Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies
|
|
- Lisa Barnett
- 6 years ago
- Views:
Transcription
1 Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies Susan Shaw, PE, CCM, DBIA Megaprojects Director Northern Virginia District Virginia Department of Transportation
2 Washington-Metropolitan Region 2
3 VDOT Northern Virginia VDOT operates the third largest state-maintained highway system in the country, just behind North Carolina and Texas. Northern Virginia District: Fairfax, Loudoun, Prince William and Arlington Counties* *Arlington maintains own secondary roads Supports 5 cities and 14 towns 15,799 lane miles 275 miles of gravel roads Traffic Volumes: I-95 at Old Keene Mill Rd: 253,000 vehicles per day. I-66 at Route 123: 175,000 vehicles per day. Signs: 250,000 Signals: 1,400 3
4 Purpose and Need Address existing and future transportation problems Improve multimodal mobility along the I-66 corridor by providing diverse travel choices in a cost-effective manner Enhance transportation safety and travel reliability 4
5 I-66 Outside the Beltway Project Area Project Location Virginia 5
6 Project Need Traffic Volume Primary highway that serves commuters travelling from Northern Virginia into the DC; crosses a variety of urban and rural areas AADT is as high as 173K vehicles in some sections The corridor has seen steady population and employment growth Unpredictable and Irregular Demand Travel times are unpredictable and traffic congestion is increasing on I-66, with heavy traffic extending beyond morning and evening rush hours, and into the weekends Poor Level of Service Over half of the corridor s peak direction roadway miles operate at a LOS E or LOS F in the a.m. peak Nearly two-thirds of the corridor s peak direction roadway miles operate at a LOS E or LOS F in the p.m. peak Unavailability of Current Real Options Peak period congestion in the eastern portion of the corridor is 4-5 hours per day (in each direction) Interstate and highway alternatives to single occupant vehicle travel during off-peak periods and in the reverse peak direction are limited Safety Crash rates at several locations within the corridor are above the statewide average for urban interstates Growing Problem By 2040, peak period congestion in the eastern portion of the corridor is expected to increase to 8 to 10 hours per day (in each direction), affecting both vehicular operations and the reliability of bus transit services Demand for enhancement of multimodal features 6
7 7
8 Project Scope Two Express Lanes (convert existing HOV lane & add one lane) HOV-3+ and buses travel free Non-HOV tolled Congestion-based tolls (similar to other Express Lanes in region) Converting HOV-2+ to HOV-3+ by 2020, consistent with the region s CLRP Three regular lanes Open to all traffic No tolls Ramp-to-ramp connections between interchanges (auxiliary lanes) Safety, interchange and operational improvements New transit service and other multimodal improvements High-frequency, fast and reliable bus service during extended peak periods Park-and-Ride facilities Transportation Demand Management (TDM) strategies Bicycle and pedestrian trail and improvements 8
9 Preferred Alternative Mainline Cross Section Flexible barrier with buffer, median for potential future transit (with auxiliary lanes, if needed) 9
10 Project Phasing Why Phase 1? Implementable by 2021 Invests wisely New construction accommodates future Metro extension Makes efficient use of existing infrastructure Elements of Phase 1 Provides 2 Express Lanes in each direction to Gainesville (University Boulevard) Provides new transit service and park-and-ride facilities Makes safety and operational improvements at key interchanges Future Phases Included in Preferred Alternative and environmental document Elements can be implemented to meet future demand as funding becomes available 10
11 New Transit Service Point-to-point commuter service between park-and-ride facilities and regional destinations Proposed new transit service includes: Preferred Alternative (By 2040) 20 Routes with up to 13,400 daily riders Phase 1 (By 2025) 13 routes with up to 10,000 daily riders Service operated by Fairfax Connector and PRTC (assumed) Some new transit service may be started during implementation of Transportation Management Plan (TMP) 11
12 Fare subsidy for existing commuter bus service New service from Front Royal Vanpool, carpool and telework formation subsidies Incident response enhancements for interstate Mobility and safety enhancements for arterial network Local law enforcement Speed & traffic monitoring Temporary traffic calming Traffic engineering & analysis Next steps: FHWA approval of strategies Implementation planning Transportation Management Plan (TMP) Strategies 12
