1 Proposed Mural Proposed Sitting Area Ninth St Proposed Bump-out Bike Lane and Buffer Zone Proposed Trees and Sitting Area Tenth St Bike Sign to Lake 47

2 Proposed Trees and Sitting Area Eighth St Bike Lane and Buffer Zone Proposed Mural Proposed Sitting Area Ninth St P d B t 48 LAKESHORE VILLAGE

3 Sixth St Proposed Trees and Sitting Area Parallel Parking Bay Proposed Sitting Area Media Box Islington Ave Intersection Feature Paving Seventh St Proposed Major Gateway Existing Trees 49

4 Existing Foutain to Remain Improved Sitting Area Fifth St Bike Lane and Buffer Zone Existing Trees 50 LAKESHORE VILLAGE

5 Proposed Mural and Bike Sign to Lake Existing Light House to Remain Fourth St 51

6 Proposed Minor Gateway Sign Second St Bike Lane and Buffer Zone Proposed Bump-Out and Sitting Area Bike Sign to Lake Third St Proposed Mural and Bike Sign to Lake 52 LAKESHORE VILLAGE

7 Dwight First St Intersection Feature Paving Proposed Railing Flower Boxes Proposed Bump-Out and Sitting Area Proposed Minor Gateway Sign Second St 53

8 54 LAKESHORE VILLAGE BIKE RACK - F.2 DURATHERM - PA.2 PLANTING - PL.1 BIKE LANES - PA.3 ASTRAL MEDIA MEDIA BOX - F.7 EXISTING LIGHT POLE SIGNAGE/BANNER - F.1 S - BENCH - F.6 STREETPRINT XD- PA.1 BUMP OUT DETAIL #1

9 LS TH + LAKE SHORE Feature paving applications will consist of four separate treatments. The intersection of Fifth Street and Lake Shore Blvd demonstrates the following paving features found within the Lakeshore Village chapter. PA.1 StreetPrint XD At twelve intersections Street Print XD will be applied; 5 major intersections and 7 minor intersections. Major intersections include where Lake Shore Blvd meets 1st Street, 3rd Street, 5th Street, 7th Street and 10th Street. Minor intersections include where Lake Shore Blvd meets 2nd Street, 4th Street, 6th Street, 8th Street, 9th Street 11th Street and 12th Street. The pattern and colour may be customized according to the BIA branding study. PA.3 Bike Lanes Existing Bike lanes run east/west on Lake Shore Blvd. The lanes will be repositioned against the existing curb. So as to not compete with the adjacent paving patterns and colours, the lane will be painted with the City of Toronto standard white marking. PA.2 Duratherm Parking Stalls The on-street parking will be repositioned to the outside of the bike lane. The stalls will be treated with a StreetPrint XD surface in a complimentary standard colour and pattern to the feature intersection paving F.1, F.2, F.6, F.7 Furniture Banners will be added to existing street poles, flower pots, benches and bike racks will be arranged along the south side of Lake Shore Blvd. Proposed softscape planted bump out - Note: All paving patterns and colours are conceptual. The BIA will determine the colour, layout, and pattern at a later date LS TH + LAKE SHORE 55

10 BIKE LANE - PA.3 ASTRAL MEDIA BENCH F.7 FLOWER POTS - F.3 BIKE RACK - F.2 S- BENCH F.6 EXISTING LIGHT POLE SIGNAGE/BANNER - F.1 STREETPRINT XD - PA.1 BUMP OUT DETAIL #2 56 LAKESHORE VILLAGE

11 LS RD + LAKE SHORE PA.1 StreetPrint XD At twelve intersections Street Print XD will be applied; 5 major intersections and 7 minor intersections. Major intersections include where Lake Shore Blvd meets 1st Street, 3rd Street, 5th Street, 7th Street and 10th Street. Minor intersections include where Lake Shore Blvd meets 2nd Street, 4th Street, 6th Street, 8th Street, 9th Street 11th Street and 12th Street. The pattern and colour may be customized according to the BIA branding study. PA.3 Bike Lanes Existing Bike lanes run east/west on Lake Shore Blvd. The lanes will be repositioned against the existing curb. So as to not compete with the adjacent paving patterns and colours, the lane will be painted with the City of Toronto standard white marking. PA.2 Duratherm Parking Stalls The on-street parking will be repositioned to the outside of the bike lane. The stalls will be treated with a StreetPrint XD surface in a complimentary standard colour and pattern to the feature intersection paving F.1, F.2, F.6, F.7 Furniture Banners will be added to existing street poles; flower pots, benches and bike racks will be arranged hardscape bump out areas along the south side of Lake Shore Blvd. using colour unit paving coordinated with the BIA branding identity. Proposed bump out pedestrian plaza - Note: All paving patterns and colours are conceptual. The BIA will determine the colour, layout, and pattern at a later date LS RD + LAKE SHORE 57

