1 Closure Plan for CCR Surface Impoundments B.L. England Generating Station Beesley s Point, New Jersey April 17, 2018 Prepared For RC Cape May Holdings, LLC 900 North Shore Road Beesley s Point, New Jersey Barry J. Sutherland, P.E. NJ Professional Engineer License No. 24GE Closure Plan for CCR Surface Impoundments 2011 RMT, Inc. All Rights Reserved
2 Table of Contents Section 1 Introduction Site Information Closure Description Closure Schedule Section 2 Closure of CCR Ponds Removal Decontamination Section 3 Closure Implementation Certification Post-Closure Use Attachments: Figure 1 Closure Plan Appendix A - Closure Schedule Closure Plan for CCR Surface Impoundments ii
3 Section 1 Introduction This Coal Combustion Residuals (CCR) Closure Plan has been prepared in accordance with the requirements of United States Environmental Protection Agency (USEPA) Disposal of Coal Combustion Residuals from Electric Utilities Rule ( CCR Rule ) at 40 CFR Part 257 to describe the steps necessary to close the Slag Ponds at the B.L. England Generating Facility (plant) located in Beesley s Point, New Jersey. The plant derives the majority of its power from coal burning operations, and the Slag Ponds have been used to quench coal slag from brackish water withdrawn from the nearby Great Egg Harbor Bay (GEHB). The Slag Ponds are currently inactive and no longer receive CCR. The first cell provided primary settling and a storage area for the recovery of slag. The second cell provided additional settling of fine particulates. Regulatory Background The ponds were constructed prior to 1987 and construction details / engineering drawings are not available; however, the current property owner conducted investigations to determine the depth and limits of the impoundments. Both ponds are unlined. The Slag Ponds currently contain approximately 5,400 cubic yards of CCR material, and cover a total area of approximately 0.48 acres. The Slag Pond operations have been replaced with a closed-loop, above-ground slag handling system, which contains and dewaters the slag before it is loaded directly onto trucks from an above-ground holding vessel. The closed-loop system piping is supported on an above ground pipe rack that is constructed on the berm between the slag baling and settling ponds. Closure of the Slag Ponds is anticipated to be performed during The Slag Ponds will be closed as described in Section 3 of this Closure Plan. The Closure Plan assumes complete removal of the CCR; therefore, post-closure care is not anticipated. 1.1 Site Information The BL England Generating Station is located at Beesley s Point in Marmora, New Jersey adjacent to the Great Egg Harbor Bay. The generating station operates two coal-fired units that produce CCR. The plant is currently operating a closed-loop recirculation slag handling system, so that no CCR is presently being sent to Slag Ponds. The Slag Ponds are inactive and Closure Plan for CCR Surface Impoundments 1
4 cover a combined area of approximately 0.48 acres as shown on Figure 1. The basins are unlined and currently contain settled ash and some liquids. Portions of the surface of the solids are covered with a dense vegetative growth. The impoundments are separated by a common berm which supports the piping associated with the closed-loop slag management system. 1.2 Closure Description The CCR impoundment on the B.L. England site will be clean-closed through removal of CCR in accordance with 40 CFR of the CCR Rule. To accomplish this, CCR will be excavated from the ponds and will be disposed of at a permitted landfill. The CCR will be removed along with impacted subsoils. After the CCR has sufficiently dewatered, it will then be hauled offsite to a permitted landfill. After removal of these materials the impoundments will be backfilled with clean soil to an elevation approximately even with the adjacent grades. Because the Closure Plan assumes complete removal of the CCR, post-closure care is not anticipated. Consistent with the proposal outlined in the August 2011 Remedial Investigation Report / Remedial Action Selection Report / Remedial Action Workplan for the site, residual impacted soils that are not removed during the Pond closure will remain in place and be addressed through institutional and