1 K avik River Barrow Prudhoe Bay Kotzebue Nome Fairbanks Eagle Tok McGrath Glennallen Bethel Valdez Kenai Dillingham Homer Seward Kodiak Cold Bay Unalaska PROJECT LOCATION Haines Juneau Sitka Ketchikan Ugnuravik River Anaktuvuk River M iluveach River Sakonowyak River, MP STATION River Putuligayuk River (Main Channel) Kuparuk Canning River Itkillik River, MP 379 STATION DALTON HIGHWAY Kadleroshilik River Juniper Creek Anaktuvuk River Nanushu k River LOCATION: COPPER RIVER MERIDIAN T5N R14E SECTIONS 6,7,,18,,29,32 T5N RE SECTION 1 T6N RE SECTIONS 1,2,,,24,25,36 T7N R14E SECTIONS 5,7,8,18,19,30 T8N R14E SECTIONS,28,32,33 Toolik River Lupine River G Echooka River ilead Cree k Ivishak R iver Kavik River Miles Pogopuk Creek Sources: Esri, DeLorme, NAVTEQ, TomTom, Intermap, ipc, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster LOCATION NL, Ordnance & Survey, VICINITY Esri Japan, METI, Esri China (Hong DATE: Kong), APRIL and the GIS 15 User Community POA ,

2 SUMMARY OF PROPOSED IMPACTS TO WETLANDS AND WATERS OF THE U.S. SUMMARY OF PROJECT IMPACTS Wetlands Below OHW Area (Acres) Fill (CY) Area (Acres) Fill (CY) Roadway Embankment MP , Culverts Temporary Impacts (Work Zone + Veg Buffer) TOTAL , *SUMMARY OF PROPOSED MATERIAL SITE IMPACTS Material Site # Wetlands Area (Acres) Volume (CY) Material Site ,000,000 Excavation / 36,500 Fill Material Site ,000,000 Excavation / 23,000 Fill Material Site ,000,000 Excavation / 34,000 Fill TOTAL SHEET SUMMARY Sheet # Name 1 LOCATION & VICINITY 2 SUMMARY OF PROJECT IMPACTS 3 TYPICAL SECTION A 4 TYPICAL SECTION B 5 TYPICAL SECTION C 6 PLAN VIEW SUMMARY MS DETAIL 41 MS SECTION X-X' 42 MS SECTION Y-Y' 43 MS DETAIL 44 MS SECTION X-X' 45 MS SECTION Y-Y' 46 MS DETAIL 47 MS SECTION X-X' 48 MS SECTION Y-Y' 49 MATERIAL SITE ACCESS ROAD TYPICAL SECTION 50 CULVERT SUMMARY 51 NON-FISH PASSAGE CULVERT DETAIL 52 FISH PASSAGE CULVERT DETAIL SUMMARY OF PROJECT IMPACTS DATE: APRIL 15 2 POA ,

3 POA ,

4 POA ,

5 POA ,

6 Detail Plan Sheets, sheets Putuligayuk River , MP STATION (Main Channel) * MS Sagavanirk tok River 14, MP 379 STATION DALTON HIGHWAY NOTES: * MS *See Material Site , Material Site , & Material Site Plan View Detail Sheets * MS ** Legend Applies to Sheets 6-40, 43, & 46 Legend DALTON HIGHWAY Permanent Impact Area New Culvert MATERIAL SITE Material Site Impact Area Material Site Boundary WETLAND DELINEATION Wetlands Ponds River Barrens/Unvegetated Gravel Bar Upper Perennial Stream Uplands/Disturbed Sources: Esri, DeLorme, NAVTEQ, TomTom, Intermap, ipc, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster Lakes NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), and the GIS User Community Miles 0 5 **Legend, see Notes DATE: APRIL 15 6 POA ,

7 Trans-Alaska Pipeline SECTION "x74' Culvert STA , MP 379 BEGIN Typical Section A 9+00 MP 379 (Main Channel, MP 379 STATION DATE: APRIL 15 POA , 7

8 SECTION MP "x90' Culvert SECTION (Main Channel DATE: APRIL 15 POA , 8

9 SECTION 30 MP 381 SECTION SECTION SEE MS SHEET SECTION (Main Channel DATE: APRIL 15 POA , 9

10 36"x82' Culvert 36"x84' Culvert SECTION 19 SECTION MP (Main Channel SEE MS ,000 SHEET DATE: APRIL 15 POA ,

11 90+00 SECTION MP 382 SECTION 36"x82' Culvert 36"x0' Culvert "x80' Culvert 36"x9' Culvert SECTION SECTION 36"x82' Culvert 36"x84' Culvert (Main Channel DATE: APRIL 15 POA ,

12 MP 383 Trans-Alaska Pipeline SECTION SECTION 8 Two 48"x75' Culverts "x85' Culvert +00 SECTION 18 SECTION (Main Channel DATE: APRIL 15 POA ,

13 Four 48"x78' Culverts SECTION Three 48"x83' Culverts MP Trans-Alaska Pipeline Two 48"x75' Culverts SECTION 18 (Main Channel +00 DATE: APRIL 15 POA ,

14 +00 U005N0E SECTION 1 SECTION "x80' Culvert 48"x76' Culvert MP U005N0E SECTION SECTION (Main Channel Four 48"x78' 0Culverts ,000 DATE: APRIL POA ,

15 MP U005N0E SECTION 1 SECTION (Main Channel DATE: APRIL POA ,

16 U006N0E SECTION 36 U006N014E SECTION MP 385 U005N0E SECTION 1 SECTION (Main Channel DATE: APRIL 15 POA ,

17 U006N0E SECTION U006N014E SECTION 30 72"x4' Culvert MP 386 U006N0E SECTION U006N014E SECTION (Main Channel DATE: APRIL 15 POA ,

18 MP U006N0E SECTION U006N014E SECTION 30 Trans-Alaska Pipeline Two 48"x81' Culverts (Main Channel DATE: APRIL POA ,

19 U006N0E SECTION 24 U006N014E SECTION MP 387 U006N0E SECTION (Main Channel U006N014E SECTION 30 DATE: APRIL POA ,

20 14+00 U006N0E SECTION MP U006N0E SECTION (Main Channel DATE: APRIL 15 POA ,

21 SHEET MP U006N0E SECTION (Main Channel DATE: APRIL 15 POA ,

22 U006N0E SECTION U006N0E SECTION SEE MS SHEET U006N0E SECTION 14 U006N0E SECTION MP 389 (Main Channel DATE: APRIL 15 POA ,