12 AREA VIEW 1 AREA VIEW 2 DETAIL VIEW 2 AREA VIEW 3 DETAIL VIEW 1 AREA VIEW 4 KEY PLAN Mimico by the Lake BIA Master Plan meters meters 58 Mimico by the Lake

13 MIMICO BY THE LAKE AREA VIEW 1 AREA VIEW 2 AREA VIEW 3 AREA VIEW 4 DETAIL

14 Alexander St. Major Gateway sign Replace uneven Pavement with proposed sitting area Bike Lane Decorative Paving Treatment at Parking Stall Consolidated Tree Planter TTC Shelter Pedestrian Light and Banner Decorative Paving Bike Intersection Intersection Feature Paving Burlington Ave Remove Unit PAvers and replace with Concrete Sidewalk 60 Mimico by the Lake Decorative Paving Bike Intersection

15 Burlington Ave. Remove Unit PAvers and replace with Concrete Sidewalk Decorative Paving Bike Intersection Sitting Areas Loading Strip Pedestrian Light and Banner Parking Stall with Decorative Paving Concrete Sidewalk New Tree Planting Proposed Mural Sitting Areas Consolidated Tree Planter Concrete Sidewalk me 61 Pedestrian Light

16 Areas Consolidated Tree Planter Concrete Sidewalk Mural Pedestrian Light and Banner Albert Ave. Parkette Street Edge Planters to be reviewed and engineered where possible Bike Racks Parking Feature Paving Proposed Astral Media Box Mimico by the Lake

Option W: N. Washington Street Project

Option W: N. Washington Street Project Option W: N. Washington Street Project Location: one block of North Washington Street, between West Broad Street and Park Avenue Description: upgrades to existing lighting new brick sidewalk to replace

More information

UDC Street Cross Sections

UDC Street Cross Sections UDC Street Cross Sections Local Street - Downtown Local Street Mountable Curb Local Street Vertical Curb Alley Major Arterial Minor Arterial Residential Lane Residential Collector Residential Collector

More information

WELCOME. City of Eden Prairie West 70 th Street

WELCOME. City of Eden Prairie West 70 th Street WELCOME City of Eden Prairie West 70 th Street Project Schedule Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug >>> May WEST SEGMENT Concept Plan Fall 2014 Plan Development Winter 2014 Summer 2015 Construction

More information

PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN

PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN CHAPTER 4 Chapter 4 Pedestrian Circulation & Trails PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN In recent years, the City has constructed new sidewalks and enhanced existing ones in the downtown with brick

More information

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets. ORIGINAL (Typical Section) CURRENT (Typical Section) 3,900 3,000 2,000 1,500 3,100 1,600 3,100 1,500 2,000 2,500 3,900 3,000 1,800 600 2,000 3,000 3,000 2,000 600 1,800 2,500 Existing Planting Traffic

More information

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District

More information

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) DRAFT SEPTEMBER 23, 14 1 Washington Street Typical Block Downtown Typical Block: DOWNTOWN (Observer Highway - 8th Street) New crosswalks

More information

Lawrence Avenue Streetscape Concepts August 30, 2011

Lawrence Avenue Streetscape Concepts August 30, 2011 Lawrence Avenue Streetscape Concepts August 30, 2011 Neighborhood Context Phase II: River to Western Ave. Phase I: Western Ave. to Clark St. Key Map Lawrence Ave. Existing Streetscape Conditions East of

More information

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan STEERING COMMITTEE MEETING June 17, 2015 Streetscape Overview Burlington Comprehensive Master Plan 1 Introduction Slide This slide show was presented to the Burlington Steering Committee on June 17, 2015

