1 Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

2 Northern Virginia Express Lanes Network 2

3 Congestion relieved on all lanes 2022: Transforming I-66 Outside the Beltway Faster transit through Express Lanes Move 2,000 to 4,000 more people per hour New buses and transit routes 4,000 new park and ride spaces Improved safety 3

4 Transform 66 Outside the Beltway Project Overview Multimodal improvements to 22.5 miles of I-66 2 express lanes in each direction from I-495 (Capital Beltway) to Gainesville (University Boulevard) 3 general purpose lanes in each direction HOV and transit access to express lanes Median space reserved for future transit Improved park and ride options with access to express lanes Shared use bike and pedestrian trails integrated with existing trails 4

5 Transform 66 Outside the Beltway Typical Cross Section 5

6 Transform 66 Outside the Beltway Project Team Public outreach Project oversight Concessionaire: Long-term agreement to finance, operate and maintain the I-66 Express Lanes. I-66 EMP is a consortium between Cintra and Meridiam Infrastructure Design-builder: Joint venture of Ferrovial Agroman and Allan Myers, VA 6

7 TODAY Transform 66 Outside the Beltway Where We Are In Design Process July 2016 VDOT Design Concepts and RFP November 2016 Partner Selected (I-66 Express Mobility Partners) Summer-Fall 2017 Concept Adjustments Late 2017 Construction Start-up Activities October 2016 Technical Proposals Submitted from Two Teams Including Alternative Technical Concepts (ATC s) June 2017 Public Information Meetings Summer-Fall 2017 Environmental and Traffic analyses of concepts Fall 2017 Design Public Hearings 2018 Environmental Reports 7

8 Transform 66 Outside the Beltway Bicycle and Pedestrian Trails Shared use trails along I-66 that integrate with County and Park trails Near homes, the path will be on the I-66 side of the noise wall Along I-66, concrete barrier with fence will separate the trail from the roadway 8

9 Transform 66 Outside the Beltway Potential Projects Funded by Concessionaire Payment Jurisdiction Project Request Arlington County East Falls Church Metrorail Station Bus Bay Expansion $4.8M Fairfax County Jermantown Road Bridge over I-66: Widen to four lanes $11.0M Route 50 and Waples Mill Road intersection improvements Monument Drive bridge pedestrian facility improvement Commuter parking structure at Government Center/Fairfax Corner Lee Highway pedestrian improvements: Completion of missing segments of pedestrian walkway on the south side of Lee Highway from Nutley Street to Vaden Drive Poplar Tree Road bridge construction to four lanes I-66 median widening (Lee Highway (Route 29) to Route 28) for WMATA Orange Line accommodation $2.0M $3.8M $38.5M $1.3M $6.0M $40.0M 9

10 Transform 66 Outside the Beltway Potential Projects Funded by Concessionaire Payment Jurisdiction Project Request Prince William Route 234 at Balls Ford Road interchange including Balls Ford Road $168.0M County improvements Balls Ford Road widening: Groveton Road to Route 234 Business $67.4M (Sudley Road) City of Fairfax George Snyder Trail: From Chain Bridge Road (Route 123) to Fairfax $13.6M Boulevard (Route 50) at Draper Drive Town of Vienna Nutley Street SW mixed-use trail: From Marshall Road SW to $0.3 M Tapawingo Road SW PRTC Western bus maintenance & storage facility $11.1 M VRE Prince William County Total VRE Manassas Line capacity expansion and real-time multimodal traveler information project (rolling stock, Broad Run station/parking/expansion, South Manassas 3rd track, Manassas Station platform extension, Manassas Park parking/bridge, real-time traveler info) Route 234 at Balls Ford Road interchange including Balls Ford Road improvements Balls Ford Road widening: Groveton Road to Route 234 Business (Sudley Road) $128.5 M $168.0M $67.4M $496.3M 10

11 Transform 66 Inside the Beltway Program Area 11

12 Transform 66 Inside the Beltway Express Lanes Tolling during weekdays, peak hours, peak directions beginning December 2017 Eastbound: 5:30 9:30 a.m. and Westbound: 3:00 7:00 p.m. E-ZPass required for all users; E-ZPass Flex if HOV HOV2 toll-free in 2017, HOV3 toll-free when express lanes open outside Beltway in 2022 Multimodal projects benefitting I-66 users funded by toll revenue Widening I-66 eastbound between Dulles Connector Road and Fairfax Drive-Exit 71 (approximately 4 miles) construction begins in 2018 and open in Mid-2020 Clean Special Fuel License Plate drivers traveling alone will need to pay toll unless meeting HOV requirements 12

