1 Tri-Party Transportation Conference Moving Alberta Into the Future Alberta Highway 881 Corridor Management Plan Lac La Biche to Anzac Session Forum 1 - Highways March 2017

2 INTRODUCTION km long, 2 lane roadway + 65 km east of Highway 63 + Connects Lac La Biche with Anzac (Fort McMurray) + Rolling forested/muskeg environment + Growing truck & industrial traffic + Many OD Loads + Increasing challenge to safely manage all types of road users

3 OUTLINE + Study Purpose + Methodology + Existing Conditions + Future Conditions + Analysis & Findings Passing Lanes Climbing Lanes Safety Rest Areas Access Management Highway Twinning + Recommendations 3

4 STUDY PURPOSE + Development of a Corridor Management Plan to Outline strategy for a staged upgrading that will safely accommodate all road users 63 Provide guidance for industrial development and access 881 Protect adjacent land for future highway upgrading 4

5 STUDY PURPOSE + In Response to: Increasing industrial activity Trucks, particularly over-dimensional loads Public concern about highway safety + Preliminary Concept 5

6 METHODOLOGY + Climbing and Passing Lane Strategy + Safety Rest / Truck Staging Area Strategy + Access Management recommendations + Preliminary Side of Twinning + Highway Realignment Options + Staging 6

7 EXISTING CONDITIONS + Traffic Volumes: Highway 881 Corridor Management Plan Average annual growth rate of 9%; 2004 to 2013 Volumes ranged from 1,600 to 3,500 vehicles/day + Truck Traffic: Approaching 20% of total volume; 1 in 5 vehicles Increasing Over-Dimensional loads; 3,300 in

8 EXISTING CONDITIONS + Numerous Accesses + Highway Operations LOS ranging from B to D Passing opportunities are often limited 8

9 EXISTING CONDITIONS + Safety The five-year average collision rate below the provincial average for 2-lane rural highways + Shoulder Width Weighted Average Pavement Width 9.4m (1m shoulder width) 9

10 EXISTING CONDITIONS + Geometry Design speed 110 km/h Substandard horizontal and vertical curves, grades 10

11 EXISTING CONDITIONS + Existing Roadside Turnouts: Highway 881 Corridor Management Plan Five pairs of turnouts, Lac La Biche to Anzac Relatively narrow, not intended as O-D staging areas 11

12 FUTURE CONDITIONS + Traffic Growth Rate Annual linear growth rate of 9% Not sustainable Volumes presently dropping off 12

13 FUTURE CONDITIONS + Highway Classification Level 2 Arterial Highway Multi-Lane Roadside Management Standard + Highway Standards: Ultimate four lane divided cross-section Expressway standard, (no interchanges) Accommodate OD loads 13

14 PASSING LANES + Purpose: Provide assured passing opportunities where length and location of passing zones are less than desirable 14

15 ANALYSIS PASSING LANES + Warrant: Highway 881 Corridor Management Plan Net Passing Opportunity Greater than 40%, satisfactory Between 30% and 40%, marginal Less than 30%, improvement considered Does not reflect the impact of OD loads 15

16 FINDINGS PASSING LANES + Based on 2013 Volumes Marginal passing opportunities two locations + Based on Estimated 2034 Volumes All sections would have marginal or insufficient passing opportunities, with majority needing improvement Highway 881 Corridor Management Plan 16

17 CLIMBING LANES + Purpose: Mitigate the effects of heavily loaded vehicles operating on long and or steep grades Provide assured passing opportunities 17

18 ANALYSIS CLIMBING LANES + Warrant: Highway 881 Corridor Management Plan Is based on meeting three conditions: 1. Greater than 45 trucks in the peak hour, 2. Trucks experience a 15 km/h speed reduction, and 3. Uphill traffic experiences Level-of-Service C or lower; Or There is economic justification for the climbing lane. 18