More information

TRANSPORTATION STANDARDS

TRANSPORTATION STANDARDS INTRODUCTION LOCAL STREETS ON-STREET PARKING SIDEWALKS STREET LIGHTING STREET FURNISHINGS TRAFFIC CALMING STREET TREES MEDIAN PLANTING BOULEVARD LOCATIONS VILLAGE CENTER STREET LOCATIONS RESIDENTIAL STREET

More information

S T A T I O N A R E A P L A N

S T A T I O N A R E A P L A N The Circulation and Access Plan describes vehicle, pedestrian, and transit improvements recommended within the Concept Plan. In order to create and sustain a vibrant business district that provides pedestrian-friendly

More information

Appendix B - Street Sections

Appendix B - Street Sections Appendix B - Street Sections 6TH STREET CORRIDOR PLAN STREET SECTIONS The street sections in Appendix B include recommended improvements to streets for North Glenwood. They include existing conditions

More information

STREETSCAPE CONCEPT PLAN

STREETSCAPE CONCEPT PLAN 03 STREETSCAPE CONCEPT PLAN Zone 1 This zone includes the gateway into both the downtown and the Village at Harlem. The gateway features are shown closer to the Harlem intersection to make them more prominent.

More information

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT 1 Project Goals 1 Improved Safety: Lighting, Multi-Modal Circulation, Emergency Access, Tripping Hazards; Stormwater 4 Environmental Performance:

More information

Streetscape: Core Shopping District

Streetscape: Core Shopping District Streetscape: Core Shopping District DRAFT DRAFT DRAFT May 00 Core Shopping District: Phase Blue Island s Core Shopping District is located along Western Avenue, between Grove and Union Streets. Streetscape

More information

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS 14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS 141 Symbols Recommendations - Southern End of 14th Street Study Area Streetscape Each icon

More information

Fulton Market Streetscape

Fulton Market Streetscape Fulton Market Streetscape Ogden Avenue to Halsted Street Public Meeting Recommended Improvements December 10th, 2014 Meeting Purpose and Goals Present Existing Conditions Community Input and Charrette

More information

PUBLIC REALM MASTER PLAN

PUBLIC REALM MASTER PLAN WESTSHORE BUSINESS DISTRICT PUBLIC REALM MASTER PLAN MASTER PLAN COMMITTEE MEETING MARCH 20, 2013 WESTSHORE BUSINESS DISTRCT PUBLIC REALM MASTER PLAN MACRO-SCALE CONCEPT: A PUBLIC REALM FRAMEWORK DEFINED

More information

DEFINING THE STREETSCAPE DRAFT

DEFINING THE STREETSCAPE DRAFT 3 DEFINING THE STREETSCAPE Context Sensitive Design Context Sensitive Design The structuring elements of streetscapes for the City of Vaughan are road classifi cation, streetscape type and level of service.

More information

71st Street Streetscape Master Plan Study

71st Street Streetscape Master Plan Study 71st Street Streetscape Master Plan Study Chicago, Illinois January 2006 Prepared For: City of Chicago Department of Transportation Division of Project Development DRAFT FOR REVIEW I. Introduction...5

More information

Microscale Audit of Pedestrian Streetscapes (MAPS), Mini Version

Microscale Audit of Pedestrian Streetscapes (MAPS), Mini Version Microscale Audit of Pedestrian Streetscapes (MAPS), Mini Version Training Manual & Picture Guide Developed by: Carrie Geremia Kelli Cain Revised February 11, 2014 Tool and protocol developed by: James

More information

Henderson Ave. Complete Streets Project

Henderson Ave. Complete Streets Project Henderson Ave. Complete Streets Project Meeting Purpose To finalize conceptual components of project prior to proceeding with preliminary engineering www.dallascompletestreets.wordpress.com MeetingAgenda

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Why invest in the 1 Street S.W. Corridor?