engineering controls. These materials do not pose a direct contact exposure risk and it has been determined that current metals concentrations in ground water are not impacting nearby receptors (i.e. saltwater marsh and GEHB). In addition, the Slag Ponds are located within the Class III-B ground water use area as defined in Ground Water Remedial Action Permit No. RAP Closure Schedule The closure of the CCR impoundment (excavation and backfilling) is anticipated to be completed in August A closure schedule outlining the timeframes for major activities from the start of closure activities to the closure completion is provided in Appendix A. Closure Plan for CCR Surface Impoundments 2
5 Section 2 Closure of CCR Ponds 2.1 Removal Following the dewatering of CCR materials, it will be hauled off-site and disposed of in a permitted landfill. Any liners and liner protection systems from the staging area, if used, will also be demolished and disposed of at an off-site permitted landfill. 2.2 Decontamination Basin materials, liners, and structures will be removed and disposed of at an off-site facility. Equipment used in the removal of CCR material and basin structures will be properly decontaminated of CCR following completion of closure activities and dispositioned off-site in accordance with the Federal and State solid waste regulations. Closure Plan for CCR Surface Impoundments 3
6 Section 3 Closure Implementation 3.1 Certification Within 30 days of completion of closure activities, a professional engineer will certify that the closure was completed in accordance with the requirements of the Closure Plan. This certification will be incorporated in the operating record and posted to the publicly accessible website. 3.2 Post-Closure Use Post-closure, the use of the land where the CCR impoundments currently stand has not been determined. Because the Closure Plan assumes complete removal of CCR, post-closure care is not anticipated. The schedule and methods described in this plan are dependent upon the operational status of the facility, site conditions, and other factors, and may be modified. Revisions to the Closure Plan will be made part of the operating record and posted to the publicly accessible website. Closure Plan for CCR Surface Impoundments 4
7 FIGURE 1 Closure Plan
8
9 APPENDIX A Closure Schedule
10 APPENDIX A CLOSURE PLAN SCHEDULE B.L. ENGLAND GENERATING STATION BEESLEY'S POINT, NEW JERSEY Task Begin End Mobilization and Waste Characterization Sampling May 8, 2018 June 1, 2018 Slag Removal, Transportation & Disposal June 4, 2018 July 20, 2018 Backfilling and Site Restoration July 23, 2018 September 13, 2018 Notification of Closure September 13, 2018 October 12, 2018
CCR Fugitive Dust Control Plan
CCR Fugitive Dust Control Plan Omaha Public Power District North Omaha Station Omaha, Nebraska October 16, 2015 OPPD North Omaha Station CCR Landfill Fugitive Dust Control Plan Table of Contents Revision
More informationTABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1
TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 PLAN CERTIFICATION 257.102(B)(4) 1 3.0 WRITTEN CLOSURE PLAN 2 3.1 Narrative 2 3.2 CCR Removal 2 3.3 CCR Left in Place 3 3.4 Maximum CCR Inventory 3 3.5 Maximum
More informationCCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri
CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station 33200 East Johnson Rd Sibley, Missouri KCP&L Greater Missouri Operations Company October 14, 2016 TABLE OF CONTENTS SECTION 1
More informationWritten Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado
Written Closure Plan Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado October 17, 2016 Table of Contents 1.0 General Information... 1 2.0 Description
More informationD.B. Wilson Station CCR Landfill
D.B. Wilson Station CCR Landfill Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule Closure and Post-closure Care Plan October 11, 2016 Prepared By: Project ID: 160030A Big
More informationCCR Closure Plan Ash Impoundment
CCR Closure Plan Ash Impoundment Iatan Generating Station Kansas City Power & Light Company Project No. 87292 Revision 0 4/13/2018 CCR Closure Plan Ash Impoundment prepared for Kansas City Power & Light
More informationWritten Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.