13 Bicycle and Pedestrian Access Enhance bicycle network in Fairfax and Prince William Counties: New crossings of I-66 would better accommodate bicycle and pedestrians, connect routes Project provides opportunities to complete segments of regional trail network 13
14 Bicycle and Pedestrian Access Parallel to I-66 Some segments of bike/ped network parallel to I-66 to be constructed in Fairfax and Prince William Counties Path cross section reduced per Fairfax County s request to reduce impacts 14
15 I-66 Active Traffic Management Improve safety from D.C. to Haymarket using sign gantries, lane controls, incident and queue detection. Features include: Expanded use of shoulder lanes between I-495 and Route 50 Routinely opened to traffic when congestion builds New lane control signals showing which lanes are usable or blocked Expanded camera and dynamic message signs Upgrades to ramp metering system to help traffic merge onto I-66 Opened September 2015 $38.6 million 15
16 Public Outreach Program Stakeholder Engagement and Meetings More than 180 public meetings from Jan Jan elected officials meetings 43 homeowners associations and community group meetings 57 meetings with governmental agencies 11 formal public information meetings or public hearings Dedicated website Media outreach Social media (Facebook and Twitter) Stakeholder database of nearly 3,000 Electronic marketing and outreach Online community discussion board 16
17 Developing the Preferred Alternative Universe of Alternatives 2 Draft Environmental Alternatives Preferred Alternativ e Elements of Alternatives Mainline cross section Express Lanes access points Interchange concepts Park-and-ride locations Transit service scenarios TDM strategies Alternatives Evaluated Technical studies Public and stakeholder input Key Features Reflects public input Combines the best elements from alternatives evaluated Refines concepts with new ideas to reduce impacts Multimodal approach Moves more people Reduces hours of congestion per day Reduces cut-through traffic on local roads 17
18 Preliminary Right-of-Way Impacts Total Parcels Residential Relocation s Overall Impacted Parcels Impacted Park Parcels Alt. 2A I-66 Corridor US 15 to I-495 Alt. 2B ,288 Phase 1 Pref. Alt * 0 1 Project goal: Minimize project footprint, while providing effective solutions for I-66 corridor Reduced impacts: Alternatives 2A and 2B impacts reduced through design refinements in coordination with public outreach Preferred Alternative impacts: Combination of impacts from Alternatives 2A and 2B * Number of parcels is higher than either 2A or 2B due to including access to Express Lanes at both Stringfellow Road (2B) and Monument Drive (2A) and both Route 50 (2A) and Route 123 (2B) 18
19 Project Procurement Virginia Secretary of Transportation is considering publically and privately financed options Commonwealth evaluated three procurement options: Toll Concession or DBFOM (Design-Build-Finance-Operate-Maintain) DBOM (Design-Build-Operate-Maintain) D-B/ATC (Design-Build with Alternative Technical Concepts) Qualifications received October 1, 2015 from multiple teams Conceptual financial proposals from shortlisted teams received on December 1, 2015 Toll concession model design build finance operate and maintain (DBFOM) announced in December 2015 Draft Request for Proposals (RFP) available One-on-one meetings with shortlisted DBFOM teams 19
20 Commissioner s Finding of Public Interest The final allocation of risks will be defined by the Commonwealth in the Comprehensive Agreement, but will conform with the high-level overview of the risks, responsibilities and liabilities outlined below. Private Entity Public Entity Toll Concession Design & Construction Operations & Maintenance Financing & Revenue Design-Build-Operate- Design-Build/ATC Maintain Design & Construction Design & Construction Operations & Maintenance (15-years) Financing & Revenue Operations & Maintenance Financing & Revenue Based on experience related to the development of projects of similar size and complexity, the inputs received from internal and external stakeholders, comments received from the general public and the results of the risk analysis workshop, the delivery risk of this Project is assessed to be medium. 20
21 Process from RFQ to RFP Delivery Model DBFOM DBOM DB/ATC Step 1: SOQs Short-List Proposers (Total # at VDOT Discretion) Step 2: Conceptual Financial Proposals Delivery Model Selected; Qualified Proposers Announced RFP Stipends paid to responsive Short-Listed Proposers for non-selected delivery methods Outcome: Delivery Methods reduced from 3 to 1 21
