1 City of Fairfax, Virginia City Council Work Session Agenda Item # 4c City Council Meeting 6/2/2015 TO: FROM: SUBJECT: Honorable Mayor and Members of City Council Robert Sisson, City Manager Discussion of I-66 Corridor Improvements Outside the Beltway ISSUE(S): SUMMARY: Review Draft Comment letter to VDOT about the I-66 project. The Virginia Department of Transportation (VDOT) in coordination with the Department of Rail and Public Transportation (DRPT) is working to improve multimodal mobility along the I-66 corridor. The proposed concept includes widening I-66 outside the Beltway to a total of five lanes in each direction: two Express Lanes (variable toll or free for HOV-3) and three general purpose lanes. A representative from the I-66 Project Team will be at the work session for this discussion. The typical sections that VDOT and DRPT have advanced (Alternatives 2A and 2B) include a flexible barrier (bollards) between the Express Lanes and the general purpose lanes (versus a concrete barrier). Alternative 2A provides a median reserved for future center transit and alternative 2B does not. These typical sections will require widening the pavement on I-66. VDOT has been able to modify the design to eliminate the need for right of way from any Mosby Woods properties. At this point, the City s primary concerns relate to the lack of a bicycle/pedestrian connection on Route 123, the proposed location of the Express Lanes access point at the Route 123 interchange, and construction-period traffic impacts. The attached comment letter summarizes the City s drafts comments on the project. These comments can be modified prior to adoption at the June 9 th Council meeting. FISCAL IMPACT: RECOMMENDATION: ALTERNATIVE COURSE OF ACTION: RESPONSIBLE STAFF/ POC: COORDINATION: ATTACHMENTS: None Review and discuss draft comments to VDOT Do not review and discuss the draft comments. Wendy Block Sanford, Transportation Director Public Works Draft Comments on I-66 Project
2 10455 Armstrong Street Fairfax, Virginia June 9, 2015 The Honorable Aubrey L. Layne, Jr. Secretary of Transportation Patrick Henry Building 1111 East Broad Street, Third Floor Richmond, Virginia Reference: City of Fairfax Comments on I-66 Tier 2 Corridor Improvement Project Dear Secretary Layne: On behalf of the City of Fairfax City Council, I am transmitting comments on the Tier 2 I-66 Draft Environmental Assessment. The City supports the Commonwealth s efforts to address multimodal mobility in the I-66 corridor. The City also appreciates the extensive public outreach that has been provided. This project will have a significant impact on the City, both during and after construction, and as a result, The City of Fairfax offers the following comments for your consideration. Right of Way 1. The City appreciates the design modifications that have been made to reduce the right of way impacts to properties in the Mosby Woods neighborhood. There are other properties in the City that will experience right of way impacts (in the Jermantown Road area) and the City encourages additional efforts to minimize the expansion footprint as much as possible. Bicycle/Pedestrian Facilities 2. The City strongly recommends that the Virginia Department of Transportation (VDOT) include bicycle and pedestrian facilities on or parallel to Route 123 (Chain Bridge Road) to connect the City of Fairfax to the shared use path proposed on the north side of I-66. The proposed shared use path at the Route 123 interchange dead-ends north of the interchange (after the first bridge) and does not connect with the network. The shared use path should be extended either on Route 123 or adjacent to it. A number of City residents as well as bicycle advocates have commented on this issue and have suggested options for this connection. Express Lanes 3. VDOT is considering locating access points to the Express Lanes at either the Route 50 or the Route 123 interchange. Add in City recommendation. Construction Impacts
3 The Honorable Aubrey L. Layne, Jr. June 9, 2015 Page 2 4. VDOT has begun development of the Traffic Management Plan (TMP), which will be used during project implementation. The City urges VDOT to ensure that traffic, noise, and storm water impacts are carefully considered as part of the TMP. 5. The City will experience a significant increase in traffic along Fairfax Boulevard/Route 50 and other roads in the City during construction of the project. VDOT should develop an aggressive traffic management plan that will mitigate these impacts in the City. The TMP should utilize alternative corridors such as Braddock Road, Fairfax County Parkway and the Dulles Access Road instead of relying primarily on Routes 29, 50, 123 and The project will likely cause an increase in neighborhood cut-through traffic. As Delegate Bulova mentioned in his May 12th letter to you on this topic, VDOT should develop proactive plans with neighborhoods about what steps will be taken if traffic volume or speeds reach certain levels. 