13 Transform 66 Inside the Beltway Tolling Construction Update Construction Status: All gantries have been installed Majority of overhead signs installed Ground mounted signs installed All seven toll shelters installed Construction Activities: Equipment installation on overhead toll gantries Electrical work on signs along I-66 and local roads Toll System testing began summer

14 Transform 66 Inside the Beltway I-66 Eastbound Widening Dulles Connector Road to Fairfax Drive Major Components Widening 4 miles of I-66 EB from two to three lanes 11,480 linear feet of noise walls (new and replacement) New W&OD Trail pedestrian and bicycle bridge over U.S. Route 29 (Lee Highway) Off-ramp improvements at Washington Boulevard and Glebe Road 14

15 Transform 66 Inside the Beltway Proposed West Falls Church Metro Access 15

16 Transform 66 Inside the Beltway Key Milestones Activities Dates Begin Initial Multimodal Projects Fall 2016 Complete Environmental Assessment - Eastbound Widening Spring 2017 Issue Design Build RFP for Widening Spring 2017 Award Design-Build Contract for Widening Fall 2017 Begin Tolling December 2017 Begin Widening Construction Spring 2018 Open New Eastbound Lane Fall

17 I-395 Project Overview Extending and converting 8 miles of HOV Lanes to Express Lanes between Turkeycock Run (near Edsall Road) to 14 th Street Bridge (DC Line) Adding a third HOV lane from north of Edsall Road to just south of Eads Street near the Pentagon Addition of a fourth regular southbound lane on 395 between Duke Street and Edsall Road Improvements in traffic flow at the Eads Street Interchange and access to the Pentagon, Metro Station and transit hub Installation and modification of sound walls Rehabilitation of I-395 bridges Project will provide revenue for transit projects 17

18 I-395 Typical Section Typical Project Cross Sections 18

19 I-395 South Widening Duke Street to Edsall Road Funded by Commonwealth s Atlantic Gateway Program to improve I-95/I-395 Corridor I-395 Widen Southbound I-395 from 3 lanes to 4 lanes between Duke Street and Edsall Road Edsall Road Interchange Replace existing Edsall Westbound to I-395 Southbound Loop Ramp with new signalized intersection Duke Street Interchange Replace existing I-395 Southbound to Duke Eastbound Loop Ramp with new signalized intersection 19

20 Pentagon Parking Improvements Reconstruction and reconfiguration of a portion of the South Parking Area to enhance circulation for transit buses and carpools Map of Eads Street Interchange and Pentagon Multimodal Improvements 20

21 Minimizing Impacts on the Community 3 rd lane constructed within existing HOV footprint No interchange construction except at Eads Street Will not require taking of any homes or businesses Eligible communities can elect for new sound walls No lane closures during peak hours 21

22 I-395 Key Dates Milestone Date Limited Notice to Proceed February 2017 Early Works March-June 2017 Full Notice to Proceed July 25, 2017 Draft Noise Abatement Decision Report (NADR) Submitted for VDOT review Summer 2017 Hayes Street Parking Lot Construction September 2017 Sound Wall Designs Available Fall 2017 Community Voting on Sound Wall Installation Fall 2017 Pentagon Parking Lot Construction November 2017 Eastern HOV Shoulder Late 2017 Western HOV Shoulder Fall 2018 Pentagon Parking Improvements Completion March 2019 Service Commencement Fall 2019 Final Completion Summer

23 23 23

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Dulles Area Transportation Association October 11, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Transform 66: Outside the Beltway 2 Project Overview Multimodal improvements

More information

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of

More information

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016 I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016 Mike Snare, PE, Project Manager Virginia Department of Transportation GEC Michelle Holland, Megaprojects

More information

I-395 Express Lanes Northern Extension Project Public Hearings

I-395 Express Lanes Northern Extension Project Public Hearings I-395 Express Lanes Northern Extension Project Public Hearings Susan Shaw, PE, Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Manager Virginia Department of

