Wellwork Chronological Regulatory Report

Size: px
Start display at page:

Download "Wellwork Chronological Regulatory Report"

Transcription

1 Well Name: UNIVERSITY 49 #0808H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern Project AFE: DV02151 AFE's Associated: / / / API: Supervisor: Phone: Production Cur/Exp Oil: 0 / 0 Gas: 0 / 0 Water: 0 / 0 Activity Date: 12/28/2013 Days on Compl: 57 TD (TVD): 0' Activity Date: 12/29/2013 Days on Compl: 58 TD (TVD): 0' Activity Date: 12/30/2013 Days on Compl: 59 TD (TVD): 0' Activity Date: 1/3/2014 Days on Compl: 63 TD (TVD): 0' MIRU Casedhole Solutions Wireline Services. MIRU Lynxs Tri-Plex pump and Raider filter pod. Hold safety meeting, discuss job tasks, pinch points and crane safety. SICP - 10#. Open csg full open to OT tank, Fluid rate.25 bpm. RIH w/ Casedhole GR/CCL, Lee Pressure Temperature tool and 5" Full Bore Spinner (Total tool string length - 30'/m to 5000', POOH logging 60'/m to 500', RIH 90'/m to 5000', POOH logging 120'/m to 500'. Well flowed.25 bpm while logging, their was no definitive leak seen while logging static passes. RU Lynx's Tri-Plex pump to flow cross, start injecting fresh water #, log from 500' to 60'/m, POOH 90'/m to 500' with injection rate of 2 750#. Definitive leak 2730'. ( files being ed to John, Terry & Barry.) Secure well. RDMO Casedhole Solutions Wireline Services. Activity Date: 1/4/2014 Days on Compl: 64 TD (TVD): 0' MIRU CC Forbes Completion Rig. Take delivery of 150 jts 2 7/8"" 8.70# PH6 tbg from BTI (Pipe has been rattled and cleaned). MI BTI Fishing and Rentals, NU & torque per API 7 1/16" 10M BOP's w/ remote hydraulic accumulator (2 7/8" pipes over blinds). SICP - 20#. Open well up and flow to OT tank, well continued to flow, MI Basic Transport loaded w/ 40 bbls 10 ppg brine, pump 40 2 bpm down 5 1/2" 17# P-110 csg, open well to OT tanks and check for flow, well still flowing minimal fluid. Pick up & TIH w/ HB Packers Arrow HD Squeeze tool 10k Packer w/ carbide slips, 2 7/8" 8rd box x Pin, 2 7/8"" PH6 box x 8rd pin, (Total Length BHA ') and 70 jts 2 7/8" 8.70# P-110 PH6 workstring, set '. RU Lynx's triplex pump to csg annulus, load and pressure test csg annulus (5 1/2" 17# x 2 7/8" 8.70#) w/ fresh water to 8000#, good test from 2211' to surface. Bleed pressure off to OT tank, release packer. Continue TIH. Pick up & TIH w/ 5 jts (75 total in), set 2367', shut pipe rams. RU Lynx's triplex pump to csg annulus, load and pressure test csg annulus (5 1/2" 17# x 2 7/8" 8.70#) w/ fresh water to 8000#, good test from 2367' to surface. Bleed pressure off to OT tank. Pick up & TIH w/ 5 jts (80 total in), set 2524', shut pipe rams. RU Lynx's tri-plex pump to csg annulus, load and pressure test csg annulus (5 1/2" 17# x 2 7/8" 8.70#) w/ fresh water packer seals appeared to have given 7000#, well circulating up 2 7/8" tbg, shut pumps down, bleed off to OT tank, release packer, pull 1 jt (79 jts in hole) set 2493', kick pumps on, well circulating. Shut pumps down. Bleed pressure off, release packer. Shut down for crew to eat lunch. TOOH stand back 40 stands 2 7/8" 8.70# P-110 PH6 tbg in derrick, visually inspect packer all elements looked good, did not see any visual signs. Pick up & TIH w/ HB Packers - Baker Retreiveamatic Squeeze tool 10k Packer w/ carbide slips, 2 7/8" 8rd box x Pin, 2 7/8" PH6 box x 8rd pin, (Total Length BHA ') and 80 jts 2 7/8"" 8.70# P-110 PH6 workstring, set 2524'. RU Lynx's tri-plex pump to csg annulus, load and pressure test csg annulus (5 1/2" 17# x 2 7/8" 8.70#) w/ fresh water, test to 8000#, good test from 2524' (80 jts) Bleed pressure off. Release packer & Continue TIH. Pick up & TIH w/ 5 jts (85 jts total in), set 2681', shut pipe rams. RU Lynx's tri-plex pump to csg annulus, load and pressure test csg annulus (5 1/2" 17# x 2 7/8" 8.70#) w/ fresh water, test for hole, test from 2681' (85 jts), test failed, pumping 1 450#, total fluid pumped 10 bbls. Bleed pressure off. Release packer,tooh stand back 1 stand, set packer (83 jts total in), set 2618', shut pipe rams. RU Lynx's tri-plex pump to csg annulus, load and pressure test csg annulus (5 1/2" 17# x 2 7/8" 8.70#) w/ fresh water, test for hole, test from 2618' (83 jts), test failed, pumping 1 450#, total fluid pumped 10 bbls. Bleed pressure off. Release packer, TOOH stand back 1 jt, set packer (82 jts total in), set 2587', shut pipe rams. RU Lynx's tri-plex pump to csg annulus, load and pressure test csg annulus (5 1/2" 17# x 2 7/8" 8.70#) w/ fresh water, test to 8000#, good test from 2587' (82 jts) Bleed pressure off. Release packer. TOP HOLE: Below ' and Above '. TIH to 2868' (91 jts total in hole). Shut pipe rams, secure well & SDFN. Page 1 of 7