19 FINDINGS CLIMBING LANES + Based on Estimated 2024 Volumes Highway 881 Corridor Management Plan 16 northbound and 13 southbound grades would meet warrant for number of trucks and speed reduction Overall segment Level-of-Service would meet warrant Level-of-service warrant for individual grades not always met; however, analysis does not reflect cumulative effect of platoon formation along the corridor 19

20 PASSING/CLIMBING LANE PLACEMENT + Climbing lanes placed first + Passing lanes placed to establish desirable overall spacing, considering: Location of existing intersections, major accesses Location of horizontal curves Proximity of reduced speed zones Presence of sidehills and muskeg Balancing northbound and southbound directions 20

21 PASSING/CLIMBING LANE PLACEMENT + Type and Number of Lanes in Three Stages + An average 8 km spacing ultimately achieved + At 100 km/h, passing opportunity every 6 minutes 21

22 ACCESS MANAGEMENT + Purpose: Consistency Safety Traffic Flow Planning & Stakeholder Information Highway 881 Corridor Management Plan 22

23 ANALYSIS ACCESS MANAGEMENT + Identified four access treatments for existing intersections: Retain, Close, Assess in Future, Long-Term Intersection Location + Minimum intersection Spacing 1.6 km, 3.2 km desirable 23

24 FINDINGS ACCESS MANAGEMENT + Average intersection spacing 3.7 km to 4.0 km + Largely prescribed by climbing/passing lane placement 24

25 SAFETY REST AREAS + Purpose Reduce driver fatigue; improve highway safety Improve driver comfort, including emergency stops Meet the needs and legislated requirements of the trucking industry 25

26 SAFETY REST AREAS + Provincial Policy Objectives: 60 minute spacing between Safety Rest Areas (SRA) 30 minute spacing from urban areas Ideally, serve only one direction of travel Typical layouts do not accommodate O-D loads Urban centres can serve as an SRA, however, not for O-D loads 26

27 ANALYSIS SAFETY REST AREAS + Warrant: Several criteria, including Highway 881 Corridor Management Plan Spacing, traffic volume and mix, safety, industrial need, weather, tourism Assessment reached 33 out of 40 points The emphasis was largely related to industrial need, the O-D loads, which are expected to drop off in the near term 27

28 FINDINGS SAFETY REST AREAS Highway 881 Corridor Management Plan + As a long-term two-lane facility, Highway 881 should target an average SRA spacing of 80 km + The typical SRA site plan was modified to accommodate two-way access and OD staging + Located on 2-lane highway sections for the passing/climbing lane stages 28

29 HIGHWAY TWINNING + Purpose: Defining a twinning concept will help the province to: Protected required right-of-way Implement access management 29

30 ANALYSIS HIGHWAY TWINNING + Constraints Affecting Side of Twinning: Highway 881 Corridor Management Plan Existing developments Existing highway geometry Intersections and access points Topography, particularly steep sidehills River crossings and other environmental features Rail crossings 30

31 FINDINGS HIGHWAY TWINNING Highway 881 Corridor Management Plan + Not warranted for upwards of 25 years + Major realignment options + Locations for early stage twinning + Most transitions located in horizontal curves 31

32 RECOMMENDATIONS + Short-to-Medium Term Two Safety Rest / Over-Dimensional Staging Areas Retain existing Roadside Turnouts at 50 km spacing Planning - Resolve alignment and access management issues 32

33 RECOMMENDATIONS + Medium-to-Long Term: Passing and Climbing Lanes (in 3 proposed stages) Existing roadside turnouts are retained where possible Minor highway realignments where warranted to accommodate passing/climbing lanes 33

34 RECOMMENDATIONS + Ultimate Stage: Highway Twinning Major Highway Realignments Two conventional southbound Safety Rest Areas, paired with the two northbound SRA/ODSA sites As traffic volumes increase, consider additional SRA s 34