More information

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016 I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016 Susan Shaw, PE, Megaprojects Director, Virginia Department of Transportation Amanda Baxter, Special Projects

More information

I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016

I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016 I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016 Susan Shaw, PE, Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Manager

More information

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018 Transform I-66 Chief Engineer Garrett W. Moore, P.E. July 12, 2018 Transform 66: Program Goals Improve multimodal mobility by providing diverse travel choices in a cost-effective manner Enhance transportation

More information

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, 2015 Susan Shaw, P.E., VDOT, Megaprojects Director I-66 Corridor Conditions Steady population growth Employment growth in activity centers Congestion

More information

Transit and Rail Funding in the Commonwealth

Transit and Rail Funding in the Commonwealth Transit and Rail Funding in the Commonwealth Jennifer Mitchell Agency Director Northern Virginia Transportation Alliance October 3, 2017 Economic Benefits Transit Capital Spending by Virginia transit agencies

More information

Washington DC Section of ITE Project Briefing

Washington DC Section of ITE Project Briefing Washington DC Section of ITE Project Briefing November 5, 2015 Renée Hamilton, VDOT, Deputy District Administrator I-66 Outside the Beltway Improvement Area Project Location Virginia 2 Purpose and Need

More information

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies Susan Shaw, PE, CCM, DBIA Megaprojects Director Northern Virginia

More information

City of Fairfax, Virginia City Council Work Session

City of Fairfax, Virginia City Council Work Session City of Fairfax, Virginia City Council Work Session Agenda Item # 4c City Council Meeting 6/2/2015 TO: FROM: SUBJECT: Honorable Mayor and Members of City Council Robert Sisson, City Manager Discussion

More information

Commuter Connections Regional TDM Marketing Group Meeting

Commuter Connections Regional TDM Marketing Group Meeting Item #6 Commuter Connections Regional TDM Marketing Group Meeting September 19, 2017 Michelle T. Holland, Megaprojects Communications Manager Virginia Department of Transportation Program Area Map 2 Program

More information

FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3,

FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3, FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3, 2018 www.novatransit.o rg 703-524-3322 Presentation Overview I-66 Commuter Choice Program Overview

More information

Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Fairfax Alliance for Better Bicycling February 28, 2019 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Nancy Smith, Public Relations Manager FAM Construction Chris Wells,

More information

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

Interstate 66 Tier 1 Environmental Impact Statement (EIS) WELCOME Welcome to the second Citizen Information Meeting for the Tier 1 Environmental Impact Statement (EIS). As an integral part in the environmental study process, the study team is seeking your comments

More information

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment Staff Recommendations Department of Environmental Services Transportation January 28, 2017 Timeline of Transform66 June 2012: I-66

More information

TRANSIT PERFORMANCE IN THE I-66 INSIDE THE BELTWAY CORRIDOR

TRANSIT PERFORMANCE IN THE I-66 INSIDE THE BELTWAY CORRIDOR TRANSIT PERFORMANCE IN THE I-66 INSIDE THE BELTWAY CORRIDOR June 2018 This report summarizes the performance of public transportation systems serving the I-66 inside the Beltway corridor in Northern Virginia.

More information

395 Express Lanes Extension

395 Express Lanes Extension 395 Express Lanes Extension January 2016 Building a network of Express Lanes Project overview Add capacity on I-395 with addition of a third HOV lane and active traffic management Generate guaranteed transit

More information

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION Alternatives Analysis Technical Report City of Alexandria,

More information

Capital Beltway HOT Lanes Project

Capital Beltway HOT Lanes Project New Travel Choices Ahead Capital Beltway HOT Lanes Project Update January 2011 Major Milestones Reached in 2010 Project is 55% complete New bridge spans completed at every interchange; Second phase well

More information

Public Information and Participation Comments

Public Information and Participation Comments Two public meetings were held in December. The first meeting was December 6, 2011 at Mary Ellen Henderson Middle School and had 36 public attendees. The second meeting was on December 14, 2011 at the Arlington

More information

I-66 Corridor Improvements Route 15 to I-495. November 2014

I-66 Corridor Improvements Route 15 to I-495. November 2014 I-66 Corridor Improvements Route 15 to I-495 November 2014 I-66 Corridor: Haymarket to the Beltway = Park and Ride Lots 2 Purpose and Need Improve multimodal mobility along the I-66 corridor by providing