22 RFQ Flow Chart 22
23 Key Business Terms Concession Term: 50 years (4 years construction, 46 years operations) Financing Developer will finance the project at its own cost and risk and non-recourse to VDOT Up to $600 million public contribution Permits VDOT will obtain required NEPA, CTB and FHWA approvals for Preferred Alternative Developer responsible for obtaining all other permits and government approvals, and obtaining any required reevaluation of NEPA approvals as a result of Developer s ATCs Design and Construction Fixed priced contract between Developer and Design-Build Contractor Intermediate milestones Intermediate parking spaces: Within 18 months of construction NTP Remove traffic signals on Route 28: Within 24 months of construction NTP Operations and Maintenance (O&M) Developer responsible for O&M of Express Lanes, except for snow and ice removal 23
24 Other Major Features Funding for transit is a requirement in the financial plan Developer retains the risks for: Higher than anticipated HOV use Extension of Metro after 10 years of operation Other corridor enhancements by Department (VDOT) with exception of constructing an additional General Purpose lane Alternative Technical Concepts (ATC) process Emphasis on innovation and increasing time and/or cost savings value Reduced scope or cheaper quality not acceptable Minimize negative impact of construction activities Expedited construction schedule with Liquidated Damages (LDs) for late Project Completion Liquidated damages for lane closures 24
25 I-66 Outside the Beltway Key Milestones Revised EA 15-Day Public Review & Comment Period January/February 2016 Final Environmental Document January/February 2016 Consideration of ATCs March/April 2016 Public Hearing on Final Draft RFP & HOV-2 to HOV-3 Conversion May 2016 Final RFP May 2016 Receive Technical Proposals July 2016 Receive Financial Proposals August 2016 Selection of Developer September 2016 Commercial Close October 2016 Financial Close April 2017 Design Public Hearing Early 2017 Construction Start 2017 Open to Traffic
26 I-66 Inside the Beltway Project Area 26
27 Project Features Tolling Convert I-66 to dynamically-priced toll lanes in the peak direction during weekday rush hours Toll prices will change depending on traffic volumes to manage demand for the lanes and ensure a more reliable trip Multimodal Enhanced bus service throughout the corridor Better access to Metro New bicycle and pedestrian access Roadway improvements on local roads Future widening Evaluation of the need for Eastbound widening Project Schedule April-June 2016: Approve draft list of multimodal projects, hold public hearing, approve final list Summer 2016: Tolling construction begins Summer 2017: Tolling begins / implementation of first group of multimodal projects 27
28 Project Benefits Move more people up to 40,000 more people per day by 2040 and enhance connectivity for the I-66 Corridor Enhance transit service Provide revenue stream support to multimodal components on I-66 and complementary corridors adjacent to I-66 Provide more travel choices for single-occupancy vehicles Improve reliability for all travelers Promote a carpool culture and commitment to multimodalism Create opportunities for improved level of service on parallel routes Provide seamless connectivity to the region s 40+ miles of express lanes 28
29 Project Types Re-investing in the I-66 corridor Transit Service Transportation Demand Management (TDM) Technology Bicycle & Pedestrian Roadway 29
30 Regional Express Lanes Network 30
31 For More Information: VDOT.Virginia.gov Transform66.org 31
Washington DC Section of ITE Project Briefing
Washington DC Section of ITE Project Briefing November 5, 2015 Renée Hamilton, VDOT, Deputy District Administrator I-66 Outside the Beltway Improvement Area Project Location Virginia 2 Purpose and Need
More informationDULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director
DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, 2015 Susan Shaw, P.E., VDOT, Megaprojects Director I-66 Corridor Conditions Steady population growth Employment growth in activity centers Congestion
More informationDulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation
Dulles Area Transportation Association October 11, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Transform 66: Outside the Beltway 2 Project Overview Multimodal improvements
More informationI-66 Corridor Improvements Route 15 to I-495. November 2014