23 15+00 U006N0E SECTION 2 U006N0E SECTION MS BOUNDARY MP 390 U006N0E SECTION U006N0E SECTION (Main Channel DATE: APRIL POA ,

24 MP U006N0E SECTION 2 U006N0E SECTION (Main Channel DATE: APRIL POA ,

25 U006N0E SECTION 2 U007N0E SECTION 35 tion U007N0E SECTION U006N0E SECTION MP 391 (Main Channel DATE: APRIL POA ,

26 U007N0E SECTION U007N0E SECTION MP 392 STA 00+00, MP 392 END Typical Section A BEGIN Typical Section B (Main Channel DATE: APRIL POA ,

27 MP 393 U007N0E SECTION U007N014E SECTION U007N0E SECTION 36 (Main Channel U007N014E SECTION 31 DATE: APRIL POA ,

28 00+00 MP 394 U007N0E SECTION 24 U007N014E SECTION U007N0E SECTION 25 U007N014E SECTION (Main Channel DATE: APRIL POA ,

29 Three 48"x91' Culverts U007N014E SECTION Trans-Alaska Pipeline MP 394 U007N0E SECTION (Main Channel DATE: APRIL POA ,

30 U007N014E SECTION U007N014E SECTION U007N014E SECTION MP Three 48"x91' Culverts U007N014E SECTION (Main Channel DATE: APRIL POA ,

31 U007N014E SECTION 7 MP 396 U007N014E SECTION U007N014E SECTION 18 U007N014E SECTION (Main Channel DATE: APRIL POA ,

32 U007N014E SECTION 7 U007N014E SECTION 8 MP 396 (Main Channel DATE: APRIL POA ,

33 U007N014E SECTION 5 MP 397 U007N014E SECTION (Main Channel DATE: APRIL POA ,

34 19+00 Tran U008N014E SECTION MP U007N014E SECTION 5 U007N014E SECTION (Main Channel DATE: APRIL POA ,

35 MP U008N014E SECTION 32 U008N014E SECTION Trans-Alaska Pipeline U007N014E SECTION 5 (Main Channel U007N014E SECTION 4 DATE: APRIL POA ,

36 U008N014E SECTION 29 U008N014E SECTION STA , MP END Typical Section B BEGIN Typical Section C U008N014E SECTION 33 U008N014E SECTION MP (Main Channel DATE: APRIL POA ,

37 +00 MP 400 U008N014E SECTION Two 48"x0' Culverts One 84"x5' Culvert (Main Channel DATE: APRIL POA ,

38 U008N014E SECTION U008N014E SECTION U008N014E SECTION 27 U008N014E SECTION (Main Channel DATE: APRIL POA ,

39 U008N014E SECTION U008N014E SECTION 15 U008N014E SECTION U008N014E SECTION, MP STATION STA 66+93, MP END Typical Section C MP (Main Channel DATE: APRIL POA ,

40 SECTION MS BOUNDARY TRANS-ALASKA PIPELINE *Y BUFFER MINING *Y' SECTION 19 SECTION DALTON HIGHWAY STAGING & STOCKPILING SECTION ACCESS ROAD MP BUFFER MINING +00 SECTION 30 *X *X' NOTES: *See MS Section X-X' and Y'Y' Details Sheets SECTION MS IMPACTS *Area (Acres) Volume (CY) Total In Wetlands In wetlands Mining ,000,000 Excavation Staging and Stockpile ,000 Fill Access Road ,000 Fill TOTAL MP 385 MP 390 DALTON HIGHWAY MP MP 400 MS BOUNDARY ,000 2,000 MP 380 DATE: APRIL 15 MS DETAIL POA ,

41 POA ,

42 POA ,

43 MS BOUNDARY *Y U004N014E SECTION U004N014E SECTION BUFFER TRANS-ALASKA PIPELINE BUFFER MINING DALTON HIGHWAY STAGING & STOCKPILING *X *X' ACCESS ROAD U004N014E SECTION 28 U004N014E SECTION 27 MS BOUNDARY *Y' MP 374 NOTES: *See MS Section X-X' and Y'Y' Detail Sheets MS IMPACTS *Area (Acres) Volume (CY) Total In Wetlands In wetlands Mining ,000,000 Excavation Staging and Stockpile ,000 Fill Access Road ,500 Fill TOTAL DALTON HIGHWAY MP 385 MP 390 MP 395 MP ,000 2,000 MP 375 MP 380 DATE: APRIL 15 MS DETAIL POA ,

44 POA ,

45 POA ,

46 U006N0E SECTION DALTON HIGHWAY *Y MS BOUNDARY U006N0E SECTION MP 390 BUFFER U006N0E SECTION ACCESS ROAD STAGING & STOCKPILE U006N0E SECTION BUFFER *X' BUFFER MINING *X NOTES: See MS Section X-X' and Y-Y' Detail Sheets MS IMPACTS *Area (Acres) Volume (CY) Total In Wetlands In wetlands U006N0E Mining 0 98 U006N0E 3,000,000 Excavation Staging SECTION and Stockpile SECTION 33,000 Fill Access Road ,000 Fill TOTAL MP 380 MP 385 MP 390 DALTON HIGHWAY MP MP 400 MP 389 MS BOUNDARY *Y' ,000 2,000 DATE: APRIL 15 MS DETAIL TRANS-ALASKA PIPELINE POA ,

47 POA ,

48 POA ,

49 POA ,

50 CULVERT SUMMARY LOCATION CULVERT DIAMETER CULVERT LENGTH IMPACTS TO WATERS OF THE U.S. (Below OHW) COMMENTS MILEPOST STATION (IN) (FT) **AREA (SQ FT) FILL (CY) See Non-Fish Passage Culvert Detail See Non-Fish Passage Culvert Detail See Non-Fish Passage Culvert Detail See Non-Fish Passage Culvert Detail See Non-Fish Passage Culvert Detail See Non-Fish Passage Culvert Detail See Non-Fish Passage Culvert Detail See Non-Fish Passage Culvert Detail See Non-Fish Passage Culvert Detail See Fish Passage Culvert Detail See Fish Passage Culvert Detail See Fish Passage Culvert Detail See Fish Passage Culvert Detail See Fish Passage Culvert Detail See Fish Passage Culvert Detail See Fish Passage Culvert Detail See Fish Passage Culvert Detail See Fish Passage Culvert Detail See Non-Fish Passage Culvert Detail See Non-Fish Passage Culvert Detail See Fish Passage Culvert Detail See Non-Fish Passage Culvert Detail See Non-Fish Passage Culvert Detail See Fish Passage Culvert Detail See Fish Passage Culvert Detail See Fish Passage Culvert Detail See Fish Passage Culvert Detail See Fish Passage Culvert Detail See Fish Passage Culvert Detail TOTAL: Culvert Impact Areas are included in the 'Permanent Impact Area' boundary shown on sheets Culvert locations and dimensions are approximate and may be adjusted to fit existing drainage features. CULVERT SUMMARY DATE: APRIL 15 POA ,

