AIAA Copyright 1996 by Pressure Systems, Inc. Published by American Institute of Aeronatutics & Astronautics with permission.

Size: px
Start display at page:

Download "AIAA Copyright 1996 by Pressure Systems, Inc. Published by American Institute of Aeronatutics & Astronautics with permission."

Transcription

1 AIAA Copyright 1996 by Pressure Systems, Inc. Published by American Institute of Aeronatutics & Astronautics with permission. Page 1

2 AIAA DESIGN AND DEVELOPMENT OF A COMMUNICATIONS SATELLITE PROPELLANT TANK Michael J. Debreceni, William D. Lay, & T. K. Kuo Pressure Systems, Inc., Commerce, CA and Donald E. Jaekle, Jr., PMD Technology, Andover, MA ABSTRACT In order to provide a lighter weight, less complicated, more easily manufactured, and more capable propellant tank for a high capacity communications satellite, a new design was conceived from two previously successful communications satellite programs. A light weight tank shell coupled with reoriented pressurant and propellant ports and a redesigned propellant management device (PMD) fulfilled this requirement. The resultant tank is fabricated in an all-welded titanium configuration with a sponge, vane and trap PMD to store and to provide pressurized gas-free propellants to the main satellite thrusters and reaction control system thrusters in a zero g environment. Each spacecraft contains two tanks - one for nitrogen tetroxide (N 2 O 4 ) oxidizer and the other for monomethylhydrazine (MMH) fuel. The tanks are mounted in tandem in the spacecraft at 32 tabs with nut plates located near the tank equator. The newly analyzed and designed PMD, with no moving parts, a minimum of surface tension elements, and titanium alloy components, minimizes weight and complexity. A stress and fracture mechanics analysis on the tank assembly, using imposed environmental conditions, operational requirements, and spacecraft interface loads, verified the structural adequacy of the PMD and tank assembly. Successful acceptance and delta qualification tests on one flight-type unit empirically validated the analysis and design of the tank assembly. A number of flight units have been delivered on time. The first launch of this propellant tank design is tentatively scheduled for October INTRODUCTION Pressure Systems, Inc. (PSI) was contracted to analyze, design, fabricate, assemble, test, qualify and deliver propellant tanks to support an initiative to build a cost competitive, high capacity commercial communications satellite. These satellites feature C-Band, KA-Band, and KU-Band transponders. The program initially provided for one delta qualification unit and eight flight units. Eight more tanks were delivered on a follow-on contract. Presently, additional tanks are in production at PSI. Each of the satellites includes two propellant tanks -- one for the nitrogen tetroxide (N 2 O 4 ) oxidizer and one for the monomethylhydrazine (MMH) fuel. They are mechanically mounted in tandem inside the satellite s central cylinder with 32 equally spaced tabs and welded into the propulsion fluid system. The tanks are of an allwelded titanium construction. They incorporate passive propellant management devices for propellant acquisition and to supply gas-free propellants to the system thrusters throughout the required mission life. This tank assembly reflects the latest in design innovation and state-of-the art technology for improved manufacturabilty, performance, reliability and testing. The PMD was specifically analyzed and designed to meet the defined mission profile and requirements. This tank assembly is compatible Copyright 1996 by Pressure Systems, Inc. Published by American Institute of Aeronatutics & Astronautics with permission. Page 2

3 with launches on Atlas-Centaur, Ariane, Long March, and Proton launch vehicles. The tank and PMD assemblies were also designed for producibility since additional tanks are required to support the initial programs with options for follow-on units. DESIGN, DEVELOPMENT, AND ASSEMBLY The propellant tank assembly summary of capabilities is shown in Figure 1. FIGURE 1: SPACECRAFT PROPELLANT TANK SUMMARY OF CAPABILITIES Tank Outside Diameter, Pressurized (in.) Tank Length, Pressurized (in.) Tank Fluid Capacity, Minimum Liters 1000 in 3 61,025 Maximum Initial Propellant Load Fluids Temperature Range 96% of tank volume 3027 lbs N 2 O lbs MMH MMH, N 2 O 4, IPA Distilled Water, Ar, He, GN2, LN o F Pressures (Psia at 122 F) MEOP * 250 Collapse 3.0 Proof Burst 375 Minimum Expulsion Efficiency, % 99.5 Leakage Zero liquid leakage 1 x 10-6 scc/sec He at MEOP * Pressurant Leakage Maximum Weight, lb Minimum Design Life, Years 16.4 Stiffness Tank (96%) Propellant Fill Fraction PMD Lateral (Immersed in NTO or MMH) PMD Axial (Immersed in NTO or MMH) Launch Vehicle Compatibility * Maximum expected operating pressure. > 50 Hz Natural Frequency > 20 Hz Natural Frequency > 100 Hz Natural Frequency Atlas, Ariane, Long March, & Proton Page 3

4 Figure 2 outlines the vibration requirements for the propellant tank. FIGURE 2: VIBRATION REQUIREMENTS Test (Sine) Axis Frequency (Hz) Acceleration (g, 0-Peak) Limit Acceleration (g) in. S.A. * 3.3 Acceptance (2094 lbs. of Lateral water at 250 psig) (X or Y) Octaves/Min in. S.A Ramp Down 7.6 Axial (Z) Ramp Down Test (Sine) Axis Frequency (Hz) Acceleration (g, 0-Peak) Limit Acceleration (g) in. S.A. 4.3 Delta Qualification Lateral (2094 lbs. of (X or Y) water at 250 psig) in. S.A Octaves/Min Ramp Down 10.2 Axial (Z) Ramp Down Test (Sine) Axis Frequency (Hz) Acceleration (g, 0-Peak) Delta in. S.A. Qualification (Dry & Un- All pressurized) (X, Y, Z) l Octaves/Min Frequency (Hz) Delta Qualification Acceptance (Reference only -- test not required) - Random (2 minutes/axis) lbs of water and pressurized to 250 psig. 90 to db/oct +30 db/oct 100 to g 2 /Hz g 2 /Hz 800 to db/oct -3 db/oct OVERALL grms * Single amplitude. Page 4

5 DESIGN, DEVELOPMENT & ASSEMBLY (cont d) The tank shells are machined from annealed titanium alloy Ti-6AL-4V hemispherical forgings. During processing the hemispheres are rough machined, solution heat treated and partial aged, skim machined, final aged and then final machined. The tank is mounted into the spacecraft structure by circumferential tabs with nut plates located on one of the hemispheres near the girth weld. The mounting tabs are machined from a ring forging that is Electron Beam (EB) welded to one of the hemispheres in the partial machined state. Individual tabs are finish machined from the ring when the hemisphere is completed. The propellant and pressurant ports are 1/2 inch diameter 6AL-4V titanium-to-304l CRES transition tubes with a flow control venturi in the propellant line. Figure 3 depicts an outline of the propellant tank assembly. FIGURE 3: OUTLINE OF PROPELLANT TANK ASSEMBLY A shell structural analysis and fracture mechanics analysis, utilizing the NASA FLAGRO program, were used to design the tank shell thicknesses and reinforcements while a stress analysis was used to analyze the PMD details, subassemblies, and assemblies including its installation into the tank. An initial fracture mechanics plan with the tank's histogram governed the former analysis while the imposed design and environmental test conditions, as listed in Figures 1, 2, and 4 dictated the structural and stress analysis parameters and boundary conditions. The all-titanium propellant management device is a combination radial sponge, lightweight trap, and vane design. This surface tension PMD has been designed to provide gas-free propellant delivery throughout mission including, but not exclusively, apogee and on-orbit maneuvers. The design utilizes a safety factor of approximately two (2) on all required volumes and a safety factor of three (3) on all required porous material bubble points. These design margins coupled with conservative analyses have yielded a PMD design which easily meets the mission requirements and, in addition, provides for some off-design capability. The PMD is for use in a 49.3 inch diameter spherical tank. The same design can be used in the NTO and the MMH propellant tanks. Additional features were incorporated into the Page 5