More information

Capital Beltway HOT Lanes - Frequently Asked Questions

Capital Beltway HOT Lanes - Frequently Asked Questions Capital Beltway HOT Lanes - Frequently Asked Questions December 20, 2007 1. What is the cost of the project? The fixed-price design-build cost is approximately $1.4 billion. 2. Why have the project costs

More information

Capital Beltway HOT Lanes Project

Capital Beltway HOT Lanes Project Some things can t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead Some things can t wait for traffic Overview Two new lanes in each direction Carpool/HOV-3 lanes on the Beltway

More information

HOW OUR REGIONAL TAX DOLLARS ARE BEING SPENT THE HONORABLE MARTY NOHE CHAIRMAN, NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

HOW OUR REGIONAL TAX DOLLARS ARE BEING SPENT THE HONORABLE MARTY NOHE CHAIRMAN, NORTHERN VIRGINIA TRANSPORTATION AUTHORITY 12 th Annual What You Need To Know About Transportation HOW OUR REGIONAL TAX DOLLARS ARE BEING SPENT THE HONORABLE MARTY NOHE CHAIRMAN, NORTHERN VIRGINIA TRANSPORTATION AUTHORITY The Authority: Working

More information

Public Opinion about Transportation Issues in Northern Virginia

Public Opinion about Transportation Issues in Northern Virginia Public Opinion about Transportation Issues in Northern Virginia Research and Strategy Presented to: The Northern Virginia Transportation Authority July 28, 2005 Research Objectives 1. Travel Patterns*

More information

Capital Beltway HOT Lanes Project

Capital Beltway HOT Lanes Project New Travel Choices Ahead Some things can t wait for traffic Capital Beltway HOT Lanes Project Fairfax County TAC Update August 16, 2011 Major Milestones Reached Some things can t wait for traffic Project

More information

Keynote. Shannon Valentine Secretary of Transportation

Keynote. Shannon Valentine Secretary of Transportation Keynote Shannon Valentine Secretary of Transportation What You Need to Know About Transportation www.nvta.org @NVAlliance (Twitter) @NVTAlliance (Facebook) Regional Express Bus: How Close to Reality?

More information

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 20, 2012 Garrett Moore VDOT District Administrator, Northern Virginia Paving Program 2012 This season's paving program will

More information

County of Fairfax, Virginia. Department of Transportation

County of Fairfax, Virginia. Department of Transportation Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway

More information

NOVEMBER 2017 DESIGN PUBLIC HEARINGS COMMENT SUMMARY (November 13, 14, and 16, 2017)

NOVEMBER 2017 DESIGN PUBLIC HEARINGS COMMENT SUMMARY (November 13, 14, and 16, 2017) NOVEMBER 2017 DESIGN PUBLIC HEARINGS COMMENT SUMMARY (November 13, 14, and 16, 2017) I-66 Outside the Beltway Project Between U.S. Route 29 in Gainesville and I-495/Capital Beltway in Fairfax County State

More information

Transportation Management Program Office Newsletter N O V E M B E R

Transportation Management Program Office Newsletter N O V E M B E R Transportation Management Program Office Newsletter N O V E M B E R 0 8 I N S I D E THIS I S S U E : Pork Chop/Eads Street Construction Continues in the Winter FSD Director s Message Upcoming Events Pentagon

More information

Project Description Form 6V

Project Description Form 6V Project Description Form 6V Basic Project Information Submitting Jurisdiction/Agency: Prince William County Project Title: Route 15 Widening: Route 55 to south of RR tracks & Construct RR Overpass Project

More information

PUBLIC COMMENT SUMMARY REPORT Public Information Meetings

PUBLIC COMMENT SUMMARY REPORT Public Information Meetings PUBLIC COMMENT SUMMARY REPORT 2015 Public Information Meetings I-66 Outside the Beltway Project Between U.S. Route 15 in Haymarket and I-495/Capital Beltway in Fairfax County State Project: 0066-96A-297,P101

More information

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update January 23, 2015 Travel Forecasting Subcommittee What is the CLRP? Federally