51 POA ,

52 POA ,

PROJECT LOCATION & VICINITY MAP PROJECT LOCATION RAINBOW INDIAN BOP: MP LAT LONG

PROJECT LOCATION & VICINITY MAP PROJECT LOCATION RAINBOW INDIAN BOP: MP LAT LONG ARCTIC OCEAN BARROW KOTZEBUE SOUND KOTZEBUE ALASKA CANADA BERING SEA YUKON RIVER FAIRBANKS BETHEL ANCHORAGE KENAI HAINES PROJECT LOCATION JUNEAU PACIFIC OCEAN KODIAK GULF OF ALASKA McHugh Creek SEWARD

More information

Baldwin Peninsula. Windmill Road. Cape Blossom EOP N W. ![ Project Location Kotzebue Cape Blossom Road DOT & PF Road

Baldwin Peninsula. Windmill Road. Cape Blossom EOP N W. ![ Project Location Kotzebue Cape Blossom Road DOT & PF Road Sheshalik Kotzebue 66.8582N 162.6180W Baldwin Peninsula Hotham Inlet Project Location Chukchi Sea Russia Kotzebue Barrow Alaska Prudhoe Bay 66.7299N 162.4314W Bering Sea Nome Fairbanks Eagle Tok McGrath

More information

Beacon Lakes NW 122nd Ave

Beacon Lakes NW 122nd Ave ¹ Site Location Document Path: M:\Projects\2015 Projects\2015-0062-001 Beacon Lakes CDDNW 122nd Avenue\4_figures and drawings\gis\figure 1 - Location Map.mxd Site Location Approximate Site Boundary (±11.00

More information

Information for File #MVP MVM

Information for File #MVP MVM Information for File #MVP-2018-00168-MVM Applicant: City of Lino Lakes Corps Contact: Marissa Merriman Address: 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678 E-Mail: Marissa.V.Merriman@usace.army.mil

More information

CITY OF WARRENVILLE MEMO

CITY OF WARRENVILLE MEMO CITY OF WARRENVILLE MEMO TO: Mayor, City Council, and City Administrator Coakley FROM: Senior Civil Engineer Hocking SUBJECT: PREFERRED ALTERNATIVE FOR MACK ROAD BIKE PATH PROJECT DATE: May 3, 2017 The

More information

The Impacts of Changing Climate on the Local Seafood Industry

The Impacts of Changing Climate on the Local Seafood Industry The Impacts of Changing Climate on the Local Seafood Industry The Ocean s Importance Regulates the Earth System Holds 97% of our Earth s Water Produce more than half of the oxygen in our atmosphere Absorb

More information

Streetscape Report Streetscape Report FALL 2017

Streetscape Report Streetscape Report FALL 2017 Streetscape Report Streetscape Report FALL 2017 EXECUTIVE SUMMARY The Streetscape Report's Plan Report is an effort to address community desires and recommendations related to the Tacoma Link Expansion

More information

Alaska s Economy: Then and Now

Alaska s Economy: Then and Now Alaska s Economy: Then and Now, PhD Institute of Social and Economic Research University of Alaska Anchorage 10/11/2017 Outline General Overview 1 General Overview Alaska s Economy and Demographics:Then

More information

NWP Page 1 of 9 Enclosure

NWP Page 1 of 9 Enclosure J I n p ' Columbia River Project Site I j_ Purpose: Knife River Sundial Prepare

More information

Minam Curve. Project Location OR82: Minam Curve Project Wallowa Lake Hwy No. 010 (OR 82) Umatilla. Wallowa

Minam Curve. Project Location OR82: Minam Curve Project Wallowa Lake Hwy No. 010 (OR 82) Umatilla. Wallowa 31.99 29 W AL LO W A LA KE 3 3.98 82 Minam Curve Umatilla Union County: Union USGS Quad: Minam TRS: T1N, R41E, Sections 6 and 7 OREGON EPARTMENT OF TRANSPORTATION 1:24, ISCLAIMER:.25.5.5 X:\Projects\OR82_Minam_Curve_and_Slope_Stabilization_KN\OR82_Minam_Curve_KN1747\Environmental\maps

More information

GLYNN COUNTY PUBLIC WORKS DEPARTMENT

GLYNN COUNTY PUBLIC WORKS DEPARTMENT GLYNN COUNTY PUBLIC WORKS DEPARTMENT 4145 Norwich Street Brunswick, Georgia 31520 Phone: (912) 554-7746 / Fax: (888) 558-1549 www.glynncounty.org/publicworks M E M O R A N D U M TO: FROM: Board of Commissioners

More information

Pacific Ocean Division. Navigation Program Overview. Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii.

Pacific Ocean Division. Navigation Program Overview. Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii. Pacific Ocean Division Navigation Program Overview Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii David Lau Pacific Ocean Division Chief, Civil Works Integration Division January

More information

Proposed Road Program. Executive Summary

Proposed Road Program. Executive Summary Proposed 2015-2019 Road Program Executive Summary Executive Summary Pavement Condition Study & 2015-2019 Proposed Road Program Option 1 Maintain Current Pavement Condition Year Preliminary Budget (2015

More information

Walkabout Summary Report

Walkabout Summary Report Walkabout Summary Report Introduction On September 3, 2014, stakeholders at Bessie Weller Elementary School (Bessie Weller ES) in Staunton, Virginia met to examine the walking and bicycling network around

More information

The Coast Guard has 145 Years of Arctic Service UNCLASSIFIED

The Coast Guard has 145 Years of Arctic Service UNCLASSIFIED The Coast Guard has 145 Years of Arctic Service 1 Operational Challenges Maritime Boundary Line Nome Barrow Great Distances Kodiak-Barrow = 825 NM Dutch Harbor - Barrow = 1167 NM Barrow-North Pole= 1,140

