419)

58 Thank You!

Toolbox of Countermeasures and Their Potential Effectiveness to Make Intersections Safer

Toolbox of Countermeasures and Their Potential Effectiveness to Make Intersections Safer 8 Toolbox of Countermeasures and Their to Make Intersections Safer Introduction Studies included in the NCHRP 17-18 (3), Guidance for Implementation of the AASHTO Strategic Highway Safety Plan, as well

More information

Road Diets. Presented by: Cristine Gowland, P.E. LADOTD District 62 March 2, 2016

Road Diets. Presented by: Cristine Gowland, P.E. LADOTD District 62 March 2, 2016 Road Diets Presented by: Cristine Gowland, P.E. LADOTD District 62 March 2, 2016 FHWA s 9 Proven Safety Countermeasures 1. Safety Edge 2. Roundabouts 3. Corridor Access Management 4. Backplates with Retroreflective

More information

Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL

Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL Jan 2006 SIGHT DISTANCE 28(i) Chapter Twenty-eight SIGHT DISTANCE Table of Contents Section Page 28-1 STOPPING SIGHT DISTANCE

More information

Road Safety Assessments. Lt. Bob McCurdy Williamson County Sheriff s s Office Marion, IL.

Road Safety Assessments. Lt. Bob McCurdy Williamson County Sheriff s s Office Marion, IL. Road Safety Assessments Lt. Bob McCurdy Williamson County Sheriff s s Office Marion, IL. Why Are We Here? 2005 US Traffic Fatalities = 43,443 1429 4329 1361 1616 1534 3504 1729 3543 Illinois Annual Fatallities

More information

ROUNDABOUTS. Improving Safety and Efficiency. SR83 & Smithville Western Rd. Joel Montgomery, PE Director of Administration

ROUNDABOUTS. Improving Safety and Efficiency. SR83 & Smithville Western Rd. Joel Montgomery, PE Director of Administration ROUNDABOUTS Improving Safety and Efficiency SR83 & Smithville Western Rd. Joel Montgomery, PE Director of Administration The Ohio Department of Transportation District 3 906 North Clark Ave. Ashland, OH

More information

Recently Developed Intersection CMFs. Nancy Lefler, VHB ATSIP Traffic Records Forum, 2014

Recently Developed Intersection CMFs. Nancy Lefler, VHB ATSIP Traffic Records Forum, 2014 Recently Developed Intersection CMFs Nancy Lefler, VHB ATSIP Traffic Records Forum, 2014 Overview General Methodology Treatments Installation of traffic signals - with and without left-turn lanes (NCDOT)

More information

Readington Road (C.R. 637) Construction

Readington Road (C.R. 637) Construction Public Information Meeting Thursday, August 2, 2012 Readington Road (C.R. 637) Construction from Dreahook Road to Harlan School Road Branchburg Township, Somerset County Readington Township, Hunterdon

More information

General References Definitions. (1) Design Guidance. (2) Supporting Information

General References Definitions. (1) Design Guidance. (2) Supporting Information Chapter 1240 Turning Roadways 1240.01 General 1240.02 References 1240.03 Definitions 1240.04 Turning Roadway Widths 1240.05 Documentation 1240.01 General The roadway on a curve may need to be widened to

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

Safety Data Resources. Multi-Discipline Safety Planning Forum March 10 & 11, 2008 Gateway Center

Safety Data Resources. Multi-Discipline Safety Planning Forum March 10 & 11, 2008 Gateway Center Safety Data Resources Multi-Discipline Safety Planning Forum March 10 & 11, 2008 Gateway Center Tom McDonald, PE Safety Circuit Rider Iowa LTAP Jack Latterell,, PE Safety Consultant FHWA Safety Engineer,

More information

J-Turn An Intersection Safety Improvement Purdue Road School 2016 Tuesday, March 8, 2016 Brian Malone, INDOT & Josh Cook, HNTB

J-Turn An Intersection Safety Improvement Purdue Road School 2016 Tuesday, March 8, 2016 Brian Malone, INDOT & Josh Cook, HNTB J-Turn An Intersection Safety Improvement Purdue Road School 2016 Tuesday, March 8, 2016 Brian Malone, INDOT & Josh Cook, HNTB US 231 and SR 62 and SR 68 US 231 and SR 62 Intersection Traffic Data Traffic