35 THANK YOU QUESTIONS? 35

36 CONTACT INFORMATION + Henry Devos, P.Eng. Senior Planning Specialist, CIMA ext henry.devos@cima.ca + John Morrall, PhD., P.Eng. President, Canadian Highways Institute Ltd jmorrall@shaw.ca + René Rosvold, P.Eng. Transportation Planner, CIMA ext rene.rosvold@cima.ca Highway 881 Corridor Management Plan 36

37 Tri-Party Transportation Conference Moving Alberta Into the Future Alberta Highway 881 Corridor Management Plan Lac La Biche to Anzac Session Forum 1 - Highways March 2017

38 38

39 Typical Combined Safety Rest / Truck Staging Area Site Plan with Interim Two-Way Access 39

DESIGN BULLETIN #66/2010

DESIGN BULLETIN #66/2010 DESIGN BULLETIN #66/2010 Highway Geometric Design Guide Chapter B, Climbing Lane Warrants for Two Lane Undivided and Four Lane Divided Highways - Revised Summary This Design Bulletin is being issued as

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca OCTOBER 2014 Municipal Class Environmental Assessment COUNTY ROAD 22 HORSESHOE VALLEY ROAD Project A Truck Climbing Lanes Project B Intersection Improvements simcoe.ca CORPORATE COMMUNICATIONS DEPARTMENT

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS Geometric Design Guide for Canadian Roads 1.3.4 CHARACTERISTICS OF CLASSIFICATIONS The principal characteristics of each of the six groups of road classifications are described by the following figure

More information

FEASIBILITY OF 2+1 ROADS ON ALBERTA RURAL HIGHWAY NETWORK

FEASIBILITY OF 2+1 ROADS ON ALBERTA RURAL HIGHWAY NETWORK FEASIBILITY OF 2+1 ROADS ON ALBERTA RURAL HIGHWAY NETWORK Robyn V. McGregor, M.Sc., P.Eng. Senior Transportation Engineer and Principal Consultant EBA Engineering Consultants Ltd., Calgary Masood Hassan,

More information

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Recommended Roadway Plan Section 2 - Land Development and Roadway Access Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

Resolving Network Hierarchy with an Unconventional Core C/D Highway Concept, Highway 63, Fort McMurray.

Resolving Network Hierarchy with an Unconventional Core C/D Highway Concept, Highway 63, Fort McMurray. Resolving Network Hierarchy with an Unconventional Core C/D Highway Concept, Highway 63, Fort McMurray. Henry Devos, P.Eng., McElhanney Consulting Services Ltd. Bob Rebus, P.Eng., Alberta Infrastructure

More information

Design of Turn Lane Guidelines

Design of Turn Lane Guidelines Design of Turn Lane Guidelines CTS Transportation Research Conference May 24, 2012 Howard Preston, PE Minnesota Department of Transportation Research Services Office of Policy Analysis, Research & Innovation

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information

102 Avenue Corridor Review

102 Avenue Corridor Review February 26, 2015 102 Avenue Corridor Review Transportation Association of Canada Road Safety Engineering Award Submission for the City of Edmonton Introduction Transportation Association of Canada Road

More information

H8 Signs, Supports and Poles

H8 Signs, Supports and Poles Alberta Infrastructure and Transportation Roadside Design Guide November 2007 H8 Signs, Supports and Poles H8.1 Introduction This section identifies the appropriate roadside safety treatment for signs,

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

Classification Criteria

Classification Criteria SCHEDULE D TO RECOMMENDED OFFICIAL PLAN AMENDMENT NO. 40 SCHEDULE C-4 Road Criteria Criteria Traffic Service Objective Land Service/Access Typical Daily Traffic Volume Flow characteristics Travel Speed

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014 Page: 1 of 8 1 POLICY 1.01 The City shall follow all of the specifications in the Manual of Uniform Traffic Control Devices for Canada, prepared by the National Committee of Uniform Traffic Control, and

More information

Capacity and Level of Service LOS

Capacity and Level of Service LOS Chapter 21 Capacity and Level of Service LOS 21.1 Introduction Often it is required to ascertain how much a transport facility can accommodate. Such information is useful in the design of traffic facility.