More information

Alternatives Development Technical Report

Alternatives Development Technical Report TRANSFORM 66 I-66 CORRIDOR IMPROVEMENTS PROJECT OUTSIDE the Beltway 66 Multimodal Solutions - 495 to Haymarket Tier 2 Final Environmental Assessment Alternatives Development Technical Report 193 Town of

More information

PenPlace SPRC #6. September 27, DRAFT

PenPlace SPRC #6. September 27, DRAFT PenPlace SPRC #6 1 Agenda Site and Project Overview Multiple Transportation Options Traffic Analysis Neighborhood Analysis Street Network Street Sections/Sidewalk Width Pedestrian/Bicycle Circulation Secure

More information

The following item was handed out at the December 6, 2018 NVTC Meeting.

The following item was handed out at the December 6, 2018 NVTC Meeting. The following item was handed out at the December 6, 2018 NVTC Meeting. 395 Express Lanes Project Update Northern Virginia Transportation Commission (NVTC) December 6, 2018 Susan Shaw, P.E., Megaprojects

More information

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10 Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10 Long-Term Study Presentation 8:10-8:40 Table Discussions 8:40-9:00

More information

Interstate 66 TRANSPORTATION TECHNICAL REPORT. From US Route 15 in Prince William County To Interstate 495 in Fairfax County FEBRUARY 2013

Interstate 66 TRANSPORTATION TECHNICAL REPORT. From US Route 15 in Prince William County To Interstate 495 in Fairfax County FEBRUARY 2013 FEBRUARY 2013 TRANSPORTATION TECHNICAL REPORT Interstate 66 From US Route 15 in Prince William County To Interstate 495 in Fairfax County Virginia Department of Rail and Public Transportation Transportation

More information

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017 MCA Member Meeting: Tysons Update Fairfax County Department of Transportation November 13, 2017 Presentation Overview Balancing Land Use and Transportation How Are We Doing? Studies and Projects Neighborhood

More information

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016 Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing May 2016 Overview 10-Year Transit Development Plan Premium Transit Network Columbia Pike service concept Premium amenities

More information

PERFORMANCE ANALYSIS of The Draft 2015 CLRP

PERFORMANCE ANALYSIS of The Draft 2015 CLRP Item 9 PERFORMANCE ANALYSIS of The Draft CLRP Presentation to the Transportation Planning Board September 16, CLRP Performance Analysis 1 What is the Long-Range Transportation Plan (CLRP)? The CLRP identifies

More information

VIRGINIA RAILWAY EXPRESS

VIRGINIA RAILWAY EXPRESS PREPARING FOR THE NEXT QUARTER-CENTURY Arlington County Board Work Session June 28, 2017 1 TODAY S PRESENTATION VRE Overview VRE in Arlington County VRE System 2040 Plan Future Vision for Crystal City

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices FY 2017-2026 Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices November 1, 2017 Forecasted Growth Arlington continues to grow with a shift towards multi-family

More information

Transportation Management Program Office Newsletter J U L Y

Transportation Management Program Office Newsletter J U L Y I N S I D E T H I S I S S U E : Traffic Changes at Eads Street; Temporary Relocation of Slug Stations FSD Director s Message 1 1 Upcoming Events 2 Transportation Management Program Office Newsletter J

More information

PRESENTATION OUTLINE

PRESENTATION OUTLINE November 8, 2017 PRESENTATION OUTLINE Regional Express Lanes Network Purpose/Benefits of Express Lanes 95 Express Phase 3C Project Video and Overview 95 Express Phase 3C Schedule 2 SOUTH FLORIDA REGIONAL

More information

I-95 Express Lanes Fredericksburg Extension (Fred Ex) Public Hearing. September 25, 2017

I-95 Express Lanes Fredericksburg Extension (Fred Ex) Public Hearing. September 25, 2017 I-95 Express Lanes Fredericksburg Extension (Fred Ex) Public Hearing September 25, 2017 Purpose of Tonight s Meeting Provide information and gain public input: Draft Environmental Assessment (EA) Design

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information

Overview of 64 Express Lanes. Secretary of Transportation Aubrey Layne April 12, 2017