2 Activity Date: 1/5/2014 Days on Compl: 65 TD (TVD): 0' SICP - 20#. Open csg to OT tank and blow down. Hold safety meeting, discuss high pressure testing and staying clear of all pump lines. Open pipe rams, set 2868', (91 jts in) screw in TIW valve, tie in hard line from Lynxs tri-plex pump to 2 7/8" 8.70# P-110 PH6 tbg. load and pressure test down 2 7/8" 8.70# tbg w/ fresh water to 8000#, good test from 2868' to toe CBP 17,910'. Bleed pressure off to OT tank, ND pump in line, release packer. TOOH lay down 1 jt leaving 90 jts in, set 2837'. Tie in hard line for pressure test. Load and pressure test down 2 7/8"" 8.70# tbg w/ fresh water to 8000#, good test from 2837' to toe CBP 17,910'. Bleed pressure off to OT tank, ND pump in line, release packer. TOOH lay down 2 jts leaving 88 jts in, set 2775'. Tie in hard line for pressure test. Load and pressure test down 2 7/8" 8.70# tbg w/ fresh water to 8000#, good test from 2775' to toe CBP 17,910'. Bleed pressure off to OT tank, ND pump in line, release packer. TOOH lay down 1 jts leaving 87 jts in, set 2743'. Tie in hard line for pressure test. Load and pressure test down 2 7/8" 8.70# tbg w/ fresh water pumping into csg #, pump total 10 bbls over displacement, test failed from 2743' to toe CBP 17,910'. Bleed pressure off to OT tank, ND pump in line, release packer. TIH w/ 1 jt leaving 88 jts in, set 2775'. Tie in hard line for pressure test. Load and pressure test down 2 7/8"" 8.70# tbg w/ fresh 4500#, well circulating up csg annulus, packer failed. Bleed pressure off to OT tank, ND pump in line, release packer. Decision was made to TOOH and pick up tension packer and 2775' to ensure csg integrity. TOOH stand back 44 stands in derrick, lay down packer. TIH w/ 5 1/2" x 2 3/8" AS1 Packer (14# to 20#) on 2 7/8" 8.70# P-110 PH6 workstring set 2775' (88 jts). Load and pressure test down 2 7/8"" 8.70# tbg w/ fresh water to 8000#, monitor 15 minutes, 2nd test good from 2775' to toe CBP 17,910'. Bleed pressure off to OT tank, ND pump in line, release packer. TOOH stand back 3 stands (6 jts) leaving 82 jts in well, set 2587'. Load and pressure test down 2 7/8"" 8.70# tbg w/ fresh water to 8000#, monitor 15 minutes, 2nd test good from 2587'' to surface. Bleed pressure off to OT tank, ND pump in line, release packer. TOOH stand back 44 stands in derrick. Close blind rams on BOP, shut in flow cross & secure well. Test Results to 8000#: good test from 2587' to surface & from 2775' to 17,910'. (188' of bad csg) Activity Date: 1/6/2014 Days on Compl: 66 TD (TVD): 0' Hold safety meeting, discuss cold temperatures, pinch pts while wearing multiple pair's of gloves. Open csg to OT tanks, flowline blockage (ice), knock line loose, run 5K hoses and tie in to OT tank, open well & blow down to light returns. NU 10M stripping head. TIH w/ 11 stands 2 7/8" 8.70 P110 PH6 tbg, TOOH lay down 22 jts tbg to clear derick for swivel operations while running Mill BHA. PU & TIH w/ Mohawk Energy supplied Tappered Mill (Length ', OD "), Watermellon Mill (Length ', OD "), Pony Collar (Length ', OD "), Watermellon Mill (Length ', OD "), Drain Sub (Length ', OD ") Total length of BHA = 21.59' on 2 7/8" 8.70# P110 PH6 tbg, stacked out below tbg head, try rotating via pipe wrench, could not make any hole, TOOH, visually inspect mill's, found tight spot on watermellon mill, caliper showed ", measure length to tight spot, measure from top of stripping head marked to below tbg head, measurements indicate we are 2' below tbg head. TIH 2nd attempt, set down in same spot mark pipe, try rotating via power tongs, still could not work down. TOOH. Lay down String Mill BHA and 1 jt tbg. Called and discussed situation with Mr. Terry Brownlee, call was made to Mr. John Conley. Descion was made to run Caliper log, called Casedhole Solutions, they will be on 0600 in the morning to run 60 finger caliper log. Also have new string mill BHA being delivered w/ OD of 4.767" (drift of 5 1/2" 17# P-110 csg). Shut well in & secure. Release all services for day. Activity Date: 1/7/2014 Days on Compl: 67 TD (TVD): 0' MIRU Casedhole Solutions Wireline Services. Hold Safety Meeting. SICP - 10#. Hydraulic fitting broke on BOP accumulator, shut down waiting on parts. Repair accumulator, start & build pressure, Open Blind Rams. RIH w/ Casedhole 2 3/4" Electronic Imaging Tool & 60 arm Caliper tool (Total Length of BHA ', Largest OD "), stop & POOH w/ repeat pass from 2900' to 2000', correlate to Spinner Temp, Gamma Ray, CCL log ran on , continue RIH to 5000', POOH 30'/m to surface. Log to be sent via to Mr. Conley, Mr. Luecker & Mr. Brownlee for analysis. Note: Caliper log did not show any tight spots below tbg head, reason unknown why Mill BHA would not pass. RDMO Casedhole Solutions. NU 10M stripping head. Prep Well to Run String Mills in the a.m.. Secure well & SDFN. Activity Date: 1/8/2014 Days on Compl: 68 TD (TVD): 0' Hold Safety Meeting. Discuss task, high winds wile picking up swivel. Crossover's for new Mill BHA arrived on location & were wrong, sent back for correct crossover's. SICP - 15#. Open csg to OT tank and blow down to minimal flow. PU & TIH Mohawk Energy spiral tapered mill & 1 jt 2 7/8" 8.70# P-110 PH6, TIH set down in top of csg head (Suspect top of csg ID burred or egged), not enough weight to work and dress up top of 5 1/2" 17# P-110 csg, lay down 1 jt tbg. Rig up Lynx's Power Swivel. PU & TIH Mohawk Energy spiral tapered mill, 10' x 2 7/8" 8.70# P-110 PH6 pony sub & 1 jt 2 7/8" 8.70# P-110 PH6 tbg, rotate mill via 10 revolutions/m to dress up top of 5 1/2" csg, worked 5 minutes, pick up shut swivel down, TOOH, inspect mill, no marks on mill body, marks were on drag blocks, TIH without rotating through top of csg to 30', TOOH got tight, turn swivel on & rotate out. Lay down mill & tbg. Rack Swivel back. Waiting on correct crossovers for new Mill BHA. PU & TIH w/ Tappered Mill (Length ', OD "), Watermellon Mill (Length ', OD "), Pony Collar (Length ', OD "), Watermellon Mill (Length ', OD "), Drain Sub (Length ', OD ") Total length of BHA = 21.59' on 2 7/8"" 8.70# P110 PH6 tbg to 2100' (66 jts) Set slips, lay down Power Tongs. Rig up Lynx's Power Swivel. PU & continue TIH w/ String Mill BHA from 2100' to 2882' (91 jts) rotating & recipocating each joint to clean up csg. MIRU Universal Pumping Services. Pressure test pump lines to 4500#, good test. Bleed pressure to 0#. Open Plug Valve. Break circulation down 2 7/8" tbg, pump 5 1 bpm, shut down, drop ball for drain sub (1.25" ball), pump & seat ball, pressure up to 3000# & flex 2 7/8" workstring 10 times. Pressure up on drain sub & shift sleeve open, circulate 5 bbls to OT tank. Start acid pump 15 bbls 15% 1 bpm down tbg, flush using 15 bbls fresh water. Shut pumps down. Realign manifold valves, Pump 60 bbls & reverse circulate acid 2 bpm using fresh water. Shut pumps down. (Note: Circulating pump pressure 100#, ISIP 10#. RDMO Universal Pumping Services. TOOH stand back 45 stands in derick, lay 1 jt & string mill BHA down. Secure well & SDFN. Activity Date: 1/9/2014 Days on Compl: 69 TD (TVD): 0' Page 2 of 7