7. The City plans to start construction on the Chain Bridge Road Widening/Improvements from Route 29/50 to Eaton Place (Northfax) project in Spring Construction will last for approximately two years, which will result in an overlap with the I-66 project. Coordination between the City and VDOT on the timing of projects and detours is critical. During construction of the Northfax project, portions of Route 123 and Route 50 will be temporarily closed and vehicles will be detoured to Eaton Place. Future Transit Service on I The City supports the implementation of Typical Section 2A, which will provide a wider center median section to accommodate a future Metrorail extension. While the City understands and agrees that the current priorities for the Washington Metropolitan Area Transit Authority (WMATA) should be to improve existing operations (including purchase of eight car trains) and the completion of the Silver Line, the City supports the reservation of this area now so that a future extension of Metrorail along this corridor will not be cost prohibitive in the future. Thank you for your time and consideration. If you have any questions or need additional information, please feel free to contact Wendy Block Sanford, the City s Transportation Director, at (703) or wendy.sanford@fairfaxva.gov. Sincerely, Scott Silverthorne Mayor DRAFT Cc: City of Fairfax City Council Members Bob Sisson, City Manager David Summers, Public Works Director Wendy Block Sanford, Transportation Director Helen Cuervo, District Administrator, VDOT, Northern Virginia Renee Hamilton, Deputy District Administrator, VDOT, Northern Virginia Susan Shaw, Megaprojects Director, VDOT Young Ho Chang, Project Manager
4 City of Fairfax City Council Work Session Briefing June 2, 2015 Susan Shaw, P.E., VDOT, Megaprojects Director Rob Prunty, P.E., I-66 Project Team Lead Traffic Engineer
5 Why Improve I-66? Improve safety Move more people Connect regional transit/hov/express lanes network Expand mode choices and transit options Reduce hours of congestion per day Reduce cut-through traffic on local roads Better accommodate future travel demand 2
6 Purpose and Need Address existing and future transportation problems Improve multimodal mobility along the I-66 corridor by providing diverse travel choices in a cost-effective manner Enhance transportation safety and travel reliability 3
7 Project Scope Elements Two Express Lanes (convert existing HOV lane & add one lane) HOV-3 and buses travel free Non-HOV tolled Congestion-based tolls (similar to other Express Lanes in region) Converting HOV-2 to HOV-3 by 2020, consistent with the region s Constrained Long Range Plan Three regular lanes Open to all traffic No tolls Ramp-to-ramp connections (auxiliary lanes) Rapid bus service and other multimodal improvements High frequency of service during peak hours and new service available beyond peak hours Travel in express lanes for predictable travel times Park-and-Ride lots, Transportation Demand Management 4
8 Typical Section Alternatives 290 Alt. 1 Concrete Barrier with Full Shoulders and Median for Future Center Transit (with auxiliary lanes, if needed) 246 Alt. 2A Flexible Barrier with Buffer and Median for Future Center Transit (with auxiliary lanes, if needed) 206 Alt. 2B Flexible Barrier with Buffer and No Median (with auxiliary lanes, if needed) 5
9 I-66 Express Lanes Access Alternatives 6
10 Comparison of I-66 Express Access Alternatives Serving City of Fairfax Alternative 2A US 50 Direct connection between points northwest of interchange and I-66 east of US 50 Route 123 No direct access Vaden Drive direct access to and from the west on I-66 Express lanes only buses & vehicles East of Nutley Street No direct access Alternative 2B US 50 No direct access Route 123 Direct connection to and from the east on I-66 Vaden Drive direct access to and from west on I-66 Express lanes only buses only East of Nutley Street Flyover from EB general lanes to Express lanes 7
11 Direct Access for Alt. 2A Stringfellow To/from I-66 East US 50 West To/from I-66 East Monument To/from I-66 East & West Vaden To/from I-66 West 8
12 Direct Access for Alt. 2B Stringfellow To/from I-66 East Monument To/from I-66 East & West Rte 123 To/from I-66 East Vaden BUS ONLY 9
13 Preliminary Concepts Chain Bridge (Route 123) Interchange Area Alternative 2B NORTH
14 Preliminary Concepts Chain Bridge (Route 123) Interchange Area Alternative 2B NORTH From I-66 WB Express Lanes To I-66 EB Express Lanes
15 Pedestrian / Bicycle Concept 12
16 Visit Transform66.org 13
DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director
DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, 2015 Susan Shaw, P.E., VDOT, Megaprojects Director I-66 Corridor Conditions Steady population growth Employment growth in activity centers Congestion
More informationI-66 Corridor Improvements Route 15 to I-495. November 2014