More information

Military Road Safety Improvements

Military Road Safety Improvements Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and

More information

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

Now Let s Think Systemic

Now Let s Think Systemic Now Let s Think Systemic Remote Rural County Use of the Highway Safety Improvement Program TRINITY COUNTY DEPARTMENT OF TRANSPORTATION Richard Tippett Director MEET TRINITY COUNTY 3,208 square miles 13,786

More information

Designing for Pedestrians: An Engineering Symposium. Rutgers University March 21, 2013

Designing for Pedestrians: An Engineering Symposium. Rutgers University March 21, 2013 Designing for Pedestrians: An Engineering Symposium Rutgers University March 21, 2013 The Problem 2 Pedestrian Fatalities Pedestrian Fatalities by Year in US (1994-2010) 6000 5000 4000 3000 2000 1000 0

More information

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane July 24, 2018 TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane DPWandYOU.com Making a difference, together Meeting Agenda Purpose of the project Overview of work conducted

More information

Local Road Safety Plans

Local Road Safety Plans An Introduction to Local Road Safety Plans June 21, 2018 Today s Presenter Jerry Roche, P.E. Safety Analysis Program Manager FHWA Office of Safety Ames, IA 2 NACE Do-It-Yourself LRSP Pilot Six states,

More information

Highway Safety Improvement Program. Metro District Program Criteria

Highway Safety Improvement Program. Metro District Program Criteria HSIP Highway Safety Improvement Program Metro District Program Criteria Minnesota Department of Transportation Metro District Traffic Engineering September 2014 Table of Contents Introduction... 1-2 Qualifying

More information

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT 405 LIMB MANAGEMENT ACTIVITY DESCRIPTION Cut and/or remove and/or grind tree limbs from the right-of-way. TRAFFIC CONTROL Utilize intermittent mobile operations

More information

Safety at Unsignalized Intersections. Unsignalized Intersections

Safety at Unsignalized Intersections. Unsignalized Intersections Safety at FHWA Safety Focus Areas 2 National Statistics 3 National Statistics There were 41,059 highway fatalities in 2007. Where did they occur? Non-Intersections 79% About half of all crashes and half

More information

Road Safety Audit Course Participant Guidebook. August 22 & 23, Cleveland Avenue Columbus, Ohio

Road Safety Audit Course Participant Guidebook. August 22 & 23, Cleveland Avenue Columbus, Ohio Road Safety Audit Course Participant Guidebook August 22 & 23, 2017 Cleveland Avenue Columbus, Ohio 1 2 Table of Contents Executive Summary... 5 Cleveland Avenue City of Columbus... 6 Road Location Details...

More information

Proposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017

Proposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017 Proposed FUL-SR 66 Relocation on to CR 24 Presentation to Archbold Village Council April 17, 2017 Robert J. Seaman, P.E., P.S. Village Engineer Andrew J. Langenderfer, P.E. Sr. Project Manager Agenda Stakeholders

More information

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Acknowledgements Mr. David Nicol Director, FHWA Office of Safety FHWA Office of Safety http://safety.fhwa.dot.gov/provencountermeasures/

More information

Ottawa Beach Road Study

Ottawa Beach Road Study Ottawa Beach Road Study Prepared For: Park Township September 30, 2014 Project No. G140303 OTTAWA BEACH ROAD STUDY PREPARED FOR: PARK TOWNSHIP SEPTEMBER 30, 2014 PROJECT NO. G140303 TABLE OF CONTENTS 1.0

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA PENN STATE TESC SESSION 8B MOVING PENNDOT AND PTC FORWARD DECEMBER 8, 2017 Agenda Define Active Traffic Management and describe

More information

VT15 / Allen Martin Drive Intersection Scoping Study

VT15 / Allen Martin Drive Intersection Scoping Study VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES PRESENTATION MEETING DECEMBER 19, 2016 Agenda Study Area Project Background Existing Conditions Identified Issues Proposed Alternatives

More information

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL THE FUTURE OF THE TXDOT ROADWAY DESIGN MANUAL Kenneth Mora, P.E. (Design Division) 10/10/2017 Table of contents 1 2 Reduction in FHWA design controlling criteria Innovative Intersection Guidance 3-7 8-42