3 Hold Safety Meeting. Discuss running Csg Patch for 5 1/2"" 17# P-110 csg. SICP - 15#. Open flowline & blow down, well has minimal flow back. Rig up 4.25" Liner csg handling tools (slips, bowl & elevators) PU setting Tool, csg lock & spacer jt (all 1 piece), PU lower seal jt and make up r2m connection (1200 ft/lbs), continue TIH w/ jts 4.25" liner (Total Liner/Patch = 48 jts ' expanded length), PU upper seal jt and make up, PU and make up Exit jt and make up, put on safety clamp, set in slips. Change out handling tools to TIH w/ 2 7/8" 8.70# P-110 PH6 tbg, make up latching BHA. Hold Safety Meeting & discuss expansion of liner/csg patch. RU Mohawk split table over liner stump. TIH w/ 91 jts 2 7/8" 8.70# P-110 PH6 tbg w/ liner latch BHA to 2882' tbg tally, latch liner, confirm tally. NU TIW valve and 10K x 1" kelly hose, Pressure test pump lines to 6000#. Bleed pressure off. Tie back drill line on 6 lines. Break circulatin & pump 5 bbls, good circulation to OT tank, start & finsh expanding bottom seal jt by hydraulic fluid stroke, good, continue expanding liner by pulling 60,000# over string wt, experienced tight 2500', RU kelly hose back up & hydraulic fluid stroke and pull through tight spot, RD kelly, continue expanding liner via pullng 60,000# over via rig, stop below top seal, RU kelly & hydraulic fluid stroke top seal, RD kelly, pull out of top 60,000# over string wt. Change out elevators, tie back on fast line & TOOH lay down remainder of 2 7/8"" workstring. (Note: Top Liner +/- 1855', Bottom Liner 2870') Shut blind rams on BOP's, Pressure test 5 1/2" 17# P-110 csg & liner to 8030#, hold 15 minutes, good test. Bleed pressure off to OT tank. Release all services. SDFN. Activity Date: 1/10/2014 Days on Compl: 70 TD (TVD): 0' Lynxs arrived on location. RU Lynxs pump lines, pressure test 5 1/2"" 17# P-110 csg & csg patch to 8000#, hold & monitor 15 minutes, no leak off. Bleed pressure off to 0#. RDMO Lynxs & CC Forbes. API Wireline cancelled CCL, GR log until tomorrow morning due to still on stage job. Activity Date: 1/11/2014 Days on Compl: 71 TD (TVD): 0' Rig up wireline. RIH, reach 3,200' to correlate gamma and logged the patch twice. The BOL is 2,830' TOL is at 1,844' according to wireline CCL. RDMO Well shut in till frac Activity Date: 1/22/2014 Days on Compl: 82 TD (TVD): 0' Rig up Frac location Activity Date: 1/23/2014 Days on Compl: 83 TD (TVD): 0' "Finish stage 1 University Land H Stage 1 of Start: 04:41 End: 07:05 Open Well SCIP 1353 PSI Ball Seat Volume N/A BBLS Initial Breakdown 4,040 PSI Acid Break Down 6400 PSI Pad Volume 709 BBLS 100 Mesh.25 ppa 586 BBLS 100 Mesh.50 ppa 547 BBLS 100 Mesh.75 ppa 575 BBLS 100 Mesh 1.00 ppa 819 BBLS 100 Mesh 1.25 ppa 521 BBLS Total 100 Mesh Pumped 96,760 LBS Ottawa 40/70 sand.50 ppa 456 BBLS Ottawa 40/70 sand.75 ppa 419 BBLS Ottawa 40/70 sand 1.00 ppa 1214 BBLS Ottawa 40/70 sand 1.25 ppa 966 BBLS Ottawa 40/70 sand 1.50 ppa 605 BBLS Total 40/70 Pumped 146,120 LBS Flush 469 BBLS ISIP 1,897 PSI Frac Gradient.66 Psi/ft 5min drop 2,500 PSI Total proppant 262,180 LBS Total clean fluid 7,895 BBLS" Stage 2 Wireline set the plug at 17,710 Ft pumped a total of 604 bbls of fresh water perforations from : , , , , of Start: 10:14 End: 12:39 Page 3 of 7

4 Open Well SCIP 2405 PSI Ball Seat Volume 369 BBLS Initial Breakdown 5042 PSI Acid Break Down 5600 PSI Pad Volume 853 BBLS 100 Mesh.50 ppa 503 BBLS 100 Mesh 1.00 ppa 924 BBLS Total 100 Mesh Pumped LBS Ottawa 40/70 sand.50 ppa 506 BBLS Ottawa 40/70 sand 1.00 ppa 761 BBLS Ottawa 40/70 sand 1.50 ppa 925 BBLS Ottawa 40/70 sand 2.00 ppa 690 BBLS Ottawa 40/70 sand 2.50 ppa 885 BBLS Ottawa 40/70 sand 2.00 ppa 438 BBLS Total 40/70 Pumped LBS RCS 40/70 sand 2.00 ppa 278 BBLS Total RCS Pumped LBS Flush 457 BBLS ISIP 3094 PSI Frac Gradient 0.81 Psi/ft 5min drop 2750 PSI Total proppant LBS Total clean fluid 6913 BBLS Average Rate 65.0 BPM Average PSI PSI Max PSI 6493 PSI" Stage 3 Wireline set the plug at 17,510 Ft pumped a total of 622 bbls of fresh water with max PSI of 4,200 lost 80 pounds when plug set perforations from : , , , , of Start: 14:39 End: 19:17 Consultant: Storm McDonald Open Well SCIP 2598 PSI Ball Seat Volume 370 BBLS Initial Breakdown 5460 PSI Acid Break Down 6481 PSI Pad Volume 760 BBLS 100 Mesh.50 ppa 569 BBLS 100 Mesh 1.00 ppa 855 BBLS Total 100 Mesh Pumped LBS Ottawa 40/70 sand.50 ppa 583 BBLS Ottawa 40/70 sand 1.00 ppa 1458 BBLS Ottawa 40/70 sand 1.50 ppa 1765 BBLS Ottawa 40/70 sand 2.00 ppa 1124 BBLS Total 40/70 Pumped LBS RCS 40/70 sand 2.25 ppa 351 BBLS Total RCS Pumped LBS Flush 459 BBLS ISIP 3328 PSI Frac Gradient.84 Psi/ft 5min drop 2900 PSI Total proppant LBS Total clean fluid 7660 BBLS Average Rate 61.8 BPM Average PSI 5429 PSI Max PSI 6137 PSI" Stage 4 Wireline set the plug at 17,310 Ft pumped a total of 1285 bbls of fresh water with max PSI of 4885 lost 55 pounds when plug set perforations from : , , , , of Start: 0:07 End: 02:49 Consultant: Storm McDonald Open Well SCIP 2614 PSI Ball Seat Volume 356 BBLS Initial Breakdown 4983 PSI Acid Break Down 6250 PSI Pad Volume 557 BBLS 100 Mesh.50 ppa 548 BBLS 100 Mesh.75 ppa 455 BBLS 100 Mesh 1.00 ppa 509 BBLS Total 100 Mesh Pumped LBS Ottawa 40/70 sand.50 ppa 1032 BBLS Ottawa 40/70 sand 1.00 ppa 1199 BBLS Ottawa 40/70 sand 1.50 ppa 1225 BBLS Ottawa 40/70 sand 2.00 ppa 1678 BBLS Total 40/70 Pumped LBS Page 4 of 7