Why invest in the 1 Street S.W. Corridor? Why invest in the 1 Street S.W. Corridor? This project is an investment in the Beltline Community and Calgary s economy. It is anticipated that The City s investment along this corridor will help with

More information

MARTIN LUTHER KING JR. WAY

MARTIN LUTHER KING JR. WAY OCTOBER 2011 40 Vision and Goals The Martin Luther King, Jr. Way Illustrative Master Plan that follows has been developed through a process of community involvement. It expresses a long term vision for

More information

Strategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018

Strategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018 Strategies for Maintaining & Renewing Innovative Street Projects Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018 1 OUR ASSETS $12B in Assets $20B Replacement Cost $372M Capital

More information

1.3 Pedestrian Environments

1.3 Pedestrian Environments SECTION 1: COMMERCIAL DEVELOPMENT 1.3 Pedestrian Environments Design Principle The quality of the pedestrian environment often defines the overall success of a commercial project. Attention to the development

More information

5. Automobile Circulation, Wayfinding and Signage

5. Automobile Circulation, Wayfinding and Signage 5. Automobile Circulation, Wayfinding and Signage Policy: The City Center should have a balanced, safe, and interconnected circulation system that provides expanded travel opportunities for transit, pedestrian,

More information

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have

More information

Clarkson Walkability Audit: Results and Recommendations Summary

Clarkson Walkability Audit: Results and Recommendations Summary Clarkson Walkability Audit: Results and Recommendations Summary The following document was prepared by the Region of Peel and includes a summary of comments made by participants during our breakout discussion

More information

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007 Community Meeting Tonight s Agenda 6:00 Introductions South Boston/Dot Ave Improvement Study Background 6:15 Consultant Introductions Review of Scope and Schedule Review of Proposed Corridor Wide Guidelines

More information

Knox Street Complete Streets Project

Knox Street Complete Streets Project Knox Street Complete Streets Project Meeting Purpose Get community feedback on two conceptual street design options Meeting Agenda Presentation (20 minutes) Project background and schedule Summary of preferences

More information

Elm Street Business District: Streetscape and Signage Plan

Elm Street Business District: Streetscape and Signage Plan Winnetka Preliminary Streetscape & Signage Village Council Presentation 1 Elm Street Business District: Streetscape and Signage Plan VILLAGE OF WINNETKA DOWNTOWN MASTER PLAN VILLAGE COUNCIL PRESENTATION

More information

Preliminary Design of Wayzata Boulevard Improvements(CSAH 112)

Preliminary Design of Wayzata Boulevard Improvements(CSAH 112) Project Area Map 6 COUNTY 112 COUNTY Preliminary Design of Wayzata Boulevard Improvements(CSAH 112) Public Open House Open House To Do List: Sign in Visit with Hennepin County staff and design team Learn

More information

SEVERN AVENUE CORRIDOR STUDY Bicycle, Pedestrian, & Landscape Improvements

SEVERN AVENUE CORRIDOR STUDY Bicycle, Pedestrian, & Landscape Improvements SEVERN AVENUE CORRIDOR STUDY Bicycle, Pedestrian, & Landscape Improvements August 2nd, 2013 ENGINEERS: MEYER ENGINEERS, LTD. CONSULTANT ARCHITECTS: PEREZ, APC TRAFFIC MODELING: ITS REGIONAL, LLC. VETERANS

More information

Chapter 3: Multi-Modal Circulation and Streetscapes

Chapter 3: Multi-Modal Circulation and Streetscapes CHAPTER 3: MULTI-MODAL CIRCULATION AND STREETSCAPES Chapter 3: Multi-Modal Circulation and Streetscapes Overview Streetscape improvements have already been completed for Depot Street between Main Avenue

More information

Design Guidelines. Overview. Design Vision for Yellow Brick Road

Design Guidelines. Overview. Design Vision for Yellow Brick Road Design Guidelines Overview This section presents the design vision for the Yellow Brick Road network. The Yellow Brick Road is envisioned to be an interconnected network of safe and secure roadways where

More information

Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers

Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers I. Purpose These standards will be applied to create a safe, comfortable, pleasant and pedestrian-friendly multi-modal

More information

4 GENERIC COST ESTIMATING TOOL

4 GENERIC COST ESTIMATING TOOL 4 GENERIC COST ESTIMATING TOOL Table 4-1 presents a generic cost estimating tools that can serve as a conceptual planning tool for local jurisdictions to estimate the costs of pedestrian improvements.