6 design to provide optimal service. First, because the PMD is a passive device with no moving parts, the design is inherently reliable. Second, the design is constructed entirely of titanium. The PMD is lightweight and offers exceptional compatibility, long life, and reliability. Finally, the PMD is designed not only to provide propellant during steady flow conditions but also to ensure gas-free delivery throughout the mission. The PMD is designed to suppress vortexing, to suppress surface dip, and to accommodate fluid transient motion (which could cause premature ingestion of gas). These additional design considerations have led to a reliable and efficient PMD design. The trap is cylindrically shaped with internal fins and a closed, domed top. The trap allows gasfree propellant during off design operation, provides a flow path to the bulk space propellant during all phases of demand, and minimizes propellant residuals. The trap s bottom platform is machined from a ring forging and incorporates four screened window assemblies. These window assemblies, consisting of 30 x 160 mesh CP titanium screen and a support plate, are EB welded to the bottom platform and are located at 90 o intervals around the platform. This platform also supports the sponge panels at the bottom. The sponge panel support plate is machined from a ring forging and provides the supports for the sponge panels and vane panels at the top of the trap. Finally, the trap is closed at the bottom by a trap base plate which is also machined from a ring forging. Sandwiched between this base plate and the bottom platform is a pick-up assembly consisting of a thin titanium sheet with three welded-in perforated sheet disks at 90 o intervals. The -X/-Y quadrant is lacking a perforated sheet window to allow for horizontal handling of the tank assembly. The vertical direction must be maintained at 45 o to the -X and -Y axes. The perforated sheet windows are positioned so that propellant access during lateral and setting maneuvers is assured throughout mission. The trap has been sized to contain propellant for contingency maneuvers during which the trap inlet windows will not have access to propellant. No such maneuvers are currently planned. In addition to the trap, a sponge comprised of titanium sheet separated by a tapered gap, has been incorporated into the design. The sponge has been designed to provide liquid to the trap during the repetitive on-orbit maneuvers. These include attitude control, East-West station keeping, North-South stationkeeping, and deorbit. The sponge also will provide propellant during transient fluid reorientation at apogee ignition. The sponge and trap are connected by four titanium screened windows located on the four thrust axes. These windows allow propellant flow into the trap while preventing gas penetration. Four large major vanes, which are laser cut from thin titanium sheet, are spaced 90 o apart and follow the inside contour of the tank. They interface into the trap at the bottom of the tank. They re-supply the sponge during the coast between burns. The major vanes and window assemblies are oriented on the major spacecraft axes. Figures 5A and 5B present schematic views of the PMD. The PMD is fabricated from 6AL-4V, 3AL- 2.5V, and commercially pure (CP) titanium sheet, tube, and bar stock. All details are resistance welded, tungsten inert gas (TIG), or EB welded into subsequent assemblies. The perforated sheet disks are EB drilled while the sponge panels are chemically etched to provide the hole pattern. After assembly, the PMD is mounted and welded into the outlet hemisphere while the vane-to-tank wall gaps are maintained. The expulsion assembly is bubble point tested and accepted before the tank assembly is closed. For this configuration there is one automatic TIG girth weld to assemble the final tank assembly. The girth weld is radiographic and dye penetrant inspected and the final assembly is stress relieved in a vacuum heat treat furnace.. The mounting tabs are then final machined and the nut plates are installed. The tank is then ready for final inspection, testing, cleaning, and delivery. PMD ANALYSIS AND DESIGN I. PMD Introduction & Requirements Page 6

7 The PMD is a passive, all titanium, surface tension device designed to provide gas-free nitrogen textroxide (NTO) and monomethylhydrazine (MMH) during all mission accelerations with a minimum expulsion efficiency of 99.5% and a safety factor of two. As with most PMDs, this PMD is designed specifically for the defined mission. The mission requirements include upright ground operations and launch, followed by three axis stabilized perigee and apogee burns to achieve orbit, and lateral thruster firings of varying duration to maintain orbit. In addition, horizontal handling will be required for Proton launch processing. The mission requirements are summarized in Table 1. II. PMD General Design Description The PMD design incorporates a small trap, a large radial sponge, and four vanes as illustrated in Figures 5A and 5B. The device consists of a cylindrical trap housing attached to the tank with bolts. The PMD attachment was designed to allow the PMD to be installed in an existing tank shell. One of the existing bolt holes is used as the outlet. The trap housing has a four screen covered entrance windows for propellant acquisition. Above these windows is the radial sponge. Also attached to the trap housing are four vanes which extend from the trap to the tank girth. Within the trap is an annular pick up assembly utilizing electron beam drilled perforated sheet windows to allow gas-free propellant acquisition within the trap. This trap, sponge and vane PMD concept easily meets the mission requirements. FIGURE 4: FACTORS OF SAFETY FOR STRUCTURAL ANALYSES Component Load Condition Factor of Safety Pressure Vessel MEOP 1) 1.25 on Yield, Peak Stress PMD, Mounting Tabs, & Other Components Protoflight Test Qualification Test Proof Test Burst Test External Pressure All 2) 1.5 on Ultimate, membrane Stress 1.4 on Ultimate, Membrane Stress 1.25 on Yield, Peak Stress 1.0 on Yield, Peak Stress 1.0 on Yield, Peak Stress 1.0 on Ultimate, Membrane Stress 1.10 on Buckling 1.25 on Ultimate 1.00 on Yield 1.10 on Buckling`` NOTES: 1) Peak Stress is defined as primary (membrane) plus secondary (bending and stress concentrations) stress at any location. 2) Membrane Stress is defined as the Average Stress across the thickness. Page 7

8 Page 8

9 Page 9

10 Ground Operations and Launch TABLE 1 PROPELLANT MANAGEMENT DEVICE PERFORMANCE REQUIREMENTS SUMMARY - Unlimited burn duration. - Ending fill fractions of 15% to 96%. Tanks are filled, drained, and launched outlet down. Apogee failure and orbit augmentation redundant modes are identical to N/S or E/W Tank fill fraction is between 70% and 96%. Stationkeeping. Tanks are upright or horizontal during handling. During horizontal handling, the tank fill fraction will be maintained sufficiently high to cover the PMD and the pressure will be 215 psia minimum. During launch, booster attitude control can produce up to 0.01g in any direction. No propellant is required. Ascent Operations Separation from the booster produces a 0.02g lateral acceleration for a maximum of 10 seconds. System line priming occurs 100 sec after separation. -The priming flow rate is 20 in 3 /s maximum. - Priming occurs during coast and while spinning about a horizontal axis through the PMD at up to 0.35 rpm. Pulsed thruster operation occurs prior to apogee and throughout mission ms duration at 1000/hr maximum. - Maximum time averaged flow rate of in 3 /s. - Maximum time averaged acceleration of 1 x 10-4 g Multiple three axis stabilized apogee engine firings consume the majority of propellant in a typical mission. Firing specifics include: - Maximum flow rate of 5.2 in 3 /s per tank. Safe mode requires spin about a horizontal axis (between the two PMDs) at up to 0.3 rpm. Propellant required to enter and leave safe mode is 5 in 3 maximum. Orbital Operations During orbital operations, all stationkeeping maneuvers are in one of four lateral directions - east, west, north, and south. Stationkeeping maneuvers will occur repeatedly and at most once every hour. The tanks are in blow down mode with a minimum pressure of 170 psia. North-South (N/S) stationkeeping. - requires 131 in 3 of each propellant at a maximum rate of 0.61 in 3 /s. - produces 0.004g maximum laterally. East-West (E/W) stationkeeping and Reposition maneuvers. - requires 52 in 3 of each propellant at a maximum rate of 1.22 in 3 /s. - produces 0.008g laterally. Pulsed thruster operation occurs throughout mission (See Ascent Operations for description). Loss of Lock requires operation during a spin about a horizontal axis at up to 1.0 rpm. Recovery requires 10.5 in 3 per tank maximum. The trap shall provide a minimum of 85 in 3 for contingency. - Axial accelerations between 0.01 and Lastly, an End-of-Life (EOL) De-Orbit is 0.05g. required which -produces 0.004g laterally, Page 10

11 - uses 157 in 3 of propellant at a rate of 0.98 in 3 /s. - alternatively uses the apogee engine. Miscellaneous MMH and NTO are the propellants. Gas-free propellant delivery is required throughout mission. Residuals shall be limited to 0.5% of the tank volume maximum. Propellant temperature is between 40 and 120 o F. The trap housing consists of a centrally located cylindrical region and an annular region below the sponge. The trap housing encloses a volume of propellant which is available for contingency maneuvers. The screened trap inlet windows are located along the thrust axes below the sponge and near the cylindrical region of the trap. All of the screen in the PMD lies in a single plane simplifying bubble point testing. The screen is constructed from commercially pure titanium and is supported by a window pane grid. The sponge consists of thin sheet metal panels positioned in proximity to one another and forming a tapered gap between each panel pair. The taper ensures that the sponge is full in zero g and that sponge draining is efficient. The sponge is located over the trap inlet windows and provides a refillable reservoir of propellant available for stationkeeping maneuvers. The four sheet metal vanes are positioned on the east, west, north, and south axes and follow the tank contour from the sponge to the tank girth. The vanes provide a flow path to the sponge from the propellant pool settled by the lateral operational accelerations. The vanes are notched at the sponge to minimize sponge leakage and are designed to refill the sponge during periods of zero g coast. The trap pick up assembly consists of an annular channel positioned outboard within the trap. Three electron beam drilled perforated sheet windows are positioned in the upper portion of the pick up channel. The windows are 90 o apart and are rotated 45 o off the thrust axes. This position reduces residuals while allowing horizontal handling with no risk of gas ingestion. All of the porous elements in the design are titanium and prevent gas from penetrating into the trap and into the outlet lines prior to depletion. The minimal area of porous element greatly increases reliability. The entire design uses less than 3.5 square inches of screen and less than 4.0 square inches of perforated sheet. Several key characteristics make the PMD robust, reliable and able to provide optimal service. First, because the PMD is a passive device with no moving parts, the design is inherently reliable. Second, the design is constructed entirely of titanium. Thus, the PMD is lightweight and offers exceptional compatibility, long life, and reliability. Third, the design contains a minimal quantity of screen and perforated sheet; providing increased strength and reliability. Reducing screen area dramatically increases reliability. Finally, the design is implemented to rely minimally on the porous elements within it. During many nominal operations all porous elements are submerged. This detail to design robustness is a key feature of this PMD. The extremely simple and robust PMD provides low cost, low mass, and high reliability. PMD performance will exceed all requirements. Typical PMD safety factors are listed in Table 2. III. PMD Operational Description This section describes the PMD function during each phase of the vehicle s life. The operation is separated into its three logical phases: Ground Operations, Ascent Operations, and Orbital Operations. Page 11