5 RCS 40/70 sand 2.50 ppa 214 BBLS Total RCS Pumped LBS Flush 439 BBLS ISIP 3565 PSI Frac Gradient.87 Psi/ft 5min drop 3000 PSI Total proppant LBS Total clean fluid 7770 BBLS Average Rate 65.8 BPM Average PSI 5546 PSI Max PSI 6664 PSI" Stage 5 Wireline set the plug at Ft pumped a total of 663 bbls of fresh water with max PSI of 4792 lost 20 pounds when plug set perforations from : , , , , 17090, Activity Date: 1/24/2014 Days on Compl: 84 TD (TVD): 0' 5 of Start: 05:30 End: 07:51 Open Well SCIP 2690 PSI Ball Seat Volume 348 BBLS Initial Breakdown 4716 PSI Acid Volume 48 BBLS Acid Break Down 6800 PSI Pad Volume 535 BBLS 100 Mesh.50 ppa 603 BBLS 100 Mesh 1.00 ppa 761 BBLS Total 100 Mesh Pumped 48,000 LBS Ottawa 40/70 sand.50 ppa 655 BBLS Ottawa 40/70 sand 1.00 ppa 713 BBLS Ottawa 40/70 sand 1.50 ppa 647 BBLS Ottawa 40/70 sand 2.00 ppa 589 BBLS Ottawa 40/70 sand 2.50 ppa 1260 BBLS Ottawa 40/70 sand 3.00 ppa 306 BBLS Total 40/70 Pumped 268,380 LBS RCS 40/70 sand 2.50 ppa 185 BBLS Total RCS Pumped 20,080 LBS Flush 443 BBLS ISIP 3476 PSI Frac Gradient 0.86 Psi/ft 5min drop 2980 PSI Total proppant 336,460 LBS Total clean fluid 6394 BBLS Average Rate 63.8 BPM Average PSI PSI Max PSI 6217 PSI" Stage 6 Wireline set the plug at Ft pumped a total of 703 bbls of fresh water with max PSI of 4620 lost 50 pounds when plug set perforations from : , , , , of Start: 09:50 End: 11:50 Open Well SCIP 2520 PSI Ball Seat Volume 336 BBLS Initial Breakdown 5264 PSI Acid Volume 40 BBLS Acid Break Down 6,500 PSI Pad Volume 443 BBLS 100 Mesh.50 ppa 359 BBLS 100 Mesh 1.00 ppa 495 BBLS 100 Mesh 1.50 ppa 258 BBLS Total 100 Mesh Pumped 44,960 LBS Ottawa 40/70 sand 1.00 ppa 1,436 BBLS Ottawa 40/70 sand 1.50 ppa 683 BBLS Ottawa 40/70 sand 2.00 ppa 742 BBLS Ottawa 40/70 sand 2.50 ppa 660 BBLS Ottawa 40/70 sand 3.00 ppa 592 BBLS Total 40/70 Pumped 269,840 LBS RCS 40/70 sand 3.00 ppa 142 BBLS Total RCS Pumped 20,010 LBS Page 5 of 7

6 Flush 438 BBLS ISIP 3,090 PSI Frac Gradient 0.81 Psi/ft 5min drop 2,840 PSI Total proppant 334,810 LBS Total clean fluid 5,960 BBLS Average Rate 63.3 BPM Average PSI 5,265.8 PSI Max PSI 6,059 PSI" Stage 7 Wireline set the plug at 16,702 Ft pumped a total of 699 bbls of fresh water with max PSI of 4,200 lost 150 pounds when plug set perforations from : , , , , Started pumping stage 7. Had to shut down due to water transfers line parting at a conection. New conection had to be brought to location from Big Lake. 7 of Start: 13:43 End: 16:57 Open Well SCIP 2500 PSI Ball Seat Volume 343 BBLS Initial Breakdown 5270 PSI Acid Volume 26 BBLS Acid Break Down 6630 PSI Pad Volume 361 BBLS 100 Mesh.50 ppa 598 BBLS 100 Mesh 1.00 ppa 353 BBLS 100 Mesh 1.50 ppa 296 BBLS Total 100 Mesh Pumped LBS Ottawa 40/70 sand 1.00 ppa 189 BBLS Ottawa 40/70 sand 1.50 ppa 898 BBLS Ottawa 40/70 sand 2.00 ppa 1273 BBLS Ottawa 40/70 sand 2.50 ppa 998 BBLS Ottawa 40/70 sand 3.00 ppa 307 BBLS Total 40/70 Pumped LBS RCS 40/70 sand 3.00 ppa 250 BBLS Total RCS Pumped LBS Flush 433 BBLS ISIP 3485 PSI Frac Gradient.90 Psi/ft 5min drop 2827 PSI Total proppant LBS Total clean fluid 5933 BBLS Average Rate 58.4 BPM Average PSI 5274 PSI Max PSI 6537 PSI" Stage 8 Wireline set the plug at Ft pumped a total of 680 bbls of fresh water with max PSI of 4650 lost 85 pounds when plug set perforations from : , , , , of Start: 19:35 End: 21:48 Consultant: Storm McDonald Open Well SCIP 2539 PSI Ball Seat Volume 344 BBLS Initial Breakdown 4717 PSI Acid Volume 47 BBLS Acid Break Down 6130 PSI Pad Volume 674 BBLS 100 Mesh.50 ppa 585 BBLS 100 Mesh 1.00 ppa 488 BBLS 100 Mesh 1.50 ppa 168 BBLS Total 100 Mesh Pumped LBS Ottawa 40/70 sand 1.00 ppa 851 BBLS Ottawa 40/70 sand 1.50 ppa 867 BBLS Ottawa 40/70 sand 2.00 ppa 866 BBLS Ottawa 40/70 sand 2.50 ppa 848 BBLS Ottawa 40/70 sand 3.00 ppa 263 BBLS Total 40/70 Pumped LBS RCS 40/70 sand 3.50 ppa 249 BBLS Total RCS Pumped LBS Flush 429 BBLS ISIP 3536 PSI Frac Gradient.90 Psi/ft 5min drop 2950 PSI Total proppant LBS Page 6 of 7