I-66 Corridor Improvements Route 15 to I-495 November 2014 I-66 Corridor: Haymarket to the Beltway = Park and Ride Lots 2 Purpose and Need Improve multimodal mobility along the I-66 corridor by providing
More informationInstitute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017
Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia
More informationTransform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018
Transform I-66 Chief Engineer Garrett W. Moore, P.E. July 12, 2018 Transform 66: Program Goals Improve multimodal mobility by providing diverse travel choices in a cost-effective manner Enhance transportation
More informationI-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016
I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016 Mike Snare, PE, Project Manager Virginia Department of Transportation GEC Michelle Holland, Megaprojects
More informationI-395 Express Lanes Northern Extension Project Public Hearings
I-395 Express Lanes Northern Extension Project Public Hearings Susan Shaw, PE, Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Manager Virginia Department of
More informationCity of Fairfax, Virginia City Council Work Session
City of Fairfax, Virginia City Council Work Session Agenda Item # 4c City Council Meeting 6/2/2015 TO: FROM: SUBJECT: Honorable Mayor and Members of City Council Robert Sisson, City Manager Discussion
More informationI-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016
I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016 Susan Shaw, PE, Megaprojects Director, Virginia Department of Transportation Amanda Baxter, Special Projects
More informationInterstate 66 Tier 1 Environmental Impact Statement (EIS)
WELCOME Welcome to the second Citizen Information Meeting for the Tier 1 Environmental Impact Statement (EIS). As an integral part in the environmental study process, the study team is seeking your comments
More informationCapital Beltway HOT Lanes - Frequently Asked Questions
Capital Beltway HOT Lanes - Frequently Asked Questions December 20, 2007 1. What is the cost of the project? The fixed-price design-build cost is approximately $1.4 billion. 2. Why have the project costs
More informationCommuter Connections Regional TDM Marketing Group Meeting
Item #6 Commuter Connections Regional TDM Marketing Group Meeting September 19, 2017 Michelle T. Holland, Megaprojects Communications Manager Virginia Department of Transportation Program Area Map 2 Program
More informationFY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3,
FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3, 2018 www.novatransit.o rg 703-524-3322 Presentation Overview I-66 Commuter Choice Program Overview
More informationI-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016
I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016 Susan Shaw, PE, Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Manager
More informationEXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative
EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of
More information395 Express Lanes Extension
395 Express Lanes Extension January 2016 Building a network of Express Lanes Project overview Add capacity on I-395 with addition of a third HOV lane and active traffic management Generate guaranteed transit
More informationProject Mobility - Route 3 South Express Toll Lanes. Industry Day Overview
Project Mobility - Route 3 South Express Toll Lanes Industry Day Overview October 15, 2014 Today s Agenda Project Mobility Overview Design Alternatives and Construction Estimates Existing Traffic Congestion/Project
More informationProject Description Form 8EE
Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:
More informationVDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations
VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment Staff Recommendations Department of Environmental Services Transportation January 28, 2017 Timeline of Transform66 June 2012: I-66
More information495 EXPRESS LANES NORTHERN EXTENSION STUDY COMMENT SUMMARY REPORT JUNE 11, 2018 PUBLIC INFORMATION MEETING
495 EXPRESS LANES NORTHERN EXTENSION STUDY COMMENT SUMMARY REPORT JUNE 11, 2018 PUBLIC INFORMATION MEETING Federal: NHPP-0495(095), State: 0495-029-419, UPC: 113414 The Virginia Department of Transportation
More informationNORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 20, 2012 Garrett Moore VDOT District Administrator, Northern Virginia Paving Program 2012 This season's paving program will
More informationRegional Transportation Needs Within Southeastern Wisconsin
Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency
More informationAn Easier Commute. Learn how to use I-77 Express to save you time.