More information

INTERSECTION SAFETY STUDY State Route 57 / Seville Road

INTERSECTION SAFETY STUDY State Route 57 / Seville Road INTERSECTION SAFETY STUDY State Route 57 / Seville Road City of Wadsworth, Medina County, Ohio Prepared For: City of Wadsworth Engineering Department 120 Maple Street Wadsworth, OH 44281 Prepared By: GPD

More information

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN maintenance, and erosion. Stability is required to maintain the integrity of the pavement structure, and a slope stability analysis should be conducted for cuts and fills greater than 15 feet. For lower

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

EXISTING (2006) CONDITIONS

EXISTING (2006) CONDITIONS Section 2 EXISTING (2006) CONDITIONS This section provides a description of the existing transportation system in the study area and a comprehensive analysis of existing traffic operations and crash history.

More information

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

TRAFFIC ACCIDENT ANALYSIS

TRAFFIC ACCIDENT ANALYSIS TRAFFIC ACCIDENT ANALYSIS Westheimer at Chimney Rock and Westheimer at Dunvale Prepared for Prepared by Klotz Associates, Inc. 1160 Dairy Ashford, Suite 500 Houston, Texas 77079 The preparation of this

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP DRAFT NOT FINAL (Note: document was not finalized due to an eastbound stopping site distance design issue that requires more detailed bridge and roadway design considerations. This discussion starts on

More information

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Adopted January 6, 2014 Town of Mooresville Development Services Department TOWN OF MOORESVILLE NEIGHBORHOOD TRAFFIC

More information

Roadside Safety Proven Countermeasures. Emmett McDevitt Transportation Safety Engineer Federal Highway Administration

Roadside Safety Proven Countermeasures. Emmett McDevitt Transportation Safety Engineer Federal Highway Administration Roadside Safety Proven Countermeasures Emmett McDevitt Transportation Safety Engineer Federal Highway Administration Safety Statistics On average each year 43,000 + people die in traffic related crashes.

More information

Kentucky s Surface Transportation System

Kentucky s Surface Transportation System Kentucky s Surface Transportation System ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit

More information

Project Name Project Description Authorized Amount

Project Name Project Description Authorized Amount 1, 13 Branchville-Lewisburg Road (CR 628) Lewisburg-Creamery Road (CR 565) 2,3 Asbury-Bloomsbury Road/Asbury- Anderson Road (CR 632) Skid-resistant surface treatment, enhanced signage, pavement markings

More information

Existing Conditions. Log Point 8.16 (SR-14) Log Point 1.49 (CR-55) Figure 1- Study Location of SR-14 & CR-55 Intersection

Existing Conditions. Log Point 8.16 (SR-14) Log Point 1.49 (CR-55) Figure 1- Study Location of SR-14 & CR-55 Intersection Abbreviated Study District: 12 County: Cuyahoga Route: SR 14 Section: 8.16 CUY-14-8.16 2016 HSP # 072 (Urban Intersection) Prepared April 3, 2018 By Drake Brauer Approved By: Keith D. Hamilton, P.E. Date:

More information

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Mandan Commission Meeting August 2, 2016 Mandan City Hall Mandan-Bismarck Corridor Improvement Study Mandan Commission Meeting August 2, 2016 Mandan City Hall 2014 HDR, Inc., all rights reserved. Mandan Corridors Study Schedule 2015 2016 Study Kick Off August

More information

APPENDIX A Urban Control Zone Corridor Study Reports

APPENDIX A Urban Control Zone Corridor Study Reports APPENDIX A Urban Control Zone Corridor Study Reports California Sites Table A-1. California Study Corridors California Study Corridor County Name Length (miles) State Highway 1 Orange 7.0 State Highway

More information

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table

More information

Cornelius Pass Road Safety Evaluation JTA. Final Report

Cornelius Pass Road Safety Evaluation JTA. Final Report Cornelius Pass Road Safety Evaluation JTA BACKGROUND Final Report The Jobs and Transportation Act, adopted by the 2009 Oregon Legislative Assembly, directs the Oregon Department of Transportation (ODOT),

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

A Sample Report of TRAFFIC CONTROL DEVICES REVIEW

A Sample Report of TRAFFIC CONTROL DEVICES REVIEW A Sample Report of TRAFFIC CONTROL DEVICES REVIEW Introduction We performed a peer review of traffic control devices at selected locations on the City s street system. As the result of our review, we have