12 The various phases of the mission that the PMD will encounter and how the PMD will affect the propellants are illustrated in Figure 6, The Operational Sequence. Ground Operations The ground operations can be divided into three parts; filling, handling, and draining. These are important not only from a flight standpoint but also from a testing standpoint. One must be able to fill the tank in a reasonable time when following a standard procedure. Similarly, handling and ground draining must be accomplished without excessive effort. The operational sequence depicts these ground operations. Filling occurs with the tank upright in the outlet down position. The tank pressure is initially at atmospheric pressure to reduce the amount of gas retained in the trap above the trap inlet windows. The trapped gas will be compressed upon pressurization. The filling process is straightforward and should introduce no difficulties either to the technician or to the PMD. The PMD was designed for handling with the tank in the outlet down or horizontal orientation. Gas will not enter the trap nor the pick up assembly during handling. Both upright and horizontal handling are illustrated in the operational sequence. Ground draining may have to be accomplished with propellants and certainly will occur with test fluids. The liquid remaining in the tank at the end of ground draining will have to be evaporated from the tank. The tank will be drained in the outlet down position as shown in the operational sequence. Ascent Operations Ascent operations can be divided into five stages: ascent, separation, system priming, coast, and apogee engine firing. In addition, the spacecraft may enter and leave safe mode; a mode where the vehicle slowly spins about a horizontal axis. The PMD is designed to be launched in the outlet down position. Similar to upright ground handling, launch is illustrated in the operational sequence with the propellant position identical to ground handling. TABLE 2 TYPICAL CALCULATED PMD SAFETY FACTORS Trap Usage: Allocation of Volume Mission Stage Volume at EOL (in 3 ) Contingency 85 Gas Trapped During Fill 31 Total Trap Use 116 Total Trap Volume 270 Trap Residual Vol. 35 Available Volume 235 Safety Factor (SF) 2.0 Perforated Sheet Loads Event SF* (NTO) SF (MMH) Ascent (Worst) Apogee (Worst) Orbital Loads on Porous Elements During Boost Element SF (NTO) SF (MMH) Trap Inlet Screen Perforated Sheet Loads on Porous Elements During Separation Element SF (NTO) SF (MMH) Trap Inlet Screen Perforated Sheet 7 16 Sponge Volume (Worst Case) o F NTO Acceleration (g) SF *Safety Factor Page 12

13 Page 13

14 After the initial ascent, the spacecraft is separated from its booster. Separation produces a lateral acceleration of up to 0.02g for up to 10 seconds. The propellant will begin to settle during the 10 second acceleration but will regain its zero g configuration soon afterward. As early as 100 seconds after separation, the system is primed. High flow rate propellant demand occurs during system priming. System priming may occur while spinning about a horizontal axis at up to 0.35 rpm. In the NTO tank the propellant will be settled by the centripetal acceleration. In the MMH tank, the propellant will move to the top of the tank. The surface tension forces will maintain propellant over the porous elements. With all of the porous elements submerged in propellant, gas ingestion is not possible. System priming will dynamically load the trap housing. The trap housing has been designed to accommodate the system priming transient structural loads. During zero g coast propellant occupies its minimal energy state. At high fill fractions, the gas in the bulk space will be spherical. The gas bubble in the trap will also be spherical. The fins in the trap keep the gas far from the porous elements. Zero g coast is illustrated in the operational sequence. During apogee engine firing, significant quantities of propellant are consumed but the trap inlet windows will remain submerged during the settling maneuver allowing gas-free acquisition. The PMD s only function during apogee is to provide propellant during the ignition transient (and subsequent slosh) and prevent vortexing which could lead to premature gas ingestion. Steady state apogee is illustrated in the operational sequence. Oribital Operations Once on-orbit, the PMD has been designed to provide gas-free propellant delivery during four types of maneuvers: 1) short duration, low propellant consumption, repetitive maneuvers such as attitude control, 2) intermediate duration, intermediate consumption, repetitive burns such as stationkeeping and reposition maneuvers, 3) low horizontal axis spin rate maneuvers such as loss of lock and safe mode, and 4) the depletion burn in a lateral or settling direction. Between these maneuvers a zero g coast is encountered and the propellant will occupy a position minimizing its surface area (and thus surface energy). The sponge is filled with propellant and the propellant resides primarily in the outlet hemisphere. The low consumption maneuvers are of sufficiently short duration to ensure that the propellant will not displace far from its equilibrium condition. Sponge propellant is easily consumed without any risk of gas ingestion into the trap. Likewise the trap pickup assembly will always be in contact with propellant making gas ingestion impossible. The operational sequence shows the zero g propellant position with all porous elements submerged. During a stationkeeping or reposition maneuver, the propellant in the sponge is consumed. The burn is long enough to reorient most of the propellant into a pool on the tank wall where it is inaccessible. The sponge will retain propellant between sponge panels during the lateral acceleration. The sponge has been sized to hold enough propellant to meet each maneuver s propellant demand. Subsequent to a lateral maneuver, the propellant in the bulk space will reorient into its coast configuration refilling the sponge thus readying it for the next maneuver. At any time, operation during a low rate spin about a horizontal axis is required. The spin produces a centripetal acceleration which settles propellant in the NTO tank and unsettles propellant in the MMH tank. However, the acceleration is very small and will not significantly deform the gas bubble in the trap and will not empty the sponge. The sponge will easily provide the propellant required to enter and leave this mode. The last maneuver is de-orbit where depletion will occur. As the remaining propellant in the sponge is consumed, the area of screen covered with propellant decreases. This decrease in area causes an increase in the flow losses. Once the head differential, caused by the flow losses and the hydrostatic head, increases to the bubble point of the screen, gas will be drawn into the Page 14

15 trap. The consumption of the trap propellant will proceed similarly until gas penetrates the perforated sheet. Because there are no porous elements downstream of the perforated sheet, the gas will enter the outlet and the tank will be depleted. The PMD has been designed to provide gas-free propellant to the tank outlet during the required conditions until the fill fraction of the tank falls below 0.5%. IV. PMD Design and Analysis Design The mission requires that the PMD provide gasfree propellant during settling burns and during subsequent non-settling burns. The maneuver duration is extremely long during settling operations and of limited duration during nonsettling operations. PMDs can be classified into two basic categories: control devices and communication devices. 1 Control devices are able to deliver a fixed quantity of propellant while communication devices offer unlimited duration operation. Because this mission requires fixed quantity propellant delivery for most maneuvers, a control PMD is feasible. A communication PMD could meet the mission requirements but the PMD chosen for this mission is the most robust, reliable and lightweight design available. The apogee phase is most easily accommodated with a pickup assembly positioned in the propellant pool. This is accomplished by using the trap inlet windows as the pickup assembly. The sponge acts as a reservoir to accommodate transients and as a vortex suppressor. The limited duration of the on-orbit maneuvers, allows the use of control devices which are more reliable, smaller, and simpler than communication devices. Two control devices were incorporated into this PMD: the sponge and the trap. The sponge can provide the propellant required for each of repetitive maneuvers such as stationkeeping. The size of the sponge and the number of sponge panels were determined based upon the stationkeeping volume and acceleration requirements. The sponge is a refillable control device and the vanes were incorporated to refill the sponge between maneuvers. The trap is not refillable and is designed to accommodate once-in-a-lifetime contingency maneuvers which the sponge cannot accommodate. Examples include a longer than anticipated station change maneuver and/or offdesign recovery operations. The trap is sized to provide 85 in 3 of propellant for these types of maneuvers as well as to allow the gas ingested into the trap to expand upon blowdown. Inside the trap is a communication device to allow unlimited burn duration for the propellant in the trap. Analysis The principle method of PMD performance verification is analysis coupled with component and tank assembly bubble point and flow loss testing. The analyses examine, in detail, the fluids reaction to all phases of the mission. Propellant location, reorientation, and flow characteristics are determined and evaluated. The PMD is analyzed to ensure adequate control and delivery of propellant. The porous elements are shown to demonstrate the required margins. In addition, flow losses and flight depletion residual propellant quantities are analytically determined. Because PMDs have been extensively proven in flight, and drop tower tests have verified the analytical techniques used to design them, no test verification program is required as such testing would yield no new information. Because each maneuver in the mission can directly affect the PMD, each performance analysis addresses a phase of mission. First, the impact of Ground Operations on the PMD is examined. Second, the impact of and operation during Ascent Operations is examined. And finally, the operation of the PMD during all Orbital Operations is analyzed. The specific analyses are listed in Table 3. Due to the summary nature of this paper, no results are presented. The detailed process of vane, Page 15