More information

Union Pacific Railroad

Union Pacific Railroad Input Questions: 404/401 Pre Application Meeting, December 18, 2013, Portland, Oregon 1. What is the project purpose and need? The purpose of the project is to improve the efficiency and average velocity

More information

Kasaan to Goose Creek Road Project Project Description U.S. Army Corps of Engineers Permit The following table presents the mile point of the culverte

Kasaan to Goose Creek Road Project Project Description U.S. Army Corps of Engineers Permit The following table presents the mile point of the culverte Kasaan to Goose Creek Road Project Project Description U.S. Army Corps of Engineers Permit The following table presents the mile point of the culverted open water crossings, name of water crossing if known,

More information

1 HAT and MLLW are referenced to the station datum for each NOAA tide station.

1 HAT and MLLW are referenced to the station datum for each NOAA tide station. TIDAL DATA All data was rounded to the nearest 0.1 foot Location HAT 1 MLLW 1 HTL 2 MHW 2 Vicinity Adak Island 8.6 3.0 5.6 3.5 Anchorage 40.9 6.3 34.7 28.4 Atka 31.8 27.0 4.9 3.2 Barter Island 2.8 2.1

More information

SNOW SURVEY SCHEDULE Speel River X X X X. *No site visit scheduled for Long Lake in winter unless repairs needed.

SNOW SURVEY SCHEDULE Speel River X X X X. *No site visit scheduled for Long Lake in winter unless repairs needed. Alaska Electric Light and Power Juneau, Alaska SNOW COURSE MAR 1 APR 1 MAY 1 JUN 1 Speel River *No site visit scheduled for Long Lake in winter unless repairs needed. Copper Valley Electric Association

More information

Limerick Metropolitan Cycle Network Study

Limerick Metropolitan Cycle Network Study Limerick Metropolitan Cycle Network Study - Section 1 Introduction Limerick Metropolitan Cycle Network Study - Section 1 Introduction Limerick City and County Council Limerick Metropolitan Cycle Network

More information

Freshwater Fish Assessment

Freshwater Fish Assessment Alaska Department of Transportation & Public Facilities Seward Highway MP 7-9 6-7 Freshwater Fish Assessment March 14, 8 Prepared by HDR Alaska C Street, Suite 3 Anchorage, Alaska 993 Project Number: BR-BH-NH-OA3

More information

August 2009 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY. 6 No GSC. 13 No GSC. 20 GSC Preseason 4:30 5:30 (AG and PS only)

August 2009 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY. 6 No GSC. 13 No GSC. 20 GSC Preseason 4:30 5:30 (AG and PS only) August 2009 1 Blue vs Gold 7 am 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 New Swimmer Tryouts 4:30 5:30 29 GSC Registration 8 10 am (New swimmers) 8 9 am 30 31 First day

More information

SNOW SURVEY SCHEDULE Speel River X X X X. *No site visit scheduled for Long Lake in winter unless repairs needed.

SNOW SURVEY SCHEDULE Speel River X X X X. *No site visit scheduled for Long Lake in winter unless repairs needed. Alaska Electric Light and Power Juneau, Alaska SNOW COURSE MAR 1 APR 1 MAY 1 JUN 1 Speel River X X X X *No site visit scheduled for Long Lake in winter unless repairs needed. Snow Survey Schedule 2008-1

More information

SNOW SURVEY SCHEDULE Speel River X X X X. *No site visit scheduled for Long Lake in winter unless repairs needed.

SNOW SURVEY SCHEDULE Speel River X X X X. *No site visit scheduled for Long Lake in winter unless repairs needed. Alaska Electric Light and Power Juneau, Alaska SNOW COURSE MAR 1 APR 1 MAY 1 JUN 1 Speel River X X X X *No site visit scheduled for Long Lake in winter unless repairs needed. Copper Valley Electric Association

More information

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By: FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project

More information

Simulating Streams Through Culverts in Mat-Su, Alaska

Simulating Streams Through Culverts in Mat-Su, Alaska Simulating Streams Through Culverts in Mat-Su, Alaska Project Managers Bill Rice, P.E., USFWS Hydrologist Mary Price, USFWS Fishery Biologist The Team Approach US Fish and Wildlife Service Bill Rice, P.E.,

More information

Attachment 6 Sensitive Areas and Habitats

Attachment 6 Sensitive Areas and Habitats Attachment 6 Sensitive Areas and Habitats Prudhoe MP 0 Bay Deadhorse 26A lton Highway D a 26B MP 100 25A MP 200 Coldfoot 24B 24A MP 300 25D 20F FLMP 0 Livengood MP 400 Steese 20B FLMP 28.87 Fairbanks

More information

Analyzing indicators for small northern places

Analyzing indicators for small northern places ReSDA Workshop No 1 Resources and Sustainable Development in the Arctic Yellowknife NWT, September 18 19 2011 Analyzing indicators for small northern places Larry Hamilton Department of Sociology University

More information

Information for File # MVP LSP

Information for File # MVP LSP Information for File # MVP- 218-2671-LSP Applicant: Pennington County Highway Department Corps Contact: Lawrence Puchalski Address: 4111 Technology Drive W, Suite 295, Bemidji, Minnesota 5661 E-Mail: Lawrence.S.Puchalski@usace.army.mil

More information

STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER LAND USE PERMIT APPLICATION AS

STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER LAND USE PERMIT APPLICATION AS STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER LAND USE PERMIT APPLICATION AS 38.05.850 Applicants must complete all sections of this application. In addition, applicants

More information

APPENDIX F. Stream Crossings

APPENDIX F. Stream Crossings APPENDIX F s - Page Intentionally Left Blank - A. Mainline s Note: This list was originally published December 29, 2015 in the ASAP Joint Application for Permit (404 / 10) (last revised June 28, 2017).