Written Closure Plan Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado October 17, 2016 Table of Contents 1.0 General Information... 1 2.0 Description of Closure
More informationCOAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN
COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN Plant Barry October 2015 Professional Engineer Certification: Based upon my knowledge, information, and belief that the content in the attached
More informationTABLE OF CONTENTS LEGAL NOTICE
Closure Plan for Existing CCR Rev. 0 Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION AND PURPOSE... 1 2. CLOSURE PLAN NARRATIVE DESCRIPTION... 2 3. FINAL COVER SYSTEM DESCRIPTION... 3
More informationCCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station
Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 525 Vine Street, Suite 1800 Cincinnati, Ohio 45202
More informationTABLE OF CONTENTS LEGAL NOTICE
Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENT CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED MAXIMUM INVENTORY OF CCR... 4 5. ESTIMATED
More informationCHOLLA POWER PLANT CLOSURE PLAN (b) SEDIMENTATION POND CH_ClosPlan_004_
CHOLLA POWER PLANT CLOSURE PLAN 257.102(b) SEDIMENTATION POND CH_ClosPlan_004_20161017 Closure Plan Contents 257.102(b)(1) The owner or operator of a CCR unit must prepare a written closure plan that describes
More informationCCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area
CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area Omaha Public Power District Nebraska City Station Nebraska City, Nebraska January 19, 2018 OPPD Nebraska City Station NC1 Ash Disposal Area
More informationAmended Written Closure Plan
Amended Written Closure Plan Valmont Station - Active CCR Impoundments 3A and 3B Public Service Company of Colorado October 17, 2016 Amended January 5, 2018 Table of Contents 1.0 General Information...
More informationTABLE OF CONTENTS LEGAL NOTICE
Closure Plan for Existing CCR Revision: 1 Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENT CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED
More informationCOAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN
COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN Plant Gaston October 2015 Professional Engineer Certification: Based upon my knowledge, information, and belief that the content in the attached
More informationFOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_
FOUR CORNERS POWER PLANT CLOSURE PLAN 257.102(b) UPPER RETENTION SUMP FC_ClosPlan_011_20161017 Closure Plan Contents 257.102(b)(1) The owner or operator of a CCR unit must prepare a written closure plan
More informationFOUR CORNERS POWER PLANT CLOSURE PLAN (b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_
FOUR CORNERS POWER PLANT CLOSURE PLAN 257.102(b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_20161017 Closure Plan Contents 257.102(b)(1) The owner or operator of a CCR unit must prepare a written
More informationCOAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN
~ Colorado Springs Utilities Ir's h
More informationLEGAL NOTICE. Report No. SL Revision: 0 Page No. i. Ottumwa Generating Station Notification of Intent to Initiate Closure
Page No. i LEGAL NOTICE This report ( Deliverable ) was prepared by Sargent & Lundy, L.L.C. ("S&L"), expressly for the sole use of Alliant Energy ("Alliant") in accordance with the agreement between S&L
More informationHard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563
Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.003 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com
More informationCCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.
Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 CCR
More informationNotice of Intent to Close Inactive CCR Surface Impoundments
Notice of Intent to Close Inactive CCR Surface Impoundments Virginia Electric and Power Company Possum Point Power Station Coal Combustion Residual Surface Impoundments A, B, C, D, and E Dumfries, Virginia
More information2018 Annual Inspection Report
2018 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Comanche Station 2005 Lime Road Pueblo, Colorado 81006 January 18, 2019 Table of Contents Certification...
More informationWritten Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016
Written Closure Plan Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado October 17, 2016 Table of Contents 1.0 General Information... 1 2.0 Description of Closure Plan
More information2017 Annual Inspection Report
2017 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Comanche Station 2005 Lime Road Pueblo, Colorado 81006 January 18, 2018 Table of Contents Certification...
More informationCOAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:
COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS Prepared for: SANDY CREEK SERVICES, LLC P.O. Box 370 Riesel, Texas 76682 Prepared by: SCS ENGINEERS TBPE
More informationCLOSURE PLAN. CFR (b) GERS Bottom Ash Pond. Northeastern 3&4 Power Station Oologah, Oklahoma. October, 2016
CLOSURE PLAN CFR 257.102(b) Bottom Ash Pond Northeastern 3&4 Power Station Oologah, Oklahoma October, 2016 Prepared for: Public Service Company of Oklahoma Oologah, Oklahoma Prepared by: American Electric
More informationAnnual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:
Annual CCR Landfill Inspection Lansing Landfill Prepared for: Interstate Power and Light Company Lansing Generating Station 2320 Power Plant Drive Lansing, Iowa 52151 Prepared by: SCS ENGINEERS 2830 Dairy
More informationAnnual Inspection Report of CCR Impoundment and CCR Landfill Wenck Project # B
Technical Memo To: Brian Trower, From: Peter Daniels, PE (Iowa PE# 21569) Dave Parenteau, PE (MN), Wenck Associates, Inc. Date: Subject: Annual Inspection Report of CCR Impoundment and CCR Landfill Wenck
More informationInitial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1
Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Ottumwa-Midland Landfill Prepared for: Ottumwa-Midland Landfill 15300 130 th Street Ottumwa, Iowa 52501 Prepared by: SCS
More informationWritten Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016
Written Closure Plan Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado October 17, 2016 Revised: March 27, 2019 Table of Contents 1.0 General Information... 3 2.0 Description
More informationAnnual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1
Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Ottumwa-Midland Landfill Prepared for: Ottumwa-Midland Landfill 15300 130 th Street Ottumwa, Iowa 52501 Prepared by: SCS ENGINEERS
More informationHard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563
Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.015.003 Report issued: July 03, 2017 Hard Hat Services ph: 877-630-7428 hardhatinc.com
More informationCCR Landfill 2015 Annual Inspection Report NC1 Ash Disposal Area
CCR Landfill 21 Annual Inspection Report NC1 Ash Disposal Area Omaha Public Power District Nebraska City Station Nebraska City, Nebraska January 19, 216 OPPD Nebraska City Station NC1 Ash Disposal Area
More informationCoal Combustion Residuals Annual Fugitive Dust Control Report. Prepared for Montana-Dakota Utilities Company R.M. Heskett Station.
Coal Combustion Residuals 2016 Annual Fugitive Dust Control Report Prepared for Montana-Dakota Utilities Company R.M. Heskett Station December 2016 Coal Combustion Residuals Fugitive Dust Emission Control
More informationCOAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:
COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS Prepared for: SANDY CREEK SERVICES, LLC P.O. Box 370 Riesel, Texas 76682 Prepared by: SCS ENGINEERS TBPE
More informationNorthern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report
REPORT Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number 2 2018 Annual RCRA CCR Unit Inspection Report Submitted to: Northern Indiana Public Service
More informationENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR )
PLATTE RIVER POWER AUTHORITY RAWHIDE ENERGY STATION BOTTOM ASH TRANSFER (BAT) IMPOUNDMENTS LARIMER COUNTY, CO ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR 257.60) FOR COAL COMBUSTION
More information2016 Annual Inspection Report
2016 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Comanche Station 2005 Lime Road Pueblo, Colorado 81006 January 18, 2017 Table of Contents Certification...
More informationCLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016
CLOSURE PLAN CFR 257.102(b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio September, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical Engineering
More informationCoal Combustion Residuals Closure Plan
Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number: C150035.00 October 2016 Prepared by: GAI Consultants, Inc. Richmond Office
More informationCLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016
CLOSURE PLAN CCR 257.102(b) Landfill Area Welsh Power Plant Pittsburg, Texas October, 2016 Prepared for : Southwest Electric Power Company Welsh Plant Pittsburg, Texas Prepared by: American Electric Power
More information2016 Annual Inspection Report
2016 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Pawnee Station 14940 Morgan County Road 24 Brush, Colorado 80723 January 18, 2017 Table of Contents
More informationCCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill
CCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill Omaha Public Power District Nebraska City, Nebraska January 18, 2019 OPPD North Omaha Ash Landfill CCR Landfill 2018 Annual Inspection
More informationFirst Annual RCRA CCR Unit Inspection Report January 2016 RESTRICTED WASTE TYPE I LANDFILL OPERATING PERMIT NUMBER 37-01
NORTHERN INDIANA PUBLIC SERVICE COMPANY R.M. SCHAHFER GENERATING STATION First Annual RCRA CCR Unit Inspection Report January 2016 REPORT RESTRICTED WASTE TYPE I LANDFILL OPERATING PERMIT NUMBER 37-01
More information2016 Annual Landfill Inspection Report. SCE&G Wateree Station Class III Landfill
2016 Annual Landfill Inspection Report for the SCE&G Wateree Station Class III Landfill in Eastover, SC County of Richland January 15, 2017 Annual Inspection Report The Annual Inspection Report is performed
More informationHolding Pond Annual Inspection Report
Holding Pond Annual Inspection Report Shiras Steam Plant Project Number: 6445171 January 12, 217 Holding Pond Annual Inspection Report Prepared for: Shiras Steam Plant Marquette, Michigan Prepared by:
More informationNorthern Indiana Public Service Company (NIPSCO) 2723 East 1500 North, Wheatfield, Indiana, USA Golder Associates Inc.
Northern Indiana Public Service Company R.M. Schahfer Generating Station Fourth Annual RCRA CCR Unit Inspection Report Restricted Waste Type I Landfill - Operating Permit Number 37-01 Submitted to: Northern
More informationCLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016
CLOSURE PLAN CCR 257.102(b) East and West Bottom Ash Ponds Pirkey Power Plant Hallsville, Texas October, 2016 Prepared for : Southwest Electric Power Company - Pirkey Plant Hallsville, Texas Prepared by:
More informationWhitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report
Whitewater Valley Station Wayne County, Indiana GAI Project Number: C151119.07 July 2017 Prepared by: GAI Consultants, Inc. Murrysville Office 4200 Triangle Lane Export, Pennsylvania 15632-1358 Prepared
More information2018 INSPECTION REPORT
2018 INSPECTION REPORT NORTHERN INDIANA PUBLIC SERVICE COMPANY R.M. SCHAHFER GENERATING STATION Third Annual RCRA CCR Unit Inspection Report January 2018 RESTRICTED WASTE TYPE I LANDFILL OPERATING PERMIT
More informationHolding Pond Annual Inspection Report
Holding Pond Annual Inspection Report Shiras Steam Plant Project Number: 445171 January 12, 218 Holding Pond Annual Inspection Report Prepared for: Shiras Steam Plant Marquette, Michigan Prepared by: Brian
More informationCLOSURE PLAN. CFR (b) Document ID: GERS Bottom Ash Complex. Mountaineer Plant New Haven, West Virginia.