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

T R A N S P O R T A T I O N M E M O R A N D U M

T R A N S P O R T A T I O N M E M O R A N D U M WILKINSON LLC t raffic engineering and t ransportation p lanning 3405 Harbor Way Fort Collins, CO 80524 phone: 970-988-0143 fax: 970-472-0223 martinawilkinson@msn.com T R A N S P O R T A T I O N M E M

More information

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN maintenance, and erosion. Stability is required to maintain the integrity of the pavement structure, and a slope stability analysis should be conducted for cuts and fills greater than 15 feet. For lower

More information

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL THE FUTURE OF THE TXDOT ROADWAY DESIGN MANUAL Kenneth Mora, P.E. (Design Division) 10/10/2017 Table of contents 1 2 Reduction in FHWA design controlling criteria Innovative Intersection Guidance 3-7 8-42

More information

Welcome to the Open House

Welcome to the Open House Leslie Street Between 19 th Avenue and Stouffville Road Addendum to Class Environmental Assessment Study Welcome to the Open House Please sign in at the front desk. March 28, 2017 Richmond Green Sports

More information

10.0 CURB EXTENSIONS GUIDELINE

10.0 CURB EXTENSIONS GUIDELINE 10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services

More information

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners DRAFT Corridor study Honeysuckle Road October 2017 Prepared for the City of Dothan, AL Prepared by TABLE OF CONTENTS SECTION I... 1 STUDY SUMMARY... 1 INTRODUCTION... 1 CONCLUSIONS... 5 SECTION II... 7

More information

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 2011 Edition - Revision 2 Page 275 Section 2G.01 Scope CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 01 Preferential lanes are lanes designated for special traffic uses such as high-occupancy vehicles

More information

Parks Highway: MP Lucus Road to Big Lake Road

Parks Highway: MP Lucus Road to Big Lake Road 2 Purpose and Need 2.1 Corridor History The Parks Highway is a 324-mile long Rural Interstate Highway that extends from its intersection with the Glenn Highway north to Fairbanks, Alaska. The Parks Highway

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

List of Display Boards

List of Display Boards List of Display Boards Welcome Introduction Municipal Class Environmental Assessment (EA) Process Need and Justification for an Interchange Alternatives for Evaluation Vertical and Horizontal Alignments

More information

WELCOME TO OPEN HOUSE # 1 June 14, 2017

WELCOME TO OPEN HOUSE # 1 June 14, 2017 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE # 1 June 14, 2017 Please sign in and join our mailing list Purpose of Open House #1 & Study Area York

More information

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4 PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 WORK DESCRIPTION 4 Repair Install Remove Clean 306 DRAINAGE PIPE ACTIVITY DESCRIPTION Install, repair, clean,

More information

Re: Paradise Springs, Municipality of Grey Highlands Transportation Review. C.C.Tatham & Associates Ltd. Consulting Engineers

Re: Paradise Springs, Municipality of Grey Highlands Transportation Review. C.C.Tatham & Associates Ltd. Consulting Engineers 5 Sandf ord Fleming Drive, Sulle 200 C.C.Tatham & Associates Ltd. Consulting Engineers Collingwood Bracebridge 0rillia Collingwood, 0ntario LgY 546 Tel: (705) 444-2565 Fax: (705) 444-2327 Email: inf o@cctatham.com

More information

Geometric Design Tables

Geometric Design Tables Design Manual Chapter 5 - Roadway Design 5C - Geometric Design Criteria 5C-1 Geometric Design Tables A. General The following sections present two sets of design criteria tables - Preferred Roadway Elements

More information

Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects

Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects NCHRP Project 15-50 July 2017 1 Research Objective Develop guidelines for safe and cost-effective