16 sponge and trap design and analysis can be found in the series of papers titled Propellant Management Device Conceptual Design and Analysis: Vanes, Sponges, or Traps and Troughs by D.E, Jaekle, Jr. 2,3,4 The analyses conducted verify that the PMD will meet all requirements of the specification by providing gas-free propellant upon demand. TABLE 3 PMD PERFORMANCE ANALYSES I. General Design Analyses A. Trap Sizing B. Pickup Assy Sizing C. Trap Inlet Window Sizing D. Sponge Sizing E. Flow P F. Thermal Effects II. Ground Operations A. Filling B. Draining C. Handling III. Ascent Operations A. Boost B. Separation C. System Priming D. Apogee Engine Firing E. Safe Mode F. 3 Axis Attitude Control IV. Orbital Operations A. Sponge Use B. Sponge Refill C. Trap Use D. Loss of Lock E. De-orbit & Depletion QUALIFICATION TESTS One test specimen was subjected to a series of delta qualification tests, so named because the tests were specifically devised to qualify the redesigned PMD only. The tank shell, which is identical to the one used for a previous propellant tank except for port locations, had previously been qualified. The delta qualification unit included a flight-type PMD mounted into reworked tank shells. These shells were from a previously tested qualification tank which had been burst tested but not taken to destruct. The shell had the center section removed, had the internal test system and original PMD removed, and had the outlet (propellant) port modified to accept the new PMD. This test tank was subjected to the tests listed in Figure 7. FIGURE 7: DELTA QUALIFICATION TESTS FOR THE PROPELLANT TANK Preliminary Inspection of Product Mass Measurement Pre-Proof Volumetric Capacity Ambient Proof Pressure Test Visual Inspection Post-Proof Volumetric Capacity Bubble Point Test Sine & Random Vibration Tests Visual Inspection Bubble Point Test Visual Inspection Expulsion & Pressure Drop Test Bubble Point Test Visual Inspection Data Review The qualification test starts with an inspection for dimensions, verification of previous inspections and tests, identification, successful completion of all manufacturing planning, damage, material certifications, and completed rework instructions. The dry tank assembly is weighed on a precision scale. The actual weight was 71.5 lbs. versus a maximum allowable of 70.0 lbs. The actual weight was measured for reference only since the test tank shell is a modified shell, which is thicker, and it contains additional closed off test and outlet ports. The shell was not optimized for this test. The tank is subjected to an ambient hydrostatic proof pressure of 200 psig for 60 seconds and the mass of water required to fill the tank is measured to determine the actual tank volume before and after the application of the proof pressure. Again, because this was a previously used shell the actual flight unit proof pressure of psig was not used. Page 16

17 The above test series merely proved that the reworked shell was structurally adequate for the ensuing vibration tests. Earlier the reworked shells had been dimensionally and dye penetrant inspected to re-zero them after the burst test. No discrepancies were noted. The pre-proof volumetric capacity was 60,837.2 in 3 while the post-proof volumetric capacity was 60,843.3 in 3. This results in a volume increase of 11.1 in 3 or a difference of 0.02% which is typical. It is well within the maximum allowable of 0.2%. A visual inspection revealed no damage or deformation. The tank was drained and dried. A bubble point test with Isopropyl Alcohol (IPA) as the test medium was accomplished on the PMD trap screens. Bubble points are verified for 60 seconds minimum to verify PMD screen integrity then the capillary breakdown value is measured. The tank bubble point was successfully tested to a level of 2.0 in. of head and the breakdown head was measured to be 2.5 in. Vibration tests are performed on the tank in two orthogonal axes (Y and Z). The tank and PMD are symmetrical in the lateral axes (X and Y); therefore, only one lateral axis has to be tested. The test fixture simulates the tank-to-spacecraft installation interface but is also sufficiently stiff to be considered a rigid mass and not introduce spurious inputs to or responses from the tank assembly. Figure 2 presents the vibration test parameters. The tank was tested first in the axial (Z) axis and than in the lateral (Y) axis. The water load simulates the worst case oxidizer load condition. The tank was pressurized to 100 psig for this series of tests since it is a reworked shell. The dry sine test was performed first followed by the wet sine and wet random tests. Up to 13 accelerometers are installed on the tank to measure the response levels and to characterize the response spectrum. Up to four control accelerometers are mounted on the test fixture to provide a closed loop control system with the vibration driver equipment to insure that the specification requirements are met. The wet sine vibration spectrum input is notched to limit the acceleration loads on the tank. Natural frequency results are presented in Figure 8. They are consistent and meet the specification limit of >50 Hz for all axes. FIGURE 8: TANK NATURAL FREQUENCIES, 96% FILL FRACTION (HZ) Axis Calculated Measured Z Y The tank was visually inspected during and after the vibration tests and no damage or deformation was noted. Bubble point tests were performed after the Z axis tests and at the completion of the vibration tests to verify that the screens had not been damaged by the vibration tests. A bubble point of 2.0 in. of IPA was held for 60 seconds in each instance, and the IPA test heads at breakdown were 2.4 in. and 2.5 in., respectively - all consistent values. An expulsion and pressure drop test was performed. The tank was initially filled with lbs. of water and pressurized to 90 psig. The water was initially discharged into an evacuated surge tank. This simulates the surge start operation and flow out of the propellant tank during system priming. The tank is drained in the vertical attitude using a 90 psig ullage pressure and a flow rate of 1.35 gpm. Pressure drop and residual water volume are measured. The tank demonstrated residuals well within the mission requirement of 305 in 3. The resultant expulsion efficiency exceeded the minimum required of 99.5% as far as ground residuals are concerned. During the final bubble point test using IPA, the PMD trap screens held a test head of 2.0 in. for 60 seconds. The test head at capillary breakdown was measured at 2.5 in. of IPA. A final visual inspection revealed no damage, deformation, or leakage. Based upon the above tests and inspections, the propellant tank assembly was qualified for flight use. Page 17

18 ACCEPTANCE TESTS The acceptance tests for the propellant tanks are listed in Figure 9. FIGURE 9: ACCEPTANCE TESTS FOR THE PROPELLANT TANK Preliminary Inspection of Product Mass Measurement Pre-Proof Volumetric Capacity Ambient Proof Pressure Test Visual Inspection Post-Proof Volumetric Capacity Cryogenic Proof Pressure Test Visual Inspection Post-Cryo Proof Volumetric Capacity External Leakage Test Bubble Point Test Sine Vibration Test Visual Inspection Pressure Drop Test Bubble Point Test External Leakage Test Radiographic Inspection Dye Penetrant Inspection Visual Inspection Cleanliness Check Data Review The acceptance test starts with an inspection for dimensions, verification of previous inspections and tests, identification, successful completion of all manufacturing planning, damage, and material certifications. The dry tank assembly is weighed on a precision scale. The tank is subjected to an ambient hydrostatic proof pressure of psig for a maximum of 66 seconds. The mass of water required to fill the tank is measured to determine the actual tank volume before and after the application of the proof pressure. Permanent set must not exceed 0.2%. The drained and dried tank is then exposed to a cryogenic proof pressure test at 440 psig for five seconds maximum. The tank is filled with liquid nitrogen and totally submerged in a stainless steel lined pit filled with liquid nitrogen. The tank is vented, drained, and allowed to reach ambient conditions without heating. Another volumetric capacity test is performed with water to insure that the test specimen has not experienced a permanent set greater than 0.2%. An external leakage test is run at 240 psig with helium gas for 15 minutes minimum in a vacuum chamber evacuated to 0.2 microns of mercury or less. Leakage must not exceed 1 x 10-6 scc/sec of helium gas. To verify the integrity of the PMD screened elements after the proof pressure tests, a bubble point test with IPA as the test fluid is performed. The bubble point is held for a minimum of 60 seconds and then the capillary breakdown is measured. Vibration tests, configured as described in Figure 2, are performed on the tanks in two orthogonal axes (Y and Z). Sufficient response accelerometers are installed on the test specimen to characterize the tank responses and control accelerometers are placed on the test fixture to insure compliance with the specification requirements. The sine vibration spectrum input is notched to limit the acceleration loads on the tank. Next, a pressure drop test, using distilled, deionized water, is completed. Water is discharged at 1.35 gpm (worst case mission flow rate) with a psig ullage pressure while the tank pressure drop is measured and compared to the specification requirements. The bubble point test, external leakage test, fracture critical radiographic inspection of the girth weld and internal PMD views, fracture critical dye penetrant inspection of the external surface, and visual inspection are performed to verify the tank has no damage as a result of the environmental tests. Finally, the units are cleaned to Figure 10 levels, purged to a -65 o F dew point, pressurized to 15 psig with dry GN 2, the ports capped, and packaged in two sealed plastic bags for shipment. Figure 11 depicts an outline of the propellant tank showing the port orientations. The top view illustrates the propellant port while the bottom view shows the pressurant and propellant outlet ports. Page 18

19 Page 19

20 Page 20

21 Page 21

22 Figures 12 through 15 show photographs of the PMD, the propellant tank, a unit in the lateral vibration fixture, and a tank installed in the proof pressure fixture, respectively. FIGURE 10: TANK CLEANLINESS LEVEL Particle Size (Microns) Maximum Amount of Particles > 100 Microns None Microns Microns Microns 500 < 10 Microns No Silting NOTES: 1. No metallics >50 microns 2. Non-volative residue (NVR) less than 1mg/100 ml. CONCLUSIONS This propellant tank has met all design objectives that can be verified by analysis and the delta qualification test specimen has successfully passed all tests. Sixteen propellant tanks have been delivered on time. Additional tanks are in work at Pressure Systems, Inc. (PSI). The delta qualification unit is in storage at PSI. The first satellite with this propellant tank is scheduled for launch in October 1996 on a Proton booster from the Baikonur Cosmodrome, Kazakhstan. The second is scheduled for an early 1997 launch on an Atlas-Centaur booster from CX36, Cape Canaveral, Florida. ACKNOWLEDGMENTS The authors wish to thank the following individuals for their assistance on the successful completion of the development and qualification of the propellant tank assembly and delivery of the first production units: Don Bond, Ron McClellan, Wayne Rogers, Carlos Solis, Tso- Ping Yeh of Loral Engineering and John Radkowski and Tom Thrailkill of Loral Subcontract Administration, who provided much support and assistance. In addition, thanks are expressed to Harold Braund, Ken Foster, and Larry Hicks of Foster Engineering, Agoura, CA who performed the Stress & Fracture Mechanics Analysis and supported the customer design review. Finally, thanks are expressed to all of PSI s subcontractors who provided materials, detail parts, manhours, and services to make the program a success REFERENCES Rollins, J. R., Grove, R. K., and Jaekle, D. E., Jr., Twenty-Three Years of Surface Tension Propellant Management System Design, Development, Manufacture, Test, and Operation, AIAA , Jaekle, D. E., Jr., Propellant Management Device Conceptual Design and Analysis: Vanes, AIAA , Jaekle, D. E., Jr., Propellant Management Device Conceptual Design and Analysis: Sponges, AIAA , Jaekle, D. E., Jr., Propellant Management Device Conceptual Design and Analysis: Traps and Troughs, AIAA , ABOUT THE AUTHORS Michael J. Debreceni is a Senior Program Manager at Pressure Systems, Inc. (PSI), Jerry Kuo is a Senior Engineer at PSI, and Bill Lay is the Engineering Manager at PSI. Donald E. Jaekle, Jr. is the owner of PMD Technology and PSI s PMD Analyst & Consultant. Page 22