I-66 Corridor Improvements Route 15 to I-495 November 2014 I-66 Corridor: Haymarket to the Beltway = Park and Ride Lots 2 Purpose and Need Improve multimodal mobility along the I-66 corridor by providing
More informationInstitute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017
Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia
More informationWashington DC Section of ITE Project Briefing
Washington DC Section of ITE Project Briefing November 5, 2015 Renée Hamilton, VDOT, Deputy District Administrator I-66 Outside the Beltway Improvement Area Project Location Virginia 2 Purpose and Need
More informationDulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation
Dulles Area Transportation Association October 11, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Transform 66: Outside the Beltway 2 Project Overview Multimodal improvements
More informationTransform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies
Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies Susan Shaw, PE, CCM, DBIA Megaprojects Director Northern Virginia
More informationEXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative
EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of
More informationTransform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018
Transform I-66 Chief Engineer Garrett W. Moore, P.E. July 12, 2018 Transform 66: Program Goals Improve multimodal mobility by providing diverse travel choices in a cost-effective manner Enhance transportation
More informationInterstate 66 Tier 1 Environmental Impact Statement (EIS)
WELCOME Welcome to the second Citizen Information Meeting for the Tier 1 Environmental Impact Statement (EIS). As an integral part in the environmental study process, the study team is seeking your comments
More informationI-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016
I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016 Susan Shaw, PE, Megaprojects Director, Virginia Department of Transportation Amanda Baxter, Special Projects
More informationInterstate 66 Tier 1 Environmental Impact Statement. Cooperating and Participating Agencies Meeting March 19, 2012
Interstate 66 Tier 1 Environmental Impact Statement Cooperating and Participating Agencies Meeting March 19, 2012 Chris Collins Virginia Department of Transportation, Environmental Division Meeting Agenda
More informationI-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016
I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016 Mike Snare, PE, Project Manager Virginia Department of Transportation GEC Michelle Holland, Megaprojects
More informationI-395 Express Lanes Northern Extension Project Public Hearings
I-395 Express Lanes Northern Extension Project Public Hearings Susan Shaw, PE, Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Manager Virginia Department of
More informationCity of Fairfax, Virginia City Council Work Session
City of Fairfax, Virginia City Council Work Session Agenda Item # City Council Meeting 12a 9/8/2015 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: FISCAL IMPACT: RECOMMENDATION: ALTERNATIVE COURSE OF ACTION: RESPONSIBLE
More informationPUBLIC COMMENT SUMMARY REPORT Public Information Meetings
PUBLIC COMMENT SUMMARY REPORT 2015 Public Information Meetings I-66 Outside the Beltway Project Between U.S. Route 15 in Haymarket and I-495/Capital Beltway in Fairfax County State Project: 0066-96A-297,P101
More informationI-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016
I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016 Susan Shaw, PE, Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Manager
More informationFairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation
Fairfax Alliance for Better Bicycling February 28, 2019 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Nancy Smith, Public Relations Manager FAM Construction Chris Wells,
More informationMeeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10
Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10 Long-Term Study Presentation 8:10-8:40 Table Discussions 8:40-9:00
More informationVDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations
VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment Staff Recommendations Department of Environmental Services Transportation January 28, 2017 Timeline of Transform66 June 2012: I-66
More informationCity of Fairfax, Virginia City Council Work Session
City of Fairfax, Virginia City Council Work Session Agenda Item # 4b City Council Meeting 6/2/2015 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: FISCAL IMPACT: RECOMMENDATION: ALTERNATIVE COURSE OF ACTION: RESPONSIBLE
More informationTRANSIT PERFORMANCE IN THE I-66 INSIDE THE BELTWAY CORRIDOR
TRANSIT PERFORMANCE IN THE I-66 INSIDE THE BELTWAY CORRIDOR June 2018 This report summarizes the performance of public transportation systems serving the I-66 inside the Beltway corridor in Northern Virginia.
More informationGRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015
GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015 Welcome! Meeting Agenda Project update presentation Up to 15 minutes for Pulse Q&A about project design. (Please reserve
More informationPublic Information Meeting
Richmond Highway (U.S. Route 1) Corridor Improvements Public Information Meeting Tuesday, April 18, 2017 Mount Vernon High School 8515 Old Mt. Vernon Road, Alexandria, VA 22309 Amanda Baxter, VDOT, Special
More informationCapital Beltway HOT Lanes Project
Some things can t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead Some things can t wait for traffic Overview Two new lanes in each direction Carpool/HOV-3 lanes on the Beltway
More informationI-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT MEPA CONSULTATION MEETING NOVEMBER 20, 2014 BRIGHTON HIGH SCHOOL
I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT MEPA CONSULTATION MEETING NOVEMBER 20, 2014 BRIGHTON HIGH SCHOOL Today s Agenda 1. 2. 3. 4. 5. Overview of the MEPA Process Project Overview
More informationBRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update
BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update January 23, 2015 Travel Forecasting Subcommittee What is the CLRP? Federally
More informationNOVEMBER 2017 DESIGN PUBLIC HEARINGS COMMENT SUMMARY (November 13, 14, and 16, 2017)
NOVEMBER 2017 DESIGN PUBLIC HEARINGS COMMENT SUMMARY (November 13, 14, and 16, 2017) I-66 Outside the Beltway Project Between U.S. Route 29 in Gainesville and I-495/Capital Beltway in Fairfax County State
More informationNORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 20, 2012 Garrett Moore VDOT District Administrator, Northern Virginia Paving Program 2012 This season's paving program will
More informationRoute 29 Solutions Projects
Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four
More informationCorridor Advisory Group and Task Force Meeting #10. July 27, 2011
Corridor Advisory Group and Task Force Meeting #10 July 27, 2011 1 Agenda Recap CAG/TF #9 Public Meeting #2 Summary Single Mode Alternatives Evaluation Results Next Steps 2 3 CAG/TF #9 Recap CAG /TF #9
More informationCity of Fairfax, Virginia City Council Work Session
City of Fairfax, Virginia City Council Work Session Agenda Item # WS 4 City Council Meeting 10/03/2017 TO: FROM: SUBJECT: ISSUE(S): Honorable Mayor and Members of City Council Robert Sisson, City Manager
More informationFY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3,
FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3, 2018 www.novatransit.o rg 703-524-3322 Presentation Overview I-66 Commuter Choice Program Overview
More informationITEM 15 Notice March 29, 2017
ITEM 15 Notice March 29, 2017 Notice of Proposed Amendment to the 2016 Constrained Long Range Plan (CLRP), As Requested by the Virginia Department of Transportation (VDOT) and the Maryland Department of
More information495 EXPRESS LANES NORTHERN EXTENSION STUDY COMMENT SUMMARY REPORT JUNE 11, 2018 PUBLIC INFORMATION MEETING
495 EXPRESS LANES NORTHERN EXTENSION STUDY COMMENT SUMMARY REPORT JUNE 11, 2018 PUBLIC INFORMATION MEETING Federal: NHPP-0495(095), State: 0495-029-419, UPC: 113414 The Virginia Department of Transportation
More informationMCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017
MCA Member Meeting: Tysons Update Fairfax County Department of Transportation November 13, 2017 Presentation Overview Balancing Land Use and Transportation How Are We Doing? Studies and Projects Neighborhood
More informationCounty of Fairfax, Virginia. Department of Transportation
Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway
More informationLos Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation
Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto
More informationPublic Information and Participation Comments
Two public meetings were held in December. The first meeting was December 6, 2011 at Mary Ellen Henderson Middle School and had 36 public attendees. The second meeting was on December 14, 2011 at the Arlington
More informationState Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway
State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,
More informationPreliminary Transportation Analysis
Preliminary Transportation Analysis Goals of a Robust, Multimodal Transportation Network Safe Accessible/Connected Efficient Comfortable Context-Sensitive Motor Vehicle: Continue to analyze the data to
More informationLee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses
Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007
More informationRio Mills Rd/Berkmar Dr Extended Connection
SMART SCALE Application Rio Mills Rd/Berkmar Dr Extended Connection Status: Scored ID: F2-0000001408-R02 General Point of Contact Information Point of Contact Name Kevin McDermott Point of Contact Phone
More informationManaging Dulles Rail Construction in Tysons Corner
Managing Dulles Rail Construction in Tysons Corner National Association of Industrial and Office Properties Northern Virginia Chapter Richard Stevens Fairfax County Department of Transportation September
More informationCommuter Connections Regional TDM Marketing Group Meeting
Item #6 Commuter Connections Regional TDM Marketing Group Meeting September 19, 2017 Michelle T. Holland, Megaprojects Communications Manager Virginia Department of Transportation Program Area Map 2 Program
More informationCapital Beltway HOT Lanes - Frequently Asked Questions
Capital Beltway HOT Lanes - Frequently Asked Questions December 20, 2007 1. What is the cost of the project? The fixed-price design-build cost is approximately $1.4 billion. 2. Why have the project costs
More informationINTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016
INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION Alternatives Analysis Technical Report City of Alexandria,
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationColumbia Pike Implementation Team (CPIT) Meeting
Columbia Pike Implementation Team (CPIT) Meeting November 30, 2010 Agenda Introductions / Purpose of Meeting Review of project goals Multimodal project: 10% street design between the curbs Discussion Multimodal
More informationTunnel Reconstruction Brooklyn CB 1 August 14, 2018
Tunnel Reconstruction Brooklyn CB 1 August 14, 2018 Reconstructing the Tunnel 2 Service During Tunnel Reconstruction April 2019 through July 2020 3 Projected Cross River Travel Paths of Customers The Service
More informationSan Jose Transportation Policy
San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland
More informationMnPASS System Today and the Future
MnPASS System Today and the Future April 2010 By Nick Thompson Minnesota Department of Transportation Topics Minnesota s Current and Future MnPASS High Occupancy Toll Systems Overview of the MnPASS System
More informationTopics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps
Topics To Be Covered Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps Tier 2 Council Direction Dismiss Bus Rapid Transit along the Union Pacific Railroad Dismiss Bus Rapid
More informationRegional Transportation Needs Within Southeastern Wisconsin
Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency
More informationRTA 2013 Leadership Briefing and Tour Report
RTA 2013 Leadership Briefing and Tour Report Suburban MD, Northern VA, Baltimore, Washington, DC Mike Fendrick, PE, Parsons Brinckerhoff Bill Jenkins, PE, AECOM Mike Surasky, PE, A. Morton Thomas & Associates,
More informationMcLEAN CITIZENS ASSOCIATION
McLEAN CITIZENS ASSOCIATION RESOLUTION DULLES RAIL SUPPLEMENTAL EIS With ATTACHMENT A - PEDESTRIAN AND BICYCLE ACCESS ISSUES DULLES CORRIDOR RAIL STATIONS IN TYSONS CORNER (Charts - 7 pages) Approved by
More informationUS 1 Express Lanes Public Kick-Off Meeting
US 1 Express Lanes Project Development & Environment (PD&E) Study Public Kick-Off Meeting September 7 & 8, 2011 Miami Dade County, Florida 1 Presentation Agenda Introduction to MDX Background to PD&E studies
More informationNorth Coast Corridor:
North Coast Corridor: Connecting People, Transportation & Environment Legislative Hearing: 11.8.10 1 North Coast Corridor Region s Lifeline A Regional Strategy Mobility, Economy & Environment North Coast