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL

Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL Jan 2006 SIGHT DISTANCE 28(i) Chapter Twenty-eight SIGHT DISTANCE Table of Contents Section Page 28-1 STOPPING SIGHT DISTANCE

More information

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS Overview Highway Functions and Classifications Highway Design Components Design Control

More information

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION CITY OF TORONTO TRANSPORTATION SERVICES DIVISION 2016 TRAFFIC CALMING GUIDE FOR TORONTO TABLE OF CONTENTS Introduction

More information

RE: 100 VARLEY LANE TRANSPORTATION OVERVIEW

RE: 100 VARLEY LANE TRANSPORTATION OVERVIEW IBI Group 400 333 Preston Stret Ottawa ON K1S 5N4 Canada tel 613 225 1311 fax 613 225 9868 April 28, 2014 Mr. Ed Blaszynski Project Manager Infrastructure Approvals Development Review Urban Services Branch

More information

Peterborough County Transportation Master Plan

Peterborough County Transportation Master Plan Peterborough County Transportation Master Plan Presentation to County Council Wednesday, February 20, 2013 Process for Developing the Transportation Plan This Transportation Plan is being developed following

More information

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT Chairperson and Committee Members ENVIRONMENT AND COMMUNITY DEVELOPMENT COMMITTEE 6 DECEMBER 2011 Meeting Status: Public Purpose of Report: For Decision PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION

More information

CITY OF SASKATOON COUNCIL POLICY

CITY OF SASKATOON COUNCIL POLICY ORIGIN/AUTHORITY Clause 1, Report No. 1-1980 and Clause 4, Report No. 22-1990 of the Works and Utilities Committee; Clause 6, Report No. 17-2004 of the Planning and Operations Committee; and Clause D5,

More information

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department) To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,

More information

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd

More information

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES (Adopted by the Town Council on June 30, 2004) (Revised December 6, 2010) (Revised February 8, 2016) POLICY AND PROCEDURES FOR TRAFFIC

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

Access Management Guidelines February 2013 THE CITY OF

Access Management Guidelines February 2013 THE CITY OF Access Management Guidelines February 2013 THE CITY OF Table of Contents Introduction 2 Review and Approval Process 5 Technical Guidelines 9... 10... 12 3. Separation Distance: Non-Signalized All-Turns

More information

Downey Road. Transportation Improvement Study

Downey Road. Transportation Improvement Study Downey Road Transportation Improvement Study Workshop 2 Participant Handbook Workshop 1 May 18 and 19, 2016 Workshop 2 June 23 and 28, 2016 Prepared By: City of Guelph Paradigm Transportation Solutions

More information

FOR HISTORICAL REFERENCE ONLY

FOR HISTORICAL REFERENCE ONLY To: From: Subject: Electronic Distribution Recipients MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 12-14-B-03 December 18, 2012 Jon M. Chiglo, P.E. Division

More information

ACCESS MANAGEMENT PLAN: BLUFFTON PARKWAY BLUFFTON PARKWAY: PHASE FOUR TOWN OF BLUFFTON & BEAUFORT COUNTY, SC

ACCESS MANAGEMENT PLAN: BLUFFTON PARKWAY BLUFFTON PARKWAY: PHASE FOUR TOWN OF BLUFFTON & BEAUFORT COUNTY, SC ACCESS MANAGEMENT PLAN: BLUFFTON PARKWAY BLUFFTON PARKWAY: PHASE FOUR TOWN OF BLUFFTON & BEAUFORT COUNTY, SC Prepared for: Beaufort County & Town of Bluffton Prepared by: SRS ENGINEERING, LLC 801 Mohawk

More information

REPORT. Engineering and Construction Department

REPORT. Engineering and Construction Department REPORT COMMUNITY SERVICES COMMITTEE MEETING DATE: JUNE 11, 2013 FROM: Engineering and Construction Department DATE: May 24, 2013 SUBJECT: Great Lakes Boulevard Mini Roundabout LOCATION: Great Lakes Boulevard