7 Total clean fluid 5998 BBLS Average Rate 63.5 BPM Average PSI 5025 PSI Max PSI 5945 PSI" Stage 9 Wireline set the plug at Ft pumped a total of 673 bbls of fresh water with max PSI of 4890 lost 35 pounds when plug set perforations from : , , , , of Start: 02:12 End: 04:22 Open Well SCIP 2562 PSI Ball Seat Volume 329 BBLS Initial Breakdown 4756 PSI Acid Volume 46 BBLS Acid Break Down 5940 PSI Pad Volume 471 BBLS 100 Mesh.50 ppa 521 BBLS 100 Mesh 1.00 ppa 451 BBLS 100 Mesh 1.50 ppa 246 BBLS Total 100 Mesh Pumped 45,400 LBS Ottawa 40/70 sand 1.00 ppa 896 BBLS Ottawa 40/70 sand 1.50 ppa 918 BBLS Ottawa 40/70 sand 2.00 ppa 1,040 BBLS Ottawa 40/70 sand 2.50 ppa 749 BBLS Ottawa 40/70 sand 3.00 ppa 282 BBLS Total 40/70 Pumped 270,300 LBS RCS 40/70 sand 3.00 ppa 197 BBLS Total RCS Pumped 20,340 LBS Flush 426 BBLS ISIP 3,583 PSI Frac Gradient 0.91 Psi/ft 5min drop 2,900 PSI Total proppant 336,040 LBS Total clean fluid 5,933 BBLS Average Rate 65.5 BPM Average PSI 4,718.3 PSI Max PSI 6,309 PSI" Stage 10 Wireline set the plug at Ft pumped a total of 675 bbls of fresh water with max PSI of 7650 lost 0 pounds when plug set perforations from : , , , , Page 7 of 7

Wellwork Chronological Regulatory Report

Wellwork Chronological Regulatory Report Well Name: UNIVERSITY 09A #1003H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern - ERPBU Project AFE: DV02251

More information

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity : Daily Completion Report - University CN A #6 API # 42-105-42334 12/23/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Put Well on Production 2655' - PBTD Activity : Arrive Location.

More information

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS 11/17/2011 11/18/2011 11/19/2011 AFE dated 11/18/2011 - pull tbg out of hole and make a mill run. Run packer on tbg and attempt to reestablish production from Devonian Formation. MIRU Great Basin Pulling

More information

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top DAYS FROM SPUD: 35 DAYS ON 0 Mar 1 2016 RIG SUPERVISOR: Tyler Clean and prep location, MIRU pulling unit to mill liner top Blade location, set anchors. Bring surface and int CSG valves to surface and fill

More information

Zarvona Energy LLC DAILY OPERATIONS

Zarvona Energy LLC DAILY OPERATIONS DAYS FROM SPUD: 120 DAYS ON 0 Jun 28 2016 RIG SUPERVISOR: Tyler Dupriest MIRU pulling unit MIRU pulling unit, move in and tally TBG. SDFN RIH with RBP DAYS FROM SPUD: 121 DAYS ON 1 Jun 29 2016 RIG SUPERVISOR:

More information

ENDEAVOR ENERGY RESOURCES

ENDEAVOR ENERGY RESOURCES ENDEAVOR ENERGY RESOURCES Lease WELL NO FIELD PBTD PERFORATIONS FOREMAN TOOLPUSHER API NUMBER DATE University 5-20-21 #1H 14,223' Tony Cody 07/02/13 OART WEATHER FLUID SUMMARY W/O UNIT DATA W/L UNIT DATA

More information

FORGE Energy UL 21 Pahaska 1H API Number:

FORGE Energy UL 21 Pahaska 1H API Number: FORGE Energy UL 21 Pahaska 1H API Number: 42-495-33740 10/26/2016 07:00 HPJM 07:15 Install 1502 Adapter Flanges to Well Head. RU Pump Truck test lines to 1000 PSI no leaks. Load hole w/ 15 bbls fresh water.

More information

FORGE Energy UL 21 Freedom 1 API Number:

FORGE Energy UL 21 Freedom 1 API Number: FORGE Energy UL 21 Freedom 1 API Number: 42-371-39061 07/13/2013 RU E&P WL Open well RIH correlate GR log to get on depth. Run BL found cement to surface. Tag 7566' PBTD. RU Rising Star test lines to 5000

More information

Zarvona DAILY WORKOVER / COMPLETION REPORT

Zarvona DAILY WORKOVER / COMPLETION REPORT Lease/Well No: CURRENT WELL TEST: PURPOSE OF WORK: MIRU service companies/start frac PULLING UNIT: KOP 10,429' TD: 15,906' KB ABOVE GL: 30 10,713' PBTD: 15,885' INT CSG: 60 10,998' TVD: 10,950' PROD CSG:

More information

EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017

EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017 5/2/27 5:23:5 Report Version: 4..6R9 Generated from data in EDM/Opens/PROFILE Report 29 5/9/27 Company Type WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 56H UNIVERSITY 9 PW UNIT 56H 32656 / 4233326.

More information

BP SIT Testing Franks Facility Lafayette

BP SIT Testing Franks Facility Lafayette BP SIT Testing Franks Facility Lafayette General Information Status: Franks test well Lafayette La. Rig: Franks Test Rig Casing: 13 3/8, 0 to 4,600 Workstring: 4 ½ IF Brine: Fresh Water Directional: Straight

More information

IWCF Equipment Sample Questions (Surface Stack)

IWCF Equipment Sample Questions (Surface Stack) IWCF Equipment Sample Questions (Surface Stack) 1. During a well control operation 4000 psi was shut in below the middle pipe rams. Ram type BOP data: Model: Cameron U type Rated Working Pressure: 15000

More information

Rig Math. Page 1.

Rig Math. Page 1. Page 1 The Calculator and Main Keyboard Display Numerical 10-key pad used for entering numerical values Trigonometric Functions These keys will be used where wellbore angle is an issue These are the keys

More information

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation ADVANTAGE composite bridge plug, caged ball and ball drop (flow thru) frac plug provide a means to isolate multiple zones during high pressure

More information

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 37.00 Objective Install Completion Original

More information

PHE KE30-A8 WORKOVER PROGRAM

PHE KE30-A8 WORKOVER PROGRAM PHE WMO KE30-A8 WORKOVER PROGRAM PHE KE30-A8 WORKOVER PROGRAM Prepared by: Ross Webber. Hendra Wahyudi. Chandra Maulana. George Lattimore Adi Benanjaya Achmad Soendaroe. Tri Wiyono DRILLING ENGINEER SR.

More information

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover: Zone: War-Wink Cherry Canyon TD: 7250' Rig: Union Drlg Rig 229 Status: WOC Spud Date: 1/26/2013 RR Date: 2/12/2013 First Sales: AFE: $1,393,293.00 DHC: $761,963.00 WI: Notes: Date Activity 11/14/2012 11/14/12

More information

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug The North American Sealing Solutions composite bridge plug, caged ball and ball drop (flow thru) frac plug provide

More information

Casing Design. Casing Design. By Dr. Khaled El-shreef

Casing Design. Casing Design. By Dr. Khaled El-shreef Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for

More information

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas 3-29-13 DAY 1 Previously built location, roads, built and lined reserve pits. Move

More information

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) 1. Given the volumes below, how much hydraulic fluid will be required to carry out the following operations (no safety margin)?