More information

Demand for Harbors, Dockage, and Other Navigational Needs for Small Boats and Commercial Fishing Vessels in Alaska

Demand for Harbors, Dockage, and Other Navigational Needs for Small Boats and Commercial Fishing Vessels in Alaska Demand for s, Dockage, and Other Navigational Needs for Small Boats and Commercial Fishing Vessels in Alaska May 2006 HDRU Series No 06-2 Prepared by: Nancy A. Connelly and Tommy L. Brown Human Dimensions

More information

Sonic Detection and Ranging (SODAR) Data Collection and Evaluation Report

Sonic Detection and Ranging (SODAR) Data Collection and Evaluation Report Sonic Detection and Ranging (SODAR) Data Collection and Evaluation Report Bolt Mountain, Pocahontas Land Corporation, B&L Excavating Bolt Mountain, Wyoming County, West Virginia (Data Evaluation Period:

More information

Assessment of Pre-restoration Habitat Conditions and Fish Populations in Branch Brook

Assessment of Pre-restoration Habitat Conditions and Fish Populations in Branch Brook Assessment of Pre-restoration Habitat Conditions and Fish Populations in Branch Brook Jacob Aman March 18, 2013 Wells National Estuarine Research Reserve Acknowledgments I would like to thank the Maine

More information

City of Palmer Action Memorandum No

City of Palmer Action Memorandum No City of Palmer Action Memorandum No. 18-072 Subject: Authorizing the City Manager to Negotiate and Enter into a Contract with Bering Marine Corporation for the Purchase and Delivery of 100 Tons of Road

More information

RE: Supplemental Information for the Donlin Gold Natural Gas Pipeline State Pipeline Right-of-Way Lease Application (ADL )

RE: Supplemental Information for the Donlin Gold Natural Gas Pipeline State Pipeline Right-of-Way Lease Application (ADL ) December, Mr. Jason Walsh State Pipeline Coordinator s Office Penland Parkway Anchorage, AK 0 RE: Supplemental Information for the Donlin Gold Natural Gas Pipeline State Pipeline Right-of-Way Lease Application

More information

COPYRIGHTED MATERIAL. The Best of Alaska. As a child, when my family traveled outside Alaska for vacations, I often met other.

COPYRIGHTED MATERIAL. The Best of Alaska. As a child, when my family traveled outside Alaska for vacations, I often met other. 1 The Best of Alaska As a child, when my family traveled outside Alaska for vacations, I often met other children who asked, Wow, you live in Alaska? What s it like? I never did well with that question.

More information

B-36

B-36 B-35 B-36 B-37 B-38 B-39 B-40 B-41 B-42 B-43 B-44 B-45 B-46 From: Oliver, Ross C. Sent: Friday, November 08, 2002 8:41 PM To: Kenneth Sims Cc: Badger, Phil C.; Schaefer, Hillary; Richey, Alan C Subject:

More information

ROCKLIN COMMUNITY TRANSIT STUDY

ROCKLIN COMMUNITY TRANSIT STUDY ROCKLIN COMMUNITY TRANSIT STUDY Prepared for the Placer County Transportation Planning Agency Prepared by Placer County Transportation Planning Agency Prepared for the Placer County Transportation Agency

More information

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS v. 8.4 WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS Objectives Define a conceptual schematic of the roadway, invert, and downstream

More information

Chapter 3 Bicycle Element

Chapter 3 Bicycle Element Chapter 3 Bicycle Element The Inyo County Collaborative Bikeways Plan was adopted in 2008 and revised in 2011. The plan includes a thorough overview of bicycle needs and an extensive list of proposed bikeways

More information

U.S. Fish & Wildlife Service West Virginia Field Office 694 Beverly Pike Elkins, WV. ATTN: Project Review Request

U.S. Fish & Wildlife Service West Virginia Field Office 694 Beverly Pike Elkins, WV. ATTN: Project Review Request December 6, 2016 VIA FEDEX U.S. Fish & Wildlife Service West Virginia Field Office 694 Beverly Pike Elkins, WV ATTN: Project Review Request Re: Rover Pipeline LLC, Rover Pipeline Project Threatened and

More information

Legend. Lower Swatara Township DAUPHIN COUNTY. 1 inch = 100 feet 02/2017. Fairview Township YORK COUNTY

Legend. Lower Swatara Township DAUPHIN COUNTY. 1 inch = 100 feet 02/2017. Fairview Township YORK COUNTY , Bore, HDD, Bore, HDD 3 33 3 YO-5 33 YO- 3 3 3 33 33 3 3 3 33 BB 3 Fairview Township YORK COUNTY 3 3 3 3 9 5 inch = feet Sheet of /7 Base Map; SPLP -, Roads from NRCS Geospatial Data Giveaway, -Year Floodplain

More information

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan Assessment of Baseline Geomorphic Features at Proposed Stream Crossings On The Proposed County Road 595 Marquette County, Michigan Prepared for: Kennecott Eagle Minerals Company Marquette, Michigan Prepared

More information

SOUTH MAIN STREET ROUTE 28

SOUTH MAIN STREET ROUTE 28 PLOTTED 10/0/016 10:4:46 AM \\vhb\proj\worcester\1148.00\cad\ts\planmisc\aerial Crossing\Aerial Crossing Plan View.dwg 1 0 NO REVISIONS AND RECORD OF ISSUE HORIZ. SCALE VERT. SCALE ROUTE 8 ENGINEER CHECKED

More information

CONGESTION MANAGEMENT PROCESS PLAN. Bay County TPO

CONGESTION MANAGEMENT PROCESS PLAN. Bay County TPO CONGESTION MANAGEMENT PROCESS PLAN Bay County TPO February 2016 This Page Intentionally Left Blank Congestion Management Process Plan Congestion Management Process Plan Bay County Transportation Planning

More information

1.Mill Creek Watershed Summary Description and Land Use

1.Mill Creek Watershed Summary Description and Land Use 1.Mill Creek Watershed Summary Description and Land Use Table xxx: Mill Creek Watershed Overview Watershed Size 31,435 acres/49.1 sq miles/ 127.1 sq km Elevation Range 5,594 feet [4,967-10,561] Stream

More information

The Emerging Arctic. A New Maritime Frontier

The Emerging Arctic. A New Maritime Frontier The Emerging Arctic A New Maritime Frontier Agenda Changes in the Arctic Coast Guard in the Arctic Coast Guard Missions Arctic Operations Summer 2008 Summer Sea Ice Retreat Barrow Boundary Claims 1) North

More information

Aransas Pass: Channel

Aransas Pass: Channel 3 4 5 5'N Print Date: 3// Side Slope Ratio: (Rise : Run Authorized Depth: -ft. 4 4 43 44 45 4 4 4 4 4 3'3 33 3 3 3 4 43 45 44 3 3 33 35 35 3 5 Survey Date(s: March 3 4 5 4'3 - -5 3'3-4 -ft.ft PORT ARAN

More information

Estuary Park/Jack London Aquatic Center

Estuary Park/Jack London Aquatic Center 1 San Francisco Bay Area Water Trail Site Description for Estuary Park/Jack London Aquatic Center Location, Ownership, and Management: The Jack London Aquatic Center (JLAC) is located within Estuary Park,