More informationAlternatives Development Technical Report
TRANSFORM 66 I-66 CORRIDOR IMPROVEMENTS PROJECT OUTSIDE the Beltway 66 Multimodal Solutions - 495 to Haymarket Tier 2 Final Environmental Assessment Alternatives Development Technical Report 193 Town of
More informationAPPENDIX D. May 22, 2002 Open House Summary and Materials
APPENDIX D May 22, 2002 Open House Summary and Materials TH 36 Partnership Study Open House May 22, 2002 Summary of Survey Responses 1. If no new crossing of the St. Croix River is built (e.g. the existing
More informationVehicular and Pedestrian Access to Herndon Metrorail Station. Robert B. Boxer, Director John Stuart, Clark Nexen October 28, 2015
Vehicular and Pedestrian Access to Herndon Metrorail Station Robert B. Boxer, Director John Stuart, Clark Nexen Project Location The project is located in the Town of Herndon along Herndon Parkway between
More informationTransportation Master Plan Advisory Task Force
Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved
More informationARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY
ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,
More informationPROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia
PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PRELIMINARY ENGINEERING REPORT Prepared for: Prepared by: July 2017 Table of Contents 1
More informationMeasuring the Distribution and Costs of Congestion. Tim Lomax Texas Transportation Institute
Measuring the Distribution and Costs of Congestion Tim Lomax Texas Transportation Institute http://mobility.tamu.edu The Congestion Measurement Story Travel time, variations, compare to goals WHAT? WHY?
More informationSketch Level Assessment. of Traffic Issues. for the Fluor Daniel I-495 HOT Lane Proposal. Ronald F. Kirby
Sketch Level Assessment of Traffic Issues for the Fluor Daniel I-495 HOT Lane Proposal Ronald F. Kirby Director of Transportation Planning National Capital Region Transportation Planning Board (TPB) Metropolitan
More informationNovember 14, Dulles To DC Loop Public-Private Partnership Proposal. Executive Summary
November 14, 2005 Dulles To DC Loop Public-Private Partnership Proposal Executive Summary Virginia Mobility Associates LLC, a newly established single purpose entity, proposes to privately finance the
More informationAgenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More informationBaseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive
Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive Planning and Environmental Assessment Study Consultation Group Meetings May 2014 Presentation Agenda Study Overview Study Progress
More informationProject Description Form 6V
Project Description Form 6V Basic Project Information Submitting Jurisdiction/Agency: Prince William County Project Title: Route 15 Widening: Route 55 to south of RR tracks & Construct RR Overpass Project
More informationRapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion
RapidRide Roosevelt Seattle Bicycle Advisory Board 1 Our mission, vision, and core values Mission: deliver a high-quality transportation system for Seattle Vision: connected people, places, and products
More information4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study
More informationOutreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary
Executive Summary Executive Summary The Columbus Avenue Neighborhood Transportation Study s objective is to identify changes to transportation infrastructure and policies that could enhance the livability
More informationAppendix F: Detailed Modeling Results
Appendix F: Detailed Modeling Results TransAction Technical Report (This page intentionally left blank) METHODOLOGY FOR CALCULATION OF PERFORMANCE MEASURES F-3 (This page intentionally left blank) Approved
More informationArterial Management Plan for US Route 250 and State Route 623
Arterial Management Plan for US Route 250 and State Route 623 June 25, 2014 Brad Shelton, AICP Access Management and Traffic Impact Analysis Programs Manager Transportation and Mobility Planning Division
More informationOverview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?
Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy
More informationDraft MOBILITY ELEMENET. Community Meeting May 22, 2013
Draft MOBILITY ELEMENET Community Meeting May 22, 2013 Agenda Presentation Ira Brown New Mobility Paradigm Movement of People Implementation Q&A Ira Brown and Dave Roseman Small Group Discussion at Each
More informationPublic Opinion about Transportation Issues in Northern Virginia
Public Opinion about Transportation Issues in Northern Virginia Research and Strategy Presented to: The Northern Virginia Transportation Authority July 28, 2005 Research Objectives 1. Travel Patterns*
More informationItem No. 14 Town of Atherton
Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More informationWelcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study
Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question
More informationDurham Region Long Term Transit Strategy
Durham Region Long Term Transit Strategy An adaptive, safe, reliable, frequent, accessible and desirable transit system that shapes and connects Durham Region and beyond in an economically and environmentally
More informationProject Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationInterstate 66 TRANSPORTATION TECHNICAL REPORT. From US Route 15 in Prince William County To Interstate 495 in Fairfax County FEBRUARY 2013
FEBRUARY 2013 TRANSPORTATION TECHNICAL REPORT Interstate 66 From US Route 15 in Prince William County To Interstate 495 in Fairfax County Virginia Department of Rail and Public Transportation Transportation
More informationSan Tomas Expressway
Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San
More informationProject Description Form 8EE
Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:
More informationIn station areas, new pedestrian links can increase network connectivity and provide direct access to stations.
The Last Mile Planning for Pedestrians Planning around stations will put pedestrians first. Making walking to stations safe and easy is important; walking will be a part of every rapid transit Accessible
More informationGEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts
GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis Special Intersections: Preliminary Concepts April 2, 2009 FILLMORE: Existing Conditions 3 lanes in underpass, 2 lanes in service road (each direction)
More informationWhat if YOU could help plan Northern Virginia s transportation future?
What if YOU could help plan Northern Virginia s transportation future? Photo credits: Washington Metropolitan Area Transit Authority And improve the quality of life in your community -- for yourself, your
More informationPERFORMANCE ANALYSIS of The Draft 2015 CLRP
Item 9 PERFORMANCE ANALYSIS of The Draft CLRP Presentation to the Transportation Planning Board September 16, CLRP Performance Analysis 1 What is the Long-Range Transportation Plan (CLRP)? The CLRP identifies
More informationPresentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN
Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN Public Outreach Fall 2011: Two community meetings/open houses Fall 2012: Three community meetings/open houses
More informationDr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018
Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.
More informationAppendix B: Forecasting and Traffic Operations Analysis Framework Document
Existing Conditions Report - Appendix Appendix B: Forecasting and Traffic Operations Analysis Framework Document This document defines the methodology and assumptions that will be used in the traffic forecasting
More informationSouthwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.
Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW
More informationSouth King County High-Capacity Transit Corridor Study
HIGH-CAPACITY TRANSIT CORRIDOR STUDY South King County Corridor South King County High-Capacity Transit Corridor Study Corridor Report August 2014 South King County High Capacity Transit Corridor Report
More information4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL
4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL The Transportation Services Committee recommends the adoption of
More informationBicycle Master Plan Goals, Strategies, and Policies
Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of
More informationVIRGINIA RAILWAY EXPRESS
PREPARING FOR THE NEXT QUARTER-CENTURY Arlington County Board Work Session June 28, 2017 1 TODAY S PRESENTATION VRE Overview VRE in Arlington County VRE System 2040 Plan Future Vision for Crystal City
More informationRoute 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council
Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: 0007-253-109 UPC 106573 Presentation to Town Council June 26, 2017 Council Decisions East Market Street / Battlefield
More informationCITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle
SDOT SR0 Design Refinements RES August, 0 Version #D 0 CITY OF SEATTLE RESOLUTION..title A RESOLUTION relating to the State Route 0, Interstate to Medina Bridge Replacement and High Occupancy Vehicle Project;
More informationNorth Shore Transportation Improvement Strategy
North Shore Transportation Improvement Strategy Preliminary, Near-term Recommendation 2016 April Transportation Improvement Strategy (TIS) Comprehensive and Analytical A multi-modal transportation strategy
More information