More information

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements INCORPORATE FEATURE PAVIN IN CROSSWALK AND INTERSECTION FIELDS Identifies high-priority pedestrian areas and create a station identity through colorful and interesting patterns ADD CURB EXTENSIONS Extending

More information

SURVEY minutes to complete this questionnaire. Your feedback will help the City determine a future design for Ocean Avenue and Geneva Avenue. Thanks!

SURVEY minutes to complete this questionnaire. Your feedback will help the City determine a future design for Ocean Avenue and Geneva Avenue. Thanks! OCEAN AVENUE CORRIDOR DESIGN ROJECT WORSHO #4 Thank you for your interest in the Ocean Avenue Corridor Design project. lease take a few SURVEY minutes to complete this questionnaire. Your feedback will

More information

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights

More information

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS 01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS Existing Bus Stop Existing US101 On-ramp Existing POC Old Redwood Highway Rich Street City ROW Environmental Study Limit Industrial Way NO DESIGNATED

More information

Blackfalds Downtown. Architectural Guidelines: Streetscape

Blackfalds Downtown. Architectural Guidelines: Streetscape Blackfalds Downtown Architectural Guidelines: Streetscape Streetscape INTRODUCTION A variety of street furniture has been chosen for locations within the Town of Blackfalds Downtown and highway commercial

More information

RZC Appendix 8A Marymoor Subarea Street Requirements

RZC Appendix 8A Marymoor Subarea Street Requirements RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS

More information

Schutte Park Master Plan February 14, 2017

Schutte Park Master Plan February 14, 2017 Schutte Park Master Plan February 14, 2017 Overview The Schutte Park Master Plan is a product of the City of Dover Recreation Needs Assessment. This primary planning document for all of the city parks

More information

Functional, Preliminary Design and Detailed Design

Functional, Preliminary Design and Detailed Design Functional, Preliminary Design and Detailed Design Main Street (Echo Drive to the Rideau River), Lees Avenue (Main Street to Chestnut Street), and Rideau River Drive (Main Street to 130m south of Main

More information

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 OVERALL LAND USE CONCEPT Overall Broadway Valdez District: 95.5 acres (35.1 acres right-of ways + 60.4 acres developable land) Plan Subareas:

More information

Omaha s Complete Streets Policy

Omaha s Complete Streets Policy Omaha s Complete Streets Policy (Adopted August 2015) VISION To create great places and enhance our quality of life, the City of Omaha will provide safe, accessible streets for all users. Complete Streets

More information

Chapter 6: Along the Street

Chapter 6: Along the Street Chapter 6: Along the Street This section describes the types of infrastructure that should be in place along school routes to make walking and bicycling to school safer. Sidewalks In communities with sidewalks,

More information

Observations and Ideas: Toomer s Corner Streetscape Improvements

Observations and Ideas: Toomer s Corner Streetscape Improvements Observations and Ideas: Toomer s Corner Streetscape Improvements AUBURN DOWNTOWN MASTER PLAN planning downtown s future August 26, 2013 Observations: Vertical Clutter at Corners 6 3 7 5 9 2 8 4 1 Excess

More information

CURBSIDE ACTIVITY DESIGN

CURBSIDE ACTIVITY DESIGN 5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented

More information

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT OVERVIEW This chapter describes a cohesive set of strategies to create a bicycle boulevard, namely to make streets safer and more efficient for bicycle

More information

MINUTES FROM THE EIGHTH MEETING OF THE MAIN STREET MARKHAM COMMITTEE IN City of Markham Canada Room - Civic Centre.

MINUTES FROM THE EIGHTH MEETING OF THE MAIN STREET MARKHAM COMMITTEE IN City of Markham Canada Room - Civic Centre. MINUTES FROM THE EIGHTH MEETING OF THE MAIN STREET MARKHAM COMMITTEE IN 2014 City of Markham Canada Room - Civic Centre Members Councillor Colin Campbell Graham Dewar Dianne More Ardy Reid Diane Kobelansky

More information

STREETSCAPE CONCEPTS

STREETSCAPE CONCEPTS STREETSCAPE S CARGO WAY CARGO WAY CYCLE TRACK Streetscape Concepts JENNINGS ST Illustrative Plan EVANS AVE PG&E BAY TRAIL HERON S HEAD PARK The recommended improvements build off the planned improvements