23 NOTES

AIAA PROPELLANT TANK WITH SURFACE TENSION PMD FOR TIGHT CENTER-OF-MASS PROPELLANT CONTROL

AIAA PROPELLANT TANK WITH SURFACE TENSION PMD FOR TIGHT CENTER-OF-MASS PROPELLANT CONTROL AIAA 2008-4942 PROPELLANT TANK WITH SURFACE TENSION PMD FOR TIGHT CENTER-OF-MASS PROPELLANT CONTROL Walter Tam and Ian Ballinger ATK Space - Commerce and Don E. Jaekle, Jr. PMD Technology ABSTRACT A propellant

More information

DESIGN AND MANUFACTURE OF A PROPELLANT TANK ASSEMBLY

DESIGN AND MANUFACTURE OF A PROPELLANT TANK ASSEMBLY AIAA 2000-3444 DESIGN AND MANUFACTURE OF A PROPELLANT TANK ASSEMBLY Walter H. Tam, Gary H. Kawahara Pressure Systems, Inc. and Donald E. Jaekle Jr. PMD Technology and Laurie W. Larsson Orbital Sciences

More information

DESIGN AND DEVELOPMENT OF THE AXAF-IPS PMD & PMD INTEGRATION

DESIGN AND DEVELOPMENT OF THE AXAF-IPS PMD & PMD INTEGRATION AIAA97-2812 Copyright 1997 by Pressure Systems, Inc. Published by American Institute of Aeronatutics & Astronautics with permission. Page 1 AIAA97-2812 DESIGN AND DEVELOPMENT OF THE AXAF-IPS PMD & PMD

More information

QUALIFICATION ENVIRONMENTS FOR AMP PROGRAM PROPELLANT TANK ALLIANT TECHSYSTEMS, P/N 80520

QUALIFICATION ENVIRONMENTS FOR AMP PROGRAM PROPELLANT TANK ALLIANT TECHSYSTEMS, P/N 80520 QUALIFICATION ENVIRONMENTS FOR AMP PROGRAM PROPELLANT TANK ALLIANT TECHSYSTEMS, P/N 80520 ATK P/N 80520 Table 1: P/N 80520 Propellant Tank Specifications Parameters Requirements Operating Pressure Proof

More information

AIAA Propellant Management Device Conceptual Design and Analysis: Traps and Troughs D. E. Jaekle, Jr. PMD Technology Andover, MA

AIAA Propellant Management Device Conceptual Design and Analysis: Traps and Troughs D. E. Jaekle, Jr. PMD Technology Andover, MA AIAA-95-2531 Propellant Management Device Conceptual Design and Analysis: Traps and Troughs D. E. Jaekle, Jr. PMD Technology Andover, MA 31st AIAA / ASME / SAE / ASEE Joint Propulsion Conference and Exhibit

More information

ZIN Technologies PHi Engineering Support. PHi-RPT CFD Analysis of Large Bubble Mixing. June 26, 2006

ZIN Technologies PHi Engineering Support. PHi-RPT CFD Analysis of Large Bubble Mixing. June 26, 2006 ZIN Technologies PHi Engineering Support PHi-RPT-0002 CFD Analysis of Large Bubble Mixing Proprietary ZIN Technologies, Inc. For nearly five decades, ZIN Technologies has provided integrated products and

More information

Load Responsive Multilayer Insulation Performance Testing

Load Responsive Multilayer Insulation Performance Testing Load Responsive Multilayer Insulation Performance Testing S. Dye 1, A. Kopelove 1, and G. L. Mills 2 1 Quest Thermal Group, 6452 Fig Street Suite A, Arvada, CO 80004 USA 2 Ball Aerospace & Technologies

More information

Берг АБ Тел. (495) , факс (495) Turning Ideas Into Engineered Solutions KAYDON RING & SEAL, INC.

Берг АБ Тел. (495) , факс (495) Turning Ideas Into Engineered Solutions KAYDON RING & SEAL, INC. Turning Ideas Into Engineered Solutions RING & SEAL, INC. K-CBS Series Circumferential Barrier Seals Kaydon s high performance circumferential barrier seals back up DGS systems with performance & economy.

More information

Optimizing Gas Supply for Industrial Lasers

Optimizing Gas Supply for Industrial Lasers Optimizing Gas Supply for Industrial Lasers Laser cutting of metals and other materials has grown rapidly due to developments in laser power, advancements in CNC automation, and decreasing costs. The industrial

More information

The Quarter Pounder A Vehicle to Launch Quarter Pound Payloads to Low Earth Orbit

The Quarter Pounder A Vehicle to Launch Quarter Pound Payloads to Low Earth Orbit The Quarter Pounder A Vehicle to Launch Quarter Pound Payloads to Low Earth Orbit Ed LeBouthillier 1 Contents Introduction... 3 Requirements... 4 Orbital Altitudes... 4 Orbital Velocities... 4 Summary...4

More information

FPG8601 Force Balanced Piston Gauge

FPG8601 Force Balanced Piston Gauge FPG8601 Force Balanced Piston Gauge Reference Level Calibration System for very low pressure Pressure range: 0 to 15 kpa gauge, absolute and absolute differential Standard resolution: 0.010 Pa, high resolution

More information

DISSOLUTION TEST FOR SOLID DOSAGE FORMS

DISSOLUTION TEST FOR SOLID DOSAGE FORMS Seite 1 von 15 01/2010:20903 corrected 6.8 2.9.3. DISSOLUTION TEST FOR SOLID DOSAGE FORMS This test is provided to determine compliance with the dissolution requirements for solid dosage forms administered

More information

Liquefied gas cargo tanks and process pressure vessels

Liquefied gas cargo tanks and process pressure vessels .1 -.3 Liquefied gas cargo tanks and process pressure vessels.1 General.1.1 The present texts give the general principles which are applied by Classification Societies for approval and survey of the relevant

More information

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2)

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2) UN-GTR PART A INSERTION Stand 09.02.2011, 17:20 Uhr A.3.3 HYDROGEN STORAGE SYSTEM The hydrogen storage system consists of all components that form the primary pressure boundary of the stored hydrogen in

More information

ASME Boiler & Pressure Vessel Code Analysis of the 1497 MHz High-Current Cryomodule Helium Vessel

ASME Boiler & Pressure Vessel Code Analysis of the 1497 MHz High-Current Cryomodule Helium Vessel 1.0 Introduction ASME Boiler & Pressure Vessel Code Analysis of the 1497 MHz High-Current Cryomodule Helium Vessel Katherine Wilson 28 May 2007 To minimize the hazards associated with vacuum and pressure

More information

KAYDON RING & SEAL, INC.

KAYDON RING & SEAL, INC. KAYDON RING & SEAL, INC. K-DGS Series Dry Gas Seals KAYDON K-DGS Dry Gas Seals K-DGS Configurations Single Seal (K-DGS) Compact and economical, the single seal configuration is recommended for non-toxic

More information

Summary of the MRA LPG Codes of Practice

Summary of the MRA LPG Codes of Practice Summary of the MRA LPG Codes of Practice COP A1 DESIGN and INSTALLATION Code COP A1 deals with above ground installations where LPG is stored under pressure at ambient temperatures in fixed vessels larger

More information

Drilling Efficiency Utilizing Coriolis Flow Technology

Drilling Efficiency Utilizing Coriolis Flow Technology Session 12: Drilling Efficiency Utilizing Coriolis Flow Technology Clement Cabanayan Emerson Process Management Abstract Continuous, accurate and reliable measurement of drilling fluid volumes and densities

More information

OPENINGS AND REINFORCEMENTS 26

OPENINGS AND REINFORCEMENTS 26 ASME BPVC.VIII.1-2015 UG-35.2 UG-36 (4) It is recognized that it is impractical to write requirements to cover the multiplicity of devices used for quick access, or to prevent negligent operation or the

More information

Design of a Solid Wall Transonic Wind Tunnel

Design of a Solid Wall Transonic Wind Tunnel Design of a Solid Wall Transonic Wind Tunnel David Wall * Auburn University, Auburn, Alabama, 36849 A solid wall transonic wind tunnel was designed with optical access from three sides to allow for flow