More information

OCEAN DRILLING PROGRAM

OCEAN DRILLING PROGRAM BIH OCEAN DRILLING PROGRAM www.oceandrilling.org Scientifi c Application Packers A packer is an inflatable rubber element that inflates to seal the annular space between the drill string and the borehole

More information

Daily Drilling Report

Daily Drilling Report Daily Drilling Report Well Name UTL 38-17-1H Report Date 05/05/2014 Field University Lands Supervisor Nate Baxter Report No. 97 Location 990' FNL & 300' FEL Supervisor 2 Kevin Evans DFS 94 County Ward

More information

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure? DAY ONE 1. Normal formation pressure gradient is generally assumed to be: A..496 psi/ft B..564 psi/ft C..376 psi/ft D..465 psi/ft 2. Referring to the last question, what mud weight would be required to

More information

SUBSEA KILL SHEET EXERCISE No. 5

SUBSEA KILL SHEET EXERCISE No. 5 Subsea Kill Sheet Exercise No. 5 SUBSEA KILL SHEET EXERCISE No. 5 Name: Date: Complete the Subsea vertical kill sheet provided on pages 2 and 3. Then answer questions 1 to 12. Please round calculations

More information

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for 2-7/8 Triple Port PBL 1-10-201 2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at Rig site, the

More information

HydroPull. Extended-Reach Tool. Applications

HydroPull. Extended-Reach Tool. Applications Extended-Reach Tool HydroPull This tool incorporates a cycling valve that momentarily interrupts the flow to create water-hammer pressure pulses inside coiled or jointed tubing used in horizontal well

More information

Practice Exam IADC WellSharp Driller and Supervisor

Practice Exam IADC WellSharp Driller and Supervisor Workover & Completion Day 4 1. In a workover operation of a shut in well a Lubricator is being used together with a Wireline BOP / Wireline Valve. Which Barrier is classified as the Primary Barrier? A.

More information

Hydro-Mech Bridge Plug

Hydro-Mech Bridge Plug Manual No: 0620000303 Revision: F Approved By: Quality Engineer Date: 2014-9-9 Hydro-Mech Bridge Plug DESCRIPTION: Map Hydro-Mech Bridge Plug is hydraulically actuated and mechanically set. Compact, with

More information

W I L D W E L L C O N T R O L SNUBBING OPERATIONS

W I L D W E L L C O N T R O L SNUBBING OPERATIONS SNUBBING OPERATIONS Snubbing Operations Learning Objectives You will learn - Various activities suitable for snubbing operations. Best practices and techniques for conducting snubbing operations. The types

More information

DB Bridge Plug. Features. Benefits. Applications

DB Bridge Plug. Features. Benefits. Applications DB Bridge Plug The WELLFIRST Premium Cast Iron Bridge Plug designed to run on electric line. Rated between 2000-10000-psi differential, and 300 F from above and below. Features Field Proven Design Constructed

More information

Live well deployment of long perforating gun system using combined CT technologies

Live well deployment of long perforating gun system using combined CT technologies Live well deployment of long perforating gun system using combined CT technologies SPE ICoTA European Well Intervention Conference Aberdeen - 12 November, 2014 Simon Smith, Technical Support Manager Baker

More information

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also) RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for -3/4 PBL -3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes -1/4 & -1/2 also) OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at

More information

HPHT Annular Casing Packer. Obex Annular Casing Packer

HPHT Annular Casing Packer. Obex Annular Casing Packer HPHT Annular Casing Packer Obex Annular Casing Packer Industry Challenge Casing packer to support second stage cement Reduce hydrostatic pressure on formation Get cement to surface Annular gas migration

More information

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS A DIFFERENT KIND OF ENERGY COMPANY Nine Energy Service isn t your typical oilfield services company. Our success stems from a culture driven by performance

More information

Drilling Morning Report

Drilling Morning Report REPORT DATE 5/0/200 Report # AFE # Casing OD(in) WT(lbs/ft) Grade Btm MD(ft) Btm TVD(ft) DCRB04 TVD: 32 MD: 32 Progress: 32 Planned TD:,500 Current Hole Size: Days From Spud: Spud Date: 5//0 Days on Well:

More information

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad. Well Control Drill Guide Example Only Drill Guide is the list of drills, questions and attributes that are in DrillPad. This Well Control Drill Guide will be used in conjunction with the rig-specific well

More information

Deepwater Horizon Incident Internal Investigation

Deepwater Horizon Incident Internal Investigation Not all Information has been verified or corroborated. Subject to review based on additional information or analysis. Deepwater Horizon Incident Internal Investigation 1 Areas of Discussion Investigation

More information

Pasquale Imbò e Marco Pelucchi ENI S.pA;

Pasquale Imbò e Marco Pelucchi ENI S.pA; 7th European Gas Well Deliquification Conference Innovative Failsafe Capillary Injection System Resolves Liquid Loading in Gas Well with a Cost- Effective Solution that Maintaining Production and Well-Safety

More information

EP WELLS DAILY OPERATIONS REPORT Report 1 08/03/2016

EP WELLS DAILY OPERATIONS REPORT Report 1 08/03/2016 Report 1 8/3/216 Company Type bore WBS No/API No PERMIAN Exploration / 424953375. Event Summary Event Type Completion only Event Start Date 8/3/216 Days on Location 1. Objective Install Completion Original

More information

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION NW NW 1 RIG UP AND TAR 1 no sub-code RIG UP AND TAR DOWN Start: Rig released from previous well, nd: Rig fully rigged up, acceptance tests successfully completed, and signed off. DOWN 1 1 Rig Under Tow

More information

"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations

Sharing To Be Better. Influx through failed cement in shoetrack during completion operations "Sharing To Be Better Influx through failed cement in shoetrack during completion operations 2 Well status completion operations Seabed @ 364m 7" liner cemented across reservoir Well filled with 1.54 SG

More information

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing Parry Hillis: Technical Manager BakerHughes David Ayre: BP Well Perforation Specialist Jim Gilliat: TCP/DST Business Development

More information

BLACK HILLS PLATEAU PRODUCTION COMPANY

BLACK HILLS PLATEAU PRODUCTION COMPANY BLACK HILLS PLATEAU PRODUCTION COMPANY DRILLING PROGRAM Homer Deep Unit 9 11CH SHL: 300 FNL, 200 FWL, NWNW Sect. 9 T8S R98W BHL: 1350 FSL, 2100 FEL NWSE Sect. 15 T8S R98W Garfield & Mesa Counties, Colorado

More information

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD 1. Introduction An incident of gas leakage from a well took place during workover operations. Subsequently, the gas caught fire on the fourth day in which twelve persons were injured. Two contract workers,

More information

Model A Sleeve Valve Cement Retainer

Model A Sleeve Valve Cement Retainer Ret. O.D. Model A Sleeve Valve Cement Retainer DIMENSIONAL DATA A B C D E F G H J K L M N P Q R 3.593 3.593 3.500 2.500 3.531 3.531 1.345 3.375.750.437 2.437 2.187 7.062 2.437 5.312 11.685 20.093 3.937