More information

Dowling/Beaty Cycling Route

Dowling/Beaty Cycling Route Public Meeting #2 Dowling/Beaty Cycling Route May 17, 2017 6:00 p.m. 8:00 p.m. Parkdale Public Library - Auditorium 1303 Queen Street West How to Participate Share your questions, ideas and concerns We

More information

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input WELCOME Purpose of the Open House The Town of Smiths Falls has initiated the Beckwith Street Redevelopment Plan that includes the preparation of a streetscape functional design for the renewal of Beckwith

More information

Ocean Park Boulevard Green Street Project Community Workshop

Ocean Park Boulevard Green Street Project Community Workshop Ocean Park Boulevard Green Street Project Community Workshop 2.2.10 Project Objectives Community Priority: reclaim OPB for public open space. Build upon LUCE principles; neighborhood enhancement, connectivity,

More information

Guthriesville Village Manual of Written & Graphic Design Guidelines

Guthriesville Village Manual of Written & Graphic Design Guidelines Exhibit B Revisions: May 23, June 21, July 20, September 20, & October 9, 2012 Updated: December 13, 2012; June 27, 2013; February 7, 2014 Outline of Contents: 1. Purpose and Applicability 2. Overall Form

More information

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm Southview Blvd & 3 rd Avenue Improvement Project Public Open House December 4, 2014 5 to 7pm Southview Blvd & 3 rd Avenue Public Information Meeting Agenda Presentation 5:30 to 6:15 pm Purpose of Project

More information

BROOKLAND Multi-Modal Transportation & Streetscape Study* NE Washington, DC

BROOKLAND Multi-Modal Transportation & Streetscape Study* NE Washington, DC BROOKLAND Multi-Modal Transportation & Streetscape Study* NE Washington, DC The study s goal is to create a multi-modal transportation and streetscape design plan to increase transportation efficiency,

More information

PART A: IDENTIFICATION/LOCATION

PART A: IDENTIFICATION/LOCATION Appendix A. Quick Bus Stop Checklist QUICK BUS STOP CHECKLIST A1 Street Name: PART A: IDENTIFICATION/LOCATION A2 Nearest Cross Street (street name or landmark if mid-block): A3 A4 A5 Bus Route Direction:

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

A Guide to Great Streets: The Basics. September 25, 2009

A Guide to Great Streets: The Basics. September 25, 2009 A Guide to Great Streets: The Basics September 25, 2009 Streets are more than connectors, they are the city 2 Streets are the glue that hold a city together 3 Streets are the means in which a city is perceived

More information

City of Richmond Bicycle Master Plan

City of Richmond Bicycle Master Plan City of Richmond Bicycle Master Plan October 2011 Prepared by Fehr & Peers In association with Eisen Letunic City of Richmond Bicycle Master Plan October 2011 Prepared by Fehr & Peers In association with

More information

GENERAL. 1. Description

GENERAL. 1. Description GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Bus Stops in the design and construction of elements for Arlington County Horizontal Design Standards. This

More information

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS FEBRUARY 2019 EXECUTIVE SUMMARY Starting in 2019, Alberta Avenue will see the replacement and enhancement of its aging collector and local

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

Victoria Park Master Plan

Victoria Park Master Plan Victoria Park Master Plan Phase I Presented By: ARCHITECTURAL ALLIANCE & HUGHES HUGHES INC. History of Victoria Park Phase I Purpose Inventory of Existing Conditions Identification of Options by Type (for

More information

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes Date of Meeting: June 10, 2010 Location: Ballston Metrorail Station and NRECA Building 4301 Wilson Blvd, Arlington, VA Subject: Ballston Station Multimodal Study Stakeholder Meeting #1 Summary: This first

More information

Long Island Rail Road Expansion Project Floral Park to Hicksville

Long Island Rail Road Expansion Project Floral Park to Hicksville Long Island Rail Road Expansion Project Floral Park to Hicksville Final Environmental Impact Statement Appendix 1-D Complete Streets Policy Checklist April 2017 0902ML PIN: Project Location: 18A-4 Floral