More information

Vibration-Free Joule-Thomson Cryocoolers for Distributed Microcooling

Vibration-Free Joule-Thomson Cryocoolers for Distributed Microcooling Vibration-Free Joule-Thomson Cryocoolers for Distributed Microcooling W. Chen, M. Zagarola Creare Inc. Hanover, NH, USA ABSTRACT This paper reports on an innovative concept for a space-borne Joule-Thomson

More information

SPECIFICATION FOR AN MRBR 9.4 TESLA/310MM/AS CRYO-COOLED MAGNET SYSTEM

SPECIFICATION FOR AN MRBR 9.4 TESLA/310MM/AS CRYO-COOLED MAGNET SYSTEM SPECIFICATION FOR AN MRBR 9.4 TESLA/310MM/AS CRYO-COOLED MAGNET SYSTEM Prepared by:- Magnex Scientific Limited The Magnet Technology Centre 6 Mead Road Oxford Industrial Park Yarnton, Oxford OX5 1QU, UK

More information

P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints

P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints Guideline No.P-04 (201510) P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints Issued date: 20 th October 2015 China Classification Society Foreword This Guideline is a part of CCS

More information

A Low Power Approach to Small Satellite Propulsion

A Low Power Approach to Small Satellite Propulsion A Low Power Approach to Small Satellite Propulsion Joe Cardin Director of Engineering VACCO Industries 0350 Vacco Street, South El Monte, CA 9733 JCardin@VACCOcom (626) 450-6435 Larry E Mosher Senior Professional

More information

Development of a Miniaturized Pressure Regulation System "mprs"

Development of a Miniaturized Pressure Regulation System mprs Development of a Miniaturized Pressure Regulation System "mprs" IEPC-2015-365 /ISTS-2015-b-365 Presented at Joint Conference of 30th International Symposium on Space Technology and Science 34th International

More information

Design Enhancements on Dry Gas Seals for Screw Compressor Applications

Design Enhancements on Dry Gas Seals for Screw Compressor Applications VDI-Berichte Nr. 1932, 2006 B 8 331 Design Enhancements on Dry Gas Seals for Screw Compressor Applications Dipl.-Ing C. Kirchner, Flowserve Dortmund GmbH & Co KG, Dortmund Introduction The development

More information

Limited quantities of compressed gases.

Limited quantities of compressed gases. 173.306 Limited quantities of compressed gases. (a) Limited quantities of compressed gases for which exceptions are permitted as noted by reference to this section in 172.101 of this subchapter are excepted

More information

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS CHAPTER 35 FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS SECTION 3501 GENERAL 3501.1 Scope. The storage and use of flammable gases shall be in accordance with this chapter. Compressed gases shall also

More information

Tradition & Technology

Tradition & Technology Gaterotor Support Gaterotor Single Screw Compressors Design & Operation Bearing Bearings Main Screw Parallex Slide System The VSM Single Screw Compressor has one main rotor and two gaterotors. All bearings

More information

HELIUM PRESSURE REGULATOR

HELIUM PRESSURE REGULATOR HELIUM PRESSURE REGULATOR 64720-1 VACCO Industries offers a compact, Helium regulator to precisely control propellant feed system pressure. The series-redundant regulator is qualified for use in spacecraft

More information

MIL-STD-883G METHOD

MIL-STD-883G METHOD STEADY-STATE LIFE 1. PURPOSE. The steady-state life test is performed for the purpose of demonstrating the quality or reliability of devices subjected to the specified conditions over an extended time

More information

Discussion and guidance on the definition and qualification of porous loads

Discussion and guidance on the definition and qualification of porous loads SUMMARY Porous Loads requiring Sterilisation are often a Critical Control Point for the manufacture of Sterile products. Particularly Aseptically filled products. Regulatory guidance in this area is not

More information

STANDARD FOR CONTROL VALVE SEAT LEAKAGE

STANDARD FOR CONTROL VALVE SEAT LEAKAGE 11-3 STANDARD FOR CONTROL VALVE SEAT LEAKAGE 1. PURPOSE 1.1 This standard establishes a series of seat leakage classes for control valves and defines the test procedures. 2. SCOPE & LIMITATIONS 2.1 Selection

More information

Gerald D. Anderson. Education Technical Specialist

Gerald D. Anderson. Education Technical Specialist Gerald D. Anderson Education Technical Specialist The factors which influence selection of equipment for a liquid level control loop interact significantly. Analyses of these factors and their interactions

More information

Irrigation &Hydraulics Department lb / ft to kg/lit.

Irrigation &Hydraulics Department lb / ft to kg/lit. CAIRO UNIVERSITY FLUID MECHANICS Faculty of Engineering nd Year CIVIL ENG. Irrigation &Hydraulics Department 010-011 1. FLUID PROPERTIES 1. Identify the dimensions and units for the following engineering

More information

Active Propellant Management

Active Propellant Management SpaceOps Conference AIAA -9 Active Propellant Management Dr. B. Yendler Lockheed Martin Technical Operations, Sunnyvale, CA, 989, USA. Operating spacecraft at End-Of-Life (EOL) presents a lot of challenges.

More information

The Discussion of this exercise covers the following points: Pumps Basic operation of a liquid pump Types of liquid pumps The centrifugal pump.

The Discussion of this exercise covers the following points: Pumps Basic operation of a liquid pump Types of liquid pumps The centrifugal pump. Exercise 2-3 Centrifugal Pumps EXERCISE OBJECTIVE In this exercise, you will become familiar with the operation of a centrifugal pump and read its performance chart. You will also observe the effect that

More information

Vertical and Horizontal Bladder Tanks

Vertical and Horizontal Bladder Tanks DATA SHEET Vertical and Horizontal Tanks Application The ANSUL bladder tank is one component in a balanced pressure proportioning system. Its operation requires no external power other than a pressurized

More information

Model 10E Enviro-Line Environmental Pressurization System Installation & Operation Manual

Model 10E Enviro-Line Environmental Pressurization System Installation & Operation Manual Model 10E Enviro-Line Environmental Pressurization System Installation & Operation Manual Table of Contents Table of Contents Page 2 Purpose and Description Page 8 Dimensions Page 2 Page 3 Identifying

More information

Design Review Agenda

Design Review Agenda Design Review Agenda 1) Introduction, Motivation, and Previous Work a. Previous Work and Accomplishments i. Platform Launches ii. Successful Test Firings 2) More In-Depth Design Overview of the Existing

More information

Other Si min/max. Cr min/max. 0.4/ / / / Bal.

Other Si min/max. Cr min/max. 0.4/ / / / Bal. 178.46 Specification 3AL seamless aluminum cylinders. (a) Size and service pressure. A DOT 3AL cylinder is a seamless aluminum cylinder with a imum water capacity of 1000 pounds and minimum service pressure

More information

Qualification of an Advanced Xenon Flow Control Module

Qualification of an Advanced Xenon Flow Control Module Qualification of an Advanced Xenon Flow Control Module IEPC-2013-382 Presented at the 33rd International Electric Propulsion Conference, The George Washington University Washington, D.C. USA October 6

More information

v. Size shall be specified on drawings.

v. Size shall be specified on drawings. SPECIFICATION FOR VACUUM INSULATED PIPING Part 1 General 1. Submittals a. After award of contract and before executing any manufacturing, shop drawings and specifications shall be submitted to the customer

More information

Active Control of Vapor Pressurization (VaPak) Systems

Active Control of Vapor Pressurization (VaPak) Systems Active Control of Vapor Pressurization (VaPak) Systems Ralph Ewig, PhD Holder Consulting Group, Renton, WA 98059, USA Vapor pressurized (VaPak) propellant feed systems hold great promise for the development

More information

NASA AEROSPACE PRESSURE VESSEL SAFETY STANDARD

NASA AEROSPACE PRESSURE VESSEL SAFETY STANDARD NSS/HP-1740.1 This Standard was CANCELLED on Jul 30 2002 22 FEBRUARY 1974 NASA AEROSPACE PRESSURE VESSEL SAFETY STANDARD OFFICE OF SAFETY AND RELIABILITY AND QUALITY ASSURANCE NATIONAL AERONAUTICS AND

More information

Dean Pump Self-Priming Chemical Process Pumps

Dean Pump Self-Priming Chemical Process Pumps Bulletin C 1.2.34.7 Dean Pump Self-Priming Chemical Process Pumps php Series HEAD CAPACITY RANGE CHARTS php Self Primer - 2 Pole 3500 RPM 500 CAPACITY M 3 /HR 2900 RPM 50 HERTZ 25 50 75 125 150 400 TOTAL

More information

Air Eliminators and Combination Air Eliminators Strainers

Air Eliminators and Combination Air Eliminators Strainers Description Air Eliminators and Combination Air Eliminator Strainers are designed to provide separation, elimination and prevention of air in piping systems for a variety of installations and conditions.

More information

E 328 E 498 Tank top mounting Connection up to G1½ / -24 SAE and SAE 2 Nominal flow rate up to 600 l/min / gpm

E 328 E 498 Tank top mounting Connection up to G1½ / -24 SAE and SAE 2 Nominal flow rate up to 600 l/min / gpm Return-Suction Filters E 8 E 98 Tank top mounting Connection up to G½ / - SE and SE Nominal flow rate up to 6 l/min / 8. gpm Description pplication For operation in units with hydrostatic drives, when

More information

Please note that there was an error in the initial proposal: samples should be nominally 1 inch in diameter (see below).