More information

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration. HY-8 Version 7.2 Build Date January 17, 2012 Federal Highway Administration http://www.fhwa.dot.gov/engineering/hydraulics/software/hy8/index.cfm SIMPLE Simple to use Use for simple culverts and bridges

More information

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019 09/25/2018 DRAFT FEMA Region I PA H&H Study ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019 Region I Federal Emergency Management Agency (FEMA) Public Assistance Hydrologic and Hydraulic (H&H)

More information

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering REVETMENTS Ijsseldam, the Netherlands Orson P. Smith, PE, Ph.D. Instructor Purposes and Operational Constraints Purposes Erosion control o o Embankment Toe protection for a seawall, retaining wall or other

More information

NAME ALTERNATE MINIMUMS NAME ALTERNATE MINIMUMS INSTRUMENT APPROACH PROCEDURE CHARTS IFR ALTERNATE AIRPORT MINIMUMS

NAME ALTERNATE MINIMUMS NAME ALTERNATE MINIMUMS INSTRUMENT APPROACH PROCEDURE CHARTS IFR ALTERNATE AIRPORT MINIMUMS M1 INSTRUMENT APPROACH PROCEDURE CHARTS IFR ALTERNATE AIRPORT MINIMUMS Standard alternate minimums for non-precision approaches and approaches with vertical guidance [NDB, VOR, LOC, TACAN, LDA, SDF, VOR/DME,

More information

REVISION RECORD. Revision Number. Date Sections Affected/Reason 0 04/17/2017 Creation of Initial EAP

REVISION RECORD. Revision Number. Date Sections Affected/Reason 0 04/17/2017 Creation of Initial EAP REVISION RECORD In accordance with 40 C.F.R. Part 257.73, this Emergency Action Plan (EAP) must be amended whenever there is a change in conditions that would substantially affect the EAP in effect. Additionally,

More information

FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS

FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS March 2, 2011 FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS STANLEY STORM DRAINAGE IMPROVEMENTS, 151sT TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS DESCRIPTION: This report relates

More information

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax Instructions: For a driveway access permit, fill in sections 1, 2, 3 and 4, and the appropriate drawings and sign. For a Utility access, fill in sections 1, 2, 3 and 5, and figures 1 and 3. Prepare a detailed

More information

Technical Report Culvert A Hydraulic Analysis

Technical Report Culvert A Hydraulic Analysis DATE: November 3, 2011 Technical Report Culvert A Hydraulic Analysis TO: FROM: RE: Jim Reiser, P.E. Project Manager Parsons Brinckerhoff, Inc. Kurt Killian, P.E., CFM Parsons Brinckerhoff, Inc. Design

More information

Thought the number of households in their community that met their harvest needs were: Between 26-50% Survey Results 2017

Thought the number of households in their community that met their harvest needs were: Between 26-50% Survey Results 2017 People who filled out this survey: Participated in harvest activities: More than the average household About the same as other households Less than other households Not sure Ranked these 10 factors as

More information

Inspection Modifications Recommend increasing the culvert size to a 48" squashed pipe. Discussion Board Decision

Inspection Modifications Recommend increasing the culvert size to a 48 squashed pipe. Discussion Board Decision 4:00 310 Business Agenda: MEETING CALLED TO ORDER: THOSE PRESENT: GUESTS: 310 INSPECTION REPORTS ~ READY FOR DECISION: Inspection Date 8 /13/2014 Application GD-036-14 Applicant River Landing, LLC Landowner

More information

REVISION RECORD. Revision Number. Date Sections Affected/Reason 0 04/17/2017 Creation of Initial EAP

REVISION RECORD. Revision Number. Date Sections Affected/Reason 0 04/17/2017 Creation of Initial EAP REVISION RECORD In accordance with 40 C.F.R. Part 257.73, this Emergency Action Plan (EAP) must be amended whenever there is a change in conditions that would substantially affect the EAP in effect. Additionally,

More information

Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3

Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3 Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3 Project Title: Marsh Creek and Albion River Instream Fish Barrier Removal, Flynn

More information

1-44. SITKA HARBOR, ALASKA (Western Channel, Crescent Bay Basin, Channel Rock Breakwaters) (CWIS NOS , 16840, 10322, 55030, 13787)

1-44. SITKA HARBOR, ALASKA (Western Channel, Crescent Bay Basin, Channel Rock Breakwaters) (CWIS NOS , 16840, 10322, 55030, 13787) SITKA 1-44 SITKA HARBOR, ALASKA (Western Channel, Crescent Bay Basin, Channel Rock Breakwaters) (CWIS NOS. 72845, 16840, 10322, 55030, 13787) Condition of Improvement 30 September 2011 AUTHORIZATION:

More information

ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR )

ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR ) PLATTE RIVER POWER AUTHORITY RAWHIDE ENERGY STATION BOTTOM ASH TRANSFER (BAT) IMPOUNDMENTS LARIMER COUNTY, CO ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR 257.60) FOR COAL COMBUSTION

More information

APPENDIX L DETAILED ANALYSIS OF EAST AND LATERAL RUNWAY SAFETY AREA ALTERNATIVES ON TIDAL CHANNEL GEOMORPHOLOGY

APPENDIX L DETAILED ANALYSIS OF EAST AND LATERAL RUNWAY SAFETY AREA ALTERNATIVES ON TIDAL CHANNEL GEOMORPHOLOGY APPENDIX L DETAILED ANALYSIS OF EAST AND LATERAL RUNWAY SAFETY AREA ALTERNATIVES ON TIDAL CHANNEL GEOMORPHOLOGY MEMORANDUM TO: Sheri Ellis (SWCA), Patti Sullivan (FAA), Allan Heese (JNU), Randy Vigil (ACOE),

More information

NAVIGABLE WATERS OF THE UNITED STATES WITHIN THE SEVENTEENTH COAST GUARD DISTRICT

NAVIGABLE WATERS OF THE UNITED STATES WITHIN THE SEVENTEENTH COAST GUARD DISTRICT The Coast Guard makes navigability determinations regarding specific waterways or portions of waterways in order to determine its jurisdiction on those waterways. These navigability determinations are

More information

INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA

INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA These regional conditions are in addition to but do not supersede the requirements in the Federal Register (Volume 82 No. 4 of January 6, 2017).

More information

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9 October 9, 2012 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 RE: Trout Unlimited Comments on the Scope of Environmental Impact Statement

More information

How did you hear about this meeting?