An Easier Commute Learn how to use I-77 Express to save you time PUBLIC-PRIVATE PARTNERSHIP I-77 Express is the first-ever toll lane public-private partnership with NCDOT I-77 Mobility Partners is financing,
More informationManaged Lanes: A National Perspective Managed Lane Strategies
Managed Lanes: A National Perspective Managed Lane Strategies Use the following control strategies to manage a lane(s) to provide a reliable transportation option: Eligibility/occupancy Access control
More informationCounty of Fairfax, Virginia. Department of Transportation
Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway
More informationTRANSIT PERFORMANCE IN THE I-66 INSIDE THE BELTWAY CORRIDOR
TRANSIT PERFORMANCE IN THE I-66 INSIDE THE BELTWAY CORRIDOR June 2018 This report summarizes the performance of public transportation systems serving the I-66 inside the Beltway corridor in Northern Virginia.
More informationManaged Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016
Managed Lanes Steve Schilke, P.E. Major Projects Unit Head District 1 Illinois Traffic Engineering and Safety Conference October 2016 Agenda Managed Lanes Projects I-55 (Stevenson Expressway) Express Toll
More informationCongestion Reducing Activities. Toby Carr GDOT Director of Planning April 10, 2014
Congestion Reducing Activities Toby Carr GDOT Director of Planning April 10, 2014 GDOT Performance Dashboard Congestion Congestion Relief Strategies 511 HEROS RTOP Highway Emergency Response Operators
More informationThe Year Ahead: Virginia Department of Transportation Northern Virginia District
The Year Ahead: Virginia Department of Transportation Northern Virginia District Nicholas J. Roper, P.E. District Project Development Engineer Phone: (703)259-1953 Email: nicholas.roper@vdot.virginia.gov
More informationPublic Information Meeting
Richmond Highway (U.S. Route 1) Corridor Improvements Public Information Meeting Tuesday, April 18, 2017 Mount Vernon High School 8515 Old Mt. Vernon Road, Alexandria, VA 22309 Amanda Baxter, VDOT, Special
More informationTransportation Master Plan Advisory Task Force
Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved
More informationProject Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationBRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update
BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update January 23, 2015 Travel Forecasting Subcommittee What is the CLRP? Federally
More informationToll Rate Public Hearing
Toll Rate Public Hearing I-77 Express Toll Rate Hearing September 13, 2018 AGENDA AND HOUSEKEEPING Speaker Signup Bathrooms/Exits Facebook Live Introductions Thanks and Recognition 6:30-6:35 6:35-6:55
More informationClackamas County Comprehensive Plan
ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They
More informationArlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016
Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing May 2016 Overview 10-Year Transit Development Plan Premium Transit Network Columbia Pike service concept Premium amenities
More informationAlternatives Development Technical Report
TRANSFORM 66 I-66 CORRIDOR IMPROVEMENTS PROJECT OUTSIDE the Beltway 66 Multimodal Solutions - 495 to Haymarket Tier 2 Final Environmental Assessment Alternatives Development Technical Report 193 Town of
More informationNovember 14, Dulles To DC Loop Public-Private Partnership Proposal. Executive Summary
November 14, 2005 Dulles To DC Loop Public-Private Partnership Proposal Executive Summary Virginia Mobility Associates LLC, a newly established single purpose entity, proposes to privately finance the
More information2045 Long Range Transportation Plan. Summary of Draft
2045 Long Range Transportation Plan Summary of Draft Fredericksburg Area Metropolitan Planning Organization The George Washington Region includes the City of Fredericksburg and the counties of Caroline,
More informationInterstate 66 Tier 1 Environmental Impact Statement. Cooperating and Participating Agencies Meeting March 19, 2012
Interstate 66 Tier 1 Environmental Impact Statement Cooperating and Participating Agencies Meeting March 19, 2012 Chris Collins Virginia Department of Transportation, Environmental Division Meeting Agenda
More informationBicycle Master Plan Goals, Strategies, and Policies
Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of
More informationMoving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.