CLOSURE PLAN CFR 257.102(b) Bottom Ash Complex Mountaineer Plant New Haven, West Virginia October, 2016 Prepared for : Appalachian Power Company - Mountaineer Plant New Haven, West Virginia Prepared by:
More informationBig Rivers Electric Corporation - D.B. Wilson Generating Station. Fugitive Dust Control Plan for Coal Combustion Residuals
Big Rivers Electric Corporation - D.B. Wilson Generating Station Fugitive Dust Control Plan for Coal Combustion Residuals Prepared For: Big Rivers Electric Corporation 201 3rd Street Henderson, KY 42419
More informationCCR Unit Closure and Post-Closure Plan. The business of sustainability. Texas Municipal Power Agency Gibbons Creek Steam Electric Station
CCR Unit Closure and Post-Closure Plan Texas Municipal Power Agency Gibbons Creek Steam Electric Station Grimes County, Texas October 12, 2016 www.erm.com The business of sustainability Texas Municipal
More informationBig Rivers Electric Corporation - Sebree Generating Station (R. A. Reid, R. D. Green and HMPL Station Two)
Big Rivers Electric Corporation - Sebree Generating Station (R. A. Reid, R. D. Green and HMPL Station Two) Fugitive Dust Control Plan for Coal Combustion Residuals Prepared For: Big Rivers Electric Corporation
More informationANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)
ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2017 EMPIRE DISTRICT ELECTRIC COMPANY Prepared by: Rachel
More informationCCR Fugitive Dust Control Plan
CCR Fugitive Dust Control Plan MidAmerican Energy Company George Neal Station South Project No. 86763 Revision A September 25, 2015 CCR Fugitive Dust Control Plan prepared for MidAmerican Energy Company
More informationConsulting Engineers and Scientists Annual Landfill Inspection Report. for the. Williams Station Highway 52 Class III Landfill
Consulting Engineers and Scientists 2015 Annual Landfill Inspection Report for the Williams Station Highway 52 Class III Landfill in Moncks Corner, SC County of Berkeley January 15, 2016 2015 Annual Landfill
More informationFUGITIVE DUST CONTROL PLAN
FUGITIVE DUST CONTROL PLAN PLEASANTS LANDFILL Willow Island, WV Allegheny Energy Supply Company, LLC A FirstEnergy Company October 19, 2015 CONTENTS Introduction 1 CCR Unit Description 1 CCR Fugitive Dust
More informationFUGITIVE DUST CONTROL PLAN
FUGITIVE DUST CONTROL PLAN PLEASANTS McELROY S RUN DISPOSAL IMPOUNDMENT Willow Island, WV Allegheny Energy Supply Company, LLC A FirstEnergy Company October 19, 2015 CONTENTS Introduction 1 CCR Unit Description
More informationOctober 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.
October 16, 2018 Mr. Mike Bednar Superintendent of Environmental Compliance GRDA-Ecosystems and Education Center PO Box 70 420 Hwy 28 Langley, OK 74350-0070 RE: GRDA CCR Landfill Compliance Report Grand
More informationGreen CCR Surface Impoundment
Green CCR Surface Impoundment Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment 2017 Annual Inspection Report January 11, 2018 Prepared By: Project ID: 170138A
More informationHunters Point Naval Shipyard Environmental Remediation Program Overview
NAVFAC Southwest Hunters Point Naval Shipyard Environmental Remediation Program Overview Bayview Hunters Point Mr. Derek Robinson, BRAC Environmental Coordinator Introductions and Overview Derek Robinson
More informationMr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No
October 17, 2016 Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop 100406 San Antonio, Texas 78296 Project No. 0352436 Subject: Compilation of Construction History Calaveras Power Station San
More information1995 Metric CSJ SPECIAL PROVISION ITEM 7. Legal Relations And Responsibilities To The Public
1995 Metric CSJ 0915-12-242 SPECIAL PROVISION TO ITEM 7 Legal Relations And Responsibilities To The Public For this project, Item 7 "Legal Relations and Responsibilities to the Public", of the Standard
More informationLa Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle
La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas Mark Coyle Corpus Christi Navigation Channel PCCA La Quinta Expansion Project History Corpus Christi Ship Channel Improvement Projects
More informationANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)
ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2019 LIBERTY UTILITIES Empire District Prepared by: Rachel
More informationHazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager
Procedure No.: PA-033-0006 Page: 1 of 19 Port Arthur, TX. Reviewed: 02/18 Effective: 02/06/18 (Rev.03) Supersedes: 02/15/16 Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager Document
More informationSTRUCTURAL STABILITY ASSESSMENT
STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical
More informationHAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE
Page 1 of 10 HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE 1.0 SCOPE This Performance Assessment Guide for Hazardous Waste Operations and Emergency Response (HAZWOPER) will be used to carry out the
More informationJuneau Douglas Harbor
Juneau Douglas Harbor Douglas Harbor Page 2 of 8 Condition of Improvements 31 December 2015 Douglas Harbor, Alaska (CWIS No. 072789, 180942) Authorization Rivers and Harbors Act, 3 July 1958 (House Doc.