How did you hear about this meeting? How did you hear about this meeting? Please stick a dot in each category that applies Radio or TV Postcard Email City Website Advertisement (Newspaper, internet) Other (Facebook, word of mouth, etc.) Future

More information

HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10

HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10 HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10 RACETRACK ROAD CULVERT OVER THE SPRING RUN & GREEN SPRINGS ROAD CULVERT OVER AN UNNAMED TRIBUTARY TO SPRING RUN BERWICK TOWNSHIP

More information

Interim Guidance Fish Presence Absence

Interim Guidance Fish Presence Absence Interim Guidance Fish Presence Absence Source: Forest Practices Act Guidance for Division 635 of the forest practices act dealing with stream classification when no fish surveys have been done (referenced

More information

WATER OBSTRUCTION AND ENCROACHMENT PERMIT

WATER OBSTRUCTION AND ENCROACHMENT PERMIT ," /.@ Permit No. E36-813 Commonwealth of Pennsylvania Department of Environmental Protection Southcentral Regional Office Watershed Management Program Permitting and Technical Services Section WATER OBSTRUCTION

More information

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS Project Name: SAWS Water Job No.: CSJ No. (if applicable): Date: AWS Consultant: PROJECT INFORMATION N/A Yes No Joint Bid (COSA/TxDOT) N/A Yes

More information

Big Spring Creek Habitat Enhancement and Fishery Management Plans

Big Spring Creek Habitat Enhancement and Fishery Management Plans Big Spring Creek Habitat Enhancement and Fishery Management Plans November 5, 2012 Big Spring Events and Activities Center Newville, PA Charlie McGarrell Regional Habitat Biologist Pennsylvania Fish and

More information

3.7 River Navigation Affected Environment

3.7 River Navigation Affected Environment 3 Affected Environment and Environmental Consequences 3.7 River Navigation 3.7.1 Affected Environment Sterling Highway MP 45 60 Project Final EIS The Kenai River is approximately 82 river miles long in

More information

APPENDIX A PHOTOGRAPHIC SUMMARY. RAINY RIVER PROJECT Final Environmental Assessment Report

APPENDIX A PHOTOGRAPHIC SUMMARY. RAINY RIVER PROJECT Final Environmental Assessment Report APPENDIX A PHOTOGRAPHIC SUMMARY RAINY RIVER PROJECT APPENDIX A: PHOTOGRAPHIC SUMMARY LIST OF PHOTOGRAPHS PAGE Plate 1: (RRP) core processing facility... 1 Plate 2: Typical exploration drilling operations...

More information

APPENDIX B: CATALOG OF SISKIYOU COUNTY CULVERTS LOCATED ON FISH-BEARING STREAM REACHES. Prepared for the Siskiyou County Public Works Department

APPENDIX B: CATALOG OF SISKIYOU COUNTY CULVERTS LOCATED ON FISH-BEARING STREAM REACHES. Prepared for the Siskiyou County Public Works Department APPENDIX B: CATALOG OF SISKIYOU COUNTY CULVERTS LOCATED ON FISH-BEARING STREAM REACHES Prepared for the Siskiyou County Public Works Department By Ross Taylor and Associates 1254 Quail Run Court McKinleyville,

More information

Post Office Box , Anchorage, AK

Post Office Box , Anchorage, AK Inupiat Subsistence Whaling in Nuiqsut, Alaska Subsistence Research Coordination Workshop, Nuiqsut AK - 01/17/07 Michael Galginaitis, Applied Sociocultural Research Post Office Box 101352, Anchorage, AK

More information

Legend. Figure 1 Location Map McKelvey Woods Trail Project City of Maryland Heights St. Louis County, Missouri. Proposed Trail NORTH.

Legend. Figure 1 Location Map McKelvey Woods Trail Project City of Maryland Heights St. Louis County, Missouri. Proposed Trail NORTH. Path: V:\St Louis Office\St Louis County\65679_McKelvey Woods Trail Extension_for Herleth\GIS\DataFiles\ArcDocs\Wetlands 2013\Report Maps\Figure1.mxd brichards 4/23/2013 Proposed Trail 0 0.5 1 2 Miles

More information

Stephens Creek Culvert Replacement. CAC April 28, 2010

Stephens Creek Culvert Replacement. CAC April 28, 2010 Stephens Creek Culvert Replacement CAC April 28, 2010 1 Top of Bank Willamette Moorage Park Existing Culverts 50 ft Greenway Setback 200 ft Greenway Setback Existing Macadam Bay Access Stephens Creek Existing

More information

Detailed Model Simulation Results for Proposed Situation

Detailed Model Simulation Results for Proposed Situation APPENDIX C Detailed Model Simulation Results for Proposed Situation Status Issue 2 Page 89 January 2013 Figure C-1 to C-15 complement the tabulated peak flood level and discharge predictions in Tables

More information

Honorable City Council i. A / Richard A. Leahy, City Manager \~v Thomas E. Hansen, P.E., Public Works Director/ ;?:?-

Honorable City Council i. A / Richard A. Leahy, City Manager \~v Thomas E. Hansen, P.E., Public Works Director/ ;?:?- ----r 1: I To: From: By: Subject: CITY OF WOODINVILLE, WA REPORT TO THE CITY COUNCIL 17301 133rd Avenue NE, Woodinville, WA 98072 WWW.Cl.WOODINVILLE.WA.US Honorable City Council i. A / Richard A. Leahy,

More information

E-3: Jurisdictional Determination Supplement Report

E-3: Jurisdictional Determination Supplement Report Lake Ralph Hall Appendix E E-3: Jurisdictional Determination Supplement Report P.O. Drawer 305 Lewisville, TX 75067 REGIONAL WATER DISTRICT (972)219-1228 Fax(972)221-9896 June 22, 2017 Mr. Chandler Peter

More information

JUNEAU SECOND CHANNEL CROSSING WATERWAY USER SURVEY RESULTS

JUNEAU SECOND CHANNEL CROSSING WATERWAY USER SURVEY RESULTS JUNEAU SECOND CHANNEL CROSSING WATERWAY USER SURVEY RESULTS PREPARED FOR: HDR Alaska, Inc. PREPARED BY: Juneau Anchorage December 2003 TABLE OF CONTENTS Executive Summary...1 Introduction and Methodology...2

More information

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN SPALDING COUNTY, GEORGIA CHAPTER 4 4.0 CULVERT DESIGN... 4-1 4.1 INTRODUCTION... 4-1 4.2 SYMBOLS AND DEFINITIONS... 4-1 4.3 ENGINEERING DESIGN CRITERIA... 4-2 4.3.1 FREQUENCY FLOOD... 4-2 4.3.2 VELOCITY

More information

Juneau Douglas Harbor

Juneau Douglas Harbor Juneau Douglas Harbor Douglas Harbor Page 2 of 8 Condition of Improvements 31 December 2015 Douglas Harbor, Alaska (CWIS No. 072789, 180942) Authorization Rivers and Harbors Act, 3 July 1958 (House Doc.