City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018 5:00 8:00 PM Region of Waterloo City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018
More informationWELCOME TO OPEN HOUSE # 1 June 14, 2017
Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE # 1 June 14, 2017 Please sign in and join our mailing list Purpose of Open House #1 & Study Area York
More informationNOVEMBER 2017 DESIGN PUBLIC HEARINGS COMMENT SUMMARY (November 13, 14, and 16, 2017)
NOVEMBER 2017 DESIGN PUBLIC HEARINGS COMMENT SUMMARY (November 13, 14, and 16, 2017) I-66 Outside the Beltway Project Between U.S. Route 29 in Gainesville and I-495/Capital Beltway in Fairfax County State
More informationFM #: ETDM #: 11241
SR 826/Palmetto Expressway PD&E Study From SR 93/I 75 to the Golden Glades Interchange FM #: 418423 1 22 01 ETDM #: 11241 Agency/ Kick Off Meeting October 27, 2011 2 Location Map From SR 93/I 75 to Golden
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationWhat if YOU could help plan Northern Virginia s transportation future?
What if YOU could help plan Northern Virginia s transportation future? Photo credits: Washington Metropolitan Area Transit Authority And improve the quality of life in your community -- for yourself, your
More informationArterial Transitway Corridors Study. Ave
Arterial Transitway Corridors Study Ave January 2012 Arterial Transitway Corridors Study Overview Corridor Features and Demographics 11 study corridors, 95 route miles 86,000 daily rides and half of existing
More informationNorth Coast Corridor:
North Coast Corridor: Connecting People, Transportation & Environment Legislative Hearing: 11.8.10 1 North Coast Corridor Region s Lifeline A Regional Strategy Mobility, Economy & Environment North Coast
More information4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL
4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL The Transportation Services Committee recommends the adoption of
More informationCity of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015
City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 McPhail Transportation Planning Services Ltd. AGENDA 6:00 7:00 pm Viewing Boards / Q & A with the Team 7:00 7:50
More informationSolana Beach Comprehensive Active Transportation Strategy (CATS)
Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element
More informationFI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway
TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for
More informationINNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES
INNER LOOP EAST TRANSFORMATION PROJECT AIA Rochester Annual Meeting November 13, 2013 Bret Garwood, NBD Erik Frisch, DES Why? We are building a city that encourages walking, biking and enjoying the outdoor
More informationRoute 7 Corridor Study
Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi
More informationINTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016
INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION Alternatives Analysis Technical Report City of Alexandria,
More informationHighway 217 Corridor Study. Phase I Overview Report
Highway 217 Corridor Study Phase I Overview Report November 3, 24 BACKGROUND AND OVERVIEW Study purpose The Highway 217 Corridor Study is developing multi-modal transportation solutions for traffic problems
More informationNorthern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018
Northern Virginia Express Lanes Design Challenges and Solutions IBTTA Maintenance and Roadway Operations Workshop June 25, 2018 Virginia Express Lanes Overview 60 miles of managed lanes (4 projects) Long
More informationToward Zero Deaths. Regional SHSP Road Show Meeting. Virginia Strategic Highway Safety Plan. presented by
Toward Zero Deaths Regional SHSP Road Show Meeting presented by Virginia Strategic Highway Safety Plan December 1, 2016 1 Welcome & Introductions Purpose of the Meeting Objectives & Key Outcomes Agenda»
More information405 Express Lanes General Information & Frequently Asked Questions
The questions and answers below provide current information on the project to improve Interstate 405 (I-405) in Orange County from State Route 73 to Interstate 605. Why are improvements needed on I-405?