More information

ROUTE 22 CORRIDOR STUDY: CORRIDOR MANAGEMENT PLAN APPENDIX A A-12

ROUTE 22 CORRIDOR STUDY: CORRIDOR MANAGEMENT PLAN APPENDIX A A-12 ROUTE 22 CORRIDOR STUDY: CORRIDOR MANAGEMENT PLAN APPENDIX A A-12 3.0 HARLEM VALLEY TRANSPORTATION PLAN Incorporates transportation systems management and safety improvements. Location: Route 22 corridor

More information

From Mile Zero to Target Zero the Dawson Creek Case Study

From Mile Zero to Target Zero the Dawson Creek Case Study From Mile Zero to Target Zero the Dawson Creek Case Study Raheem Dilgir, President, TranSafe Consulting Ltd. and Kevin Henderson, Manager of Planning and Development, City of Dawson Creek Paper prepared

More information

INTERSECTIONS AT GRADE INTERSECTIONS

INTERSECTIONS AT GRADE INTERSECTIONS INTERSECTIONS 1 AT GRADE INTERSECTIONS INTERSECTIONS INTERSECTIONS = INTERRUPTED FACILITIES Definitions and key elements An intersection is defined as an area where two or more roadways join or cross.

More information

ENGINEER S PRELIMINARY REPORT. for the #######-###### COLLISION

ENGINEER S PRELIMINARY REPORT. for the #######-###### COLLISION ENGINEER S PRELIMINARY REPORT for the #######-###### COLLISION By: Lance E. Robson, P.E. October 3, 2005 1 INVESTIGATION OF THE #######-###### COLLISION ENGINEER S PRELIMINARY REPORT October 3, 2005 ---------------------------------------------------------------------------------------------------------------

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information

Engineering Countermeasures for Transportation Safety. Adam Larsen Safety Engineer Federal Highway Administration

Engineering Countermeasures for Transportation Safety. Adam Larsen Safety Engineer Federal Highway Administration Engineering Countermeasures for Transportation Safety Adam Larsen Safety Engineer Federal Highway Administration 360-619-7751 Adam.Larsen@DOT.GOV Countermeasure Selection Resources Manual for Selecting

More information

Recent U.S. Research on Safety Evaluation of Low-Cost Road Engineering Safety Countermeasures Lessons for Canada

Recent U.S. Research on Safety Evaluation of Low-Cost Road Engineering Safety Countermeasures Lessons for Canada Recent U.S. Research on Safety Evaluation of Low-Cost Road Engineering Safety Countermeasures Lessons for Canada Bhagwant Persaud Department of Civil Engineering, Ryerson University 350 Victoria Street,

More information

PEDESTRIAN SAFETY STUDY

PEDESTRIAN SAFETY STUDY PEDESTRIAN SAFETY STUDY SR 699 (BLIND PASS RD/GULF BLVD) FROM 93 RD AVENUE TO PINELLAS BAYWAY PINELLAS COUNTY SECTION NO.: 15100 MILEPOST: 0.111 3.569 STUDY LIMITS Prepared For: Florida Department of Transportation

More information

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4 PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 WORK DESCRIPTION 4 Repair Install Remove Clean 306 DRAINAGE PIPE ACTIVITY DESCRIPTION Install, repair, clean,

More information

Access Management in the Vicinity of Intersections

Access Management in the Vicinity of Intersections Access Management in the Vicinity of Intersections FHWA-SA-10-002 Technical Summary Photo: Ralph Bentley (used with permission) 0 Access Management is: The design, implementation and management of entry

More information

REDUCING COLLISIONS AT HIGH CRASH LOCATIONS

REDUCING COLLISIONS AT HIGH CRASH LOCATIONS REDUCING COLLISIONS AT HIGH CRASH LOCATIONS Presented by Nazir Lalani P.E. Traffex Engineers Inc. N_lalani@hotmail.com ACCIDENTS AND SAFETY Why is safety important? Safety components Who is responsible?