More informationExplosive gas migration monitoring for a sanitary landfill facility.
3745-27-12 Explosive gas migration monitoring for a sanitary landfill facility. (A) Applicability and implementation. This rule applies to the following: (1) The owner or operator of a sanitary landfill
More informationIf you have any questions or comments, please feel free to contact me at
Phone: 256.847.0780 Fax: 256.8470905 matrixdesigngroup.com October 3, 2013 Mr. Eric Sanderson Chief, Solid Waste Branch, Land Division Alabama Department of Environmental Management P.O. Box 301463 Montgomery,
More informationFINAL Caples Lake Fisheries Management Plan. Version 4.0
FINAL Caples Lake Fisheries Management Plan Version 4.0 August 15, 2008 Purpose The Caples Lake Fisheries Management Plan (Plan) outlines the stocking plan to reestablish a sport fishery in Caples Lake
More informationAPPENDIX H. Risk-Based Disposal Application. Revised EE/CA. Lower Duwamish Waterway Superfund Site: T-117 Early Action Area
APPENDIX H Risk-Based Disposal Application Revised EE/CA Appendix H Risk-Based Disposal Application Since the T-117 EAA contamination includes PCBs, cleanup and disposal of PCBcontaminated waste will follow
More informationINADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)
INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) FACILITY OPERATOR: NextEra Energy Resources, LLC 700 Universe Boulevard Juno Beach, FL 33408 For Horizontal Directional Drilling Contents
More informationSHOOTING ISLAND RESTORATION: LIVING SHORELINE AND HABITAT CONSTRUCTION
: : : : LIVING SHORELINE AND HABITAT CONSTRUCTION CITY OF OCEAN CITY, NEW JERSEY CONTRACT NO. 8 ID 4468 Sheet List Table Sheet Number Sheet Description Sheet Title Newark T- TITLE SHEET G- SITE OVERVIEW
More informationRULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS
RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER 0400-52-06 DRILLING WELLS TABLE OF CONTENTS 0400-52-06-.01 Drilling Equipment 0400-52-06-.03 Casingheads 0400-52-06-.02 Blowout Prevention
More informationThis section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches.
Appendix H Specific Excavation Requirements This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches. Surface encumbrances All surface encumbrances
More informationMelancthon Pits Extension Noise Study Part of West Half of Lots 12 and 14, Concession 3 O.S. Township of Melancthon, County of Dufferin
NOISE IMPACT STUDY - Project: 16099 Melancthon Pits Extension Noise Study Part of West Half of Lots 12 and 14, Concession 3 O.S. Township of Melancthon, County of Dufferin Prepared for: MHBC Planning c/o
More informationInspector MUST Sign and Date Each Inspection
Work Area: Applicant: Mercer County Department of Transportation - Highways Division Application and Permit for Road Work in Mercer County, New Jersey NO. East Windsor Ewing Hamilton Hopewell Lawrence
More information1-44. SITKA HARBOR, ALASKA (Western Channel, Crescent Bay Basin, Channel Rock Breakwaters) (CWIS NOS , 16840, 10322, 55030, 13787)
SITKA 1-44 SITKA HARBOR, ALASKA (Western Channel, Crescent Bay Basin, Channel Rock Breakwaters) (CWIS NOS. 72845, 16840, 10322, 55030, 13787) Condition of Improvement 30 September 2011 AUTHORIZATION:
More informationHISTORY OF CONSTRUCTION
HISTORY OF CONSTRUCTION CFR 257.73(c)(1) West Boiler Slag Pond Clifty Creek Plant Madison, Indiana October, 2016 Prepared for: Indiana Kentucky Electric Corporation Prepared by: American Electric Power
More informationNinilchik Harbor Page 2 of 11
Ninilchik Harbor Ninilchik Harbor Page 2 of 11 Condition of Improvements 31 December 2017 Ninilchik Harbor, Alaska (CWIS No. 012640, 087345) Authorization Rivers and Harbors Act, 3 July 1958 (P.L. 85-500
More informationPressure Vessel Program
Pressure Vessel Program 1. PURPOSE 1.1 This program provides guidance to University employees that work with or are responsible for pressure vessels. Conformance to this Program aids the University in
More informationMSW Objective 1.1: Level of Service Standards To maintain the IMSWMS MSW collection system to meet or exceed established LOS standards.