More information

4.0 IDENTIFICATION OF DEFICIENCIES

4.0 IDENTIFICATION OF DEFICIENCIES 4.0 IDENTIFICATION OF DEFICIENCIES 4.1 PERFORMANCE MEASURES AND RESULTS OF ANALYSIS 4.1.1 Roadway Safety As documented in Chapter 3, there were four key factors that were used to analyze the occurrence

More information

7 DESIGN CRITER RIA 7.1 Design Space Requirements

7 DESIGN CRITER RIA 7.1 Design Space Requirements 7 DESIGN CRITERIA 7.1 Design Space Requirements The Nebraskaa Department of Roads (NDOR) provided examples of intersections where an approved guardrail end terminal and Approach Guardrail Transition (AGT)

More information

Corridor Studies. LA 415 and LA 73

Corridor Studies. LA 415 and LA 73 Corridor Studies LA 415 and LA 73 Project Approach for Both Corridors 1. Data Collection 2. Data Summary 3. Traffic Analysis 4. Micro-Simulation modeling 5. Generation of alternatives 6. Modeling alternatives

More information

DRAFT. Scholls Ferry Road Conceptual Design Plan Technical Memorandum Multi-Modal Examples. Multnomah County 1600 SE 190th Avenue Portland, OR 97233

DRAFT. Scholls Ferry Road Conceptual Design Plan Technical Memorandum Multi-Modal Examples. Multnomah County 1600 SE 190th Avenue Portland, OR 97233 Technical Memorandum Multi-Modal Examples Prepared for 1600 SE 190th Avenue Portland, OR 97233 December 2008 CITATION This project is partially funded by a grant from the Transportation and Growth Management

More information

IHSDM- HSM Predictive Methods. Slide 1

IHSDM- HSM Predictive Methods. Slide 1 IHSDM- HSM Predictive Methods Slide 1 Presentation Outline IHSDM Overview Relationship between HSM and IHSDM Crash Prediction Models and Data Needs IHSDM HSM Predictive Method 2011 Release Preview Questions

More information

Operational Comparison of Transit Signal Priority Strategies

Operational Comparison of Transit Signal Priority Strategies Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,

More information

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including

More information

Zlatko Krstulich, P.Eng. City of O9awa

Zlatko Krstulich, P.Eng. City of O9awa Zlatko Krstulich, P.Eng. City of O9awa 1. Introduction to the Ontario Traffic Manual Series 2. What is OTM Book 18: Bicycle Facilities? 3. Study / Committee Team Members 4. Brief overview of the content

More information

Highway 1 Kamloops to Alberta Four-Laning Program

Highway 1 Kamloops to Alberta Four-Laning Program Highway 1 Kamloops to Alberta Four-Laning Program COMMUNITY ENGAGEMENT DISCUSSION GUIDE AND FEEDBACK FORM February 7 March 1, 2013 www.bchwy1.ca 1 FEEDBACK FORM INSIDE HOW INPUT WILL BE CONSIDERED FAST

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007

More information

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN 8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendation contained in the following report

More information

Freeway System Considerations

Freeway System Considerations Session 11 Jack Broz, PE, HR Green May 5-7, 2010 Freeway System Considerations Mainline Transit: Shoulder Operations, BRT, Stations HOV, HOT, UPA Interchanges Exit Ramps Entrance Ramps Bridges Local Crossings

More information

To position power poles a safe distance from the road to minimise the likelihood of being accidentally hit by vehicles.

To position power poles a safe distance from the road to minimise the likelihood of being accidentally hit by vehicles. Policy Statement Subject Placement of Rigid Distribution Poles Along Roads With Speed Limits Exceeding 70KM/H Approved by Robert Rogerson Signature & Date Distribution Standards and Policy Manager Authorised

More information

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones

More information

Road Safety Assessments. Lt. Bob McCurdy Williamson County Sheriff s s Office Marion, IL.