More information

STREETSCAPE / URBAN DESIGN ELEMENTS

STREETSCAPE / URBAN DESIGN ELEMENTS CITY OF CHEYENNE STREETSCAPE / URBAN DESIGN ELEMENTS DEFINITIONS TABLE OF CONTENTS Introduction How To Use This Guide...1 Design Elements Sidewalks...2 Street Corners and Curb Extension...4 Trees and Landscape

More information

DISTRICT BICYCLE PROGRAM

DISTRICT BICYCLE PROGRAM DISTRICT BICYCLE PROGRAM TxDOT Fort Worth District Public Hearing Bicycle Use on the State Highway System Public Hearing Agenda 1 2 3 4 5 6 Introduction Susan Howard TxDOT Public Involvement Specialist

More information

4.0 STREETSCAPE ELEMENTS

4.0 STREETSCAPE ELEMENTS .0 Table 3 lists streetscape elements and their maintenance requirements. The figures that follow the table illustrate the streetscape elements. With respect to maintenance, if an element is required as

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability About the study Key goals of this study are to: North Milwaukee Avenue is a local and regional street for multiple modes of transportation. It is officially zoned and functions as a pedestrian street southeast

More information

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs City Council Study Session January 27, 2009 Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs Scope of Work Purpose of Tonight s Meeting Review work to date and direct staff

More information

BLOOMFIELD GATEWAY AND STREETSCAPE IMPROVEMENT PLAN

BLOOMFIELD GATEWAY AND STREETSCAPE IMPROVEMENT PLAN BLOOMFIELD GATEWAY AND STREETSCAPE IMPROVEMENT PLAN December 22, 2009 PREPARED BY: with Wilbur Smith Associates, Transporation Planners PREPARED FOR: Bloomfield Development Corporation PROJECT FUNDING

More information

Lower Jarvis Street Pedestrian Promenade Plan, Front Street East to Queens Quay East

Lower Jarvis Street Pedestrian Promenade Plan, Front Street East to Queens Quay East STAFF REPORT ACTION REQUIRED Lower Jarvis Street Pedestrian Promenade Plan, Front Street East to Queens Quay East Date: March 6, 2009 To: From: Wards: Reference Number: Toronto and East York Community

More information

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015 Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015 Agenda Welcome and introductions Project overview, history and goals Concept

More information

Pavement Rehabilitation & Buffered Bike Lane

Pavement Rehabilitation & Buffered Bike Lane Pembina Highway from Grant Avenue to Osborne Street Pavement Rehabilitation & Buffered Bike Lane Welcome April 21, 2016 Please complete and submit a comment sheet prior to leaving or complete it online

More information

City of Darlington Beautification Report

City of Darlington Beautification Report City of Darlington Beautification Report Approved by the City of Darlington Beautification Board February 2016 The New Downtown Darlington has seen many changes during the past decade with the rehabilitation

More information

2.0 Existing Conditions

2.0 Existing Conditions 20 2.0 Existing Conditions 2.1 Land Use, Future Growth Patterns, Physical Barriers Geographic Overview Sutter County s land use pattern is characterized by extensive agricultural areas, significant natural

More information

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING 4. IMPLEMENTATION PHASES & FUNDING HOOPA DESIGN FAIR 4-1 4. IMPLEMENTATION PHASES & FUNDING Phase One Development 1. Implementation The Conceptual Plan recommends five concept elements to revitalize downtown

More information

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison 20 minute presentation on proposed project Comments and Questions following presentation 2016 2017 Replace concrete pavement & base Replace curb and sidewalk as needed Proposed contra-flow bike lane Replace

More information

PROJECT SUMMARY ALBERTA STREETSCAPE PROJECT

PROJECT SUMMARY ALBERTA STREETSCAPE PROJECT ALBERTA STREETSCAPE PROJECT Revitalizing a Street Rebuilding a Community Realizing a Dream PROJECT SUMMARY December 2001 Project Background In 1998 and 1999, the Alberta Street community was engaged in

More information

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Planning Commission March 4, 2009 Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Purpose of Tonight s Meeting Review concept plans and options Provide input on alternatives and trade-offs

More information

State Street Workshop Summary September 26, 2012 SITE A. - INTERSECTION OF STATE AND HOLLY TOTAL ATTENDEES = ~29