Please note that there was an error in the initial proposal: samples should be nominally 1 inch in diameter (see below). Test schedule for Inter-lab testing Perm/Strength/Vel... October 9, 2008 from David Lockner Dear colleagues, Here is the revised protocol for Inter-lab testing of Strength/Permeability/Wave

More information

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008 UNITY 2 TM Air Server Series 2 Operators Manual Version 1.0 February 2008 1. Introduction to the Air Server Accessory for UNITY 2...2 1.1. Summary of Operation...2 2. Developing a UNITY 2-Air Server method

More information

Inflatable Standing Aid Device

Inflatable Standing Aid Device Inflatable Standing Aid Device Design Team Travis Fulton, Megan McGuire James O Keefe, Justin Tichy, David Venturoso Design Advisor Prof. Andrew Gouldstone Abstract The purpose of this project is to design

More information

Motion and Flow Controls for Space Systems RELIABILITY WITHOUT COMPROMISE

Motion and Flow Controls for Space Systems RELIABILITY WITHOUT COMPROMISE Motion and Flow Controls for Space Systems RELIABILITY WITHOUT COMPROMISE When it comes to reliable, high-performance controls for space applications, manufacturers around the world rely on Marotta Controls.

More information

A New Piston Gauge to Improve the Definition of High Gas Pressure and to Facilitate the Gas to Oil Transition in a Pressure Calibration Chain

A New Piston Gauge to Improve the Definition of High Gas Pressure and to Facilitate the Gas to Oil Transition in a Pressure Calibration Chain A New iston Gauge to Improve the Definition of High Gas ressure and to Facilitate the Gas to Oil Transition in a ressure Calibration Chain ierre Delajoud, Martin Girard DH Instruments, Inc. 4765 East Beautiful

More information

Computer Simulation Helps Improve Vertical Column Induced Gas Flotation (IGF) System

Computer Simulation Helps Improve Vertical Column Induced Gas Flotation (IGF) System JOURNAL ARTICLES BY FLUENT SOFTWARE USERS JA187 Computer Simulation Helps Improve Vertical Column Induced Gas Flotation (IGF) System Computer simulation has helped NATCO engineers make dramatic improvements

More information

www.ompressedairsystems.com ultra-high purity nitrogen generators nitrogen purity: 95% to 99.999% www.ompressedairsystems.com ultra-high purity nitrogen generators nitrogen purity: 95% to 99.999% Leading

More information

AC : MEASUREMENT OF HYDROGEN IN HELIUM FLOW

AC : MEASUREMENT OF HYDROGEN IN HELIUM FLOW AC 2010-2145: MEASUREMENT OF HYDROGEN IN HELIUM FLOW Randy Buchanan, University of Southern Mississippi Christopher Winstead, University of Southern Mississippi Anton Netchaev, University of Southern Mississippi

More information

Development of a High Pressure, Oil Free, Rolling Piston Compressor

Development of a High Pressure, Oil Free, Rolling Piston Compressor Purdue University Purdue e-pubs International Compressor Engineering Conference School of Mechanical Engineering 1994 Development of a High Pressure, Oil Free, Rolling Piston Compressor S. J. Delmotte

More information

DNVGL-CP-0187 Edition March 2016

DNVGL-CP-0187 Edition March 2016 CLASS PROGRAMME Type approval DNVGL-CP-0187 Edition March 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

Current Leads for Cryogenic Systems

Current Leads for Cryogenic Systems Current Leads for Cryogenic Systems American Magnetics Inc. s (AMI) Vapor Cooled Current Leads provide reliable and consistent electrical current transfer from room temperature (300K) to a Liquid Helium

More information

Control of Nuclear Gloveboxes and Enclosures Using the No- Moving-Part Vortex Amplifier (VXA)

Control of Nuclear Gloveboxes and Enclosures Using the No- Moving-Part Vortex Amplifier (VXA) Control of Nuclear Gloveboxes and Enclosures Using the No- Moving-Part Vortex Amplifier (VXA) ABSTRACT M.J. Crossley AEA Technology ES. Inc. 1100 Jadwin Ave, Richland, WA 99352, USA This paper describes

More information

Development of Xenon feed system for a 300-W Hall-Thruster

Development of Xenon feed system for a 300-W Hall-Thruster Development of Xenon feed system for a 300-W Hall-Thruster IEPC-2009-061 Presented at the 31st International Electric Propulsion Conference, University of Michigan Ann Arbor, Michigan USA Younho Kim 1

More information

Design. Pompetravaini-NSB API SB Liquid Ring Compressor for Gas Processing. Working Principle

Design. Pompetravaini-NSB API SB Liquid Ring Compressor for Gas Processing. Working Principle SB Pompetravaini-NSB API SB Liquid Ring Compressor for Gas Processing A family of API liquid ring compressors has been developed and has been in the market for nearly a decade, they are specifically made

More information

Installation Operation Maintenance

Installation Operation Maintenance 682 Seal Cooler New generation seal cooler to meet and exceed the seal cooler requirements stated in the 4th Edition of API Standard 682 Installation Operation Maintenance Experience In Motion Description

More information

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax: 2 Table Of Contents 1. Introduction 3 2. About this Manual 3 3. Contacting YZ Systems 3 4. Vessel Components 4 5. Specifications 5 6. Application 6 7. Theory of Operation 7 8. DuraSite Installation & Use

More information

MSC Guidelines for Pressure Vessels

MSC Guidelines for Pressure Vessels References: a. 46 CFR Part 54 Pressure Vessels S. T. Brady, CDR, Chief, Engineering Division b. ASME Boiler and Pressure Vessel Code (BPVC), Section VIII, Division 1, (1998 Edition) c. Navigation and Inspection

More information

HORIZONTAL BLADDER TANK

HORIZONTAL BLADDER TANK Balanced Pressure Proportioning System Reliable Foam System Requiring Only Water Power Perfect For Low Ceilings UL Listed, ASME, National Board Registered Bladder-UL162 Approved, High Tensile Pressure

More information

Space Launchers. Cryogenic, gas-related equipment and engineering solutions for launchers and launch pads infrastructures

Space Launchers. Cryogenic, gas-related equipment and engineering solutions for launchers and launch pads infrastructures Space Launchers Cryogenic, gas-related equipment and engineering solutions for launchers and launch pads infrastructures Launcher equipment Cryogenic propulsion enables a significant increase of space

More information

2.1 Introduction to pressure vessels

2.1 Introduction to pressure vessels 2.1 Introduction to pressure vessels Pressure vessels in the form of cylinders and tanks are used for storing variety of liquids and gasses at different temperatures and pressures. Some of the substances

More information

Vehicle- or rack-mounted liquefied gas meters, pump supplied

Vehicle- or rack-mounted liquefied gas meters, pump supplied Purpose This inspection procedure outline (IPO) defines the minimum tests which must be performed to ensure that basic volumetric measuring devices comply with the legislation. Application Rack/fixed metering

More information

Annex G (normative) Requirements for Nondestructive Examination

Annex G (normative) Requirements for Nondestructive Examination Purchase API Spec online at http://www.techstreet.com/api Annex G (normative) G.1 General Requirements for Nondestructive Examination This annex specifies the requirements for NDE that shall be performed

More information

COMPUTATIONAL FLOW MODEL OF WESTFALL'S LEADING TAB FLOW CONDITIONER AGM-09-R-08 Rev. B. By Kimbal A. Hall, PE

COMPUTATIONAL FLOW MODEL OF WESTFALL'S LEADING TAB FLOW CONDITIONER AGM-09-R-08 Rev. B. By Kimbal A. Hall, PE COMPUTATIONAL FLOW MODEL OF WESTFALL'S LEADING TAB FLOW CONDITIONER AGM-09-R-08 Rev. B By Kimbal A. Hall, PE Submitted to: WESTFALL MANUFACTURING COMPANY September 2009 ALDEN RESEARCH LABORATORY, INC.

More information

STRUCTURAL ANALYSIS OF THE VACUUM VESSEL FOR THE LHCb VERTEX LOCATOR (VELO)

STRUCTURAL ANALYSIS OF THE VACUUM VESSEL FOR THE LHCb VERTEX LOCATOR (VELO) National Institute for Nuclear Physics and High Energy Physics Kruislaan 409 1098 SJ Amsterdam The Netherlands NIKHEF Reference no.: MT-VELO 04-1 EDMS no: 432626 OF THE VACUUM VESSEL FOR THE LHCb VERTEX

More information

Unique solutions for Oxygen and Nitrogen supply

Unique solutions for Oxygen and Nitrogen supply Unique solutions for Oxygen and Nitrogen supply SHAPING THE FUTURE Index Competence and Trust 3 Modular PSA 4 Superior PSA generator Technology 5 NOXERIOR Competence and Trust NOXERIOR focuses on all aspects

More information

The Shand & Jurs Model Vapor Guard Tank Blanketing Valve

The Shand & Jurs Model Vapor Guard Tank Blanketing Valve Lower maintenance due to fewer parts Occupies less space, less stress to tank Teflon is inert to most chemicals; extends service life Simplifies and lowers maintenance cost Optimizes flow of blanketing

More information

CVI Valve Line. Exceeds the industry s highest standards for reliability and performance

CVI Valve Line. Exceeds the industry s highest standards for reliability and performance CVI Valve Line Exceeds the industry s highest standards for reliability and performance Available in the most standard models with the shortest lead times in the industry Exceptional quality every CVI

More information

VERTICAL BLADDER TANK

VERTICAL BLADDER TANK Balanced Pressure Proportioning System Reliable Foam System Requiring Only Water Power Perfect For Tight Spaces UL Listed, ASME, National Board Registered Bladder-UL162 Approved, High Tensile Pressure

More information

SPECIFICATIONS. Approximate Weight: 10 oz. Surface Finish: Ra micro inch or less MATERIALS OF CONSTRUCTION

SPECIFICATIONS. Approximate Weight: 10 oz. Surface Finish: Ra micro inch or less MATERIALS OF CONSTRUCTION DIFFUSION-RESISTANT, DIAPHRAGM SEAL, EXCESS FLOW SHUT-OFF VALVES (FS SERIES) FS Series Excess Flow Shut-Off Valves are designed to automatically shut-off the delivery of gas in a line if the flow exceeds

More information

Design and Safety Document for the Vacuum Windows of the NPDGamma Liquid Hydrogen Target at SNS

Design and Safety Document for the Vacuum Windows of the NPDGamma Liquid Hydrogen Target at SNS Design and Safety Document for the Vacuum Windows of the NPDGamma Liquid Hydrogen Target at SNS Prepared: Checked: Approved: H. Nann W. Fox M. Snow The NPDGamma experiment is going to run at BL13 at SNS

More information

Operation Manual Piston Sensed Gas Pressure Regulators

Operation Manual Piston Sensed Gas Pressure Regulators 687 Technology Way Napa, CA 94558 Phone: (707) 259-0102 FAX: (707) 259-0117 www.aptech-online.com Operation Manual Piston Sensed Gas Pressure Regulators (Models KT9, KT10, Welded KT10, KT12) Table of Contents:

More information

ACCURACY, PERFORMANCE, AND HANDLING OF OIL-FILLED DIGIQUARTZ PRESSURE INSTRUMENTATION

ACCURACY, PERFORMANCE, AND HANDLING OF OIL-FILLED DIGIQUARTZ PRESSURE INSTRUMENTATION Application Note Doc. G8108-001 Rev. A - 23-Jul-02 ACCURACY, PERFORMANCE, AND HANDLING OF OIL-FILLED DIGIQUARTZ PRESSURE INSTRUMENTATION For more information regarding Digiquartz products contact: Paroscientific,

More information

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor) 1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor) 1. According to NFPA 99, SCFM is an acronym for. a) Surface Conditions at Fahrenheit Mercury b) Standard Conditions

More information

CONTENTS Article NC-1000 Introduction Figures Article NC-2000 Material

CONTENTS Article NC-1000 Introduction Figures Article NC-2000 Material CONTENTS Foreword... xv Statements of Policy... xvii Personnel... xix Organization of Section III... xxxi Summary of Changes... xxxiii List of Changes in BC Order... xxxiv Article NC-1000 Introduction...

More information

PRO-50 Instrument Supply Regulator

PRO-50 Instrument Supply Regulator Features CRN Approved The PRO-50 Regulator has been granted a Canadian Registration Number. Sour Service Capability Available in NACE configurations that comply with NACE MR0175/MR0103. Environmental limits

More information

Pro-V Multivariable Flowmeter Model M22 In-line Vortex

Pro-V Multivariable Flowmeter Model M22 In-line Vortex Pro-V Multivariable Flowmeter Model M22 In-line Vortex Pro-V TM Advantage: Volumetric or mass flow monitoring of most liquids, gases, and steam Multivariable meter delivers mass flow, temperature, pressure,

More information

Vapor Sorption Analyzer

Vapor Sorption Analyzer Vapor Sorption Analyzer Quick Start Guide 1. Getting Started Place the AquaLab VSA on a flat surface. Use the bubble level(figure 1: Adjustment and bubble level) and use the adjustable feet to level the

More information

Aeroquip Fluid Conveyance

Aeroquip Fluid Conveyance Aeroquip Fluid Conveyance Technical Focus Rynglok Hydraulic Tube Fitting System Eaton s Aeroquip Brand RYNGLOK tube fitting system is the system of choice for aerospace hydraulic tubing for military, commercial

More information

NSPS SUBPART Ka Check-off Form JULY 11, LAFAYETTE ROAD NO., ST. PAUL, MN

NSPS SUBPART Ka Check-off Form JULY 11, LAFAYETTE ROAD NO., ST. PAUL, MN 520 LAFAYETTE ROAD NO., ST. PAUL, MN 55155-4194 NSPS FORM NSPS-Ka NSPS SUBPART Ka Check-off Form JULY 11, 2005 I. Introduction An owner or operator may fill in this form in replacement of a highlighted

More information

CS Controlled Dissolved Gas assembly with optional CS Air Aspirator assembly. Installation and Operation information

CS Controlled Dissolved Gas assembly with optional CS Air Aspirator assembly. Installation and Operation information CS-425-01 Controlled Dissolved Gas assembly with optional CS-603-01 Air Aspirator assembly Installation and Operation information Serial # CS-XXX Date of shipment:, 2005 Shipped to: Purchase order #: xxxxxxx

More information

Offshore platforms survivability to underwater explosions: part I

Offshore platforms survivability to underwater explosions: part I Computational Ballistics III 123 Offshore platforms survivability to underwater explosions: part I A. A. Motta 1, E. A. P. Silva 2, N. F. F. Ebecken 2 & T. A. Netto 2 1 Brazilian Navy Research Institute,

More information

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL) STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL) TEE (HOT TAPPING MATERIAL) S-04-02-040 Page 1 of 7 1.0 SCOPE This specification covers the basic requirements for the design, manufacture and supply

More information

Experimental Verification of Integrated Pressure Suppression Systems in Fusion Reactors at In-Vessel Loss-of -Coolant Events

Experimental Verification of Integrated Pressure Suppression Systems in Fusion Reactors at In-Vessel Loss-of -Coolant Events Experimental Verification of Integrated Pressure Suppression Systems in Fusion Reactors at In-Vessel Loss-of -Coolant Events K. Takase 1), H. Akimoto 1) 1) Japan Atomic Energy Research Institute (JAERI),

More information

Figure 1 Schematic of opposing air bearing concept

Figure 1 Schematic of opposing air bearing concept Theoretical Analysis of Opposing Air Bearing Concept This concept utilizes air bearings to constrain five degrees of freedom of the optic as shown in the figure below. Three pairs of inherently compensated

More information

Leak testing of Valves. Standards for acceptable Rates of Valve Leakage

Leak testing of Valves. Standards for acceptable Rates of Valve Leakage Leak testing of Valves Standards for acceptable Rates of Valve Leakage American Petroleum Institute (API) The API standard 598: Valve Inspection and Testing, covers the testing and inspection requirements

More information

Assessing Compliance with United States Government Orbital Debris Mitigation Guidelines

Assessing Compliance with United States Government Orbital Debris Mitigation Guidelines Assessing Compliance with United States Government Orbital Debris Mitigation Guidelines R. L. Kelley 1, D. R. Jarkey 2 1. Jacobs, NASA Johnson Space Center, Houston, TX 77058, USA 2. HX5 - Jacobs JETS

More information

PHASE 1 WIND STUDIES REPORT

PHASE 1 WIND STUDIES REPORT PHASE 1 WIND STUDIES REPORT ENVIRONMENTAL STUDIES AND PRELIMINARY DESIGN FOR A SUICIDE DETERRENT SYSTEM Contract 2006-B-17 24 MAY 2007 Golden Gate Bridge Highway and Transportation District Introduction

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S Page 1 of 13 1. DESCRIPTION The Viking 6 Model G-6000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler

More information

[Reserved] Packagings ICC 3 1 3AA 3AL 3AX 3A480X 3AAX

[Reserved] Packagings ICC 3 1 3AA 3AL 3AX 3A480X 3AAX 173.300 [Reserved] 173.301 General requirements for shipment of compressed gases and other hazardous materials in cylinders, UN pressure receptacles and spherical pressure vessels. (a) General qualifications

More information

Comparison of Methods and Devices for High Pressure Vessel Passivation B. Zitouni (1), L. Denies (1),M. Peukert (1)

Comparison of Methods and Devices for High Pressure Vessel Passivation B. Zitouni (1), L. Denies (1),M. Peukert (1) SPC2016_ 3124678 Comparison of Methods and Devices for High Pressure Vessel Passivation B. Zitouni (1), L. Denies (1),M. Peukert (1) (1) OHB System AG, Universitätsallee 27-29, 28359 Bremen, Germany Email:

More information

Development of a Back Pressure Valve for the Spacesuit Water Membrane Evaporator (SWME)

Development of a Back Pressure Valve for the Spacesuit Water Membrane Evaporator (SWME) 45th 12-16 July 2015, Bellevue, Washington ICES-2015-338 Development of a Back Pressure Valve for the Spacesuit Water Membrane Evaporator (SWME) Brad Harris 1 and Thomas O. Leimkuehler 2 Paragon Space

More information

Rotary air valves used for material feed and explosion protection are required to meet the criteria of NFPA 69 (2014)

Rotary air valves used for material feed and explosion protection are required to meet the criteria of NFPA 69 (2014) Rotary air valves used for material feed and explosion protection are required to meet the criteria of NFPA 69 (2014) 12.2.4.2. 12.2.4.2 rotary valve design criteria (close clearance) 12.2.4.3 THE DESIGN

More information