More information

Abandonment Program for Paramount Fort Liard F 36

Abandonment Program for Paramount Fort Liard F 36 Abandonment Program for Paramount Fort Liard F 36 Well Name: Paramount et al Liard F 36 Area: 60 0 10 N, 123 0 15 W Location: Latitude: 60 0 05 27 Longitude: 123 0 22 00 UWI: 300F366010123150 WID: 1841

More information

OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE

OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE Page 1 of 8 OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE Size Series 6.50" 478 Reviewed And Approved By: Signature: Initials: Date: Page 2 of 8 Section OPERATING MANUAL DOUBLE ACTING

More information

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger Advanced Applications of Wireline Cased-Hole Formation Testers Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger Agenda Introduction to Cased Hole Formation tester Tool specifications Applications

More information

TAM Single SeT inflatable

TAM Single SeT inflatable TAM Single SeT inflatable ReTRievAble PAckeRS Sets with pressure only Releases with straight pull or rotate Ideal for horizontal applications Sets in casing or open hole Runs on tubing, coiled tubing,

More information

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP MENAPS 2013 Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells Kerry Daly, Global BD Manager- DST TCP MENAPS 13-17 WELL FLOW MANAGEMENT TM Scope/ Contents: MENAPS 13-17 Study

More information

Study Guide IADC WellSharp Driller and Supervisor

Study Guide IADC WellSharp Driller and Supervisor Times to Flow Check: Before pulling out of the hole Before pulling BHA into the BOP When bit is pulled into the casing Increase in cuttings at shakers with same ROP On connections Upon abnormal trip tank

More information

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary AEPB WELL NO. Report End Date: Report Number: 1 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : 70 : 0 Planned VS (ft): Current VS (ft): 42383383570000 MIRU MIRU INTEGRITY 3. 70 Longitude Orig

More information

H. H. HOWELL, INC. Inland Ocean Bevans #1 Bevans & Wildcat Field Menard County, Texas

H. H. HOWELL, INC. Inland Ocean Bevans #1 Bevans & Wildcat Field Menard County, Texas H. H. HOWELL, INC. Bevans & Wildcat Field Menard County, Texas API #42-327- 31235 RRC Permit # 803460 GAU letter, RRC Letter #GAU-1436 = 245 Ground Elevation GL: 2186 (Rig KB to GL =8 ) Rig KB =2194 Location:

More information

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL CIRCULATION & WELL CONTROL Learning Objectives You will learn: The importance of pump rates and pressures during well control operations Pressure relationships Basic calculations necessary in well control

More information

VOLUMETRIC METHODS and STRIPPING OPERATIONS

VOLUMETRIC METHODS and STRIPPING OPERATIONS VOLUMETRIC METHODS and STRIPPING OPERATIONS WELL CONTROL SCHOOL Muscat, Oman Training Center VOLUMETRIC METHODS and STRIPPING OPERATIONS The material contained here, is based on the best sources available

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS What are some applications in which you ve successfully used this product? New Completions - Stage by Stage Diversion Between Frac plugs for Intra-Stage Diversion Replace Frac Plugs with Perf PODs - Full

More information

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph:

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph: Please read this entire document. It concerns all 9⅝ Vented Thru-tubing Bridge Plugs Read this document before proceeding to NeoProducts Recommended Best Practices for 9⅝ vented T- TBPs. Whenever running

More information

1. The well has been shut in on a kick and the kill operation has not started.

1. The well has been shut in on a kick and the kill operation has not started. Well Control Methods Day 2 1. The well has been shut in on a kick and the kill operation has not started. Shut in drill pipe pressure Shut in casing pressure 500 psi 700 psi After stabilization, both pressures

More information

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES SHUT-IN PROCEDURES Shut-in Procedures Learning Objectives You will learn general shut-in procedures: For surface BOPs. For subsea BOPs. You will learn to interpret shut-in pressures and be able to perform

More information

PERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary

PERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary PRES WELL NO. Report End Date: 5/19/2016 Report Number: 3 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : : 0 Planned VS (ft): Current VS (ft): WOC WOC, CONTACTED TRRC, SPOKE TO ABRAHAM, ADVISED

More information

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS PRESSURE BASICS AND CONCEPTS Pressure Basics and Concepts Learning Objectives You will be familiarized with the following basic pressure concepts: Defining pressure Hydrostatic pressure Pressure gradient

More information

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001 OCS Report MMS 2002-040 Investigation of Loss of Well Control Eugene Island Block 277 OCS-G 10744 Well A-2 Off the Louisiana Coast July 6, 2001 U.S. Department of the Interior Minerals Management Service

More information

On-Off Connector Skirt

On-Off Connector Skirt On-Off Connector Skirt Retrievable Packers & Accessories The On-Off Connector Skirt is compact, reliable, fully sealing, J-type tubing disconnect device that automatically engages and releases with a small

More information

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve MOCS Multiple Opening Circulation Sub Fluid Bypass Valve 1 Applications BHA Protection o o Pumping LCM Spotting Acid Work-over and completions o o o Well bore cleanout Fluid displacements Bottoms-up circulation

More information

Chapter 5 HORIZONTAL DRILLING

Chapter 5 HORIZONTAL DRILLING Chapter 5 HORIZONTAL DRILLING Chapter 5 How much money am I about to put on the table for a horizontal well? Did I do sufficient planning? Keys to Successful Horizontal Wells Multi-disciplined teams working

More information

Colorado Oil and Gas Conservation Commission

Colorado Oil and Gas Conservation Commission Colorado Oil and Gas Conservation Commission http://cogcc.state.co.us/ FORM 5A Completed Interval Report INDUSTRY TRAINING Denver, Colorado November 27, 2012 Form 5A Completed Interval Report Introduction

More information

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Abstract: Paper Presenter: Ebrahim Rabbani 1 e.rabbani@mehranservices.com Ebrahim Rabbani, Danial Davoodi 2, Fatemeh

More information

W I L D W E L L C O N T R O L AIR DRILLING

W I L D W E L L C O N T R O L AIR DRILLING AIR DRILLING Air Drilling Learning Objectives You will learn the basics of: Air drilling equipment Types of air drilling Differences between mud and air drilling You will learn how to apply well control

More information

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log Tracking No.: 102948 Status: Submitted RAILROAD COMMISSION OF TEXAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records

More information

North Dakota Petroleum Council Re-stimulation Initiative

North Dakota Petroleum Council Re-stimulation Initiative North Dakota Petroleum Council Re-stimulation Initiative Refracs: Completion Discussion for Bakken Generation 1 Wellbores Originally presented to the Interim Energy Development and Transmission Committee

More information

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions NOTE: Changes to the Form 5A, effective June 1, 2012, to accommodate the disclosure requirements are indicated by a preceding asterisk (*) and bold italics. All other fields are unchanged. FORM 5A HEADING

More information

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT EXECUTIVE SUMMARY I was requested by management to review the Banjar Panji-1 drilling operations from the conception of the Integrated Drilling Management approach