Overview of 64 Express Lanes. Secretary of Transportation Aubrey Layne April 12, 2017 Overview of 64 Express Lanes Secretary of Transportation Aubrey Layne April 12, 2017 2 More Choices for Motorists Coming December 2017 Purpose and Use Our purpose is two-fold: Reduce congestion by making

More information

Interstate 66 Tier 1 Environmental Impact Statement. Cooperating and Participating Agencies Meeting March 19, 2012

Interstate 66 Tier 1 Environmental Impact Statement. Cooperating and Participating Agencies Meeting March 19, 2012 Interstate 66 Tier 1 Environmental Impact Statement Cooperating and Participating Agencies Meeting March 19, 2012 Chris Collins Virginia Department of Transportation, Environmental Division Meeting Agenda

More information

Transportation. Pages E-3 to E-145 PROPOSED FY CAPITAL IMPROVEMENT PLAN (CIP) CCCRC Presentation Thursday, June 14, 2018

Transportation. Pages E-3 to E-145 PROPOSED FY CAPITAL IMPROVEMENT PLAN (CIP) CCCRC Presentation Thursday, June 14, 2018 PROPOSED FY 2019-2028 CAPITAL IMPROVEMENT PLAN (CIP) Pages E-3 to E-145 CCCRC Presentation Thursday, June 14, 2018 in the CIP Continues Arlington s commitment to a transportation system that expands travel

More information

EXHIBIT U THE SCOPE DOCUMENT

EXHIBIT U THE SCOPE DOCUMENT EXHIBIT U THE SCOPE DOCUMENT 1. Introduction 1.1 Purpose of the Scope Document The Scope Document provides an overview of the Route 495 HOT Lanes in Virginia Project as description of the Concessionaire

More information

Terwillegar Drive Expressway Draft Concept Plan

Terwillegar Drive Expressway Draft Concept Plan Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Evaluation of Significant Transportation s in Northern Virginia Transportation District Fact Sheet Spring 2014 Virginia Department of Transportation Study Update April 2014 Since the fall 2013 update,

More information

What if YOU could help plan Northern Virginia s transportation future?

What if YOU could help plan Northern Virginia s transportation future? What if YOU could help plan Northern Virginia s transportation future? Photo credits: Washington Metropolitan Area Transit Authority And improve the quality of life in your community -- for yourself, your

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four

More information

An Easier Commute. Learn how to use I-77 Express to save you time.

An Easier Commute. Learn how to use I-77 Express to save you time. An Easier Commute Learn how to use I-77 Express to save you time PUBLIC-PRIVATE PARTNERSHIP I-77 Express is the first-ever toll lane public-private partnership with NCDOT I-77 Mobility Partners is financing,

More information

McLEAN CITIZENS ASSOCIATION

McLEAN CITIZENS ASSOCIATION McLEAN CITIZENS ASSOCIATION RESOLUTION DULLES RAIL SUPPLEMENTAL EIS With ATTACHMENT A - PEDESTRIAN AND BICYCLE ACCESS ISSUES DULLES CORRIDOR RAIL STATIONS IN TYSONS CORNER (Charts - 7 pages) Approved by

More information

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for

More information

495 EXPRESS LANES NORTHERN EXTENSION STUDY COMMENT SUMMARY REPORT JUNE 11, 2018 PUBLIC INFORMATION MEETING

495 EXPRESS LANES NORTHERN EXTENSION STUDY COMMENT SUMMARY REPORT JUNE 11, 2018 PUBLIC INFORMATION MEETING 495 EXPRESS LANES NORTHERN EXTENSION STUDY COMMENT SUMMARY REPORT JUNE 11, 2018 PUBLIC INFORMATION MEETING Federal: NHPP-0495(095), State: 0495-029-419, UPC: 113414 The Virginia Department of Transportation

More information

405 Express Lanes General Information & Frequently Asked Questions

405 Express Lanes General Information & Frequently Asked Questions The questions and answers below provide current information on the project to improve Interstate 405 (I-405) in Orange County from State Route 73 to Interstate 605. Why are improvements needed on I-405?