More informationBasalt Creek Transportation Refinement Plan Recommendations
Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for
More informationCITY OF BLOOMINGTON COMPLETE STREETS POLICY
CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,
More informationCapital Beltway HOT Lanes Project
Some things can t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead Some things can t wait for traffic Overview Two new lanes in each direction Carpool/HOV-3 lanes on the Beltway
More informationPERFORMANCE ANALYSIS of The Draft 2015 CLRP
Item 9 PERFORMANCE ANALYSIS of The Draft CLRP Presentation to the Transportation Planning Board September 16, CLRP Performance Analysis 1 What is the Long-Range Transportation Plan (CLRP)? The CLRP identifies
More informationMnPASS System Today and the Future
MnPASS System Today and the Future April 2010 By Nick Thompson Minnesota Department of Transportation Topics Minnesota s Current and Future MnPASS High Occupancy Toll Systems Overview of the MnPASS System
More informationI-105 ExpressLanes Project
I-105 ExpressLanes Project Public Scoping Meetings March 2018 Introduction to Scoping This process is your opportunity to give us your thoughts on: The purpose and need for the proposed improvements The
More informationFY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices
FY 2017-2026 Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices November 1, 2017 Forecasted Growth Arlington continues to grow with a shift towards multi-family
More informationHighway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County
Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County
More informationCharlotte Region Fast Lanes Study Phase III
Charlotte Region Fast Lanes Study Phase III Stakeholder Workshop #3 December 13, 2012 Fast Lanes Study, Phases I and II Performed between 2007 and 2009 Evaluated all types of managed lanes (HOV, HOT, truck-only
More informationTRANSPORTATION TRAINING TOPICS. April 6, 2010
TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA
More informationProject Description Form 6V
Project Description Form 6V Basic Project Information Submitting Jurisdiction/Agency: Prince William County Project Title: Route 15 Widening: Route 55 to south of RR tracks & Construct RR Overpass Project
More informationState Highway 44/State Street High Capacity Corridor
Background State Highway 44/State Street runs from I-84 in Canyon County through parts of the cities of Middleton, Star, Eagle, and Garden City to downtown Boise. It is a commuter route from several communities
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More informationMnDOT Implementation of Complete Streets Policy. January 2014
MnDOT Implementation of Complete Streets Policy January 2014 1 Prepared by Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, Minnesota 55155-1899 Phone: 651-296-3000 Toll-Free:
More informationEXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives
Contents EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW... 1-1 1.1 Study Scope... 1-1 1.2 Study Area... 1-1 1.3 Study Objectives... 1-3 2 EXISTING CONDITIONS... 2-1 2.1 Existing Freeway Conditions... 2-4 2.1.1
More informationMeasuring the Distribution and Costs of Congestion. Tim Lomax Texas Transportation Institute
Measuring the Distribution and Costs of Congestion Tim Lomax Texas Transportation Institute http://mobility.tamu.edu The Congestion Measurement Story Travel time, variations, compare to goals WHAT? WHY?