INFRASTRUCTURE - MUNICIPAL SOLID WASTE PURPOSE The purpose of the Solid Waste section of the Infrastructure Element is to ensure that necessary sanitation facilities and services are in place to provide
More informationDEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management
DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management DOCUMENT NUMBER: 800-0810-003 TITLE: EFFECTIVE DATE: AUTHORITY: POLICY: PURPOSE: APPLICABILITY: DISCLAIMER: Guidelines for Development
More informationADDENDUM A EMERGENCY ACTION PLAN FLY ASH BASIN FACILITY EMERGENCY ACTION PLAN. INACTIVE BOTTOM ASH BASIN MONROE POWER PLANT Monroe, Michigan
ADDENDUM A EMERGENCY ACTION PLAN FLY ASH BASIN FACILITY EMERGENCY ACTION PLAN INACTIVE BOTTOM ASH BASIN MONROE POWER PLANT Monroe, Michigan Prepared by 3520 Green Court Suite 275 Ann Arbor, Michigan 48015
More informationHAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE (HAZWOPER)
SECTION 28 HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE (HAZWOPER) 28.A. GENERAL. 28.A.01 This Section applies to: a. Hazardous waste site cleanup operations performed under the Comprehensive Environmental
More informationEMA, Inc. SITE SAFETY PLAN
EMA, Inc. SITE SAFETY PLAN A. SITE DESCRIPTION JOB NAME: JOB NUMBER: DATE: PLAN REVISION NUMBER: SITE ADDRESS: Additional Site / Project Information: B. SCOPE OF WORK 1. 2. 3. 4. 5. 6. C. ONSITE ORGANIZATION
More informationIC Chapter 9. Regulation of Fishing
IC 14-22-9 Chapter 9. Regulation of Fishing IC 14-22-9-1 Unlawful means of taking fish; special permits Sec. 1. (a) Except as allowed by sections 3 and 11 of this chapter, an individual may not take fish
More informationPRINTED COPY IS NOT CONTROLLED Page 1 of 22
The current (electronic) copy of this procedure is found at: Z:/ISDC Procedures and Forms/Current/ (Revision History/Approvals is on last page) 1. PURPOSE The following guidelines are intended to help
More informationComments and Requests for Additional Information. Regarding
Comments and Requests for Additional Information Regarding Furie Operations Alaska, LLC Cook Inlet Exploration Program Oil Discharge Prevention and Contingency Plan (12-CP-5184) Submitted By COOK INLET
More informationProject Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3
Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3 Project Title: Marsh Creek and Albion River Instream Fish Barrier Removal, Flynn
More informationROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax
Instructions: For a driveway access permit, fill in sections 1, 2, 3 and 4, and the appropriate drawings and sign. For a Utility access, fill in sections 1, 2, 3 and 5, and figures 1 and 3. Prepare a detailed
More informationAppendix B. Emissions Inventory
Appendix B Emissions Inventory This page intentionally blank. Appendix B: Emissions Inventory TABLE OF CONTENTS B. Emissions Inventory...B-1 B.1 Emissions Inventory Tables...B-2 B.2 Emissions Inventory
More informationBasemap Data Collection for Ash Pond Closure Designs: Topographic and Bathymetric Challenges
2015 World of Coal Ash (WOCA) Conference in Nasvhille, TN - May 5-7, 2015 http://www.flyash.info/ Basemap Data Collection for Ash Pond Closure Designs: Topographic and Bathymetric Challenges David Reynolds,
More informationSuitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More information