More information

Float Equipment TYPE 925/926

Float Equipment TYPE 925/926 Type 925 Float Collar Plunger Valve Float Equipment For less demanding well conditions, such as shallower depths or lower pressures, Top- Co offers economical float equipment certified to API RP 10F category

More information

5k Slickline Lightweight Pressure Control Equipment 4 ID

5k Slickline Lightweight Pressure Control Equipment 4 ID 5k Slickline Lightweight Pressure Control Equipment 4 ID Table of Contents 5k Slickline Lightweight Pressure Control Equipment 4 ID... 1 Hydraulic Slickline Stuffing Box... 3 Wireline Lubricators... 4

More information

International Well Control Forum. IWCF Drilling Well Control Syllabus Level 3 and 4 March 2017 Version 7.0

International Well Control Forum. IWCF Drilling Well Control Syllabus Level 3 and 4 March 2017 Version 7.0 International Well Control Forum IWCF Drilling Well Control Syllabus and 4 March 2017 Version 7.0 IWCF Drilling Well Control Syllabus and 4 Contents Guidance Notes... 5 1.1. Introduction... 5 1.2. Who

More information

SPE MS. Copyright 2015, Society of Petroleum Engineers

SPE MS. Copyright 2015, Society of Petroleum Engineers SPE-173678-MS Cost Effective Solutions to Achieve Injection Post Toe Valve Failure Cody Trebing, Thru Tubing Solutions; Jeff Whitworth, Thru Tubing Solutions; Alex Beszterda, ConocoPhillips Copyright 2015,

More information

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log Tracking No.: 16947 Status: Submitted RAILROAD COMMISSION OF TEAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records

More information

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent 26 Feb - 2014 SPE Thailand 1 Outline Drivers for MPD: 1. Safety of personnel in remote operations 2.

More information

Optimising Hydraulic Energy to Dramatically Improve Lateral Reach

Optimising Hydraulic Energy to Dramatically Improve Lateral Reach Optimising Hydraulic Energy to Dramatically Improve Lateral Reach What Affects Reach? Build angle Size of completion CT size Drag Mechanical Fluid Debris in well BHA size End load CT size End load Buoyancy

More information

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting Squeeze Cementing Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting Definition Squeeze Cementing is the process of applying hydraulic pressure to force or squeeze a cement slurry

More information

Subsea Safety Systems

Subsea Safety Systems Subsea Safety Systems The ELSA-HP has been developed to service the high pressure horizontal tree completion and intervention market. With systems designed and qualified up to 15,000 psi, 250 degf and

More information

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper Offshore Managed Pressure Drilling Experiences in Asia Pacific SPE paper 119875 Authors: Steve Nas, Shaun Toralde, Chad Wuest, SPE, Weatherford Solutions Sdn Bhd, SPE, Weatherford Indonesia SPE, Weatherford

More information

Air and Gas Drilling

Air and Gas Drilling Air and Gas Drilling Air and Gas Drilling It is a technique in which the more common drilling fluids, (water or mud) are replaced by highly compressible Air or Natural gas. But Compressibility makes pressure

More information

Extended leak off testing

Extended leak off testing Extended leak off testing Rev: 1.0 03/01/01 Purpose To ensure minimal operational time and risk exposure to personnel, process, production and equipment. The following extended leak off test procedures

More information

Standard Operating Procedures

Standard Operating Procedures Standard Operating Procedures GlassBore and GlassLine EUE 8RD Tubular Goods Composite Lining Systems Focus on Safety and Quality COMPOSITE LINING SYSTEMS Table of Contents Section 1 page 3 Arrival on Production

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 10/13/2015

More information

Understanding pressure and pressure

Understanding pressure and pressure CHAPTER 1 1-1 PRESSURE BASICS Remember to think downhole. The concepts provided in this section cover the foundations for good well control. Understanding pressure and pressure relationships is important

More information

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment Contents 1. GENERAL INFORMATION & RECOMMENDATIONS 1 2. INSTALLATION FLOAT EQUIPMENT 2 2.1 PRE-USE FIELD INSPECTION 2 2.2 POSITION FLOAT ON CASING STRING 3 3. RUNNING OF FLOAT EQUIPMENT 3 3.1 CIRCULATION

More information

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer Inflatable Packer Single & Double Single & Double Packer Dimension Wireline Packer Water Testing Packer (WTP) Packer Packer Working Pressure & Depth Chart Packer Water Hand Pump Packer Air Driven Pump

More information

The Developing Design of the Blowout Preventer in Deep Water

The Developing Design of the Blowout Preventer in Deep Water The Developing Design of the Blowout Preventer in Deep Water IADC World Drilling 2011 Conference & Exhibition 15-16 June 2011, Bella Centre, Copenhagen Eric Brown Project Manager National Oilwell Varco

More information

RIH intermediate section casing in Bazian-1 exploration oil well

RIH intermediate section casing in Bazian-1 exploration oil well Energy and Sustainability V 559 RIH intermediate section casing in Bazian-1 exploration oil well A. K. Darwesh Petroleum Engineering Department, Engineering Faculty, Koya University, Kurdistan Abstract

More information

E NGINEERED C EMENTING S OLUTIONS

E NGINEERED C EMENTING S OLUTIONS DART CATCHER TOOL Blackhawk s Dart Catcher Tool provides indication of the exact location of downhole fluids during inner string cement jobs, cementing squeezes, or balanced cement plugs for temporary/permanent

More information

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WELL SERVICING OPERATIONS (WIRELINE, COILED TUBING & SNUBBING) CORE CURRICULUM AND RELATED FORM WCT-2WSI INTRODUCTORY LEVEL For information on how an course

More information

I. HANDLING TOOLS 1.1Drill Pipe Elevator

I. HANDLING TOOLS 1.1Drill Pipe Elevator I. HANDLING TOOLS 1.1Drill Pipe Elevator ½ -BJ Model - Air operated ½ -BJ -BJ Type - HGG -BJ Model - Air operated -BJ JOY-WEB WILSON Type - T -BJ Type - MGG Model - air operated Rated capacity [ton] 250

More information

Dynamic Underbalance (DUB)

Dynamic Underbalance (DUB) Dynamic Underbalance (DUB) Perforating Cam Le Perforating Product Champion Agenda Overview DUB Software Tools Case histories 2011 HALLIBURTON. ALL RIGHTS RESERVED. 2 Dynamic Underbalance Software Dynamic

More information

Chapter 5 Drilling and Well Testing Practices

Chapter 5 Drilling and Well Testing Practices Chapter 5 Drilling and Well Testing Practices Drilling and Well Testing Practices Activities in rotary drilling, completing, testing and maintaining a well. Health and safety requirements shall be covered

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 03/16/2016

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 06/29/2015

More information

Cased-Hole Logging Environment

Cased-Hole Logging Environment Cased-Hole Logging Environment 2 Planning a Production Logging Job Planning is an important part of a production logging job. Frequently these jobs can only be done in safety during daylight. Thus, the

More information