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

TRANSFORM I-66 COMES WITH MULTI-MODAL OPTIONS

TRANSFORM I-66 COMES WITH MULTI-MODAL OPTIONS The Commuter Information Source for Maryland, Virginia, and the District of Columbia Issue 1, Volume 21 Winter 2017 WHAT S INSIDE 2 Real-time Ridematching - Try the Free CarpoolNow App 4 Bus Transit Crosses

More information

Corridor 1 - Dulles/VA 7 TransAction 2040 Projects

Corridor 1 - Dulles/VA 7 TransAction 2040 Projects Corridor 1 - Dulles/VA 7 Reconstruct Elden Street from Monroe Street to Center Street Reconstruct East Elden Street from Fairfax County Parkway to Monroe Street Reconstruct South Elden Street from Herndon

More information

City of Fairfax, Virginia City Council Work Session

City of Fairfax, Virginia City Council Work Session City of Fairfax, Virginia City Council Work Session Agenda Item # City Council Meeting 12a 9/8/2015 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: FISCAL IMPACT: RECOMMENDATION: ALTERNATIVE COURSE OF ACTION: RESPONSIBLE

More information

Copyright by Home by School.com (Third Conversion, LLC). All rights reserved. Published by Third Conversion, LLC

Copyright by Home by School.com (Third Conversion, LLC). All rights reserved. Published by Third Conversion, LLC Copyright 2010-2012 by Home by School.com (Third Conversion, LLC). All rights reserved. Published by Third Conversion, LLC No part of this publication may be reproduced or transmitted in any form or by

More information

The Year Ahead: Virginia Department of Transportation Northern Virginia District

The Year Ahead: Virginia Department of Transportation Northern Virginia District The Year Ahead: Virginia Department of Transportation Northern Virginia District Nicholas J. Roper, P.E. District Project Development Engineer Phone: (703)259-1953 Email: nicholas.roper@vdot.virginia.gov

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

ITEM 15 Notice March 29, 2017

ITEM 15 Notice March 29, 2017 ITEM 15 Notice March 29, 2017 Notice of Proposed Amendment to the 2016 Constrained Long Range Plan (CLRP), As Requested by the Virginia Department of Transportation (VDOT) and the Maryland Department of

More information

TECHNICAL MEMORANDUM. Introduction

TECHNICAL MEMORANDUM. Introduction TECHNICAL MEMORANDUM To: From: John M. Welsh Chris Furlong AHC, Inc. Andrew T. Smith, P.E. Edward Y. Papazian, P.E. Kimley-Horn and Associates, Inc. Date: July 6, 2017 Subject: 200 9 th reet South Redevelopment

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.

More information

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase Presentation for County Board, February 27, 2018 Regular Hearing N. Lynn Street Esplanade and Custis Trail Improvements Funding Request for VDOT Construction Bid Award UPC Design 70762 / CN 109813 Locally

More information

2. What concepts do you think would address the problem?

2. What concepts do you think would address the problem? 2. What concepts do you think would address the problem? Mass Transit and transit, commuter facilities, add metro cars, add third rail, extend Metro to Dulles, more parking, build rail on Columbia Pike

More information

Ownership Lots 17 & 18 (Part of Lot 14), Montgomery Auto Sales Park

Ownership Lots 17 & 18 (Part of Lot 14), Montgomery Auto Sales Park Traffic Impact Analysis Ownership Lots 17 & 18 (Part of Lot 14), Montgomery Auto Sales Park Silver Spring, MD Lot 17: Site Plan No. 821413 Lot 18: Site Plan No. 821414 Filing Number: 13-TS-1198527A Prepared

More information

Toll Rate Public Hearing

Toll Rate Public Hearing Toll Rate Public Hearing I-77 Express Toll Rate Hearing September 13, 2018 AGENDA AND HOUSEKEEPING Speaker Signup Bathrooms/Exits Facebook Live Introductions Thanks and Recognition 6:30-6:35 6:35-6:55

More information

Appendix B: Forecasting and Traffic Operations Analysis Framework Document

Appendix B: Forecasting and Traffic Operations Analysis Framework Document Existing Conditions Report - Appendix Appendix B: Forecasting and Traffic Operations Analysis Framework Document This document defines the methodology and assumptions that will be used in the traffic forecasting

More information

Public Information Meeting

Public Information Meeting Richmond Highway (U.S. Route 1) Corridor Improvements Public Information Meeting Tuesday, April 18, 2017 Mount Vernon High School 8515 Old Mt. Vernon Road, Alexandria, VA 22309 Amanda Baxter, VDOT, Special