More informationI-95 Express Lanes Fredericksburg Extension (Fred Ex) Public Hearing. September 25, 2017
I-95 Express Lanes Fredericksburg Extension (Fred Ex) Public Hearing September 25, 2017 Purpose of Tonight s Meeting Provide information and gain public input: Draft Environmental Assessment (EA) Design
More informationACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION
ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION BACKGROUND Active transportation, also known as nonmotorized transportation, is increasingly recognized as an important consideration when planning and
More informationCorridor Advisory Group and Task Force Meeting #10. July 27, 2011
Corridor Advisory Group and Task Force Meeting #10 July 27, 2011 1 Agenda Recap CAG/TF #9 Public Meeting #2 Summary Single Mode Alternatives Evaluation Results Next Steps 2 3 CAG/TF #9 Recap CAG /TF #9
More informationDumbarton Transportation Corridor Study. San Francisco Bay ITE November 2016
Dumbarton Transportation Corridor Study San Francisco Bay ITE November 2016 Dumbarton Corridor Source: Wikipedia 2 Dumbarton Corridor 3 Growth Imbalance Jobs-housing imbalance Major employers driving growth
More information2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE
About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation
More informationPUBLIC COMMENT SUMMARY REPORT Public Information Meetings
PUBLIC COMMENT SUMMARY REPORT 2015 Public Information Meetings I-66 Outside the Beltway Project Between U.S. Route 15 in Haymarket and I-495/Capital Beltway in Fairfax County State Project: 0066-96A-297,P101
More informationPreliminary Transportation Analysis
Preliminary Transportation Analysis Goals of a Robust, Multimodal Transportation Network Safe Accessible/Connected Efficient Comfortable Context-Sensitive Motor Vehicle: Continue to analyze the data to
More informationWHAT IFS: Over the course of
WHAT IFS: Over the course of the 422plus Project certain questions have arisen multiple times at meetings, briefings and on-line at the website. Most of these questions start with WHAT IF. WHAT IF vehicle
More informationDurham Region Long Term Transit Strategy
Durham Region Long Term Transit Strategy An adaptive, safe, reliable, frequent, accessible and desirable transit system that shapes and connects Durham Region and beyond in an economically and environmentally
More informationThe Route 29 Corridor Study was initiated at the request of Virginia s Commonwealth
CHAPTER 2: Study Background and approach The Route 29 Corridor Study was initiated at the request of Virginia s Commonwealth Transportation Board in response to requests from members of the General Assembly
More informationTRANSPORTATION NEEDS ASSESSMENT
TRANSPORTATION NEEDS ASSESSMENT A travel demand analysis was carried out to determine the operational issues and the potential benefit that adding traffic capacity would have on the road network. All the
More informationAccess Management Regulations and Standards
Access Management Regulations and Standards January 2014 Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while preserving
More informationImproving Mobility Without Building More Lanes
Improving Mobility Without Building More Lanes By Mike Salisbury and Will Toor July 2017 Copyright 2017 by Southwest Energy Efficiency Project. All rights reserved. Photo: Courtesy of the Denver Post Anyone
More informationArterial Transitway Corridors Study
Arterial Transitway Corridors Study February 2012 Arterial Transitway Corridors Study Overview Corridor Features and Demographics 11 study corridors, 95 route miles Routes: 86,000 daily rides and half
More informationRoute 29 Solutions Projects
Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four
More informationCity of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A
A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table
More informationState Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway
State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,
More informationMCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017
MCA Member Meeting: Tysons Update Fairfax County Department of Transportation November 13, 2017 Presentation Overview Balancing Land Use and Transportation How Are We Doing? Studies and Projects Neighborhood
More informationFairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation
Fairfax Alliance for Better Bicycling February 28, 2019 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Nancy Smith, Public Relations Manager FAM Construction Chris Wells,
More informationRTA 2013 Leadership Briefing and Tour Report
RTA 2013 Leadership Briefing and Tour Report Suburban MD, Northern VA, Baltimore, Washington, DC Mike Fendrick, PE, Parsons Brinckerhoff Bill Jenkins, PE, AECOM Mike Surasky, PE, A. Morton Thomas & Associates,
More informationWe believe the following comments and suggestions can help the department meet those goals.
The Honorable Secretary Anthony Foxx The Secretary of Transportation United States Department of Transportation 1200 New Jersey Avenue, SE Washington, DC 20590 August 30, 2013 Dear Secretary Foxx, Thank
More informationCITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle
SDOT SR0 Design Refinements RES August, 0 Version #D 0 CITY OF SEATTLE RESOLUTION..title A RESOLUTION relating to the State Route 0, Interstate to Medina Bridge Replacement and High Occupancy Vehicle Project;
More informationBus Rapid Transit Plans
Twin Cities Region Bus Rapid Transit Plans ULI Minnesota Workshop Connecting Bus Rapid Transit to the Community December 15, 2009 John Levin Director of Service Development Metro Transit Metropolitan Area
More information