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT

11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT 11 CHECKLISTS 11.1 Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT 1.1 General topics 1. Scope of project; function; traffic mix 2. Type and degree of access to property and developments

More information

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017 EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

Roundabout Feasibility Memorandum

Roundabout Feasibility Memorandum Roundabout Feasibility Memorandum To From Gwen Pipkin Bill Howell Date June 18, 2013 Subject Roundabout Feasibility Study SR 29 PD&E Study From Oil Well Road to SR 82 Collier County, FL FPID 417540-1-22-01

More information

DESIGN EXCEPTION MANUAL

DESIGN EXCEPTION MANUAL DESIGN EXCEPTION MANUAL 2004 U.S. Customary English Units DESIGN EXCEPTION PROCEDURE A. General When conditions warrant, a design exception may be granted for a project design that proposes one or more

More information

Lessons Learned from the Minnesota County Road Safety Plans. Richard Storm CH2M HILL

Lessons Learned from the Minnesota County Road Safety Plans. Richard Storm CH2M HILL Lessons Learned from the Minnesota County Road Safety Plans Richard Storm CH2M HILL May 21, 2014 Overview of the MN CRSP: Why Prepare Safety Plans for Local Systems? MAP-21: Requires states to address

More information

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

Owl Canyon Corridor Project Overview and Summary

Owl Canyon Corridor Project Overview and Summary Owl Canyon Corridor Project Overview and Summary December 22, 2008 The Owl Canyon corridor (generally the connection between the I-25 / Larimer County Road 70 interchange and the US 287 / Larimer County

More information

Complete Streets. Designing Streets for Everyone. Sarnia

Complete Streets. Designing Streets for Everyone. Sarnia Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the

More information

Swamp Road Residents Study

Swamp Road Residents Study Swamp Road Residents Study SRRG Meeting with PennDot and Elected Officials Newtown and Wrightstown, PA April 25, 2008 Newtown Township Section of Swamp Road Limited Public Funds No reconstruction of a

More information

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report Traffic Study of Fuller Street, Cady Street, West Street and West Avenue Final Report July 2005 Prepared for: Town of Ludlow Prepared by: Pioneer Valley Planning Commission 26 Central Street West Springfield,

More information

Clinton Street Bridge over the Maumee River. ODOT Project DEF April 1, 2015 Stakeholder s Meeting

Clinton Street Bridge over the Maumee River. ODOT Project DEF April 1, 2015 Stakeholder s Meeting Clinton Street Bridge over the Maumee River ODOT Project DEF-15-14.77 April 1, 2015 Stakeholder s Meeting Purpose of Stakeholder Meeting Review the project and why it s happening Share the results of the

More information

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility

More information

CITY OF SPOKANE VALLEY Request for Council Action

CITY OF SPOKANE VALLEY Request for Council Action CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: December 16, 2014 Department Director Approval: Check all that apply: consent old business new business public hearing information admin.

More information

Multi-Modal Traffic Analysis. Parisi and Associates

Multi-Modal Traffic Analysis. Parisi and Associates Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table

More information

Project Application. Project Location: Salem Drive (Federal Route 1101)

Project Application. Project Location: Salem Drive (Federal Route 1101) Project Application General Information Municipality/Lead Agency: Hoffman Estates 1. Contact Person: Michael Hankey 2. Contact Phone: 847 252-5801 3. Contact Email: mike.hankey@hoffmanestates.org Project

More information

Form DOT F (8-72) Texas Transportation Institute The Texas A&M University System College Station, Texas

Form DOT F (8-72) Texas Transportation Institute The Texas A&M University System College Station, Texas Technical Report Documentation Page. Report No. FHWA/TX-2/448-2. Government Accession No. 3. Recipient's Catalog No. 4. Title and Subtitle CHARACTERISTICS OF AND POTENTIAL TREATMENTS FOR CRASHES ON LOW-VOLUME,

More information

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway

More information

CE576: Highway Design and Traffic Safety

CE576: Highway Design and Traffic Safety CE576: Highway Design and Traffic Safety Predicting Crash Frequency for Two-Lane Rural Highway Segments Cross Sectional Elements Ahmed Abdel-Rahim, Ph.D., P.E. Civil Engineering Department University of

More information

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY 7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PRESENTATION RECONSTRUCTION OF SR-76 (SW KANNER HIGHWAY)