More information

Stream Assessment Cut-block: For: Island Timberlands Limited Partnership, Cameron Operation

Stream Assessment Cut-block: For: Island Timberlands Limited Partnership, Cameron Operation Stream Assessment Cut-block: 171214 For: Island Timberlands Limited Partnership, Cameron Operation Tony Norris Area Engineer Island Timberlands Cameron Operation Port Alberni D.G. Rigets E.I.A. CTech.

More information

CONSERVATION COMMISSION Meeting Minutes THURSDAY May 10, :00 p.m. Stoughton Police Department 26 Rose Street, Stoughton, MA 02072

CONSERVATION COMMISSION Meeting Minutes THURSDAY May 10, :00 p.m. Stoughton Police Department 26 Rose Street, Stoughton, MA 02072 CONSERVATION COMMISSION Meeting Minutes THURSDAY May 10, 2018 6:00 p.m. Stoughton Police Department 26 Rose Street, Stoughton, MA 02072 The May 10, 2018 meeting of the Conservation Commission was called

More information

62. Gulkana River, Main Fork, Middle Fork, and West Fork

62. Gulkana River, Main Fork, Middle Fork, and West Fork 62. Gulkana River, Main Fork, Middle Fork, and West Fork The Gulkana, a National Wild and Scenic River, is one of Alaska s most popular whitewater rivers because of its road accessibility and because of

More information

Importance of un-named tributary streams to Brook Trout populations. Dr. Jonathan M. Niles Dr. Dan Ressler

Importance of un-named tributary streams to Brook Trout populations. Dr. Jonathan M. Niles Dr. Dan Ressler Importance of un-named tributary streams to Brook Trout populations. Dr. Jonathan M. Niles Dr. Dan Ressler Pennsylvania Streams All streams of PA have a designated use - Huge resource - 8,011 named tributaries:

More information

TOWN OF DENNIS 10 YR COMPREHENSIVE DREDGE PERMIT SEPTEMBER 10, 2013

TOWN OF DENNIS 10 YR COMPREHENSIVE DREDGE PERMIT SEPTEMBER 10, 2013 TOWN OF DENNIS 10 YR COMPREHENSIVE DREDGE PERMIT SEPTEMBER 10, 2013 WHAT IS IT? ALL NECESSARY PERMITS FOR DREDGING FOR PORTIONS OF BASS RIVER, SWAN POND RIVER, SESUIT HARBOR AND CHASE GARDEN CREEK ONE

More information

Seafood Industry. The 2012 Juneau and Southeast Alaska Economic Indicators 11/1/12 Page 60

Seafood Industry. The 2012 Juneau and Southeast Alaska Economic Indicators 11/1/12 Page 60 Seafood Industry In 2011, fishermen in Southeast landed 395,628,268 pounds of fish with an ex vessel value of $391,091,684. This harvest resulted in 272.6 million pounds of product, with a wholesale value

More information

Fish Passage Assessment Report Mare Brook Culverts

Fish Passage Assessment Report Mare Brook Culverts Fish Passage Assessment Report Mare Brook Culverts Fish Passage Assessment Component of Mare Brook Watershed Assessment and Community Engagement Project Prepared for: FB Environmental Associates 97A Exchange

More information

Initial Project Assessment DRAFT Technical Memorandum

Initial Project Assessment DRAFT Technical Memorandum Initial Project Assessment DRAFT Technical Memorandum Anchorage Metropolitan Planning Area Prepared for: AMATS/MOA 4700 Elmore Road Anchorage, Alaska 99507 and PTS, Inc. 912 E 15th Avenue, Suite 200 Anchorage,

More information

FINAL REPORT ON THE FISHERY SURVEYS ALONG NORTHWEST ALASKAN PIPELINE COMPANY'S PROPOSED GAS PIPELINE ROUTE - DELTA JUNCTION TO THE CANADA BORDER

FINAL REPORT ON THE FISHERY SURVEYS ALONG NORTHWEST ALASKAN PIPELINE COMPANY'S PROPOSED GAS PIPELINE ROUTE - DELTA JUNCTION TO THE CANADA BORDER FINAL REPORT ON THE FISHERY SURVEYS ALONG NORTHWEST ALASKAN PIPELINE COMPANY'S PROPOSED GAS PIPELINE ROUTE - DELTA JUNCTION TO THE CANADA BORDER I /N rsosv ~S$"' /'11'::2. George V. Elliott ARLIS.,Iaska

More information

NWS 44: Mining Activities Location #1, Stanislaus River

NWS 44: Mining Activities Location #1, Stanislaus River NWS 44: Mining Activities Location #1, Stanislaus River Permit is for the use of a single 8 dredge on a federal mining claim at the location described on the map and as Twp 02N Range 14E, Section 04, MDM

More information

MEETING CALLED TO ORDER: THOSE PRESENT: EXCUSED: GUESTS: 310 INSPECTION REPORTS ~ READY FOR DECISION:

MEETING CALLED TO ORDER: THOSE PRESENT: EXCUSED: GUESTS: 310 INSPECTION REPORTS ~ READY FOR DECISION: MEETING CALLED TO ORDER: THOSE PRESENT: EXCUSED: GUESTS: 310 Agenda: 310 INSPECTION REPORTS ~ READY FOR DECISION: Inspection Date 3 /17/2016 Application Number GD-009-16 Applicant Longmire Court Holdings,

More information

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project

More information

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP) MOREHEAD CITY HARBOR, NC Dredged Material Management Plan (DMMP) Public Meeting/Info Session 15 January 2014 US Army Corps of Engineers Morehead City Harbor DMMP Presentation Topics Morehead City Harbor

More information

Environmental Review and Permitting for Wild Trout

Environmental Review and Permitting for Wild Trout Environmental Review and Permitting for Wild Trout Tom Shervinskie Wild Trout Summit Watershed Analysis Section August 26, 2017 Division of Environmental Services The mission of the Pennsylvania Fish and

More information