Road Safety Assessments. Lt. Bob McCurdy Williamson County Sheriff s s Office Marion, IL. Road Safety Assessments Lt. Bob McCurdy Williamson County Sheriff s s Office Marion, IL. Why Are We Here? 2005 US Traffic Fatalities = 43,443 1429 4329 1361 1616 1534 3504 1729 3543 Illinois Annual Fatallities

More information

SECTION 1 - TRAFFIC PLANNING

SECTION 1 - TRAFFIC PLANNING SECTION 1 - TRAFFIC PLANNING 1.1 TRAFFIC OPERATIONS 1.1.1 Roadway Functional Classification The Multnomah County Comprehensive Framework Plan s Policy 34: Trafficways and the Functional Classification

More information

5.0 Roadway System Plan

5.0 Roadway System Plan Southwest Boise Transportation Study Page 16 5.0 Roadway System Plan The Roadway System Plan outlines roadway improvements in the Initial Study Area. It forecasts future deficiencies on the arterial system,

More information

ACCOMMODATING COMMERCIAL AND OVER- DIMENSIONAL VEHICLES AT ROUNDABOUTS

ACCOMMODATING COMMERCIAL AND OVER- DIMENSIONAL VEHICLES AT ROUNDABOUTS ACCOMMODATING COMMERCIAL AND OVER- DIMENSIONAL VEHICLES AT ROUNDABOUTS Presenting Author Phil Weber, P.Eng. Ourston Roundabout Engineering Canada (A Member of The Sernas Group Inc.) 45 Vogell Road, Suite

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

122 Avenue: 107 Street to Fort Road

122 Avenue: 107 Street to Fort Road : 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

The Corporation of the TOWN OF MILTON

The Corporation of the TOWN OF MILTON The Corporation of the TOWN OF MILTON Report To: From: Committee of the Whole M. Paul Cripps, P. Eng., Commissioner, Engineering Services Date: October 3, 2016 Report No: Subject: Recommendation: ENG-029-16

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

STANLEY STREET December 19, 2017

STANLEY STREET December 19, 2017 STANLEY STREET December 19, 2017 Welcome Mike Wiza, Mayor Scott Beduhn, Director of Public Works Agenda 1. Introduction 2. Existing Roadway Conditions 3. Current Alternative Improvements 4. Summary of

More information

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02 1 VicRoads Access Management Policies May 2006 Ver 1.02 VicRoads Access Management Policies May 2006 Version 1.02 2 VicRoads Access Management Policies May 2006 Ver 1.02 FOREWORD FOR ACCESS MANAGEMENT

More information

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE PAVED SHOULDERS ON PRIMARY HIGHWAYS IN IOWA: AN ANALYSIS OF SHOULDER SURFACING CRITERIA, COSTS, AND BENEFITS EXECUTIVE SUMMARY Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation

More information

LANE ELIMINATION PROJECTS

LANE ELIMINATION PROJECTS PRESENTATION OUTLINE Lane Elimination Considerations Districts 4 & 7 Draft Lane Elimination Processes FDOT Lane Elimination Guidelines Example Projects D4 Case Study: SR A1A (Ft. Lauderdale) D7 Case Study:

More information

J-Turn An Intersection Safety Improvement Purdue Road School 2016 Tuesday, March 8, 2016 Brian Malone, INDOT & Josh Cook, HNTB

J-Turn An Intersection Safety Improvement Purdue Road School 2016 Tuesday, March 8, 2016 Brian Malone, INDOT & Josh Cook, HNTB J-Turn An Intersection Safety Improvement Purdue Road School 2016 Tuesday, March 8, 2016 Brian Malone, INDOT & Josh Cook, HNTB US 231 and SR 62 and SR 68 US 231 and SR 62 Intersection Traffic Data Traffic