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

KY s s RSA Evolution. Jo Anne Tingle, PE Kentucky Transportation Cabinet (KYTC) AASHTO TIG/FHWA RSA PEER Exchange Little Rock, AR - April 29, 2008

KY s s RSA Evolution. Jo Anne Tingle, PE Kentucky Transportation Cabinet (KYTC) AASHTO TIG/FHWA RSA PEER Exchange Little Rock, AR - April 29, 2008 KY s s RSA Evolution Jo Anne Tingle, PE Kentucky Transportation Cabinet (KYTC) AASHTO TIG/FHWA RSA PEER Exchange Little Rock, AR - April 29, 2008 Presentation Outline KY s s RSA History How we decided

More information

BUILDING CHINARAP. Zhang Tiejun Research Institute of Highway (RIOH) Beijing, China

BUILDING CHINARAP. Zhang Tiejun Research Institute of Highway (RIOH) Beijing, China BUILDING CHINARAP Zhang Tiejun Research Institute of Highway (RIOH) Beijing, China E-mail: tj.zhang@rioh.cn Greg Smith International Road Assessment Programme (irap) Beijing, China E-mail: greg.smith@irap.org

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations

More information

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation Lincoln Way Multimodal Safety and Operations Study City and University Summary Presentation February 27, 2018 Agenda Introductions Study Overview: Phase 1 - Discovery Phase 2 Improvement Recommendations

More information

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1 BD00 RESOLUTION NO. - RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE [NTIP PLANNING] FINAL REPORT WHEREAS, The Vision Zero Ramp Intersection Study Phase was recommended by Commissioner

More information

SUCCESFUL HSIP APPLICATIONS CUUATS & CHAMPAIGN COUNTY

SUCCESFUL HSIP APPLICATIONS CUUATS & CHAMPAIGN COUNTY SUCCESFUL HSIP APPLICATIONS CUUATS & CHAMPAIGN COUNTY Traffic Engineering and Safety Conference October 15, 2014 CUUATS and Champaign County The Champaign-Urbana Urbanized Area Transportation Study (CUUATS)

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Safety Assessment of Installing Traffic Signals at High-Speed Expressway Intersections

Safety Assessment of Installing Traffic Signals at High-Speed Expressway Intersections Safety Assessment of Installing Traffic Signals at High-Speed Expressway Intersections Todd Knox Center for Transportation Research and Education Iowa State University 2901 South Loop Drive, Suite 3100

More information

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE PAVED SHOULDERS ON PRIMARY HIGHWAYS IN IOWA: AN ANALYSIS OF SHOULDER SURFACING CRITERIA, COSTS, AND BENEFITS EXECUTIVE SUMMARY Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation

More information

A plan for improved motor vehicle access on Railroad Avenue in Provincetown

A plan for improved motor vehicle access on Railroad Avenue in Provincetown A plan for improved motor vehicle access on Railroad Avenue in Provincetown February 2011 A plan for improved motor vehicle access on Railroad Avenue in Provincetown INTRODUCTION AND PROBLEM IDENTIFICATION

More information

Multimodal Design Guidance. October 23, 2018 ITE Fall Meeting

Multimodal Design Guidance. October 23, 2018 ITE Fall Meeting Multimodal Design Guidance October 23, 2018 ITE Fall Meeting Introductions Jessica Wilson TDOT Multimodal Division Office of Multimodal Planning Program Supervisor Jessica.L.Wilson@tn.gov Ali Hangul TDOT

More information

Alleviate Traffic Congestion and Improve Operational Reliability of the Route 17 Corridor

Alleviate Traffic Congestion and Improve Operational Reliability of the Route 17 Corridor Project Purpose PURPOSE AND NEED STATEMENT Route 17 Bottleneck Project, MP 10.19 to 12.04 Alternatives Analysis and Preliminary Engineering Borough of Maywood, Township of Rochelle Park, and Borough of

More information

Proven Safety Countermeasures. FHWA Office of Safety January 12, :00 p.m. to 2:00 p.m. Eastern Time

Proven Safety Countermeasures. FHWA Office of Safety January 12, :00 p.m. to 2:00 p.m. Eastern Time Proven Safety Countermeasures FHWA Office of Safety January 12, 2012 1:00 p.m. to 2:00 p.m. Eastern Time Introduction and Background While States should still be considering the application of all of the

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information