State Street Workshop Summary September 26, 2012 SITE A. - INTERSECTION OF STATE AND HOLLY TOTAL ATTENDEES = ~29 State Street Workshop Summary September 26, 2012 TOTAL ATTENDEES = ~29 SITE A. - INTERSECTION OF STATE AND HOLLY What do you like best about this place? YMCA building / facade Crosswalk design Landscaping

More information

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9. Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9 Prepared By: URS Canada Inc. 4 th Floor, 30 Leek Crescent Richmond Hill, Ontario L4B

More information

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary Ocean Avenue Corridor Design Project Public Workshop #2 Summary The second public workshop for the Ocean Avenue Corridor Design Project was held on Wednesday, May 14, 2014 from, 6 to 8 pm at Lick Wilmerding

More information

Richmond-Adelaide Cycle Tracks

Richmond-Adelaide Cycle Tracks Public Drop-In Event Richmond-Adelaide Cycle Tracks June 25, 2018 12:00 p.m. 3:00 p.m. 4:30 p.m. 7:30 p.m. Metro Hall, Rotunda 55 John Street 1 Purpose of Event In Scope Communicate an update about the

More information

Healthy Built Environments Cowlitz-Wahkiakum County, Washington

Healthy Built Environments Cowlitz-Wahkiakum County, Washington Healthy Built Environments Cowlitz-Wahkiakum County, Washington Bringing Back Active Transportation and Health Presented By Dan Burden, Blue Zones, LLC Livability/Health and the role of Place, Walkability

More information

Site 1180_042 Kekaulike Mall. Bikeshare Hawaii. Location: ewa side of Kekaulike Mall makai of Hotel Street. Power Source: solar

Site 1180_042 Kekaulike Mall. Bikeshare Hawaii. Location: ewa side of Kekaulike Mall makai of Hotel Street. Power Source: solar Station located on the ewa side of Kekaulike Mall makai of Hotel Street 24 18 wide clear space remains for pedestrians and maintenance/emergency vehicles 40 Location: ewa side of Kekaulike Mall makai of

More information

MEMORANDUM Ashford Dunwoody Road: Request to waive right of way dedication requirements of Sec

MEMORANDUM Ashford Dunwoody Road: Request to waive right of way dedication requirements of Sec MEMORANDUM To: From: Mayor and City Council Michael Smith, Public Works Director Date: October 13, 2014 Subject 4400 Ashford Dunwoody Road: Request to waive right of way dedication requirements of Sec.

More information

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements Harbor Mixed Use CHAPTER Transit Corridor 4: Mobility Plan 4 MOBILITY PLAN Mobility Plan Objectives The Harbor Corridor Plan seeks to expand and improve the ways that people move along and through the

More information

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix DESCRIPTION OF WORK NEW CONSTR. ALTERATION MAINT. COMMENTS STREET PAVING New street paving or overlay through an intersection (Figures 1 &

More information

Sidewalk Accessibility Checklist

Sidewalk Accessibility Checklist Starting Address: Ending Address: Date: Sidewalk Accessibility Checklist Please indicate your experience with any barriers you encountered when using the sidewalks in your neighborhood. 1. Did you have

More information

PARK(ING) DAY 2018 GUIDELINES

PARK(ING) DAY 2018 GUIDELINES PARK(ING) DAY 2018 GUIDELINES PARK(ING) Day happens once a year, on the third Friday in September. This year the event takes place on Friday September 21. It is an opportunity for people to temporarily

More information

Construction Newsletter No. 32 October 14, 2016 On-Going

Construction Newsletter No. 32 October 14, 2016 On-Going Construction Newsletter No. 32 October 14, 2016 On-Going Here s a block-by-block breakdown of the work currently underway: Harvey Street to Clegg Street: Placement of green thermoplastic for the cycle

More information

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3. Masonic Ave Street Design Study Community Workshop 3 September 30, 2010

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3. Masonic Ave Street Design Study Community Workshop 3 September 30, 2010 Masonic Ave Street Design Study Community Workshop 3 September 30, 2010 Introduction MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3 SF Municipal Transportation Agency Javad Mirabdal, Project Manager

More information