More information

NEIGHBORHOOD TRAFFIC CALMING POLICY

NEIGHBORHOOD TRAFFIC CALMING POLICY NEIGHBORHOOD TRAFFIC CALMING POLICY I. PURPOSE The City of Kent continually strives to strengthen and protect its neighborhoods by improving the quality of life in residential areas. Traffic conditions

More information

ATTACHMENT NO. 18 GMI-C. National Committee on Uniform Traffic Control Devices GMI SIGNS TECHNICAL COMMITTEE RECOMMENDATION

ATTACHMENT NO. 18 GMI-C. National Committee on Uniform Traffic Control Devices GMI SIGNS TECHNICAL COMMITTEE RECOMMENDATION 1 2 3 ATTACHMENT NO. 18 GMI-C 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 GMI agenda item II.H.2., January 19, 2012 National Committee on Uniform

More information

By: CHE ROS ISMAIL PROF DR MOHD ROSLI HAININ DR HARYATI YAACOB DR SITTI ASMAH HASSAN JGP-FKA, UTM

By: CHE ROS ISMAIL PROF DR MOHD ROSLI HAININ DR HARYATI YAACOB DR SITTI ASMAH HASSAN JGP-FKA, UTM By: CHE ROS ISMAIL PROF DR MOHD ROSLI HAININ DR HARYATI YAACOB DR SITTI ASMAH HASSAN JGP-FKA, UTM CONTENT 1. INTRODUCTION 2. STAGES OF HIGHWAY DEVELOPMENT 3. ROAD CATEGORY/CLASSIFICATION 4. DESIGN STANDARDS

More information

INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z

INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z WISCONSIN DEPARTMENT OF TRANSPORTATION INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z OCONOMOWOC, WI WISCONSIN DEPARTMENT OF TRANSPORTATION INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z OCONOMOWOC, WI

More information

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Trans-Canada Highway 1 RW Bruhn Bridge Replacement Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the

More information

Cornelius Pass Road Safety Evaluation JTA. Final Report

Cornelius Pass Road Safety Evaluation JTA. Final Report Cornelius Pass Road Safety Evaluation JTA BACKGROUND Final Report The Jobs and Transportation Act, adopted by the 2009 Oregon Legislative Assembly, directs the Oregon Department of Transportation (ODOT),

More information

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E. RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project 0-6840) June 7, 2016 Presented by: Karen Dixon, Ph.D., P.E., TTI Team: Kay Fitzpatrick, Raul Avelar, & Subasish Das Project

More information

As the Toronto Transit Commission (TTC) operates a transit service on Avenue Road, City Council approval of this report is required.

As the Toronto Transit Commission (TTC) operates a transit service on Avenue Road, City Council approval of this report is required. REPORT FOR ACTION Corridor Safety Review - Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP DRAFT NOT FINAL (Note: document was not finalized due to an eastbound stopping site distance design issue that requires more detailed bridge and roadway design considerations. This discussion starts on

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

TRAFFIC SIGNAL WARRANT STUDY

TRAFFIC SIGNAL WARRANT STUDY TRAFFIC SIGNAL WARRANT STUDY 5 th STREET & ENCHANTED PINES DRIVE JANUARY 2013 TRAFFIC OPERATIONS ENGINEERING SERVICES/PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS INTERSECTION LOCATION MAP ii INTRODUCTION

More information

An International Experience on the Safety Performance of 2+1 cross-section. Basil Psarianos Nat l Techn. Univ. Athens, Greece

An International Experience on the Safety Performance of 2+1 cross-section. Basil Psarianos Nat l Techn. Univ. Athens, Greece An International Experience on the Safety Performance of 2+1 cross-section Basil Psarianos Nat l Techn. Univ. Athens, Greece bpsarian@mail.ntua.gr What is a 2+1 cross-section? It s a 3 lane rural road

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Revised December 2013 2013 by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2013-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information