More information

NAUCK SHIRLINGTON ALEXANDRIA FIGURE 2.22: CIRCULATION MAP 2.24

NAUCK SHIRLINGTON ALEXANDRIA FIGURE 2.22: CIRCULATION MAP 2.24 FIGURE 2.22: CIRCULATION MAP LEGEND DOUGLAS PARK Area Plan Boundary Parks Master Plan Boundary Existing Street Network Existing Sidewalks/Trails Primary Circulation Routes S NAUCK SW AL TE RR EE DD R 4MRV

More information

SPRINGFIELD REVITALIZATION REPORT

SPRINGFIELD REVITALIZATION REPORT SPRINGFIELD REVITALIZATION REPORT August 2015 Homewood Suites Springfield Town Center Promenade 2 SPRINGFIELD OVERVIEW This report covers recent development activity in the Springfield Commercial Revitalization

More information

Managing Dulles Rail Construction in Tysons Corner

Managing Dulles Rail Construction in Tysons Corner Managing Dulles Rail Construction in Tysons Corner National Association of Industrial and Office Properties Northern Virginia Chapter Richard Stevens Fairfax County Department of Transportation September

More information

Route 28 Widening (PW County Line to Old. Old Centreville Road) Scored HB 2 Application

Route 28 Widening (PW County Line to Old. Old Centreville Road) Scored HB 2 Application Route 28 Widening (PW County Line to Old Centreville Road) Scored HB 2 Application Project Application ID: 432 General Project Information Project Title Route 28 Widening (PW County Line to Old Centreville

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

Table of Contents. 2.0 Land Use and Transportation Inputs Land Use Factors Transportation Factors

Table of Contents. 2.0 Land Use and Transportation Inputs Land Use Factors Transportation Factors TransAction 2040 Plan Table of Contents 1.0 Overview of the TransAction 2040 Plan... 1-1 1.1 Background... 1-1 1.2 Process... 1-6 1.3 Organization of TransAction 2040 Plan... 1-7 2.0 Land Use and Transportation

More information

Sketch Level Assessment. of Traffic Issues. for the Fluor Daniel I-495 HOT Lane Proposal. Ronald F. Kirby

Sketch Level Assessment. of Traffic Issues. for the Fluor Daniel I-495 HOT Lane Proposal. Ronald F. Kirby Sketch Level Assessment of Traffic Issues for the Fluor Daniel I-495 HOT Lane Proposal Ronald F. Kirby Director of Transportation Planning National Capital Region Transportation Planning Board (TPB) Metropolitan

More information

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007

More information

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report UPC 70762 Locally Administered PE Phase VDOT Administered CN Phase 4/6/17 1 Project

More information

Preliminary Transportation Analysis

Preliminary Transportation Analysis Preliminary Transportation Analysis Goals of a Robust, Multimodal Transportation Network Safe Accessible/Connected Efficient Comfortable Context-Sensitive Motor Vehicle: Continue to analyze the data to

More information

City of Fairfax, Virginia City Council Work Session

City of Fairfax, Virginia City Council Work Session City of Fairfax, Virginia City Council Work Session Agenda Item # WS 4 City Council Meeting 10/03/2017 TO: FROM: SUBJECT: ISSUE(S): Honorable Mayor and Members of City Council Robert Sisson, City Manager

More information

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

San Tomas Expressway

San Tomas Expressway Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San

More information

Crystal City-Potomac Yard Transitway Extension

Crystal City-Potomac Yard Transitway Extension FINAL Crystal City-Potomac Yard Transitway Extension PREPARED FOR Department of Environmental Services 2100 Clarendon Boulevard, Suite 900 Arlington, VA, 22201 703.228.3344 PREPARED BY 8300 Boone Boulevard,

More information

Planned Improvements from Sector & Area Plans that have been added to the MTP

Planned Improvements from Sector & Area Plans that have been added to the MTP Appendix P Bikeway Projects in Currently Approved Plans Planned Improvements from Sector & Area Plans that have been added to the MTP Airport Viaduct Trail Connection to National Airport Implement a pedestrian/bicycle

More information

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report UPC Design 70762 / CN 109813 Locally Administered PE Phase VDOT Administered

More information

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. 28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW