1 DENTON INTEGRITY STUDY APPENDIX C INCIDENT REPORTS

2 Incident One FPSO Questionnaire Failure of gripper used to rotate turret Several months after installation This FPSO has an internal partially rotating turret utlising a drag chain to control the speed of rotating. In order to change the heading of the FPSO a set of grippers were design in that lock onto the turret and push the hull around it. During one of these movements one of the grippers failed and so the vessels heading could not be changed. Overloading on the hydraulic rams used in the grippers and the grippers associated locking pins. The vessels heading could not be changed and so the vessel was at increased risk of greenwater damage until such time as the unit could be changed out and full heading control restored. Loss of heading control system via alarms in control room. Damaged gripper was replaced with spare and damaged gripper was subsequently repaired. There is an ongoing program to try and improve the design of the grippers as they are known to be continuously overloaded when in use. 72 hours

3 Incident Two FSU Connecting Socket detail between chain and wire element(s) of the mooring system. 2-3 years after installation. On a turret moored floating storage unit connection detail between the chain and wire elements consisted of a wire end socket, a tri-plate and a d-type shackle connecting to the ground chain. The wire open end socket was connected to the tri-plate by a round connecting pin that was held in place by an end plate secured to the socket by 3 bolts around its circumference and to the pin by three bolts in a line. During a subsea survey it was found that the end plate had dropped off and the pin dropped out. It was also noted that end plate bolts had failed or backed off on a number of the other socket connections although the pin(s) had not yet dropped out. The subject connection was in the seabed working section of the catenary and as the wire socket repeatedly picked up and set down (preliminary) there was a large relative motion between the socket and the heavier tri-plate and ground chain section that remained on the seabed. It is thought that this introduced a large torsional/friction load between the pin and the body of the socket that could not be accommodated by the end plate retaining bolts and these failed allowing the end plate to drop off and the pin drop out. There had also been a failure to properly insulate the wire section from the chain section and the cathodic protection on the wire was drained down by the ground chain section resulting in a corrosive environment that might have contributed to the failure. Temporarily restricted offloading operations and repair costs. Subsea ROV survey. Replacement of pin(s) modification of retention bolts, re-instatement of cathodic protection. Initial repair approx 12 weeks total refurbishment several months

4 Incident Three Description: FPSO / Questionnaire Chain link failed single line failure. Several months after installation Having been on location for several months the crew felt that the motions of the vessel had changed and so suspected that a line had failed, this was reinforced by the fact that one of the line tension monitors was reading zero but the monitors were uncalibrated and unreliable and the zero reading was not initially believed. The line tension data was therefore examined on the beach and after 3 weeks of signal processing a step change of 10 tonnes was noted in the remaining lines thus indicating that the line tension monitor was indeed working correctly and the line had failed. Luckily, during and after the failure the conditions were benign and so the rig was not left exposed to a storm in the one line failed condition. On examination of the failed line it was found that the chain had failed at the fairlead. Fatigue failure of the anchor chain due to one of the chain links continuously slapping against the sharp edges of the fairlead (which was a fabricated item rather than a cast pocket). The failure was accelerated due to the detailed design of the fairlead, the large relative motion between the fairlead and the mooring line and the lack of movement of chain through it to spread the wear zone and fatigue loading. Production was not suspended, but examination of the remaining lines found similar damage to all the other lines. To prevent the incident from re-occurring the top sections of all the lines were changed out and the fairlead design was modified. : Changes to IRM The top sections of the chains are now routinely rotated through the fairlead to spread the wear zone and so reduce the fatigue loading. In addition to which, these sections of chain are now routinely inspected to look for damage or excess wear. Lessons Learnt: The lessons learnt from this, was that detailed design of the fairlead should be carefully undertaken and that chain should be routinely rotated through fairleads to spread any damage and so lengthen the working life of the chain. In addition to which, the fact that the top section of each mooring line was designed to be changed out facilitated the quick resolution of the problem. 6 weeks for initial repair plus 3 weeks for the initial identification of the problem. Modifications to the fairlead several months and only feasible by dry docking the vessel.

5 Incident Four FPSO Questionnaire Turret control system (intermittent) This is an intermittent problem and has been occurring since soon after installation The turret in this installation is not directly coupled to the FPSO, instead it floats inside the FPSO moon pool and the vessel centres itself on it by means of a number of horizontal and vertical hydraulic rams that each push 3 graphite type pads onto polished bearing surfaces. Domestic PCs and a specially written piece of software control these rams, and on several occasions the system has lost the plot and locked the turret up solid. Integrity of domestic PCs in an industrial control situation. The vessel becomes stuck on heading when the system flips out and so is at increased risk of greenwater damage until such time as full heading control can be restored. Lack of rotation of the FPSO about its turret. The system is unreliable and so the control system has to be changed out for a system utilising industrial computers. N/A

6 Incident Five FSU Mooring to turret connection detail. Within 2-3 years of initial installation. The connection between a mooring wire and the turret was made by an open ended socket with a central pin. The pin was retained by a bolted detail that became subject to corrosion and fatigue and subsequently failed. Failure to correctly appreciate complex corrosion/fatigue mechanism at critical wire socket to turret detail. Temporary loss of availability and repair costs Annual ROV survey Initial repair with similar item followed by redesign and long term replacement of all similar details with more robust arrangement in more compatible materials. Not Known

7 Incident Six : FPSO Thruster Within first 2-3 years of operation. One of two thruster motors burned out due to Lack of manufacturing integrity of motor windings causing short and burn out of the motor. Loss of availability to thruster, limited operational restriction to ST loading operations and repair and replacement costs. Loss of motor function. Motor removed to beach for repairs. 3 months

8 Incident Seven : FSU Line tension monitoring via sensor on pipe hawser(s) Line tension signals lost Not knowm Not known Loss of line tension read-out Loss of line tension read-out None Not re-instated

9 Incident Eight FPSO Questionnaire Line Tension Monitors Several Years after installation The line tension monitoring system on the unit consists of electronic inclinometers connected to the chain out with the chain pipes. During routine inspection of the chain pipes by an air diving team one of the divers inadvertently knocked off several of the inclinometers. Air diver Loss of line tension monitoring capability Line tension gauges ceased to show any tension even though system was known to be intact. Line tension monitoring was dropped in favour of position monitoring to monitor the status of the mooring system. It has not been repaired.

10 Incident Nine FSU Thruster Several months after installation Due to the loss of the main electrical system the unit was unable to use its electrically driven thruster. Electrical blackout. As the thruster is only used for heading and surge control during shuttle tanker, supply boat and helicopter operations the consequences were not high. N/A None with regard to the mooring system. 5-6 hours

11 Incident Ten FPSO (MOBILE EWT) Mooring Chain 10 years after initial construction After being hit by a 20-25m high wave the vessel lost two moorings lines, subsequent to this over the following 8 hours a further two lines failed. Resulting in the loss of half the mooring system, but the vessel managed to stay on station by utlising its main engine and the remaining 4 mooring lines. It should be noted that although this was a multiple line failure there had been previous single line failures in the unit(s) previous operating history. Excessive wear/motion at the fairlead mooring line interface, chain cables working at high utilisations. Temporary interruption to production, no major loss of position, repair costs. Larger excursions after extreme event. Mooring system upgraded, procedure introduced for inspection, rotation and change out of chain cables in the fairlead working zone. Initial repair one week.

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0) Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW Tel +44 (0)1254 615100 www.allspeeds.co.uk WIRE ROPE GRIPPER WGO135 (without manifold and intensifier) PRODUCT

More information

LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN

LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN Fabrice Dumortier 1, Jean-Pierre Queau 1, Jean-Robert Fournier 2 1. SBM Offshore 2. SBM Offshore Keywords: 1. LNG;

More information

An Ocean of Possibility

An Ocean of Possibility An Ocean of Possibility SPM Offloading Buoy CALM Buoy Orwell Offshore s Catenary Anchor Leg Mooring (CALM) Buoy offers a reliable state-of-the-art solution for loading and offloading crude oil, refined

More information

RAMSTM. 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs

RAMSTM. 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs RAMS 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs Introduction to RAMS Tritech s RAMS is a 360 anchor-chain and riser integrity monitoring system for Floating Production Storage and Offloading

More information

RIGID RISERS FOR TANKER FPSOs

RIGID RISERS FOR TANKER FPSOs RIGID RISERS FOR TANKER FPSOs Stephen A. Hatton 2H Offshore Engineering Ltd. SUMMARY Recent development work on the subject of dynamic rigid (steel pipe) risers demonstrates that their scope of application

More information

Anchor and Anchor Cable Losses. Athens, Greece, 2 nd February 2018 Capt. Simon Rapley

Anchor and Anchor Cable Losses. Athens, Greece, 2 nd February 2018 Capt. Simon Rapley Anchor and Anchor Cable Losses Athens, Greece, 2 nd February 2018 Capt. Simon Rapley Anchor Loses Items lost: Whole anchors Anchor crowns Anchor and shackles of cable Anchor and entire anchor cable Shank

More information

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0) Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW Tel +44 (0)1254 615100 www.allspeeds.co.uk SOFT LINE CUTTER SL55 PRODUCT CODE No. 980504 INSTRUCTIONS FOR INSTALLATION,

More information

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0) Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW Tel +44 (0)1254 615100 www.allspeeds.co.uk SOFTLINE CUTTER SL80 PRODUCT CODE No. 980248 INSTRUCTIONS FOR INSTALLATION,

More information

ROV Development ROV Function. ROV Crew Navigation IRATECH SUB SYSTEMS 2010

ROV Development ROV Function. ROV Crew Navigation IRATECH SUB SYSTEMS 2010 IR AT EC H SU B SY ST EM S 20 10 Remotely Operated Vehicle ROV INTRODUCTORY 2008 2008 1 KEY POINTS ROV Introductory ROV Development ROV Function Types of ROV ROV Crew Navigation ROV Components 2 ROV Development

More information

FPSO MOORING CONFIGURATION BASED ON MALAYSIA S ENVIRONMENTAL CRITERIA

FPSO MOORING CONFIGURATION BASED ON MALAYSIA S ENVIRONMENTAL CRITERIA FPSO MOORING CONFIGURATION BASED ON MALAYSIA S ENVIRONMENTAL CRITERIA Mazlan Muslim and Md Salim Kamil Marine and Design Technology Section, University Kuala Lumpur MIMET, Lumut, Perak, Malaysia E-Mail

More information

FMEA Proving Trials and Offloading Simulations

FMEA Proving Trials and Offloading Simulations FMEA Proving Trials and Offloading Simulations Lessons Learned Arjen Tjallema Bluewater Energy Services BV Douwe Stapersma Delft University of Technology Agenda p. 2 Introduction FPSO Munin Soliton Currents

More information

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0) Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW Tel +44 (0)1254 615100 www.allspeeds.co.uk HOSE/UMBILICAL CUTTER HCV100 PRODUCT CODE No. 980292 INSTRUCTIONS

More information

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0) Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW Tel +44 (0)1254 615100 www.allspeeds.co.uk WIRE ROPE CUTTER WCS75HDZ PRODUCT CODE No. 980482 INSTRUCTIONS FOR

More information

Isis Deployment. TMS and Live Boating. Inmartech08. Dave Turner Operations Co-ordinator.

Isis Deployment. TMS and Live Boating. Inmartech08. Dave Turner Operations Co-ordinator. Isis Deployment TMS and Live Boating Inmartech08 Dave Turner Operations Co-ordinator TMS Operations Why Why do do we we have have aa TMS? TMS? ItIt was was deemed deemed an an essential essential part

More information

M S I C R A N E S C A L E

M S I C R A N E S C A L E 2 M E A S U R E M E N T S Y S T E M S I N T E R N A T I O N A L Table of Contents Forward...3 Safe Operating Guidelines...4 Operating Suggestions...4 Handling Hoist Motion...4 Safe Loading and Rigging

More information

Transfer Chain (SA-1002) & Adjustable I-Beam Clamp (SA-1039 or SA-1040) Operating Instructions

Transfer Chain (SA-1002) & Adjustable I-Beam Clamp (SA-1039 or SA-1040) Operating Instructions Transfer Chain (SA-1002) & Adjustable I-Beam Clamp (SA-1039 or SA-1040) Operating Instructions SPIDER Page 1 of 8 702127 Rev A Using Transfer Chain with Adjustable I-Beam Clamp Safety Notes Do not use

More information

CLIENT NAME: LOCATION: CALM BUOY INSPECTION:

CLIENT NAME: LOCATION: CALM BUOY INSPECTION: INSPECTOR REVIEWED INSPECTION OF CALM BUOY OVERALL PHOTO REVISION DESCRIPTION: Preliminary / Final Page: 1 TABLE OF CONTENT 1. MANAGEMENT SUMMARY... 3 1.1. SCOPE OF WORK:... 3 1.2. CORRECTIVE ACTIONS...

More information

The topics I will briefly cover, are; Stack Configurations Wellhead Connector Considerations Control Systems Tensioning Systems will be discussed by

The topics I will briefly cover, are; Stack Configurations Wellhead Connector Considerations Control Systems Tensioning Systems will be discussed by Thank you Greg. 1 The topics I will briefly cover, are; Stack Configurations Wellhead Connector Considerations Control Systems Tensioning Systems will be discussed by Mr. Muhammad Sadiq, however in short,

More information

PRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction

PRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction PRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction This lecture deals with the equipment developed and the experience gained during

More information

A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING

A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING By Marian Copilet, Durham Pipeline Technology Ltd., Gateshead, UK & Prof. Ernie Appleton, University of Durham 1. ABSTRACT This paper discusses

More information

Safety Flash. IMCA Safety Flash 08/10 December Welding of Shackles. 2 Lacerated Chin Caused by Flying Wedge

Safety Flash. IMCA Safety Flash 08/10 December Welding of Shackles. 2 Lacerated Chin Caused by Flying Wedge AB Safety Flash IMCA Safety Flash 08/10 December 2010 These flashes summarise key safety matters and incidents, allowing wider dissemination of lessons learnt from them. The information below has been

More information

TP 11249E SHIP SAFETY STANDARD FOR IN-WATER SURVEYS

TP 11249E SHIP SAFETY STANDARD FOR IN-WATER SURVEYS TP 11249E SHIP SAFETY STANDARD FOR IN-WATER SURVEYS Canadian Coast Guard Ship Safety Branch 1992 TP 11249E RECORD OF CHANGES STANDARD FOR IN WATER SURVEYS DATE OF AMENDMENT AMENDMENT NUMBER SECTION AMENDED

More information

DP Station Keeping Event Bulletin

DP Station Keeping Event Bulletin DP Station Keeping Event Bulletin IMCA DP Station Keeping Event Bulletin 04/17 October 2017 The following event trees have been compiled from recent reports received by IMCA. The originators granted IMCA

More information

Offshore Losses Case Studies

Offshore Losses Case Studies Offshore Losses Case Studies David Brown BSc(Eng), PhD, CEng, FRINA, FSUT, SNAME, FIMechE Engineering Director BPP Technical Services OPERA Lessons from Disaster Author s Experience Experience Professional

More information

Time-domain Nonlinear Coupled Analyses Covering Typical Mooring and Riser Configurations for FPSOs

Time-domain Nonlinear Coupled Analyses Covering Typical Mooring and Riser Configurations for FPSOs PAU, FRANCE 5-7 APRIL 2016 Time-domain Nonlinear Coupled Analyses Covering Typical Mooring and Riser Configurations for FPSOs Author: Fan Joe Zhang Presenter: Styrk Finne DNV GL - Software Contents Typical

More information

Offshore Oil and Gas Platforms for Deep Waters

Offshore Oil and Gas Platforms for Deep Waters Offshore Oil and Gas Platforms for Deep Waters Atilla Incecik Department of Naval Architecture, Ocean and Marine Engineering University of Strathclyde, Glasgow, UK (atilla.incecik@strath.ac.uk) Summary

More information

1.0 - OPENING AND CLOSING THE DOOR

1.0 - OPENING AND CLOSING THE DOOR The purpose of this manual is to provide the user with instructions on how to safely open and close, how to conduct routine maintenance, and how to install the PEI TWINLOCK Closure on a pressure vessel.

More information

IMCA DP Station Keeping Bulletin 04/18 November 2018

IMCA DP Station Keeping Bulletin 04/18 November 2018 DP STATION KEEPING BULLETIN IMCA DP Station Keeping Bulletin 04/18 November 2018 The following event trees have been compiled from recent reports received by IMCA. The originators granted IMCA permission

More information

ACFM ARRAY PROBE TECHNOLOGY WELD INSPECTION DATA Array probe scan on test piece with longitudinal and transverse cracks. ALTERNATIVE CONTOUR PLOT REDUCING COSTS FOR OPERATORS REMOTELY DEPLOYED ACFM INSPECTION

More information

Guidelines on Surveys for Dynamic Positioning System

Guidelines on Surveys for Dynamic Positioning System Guidelines on Surveys for Dynamic Positioning System (2002) BEIJING 1 CONTENTS Chapter 1 GENERAL 1.1 General requirements 1.2 Class notation 1.3 Definitions 1.4 Plans and documents 1.5 Failure mode and

More information

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development 10121-4404-03 Jelena Vidic-Perunovic, Doris, Inc. Lars Ødeskaug, Sevan Marine ASA RPSEA Ultra-Deepwater Technology

More information

Stevpris installation

Stevpris installation chaser Stevpris deployment for MODUs Introduction Typical methods for deployment and retrieval of Stevpris anchors with an anchor handling vessel (AHV) are described, focusing on the use of chasers for

More information

OFFICIAL MESSAGE CIRCULAR

OFFICIAL MESSAGE CIRCULAR OFFICIAL MESSAGE CIRCULAR From: NI/ DP Department Number: 010/2012 Date: 20.12.2012 Number of pages: 7 To: Dynamic Positioning Accredited Training Centres Cc: DPTEG members Referent to: Aims and Objectives

More information

CRANE WITH WINCH USE AND MAINTENANCE MANUAL. Code Rev. Release MD /03

CRANE WITH WINCH USE AND MAINTENANCE MANUAL. Code Rev. Release MD /03 CRANE WITH WINCH Code Rev. Release MD.0.097 0 06/03 USE AND MAINTENANCE MANUAL CONTENTS 1 FOREWORD page 3 1.1 Description of the crane with winch page 3 2 USE OF THE CRANE WITH WINCH page 3 2.1 General

More information

Re-usable Riser and Flowline System for Deep Water Application. C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008

Re-usable Riser and Flowline System for Deep Water Application. C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008 Re-usable Riser and Flowline System for Deep Water Application C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008 Table of Contents Flexible Pipe Technology Deep Water Challenges for Riser, Flowline and Umbilical

More information

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0) Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW Tel +44 (0)1254 615100 www.allspeeds.co.uk WIRE ROPE CUTTER RCO40 PRODUCT CODE No. 980502 INSTRUCTIONS FOR INSTALLATION,

More information

IMCA Safety Flash 05/10 July 2010

IMCA Safety Flash 05/10 July 2010 AB IMCA Safety Flash 05/10 July 2010 These flashes summarise key safety matters and incidents, allowing wider dissemination of lessons learnt from them. The information below has been provided in good

More information

THOR 10 HAMMER CAGE INSTRUCTIONS

THOR 10 HAMMER CAGE INSTRUCTIONS 75 " 7m 78 4" m 6" 8.8m 45 ".70m 4.9deg 6 4" 6m 44 4".67m 75 " 7m 9 4" 0m 44".m 497 4".64m The 70, Thor Hammer Cage, consists of four heavy duty aluminum net poles. The unique pole structure reduces the

More information

APPENDIX D Oil Loading Pipeline - Options

APPENDIX D Oil Loading Pipeline - Options MAUREEN DECOMMISSIONING PROGRAMME APPENDIX D CONTENTS D.1 Summary of Decommissioning Options Considered 3 D.1.1 D.1.2 D.1.3 Option 1 - Float the Pipeline and Tow it to Shore for Disposal 3 Option 2 Recover

More information

CB-50 Data Buoy Quick Start Guide

CB-50 Data Buoy Quick Start Guide CB-50 Data Buoy Quick Start Guide The NexSens CB-50 Data Buoy is designed for quick deployment in emergency response situations including industrial spills and natural disasters. The buoy can be deployed

More information

A N C H O R T A B S N O R T H W E S T ANCHOR TAB VF. Patented. User Instructions

A N C H O R T A B S N O R T H W E S T   ANCHOR TAB VF. Patented. User Instructions A N C H O R T A B S N O R T H W E S T www.anchortabs.com ANCHOR TAB VF Patented User Instructions National standards, and state, provincial, and federal laws, require installer/user of this product to

More information

Dynamic Positioning: Method for Disaster Prevention and Risk Management

Dynamic Positioning: Method for Disaster Prevention and Risk Management Available online at www.sciencedirect.com ScienceDirect Procedia Earth and Planetary Science 11 ( 2015 ) 216 223 Global Challenges, Policy Framework & Sustainable Development for Mining of Mineral and

More information

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0) Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW Tel +44 (0)1254 615100 www.allspeeds.co.uk WIRE ROPE CUTTER RCO40LP PRODUCT CODE No. 980503 INSTRUCTIONS FOR

More information

Pile Gripper Systems

Pile Gripper Systems Pile Gripper Systems Accurate positioning and restraint of offshore construction piles + + Accurate handling of piles up to 8.0m in diameter + + Pile positioning and adjustment within large envelopes +

More information

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum Chapter 2 Rigging Cutting Wire Rope The wire rope must be tightly seized on both sides of the point where the wire rope will be cut, as shown in Figure 2-1. Seize the wire rope with either seizing wire

More information

A NEW DEEPWATER TANKER LOADING SYSTEM FOR WEST AFRICA

A NEW DEEPWATER TANKER LOADING SYSTEM FOR WEST AFRICA A NEW DEEPWATER TANKER LOADING SYSTEM FOR WEST AFRICA Arun S. Duggal, FMC SOFEC Floating Systems, USA Charles O. Etheridge, FMC SOFEC Floating Systems, USA James Mattinson, FMC SOFEC Floating Systems,

More information

RULES PUBLICATION NO. 52/P UNDERWATER INSPECTION OF MOBILE OFFSHORE DRILLING UNITS IN LIEU OF DRYDOCKING

RULES PUBLICATION NO. 52/P UNDERWATER INSPECTION OF MOBILE OFFSHORE DRILLING UNITS IN LIEU OF DRYDOCKING RULES PUBLICATION NO. 52/P UNDERWATER INSPECTION OF MOBILE OFFSHORE DRILLING UNITS IN LIEU OF DRYDOCKING 2001 Publications P (Additional Rule Requirements) issued by Polski Rejestr Statków complete or

More information

BC Shackle. Made in the China. Alloy Steel Anchor Shackle. Instructions for handling and use - Please read in full before using this device

BC Shackle. Made in the China. Alloy Steel Anchor Shackle. Instructions for handling and use - Please read in full before using this device BC Shackle Made in the China Alloy Steel Anchor Shackle Instructions for handling and use - Please read in full before using this device Index 1.) Introduction 2.) Warnings / General Use Guidelines 3.)

More information

Emergency Situation Assessment

Emergency Situation Assessment Appendix 1 Emergency Situation Assessment Emergency Situation Assessment In-coming mains electricity failure sites with generator backup Useful Information: Severity 2 Risk Rating Low / 10 Likelihood 5

More information

PORTS OF DAMPIER & ASHBURTON MOORING DIVE INSPECTION STANDARDS AND DELIVERABLES TABLE OF CONTENTS

PORTS OF DAMPIER & ASHBURTON MOORING DIVE INSPECTION STANDARDS AND DELIVERABLES TABLE OF CONTENTS TABLE OF CONTENTS 1. MEASURING MOORING COMPONENTS...2 1.1 INTRODUCTION...2 1.2 CHAIN...3 1.3 KENTER AND PEAR SHACKLE... 1. BOW SHACKLES, JOINING SHACKLES & ANCHOR JOINING SHACKLES... 1.5 GROUND RING...5

More information

User Instructions 1789 Parapet Wall Anchor

User Instructions 1789 Parapet Wall Anchor User Instructions 1789 Parapet Wall Anchor This manual is intended to meet the Manufacturer Instructions as required by ANSI Z359.1 and should be used as part of an employee training program as required

More information

USE AND MAINTENANCE LIGHT TOWER

USE AND MAINTENANCE LIGHT TOWER USE AND MAINTENANCE LIGHT TOWER General Safety Information Allowed use The light tower has been designed to lighten the area in which it is positioned and oriented, after installing it on a generating

More information

Risers and Mooring Lines Integrity Management based on Real-Time Integrity Monitoring.

Risers and Mooring Lines Integrity Management based on Real-Time Integrity Monitoring. Risers and Mooring Lines Integrity Management based on Real-Time Integrity Monitoring. Pedro Viana, 2H Offshore Peter Falconer, 2H Offshore Abstract In the past few years there have been a number of deepwater

More information

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 1 Introduction 2 Regulatory Requirements 2 Protective Materials

More information

Quicker and Safer Deployment of Deepwater MODU Moorings.

Quicker and Safer Deployment of Deepwater MODU Moorings. Quicker and Safer Deployment of Deepwater MODU Moorings www.offspringinternational.com Deepwater MODU Mooring Deepwater exploration increasing further offshore Deeper moorings over 7,000ft Larger MODUs

More information

TECHNICAL DATA. System water supply pressure enters the priming chamber of the deluge valve (A.1) through the 1/4 (8 mm) priming line, which

TECHNICAL DATA. System water supply pressure enters the priming chamber of the deluge valve (A.1) through the 1/4 (8 mm) priming line, which January 27, 2012 307a 1. (Refer to Figures 1-3.) A Viking Non-Interlocked Preaction system utilizes a Viking Deluge Valve to control water flow into system piping equipped with closed sprinklers. Under

More information

GUIDELINES FOR VESSELS WITH DYNAMIC POSITIONING SYSTEMS ***

GUIDELINES FOR VESSELS WITH DYNAMIC POSITIONING SYSTEMS *** INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT MSC/Circ.645 LONDON SE1 7SR 6 June 1994 Telephone: 020 7735 7611 Fax: 020 7587 3210 Telex: 23588 IMOLDN G Ref. T4/3.03 GUIDELINES FOR VESSELS WITH

More information

GUIDANCE IN-SERVICE INSPECTION PROCEDURES. Status: Issue: 01 Date: 05/12/07

GUIDANCE IN-SERVICE INSPECTION PROCEDURES. Status: Issue: 01 Date: 05/12/07 GUIDANCE IN-SERVICE INSPECTION PROCEDURES Number: PEC08 Prepared by: Pressure Equipment Committee (TC1) Status: Issue: 01 Date: 05/12/07 Reference: Guidance PSG04. Guidelines for the Production of Written

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S Page 1 of 13 1. DESCRIPTION The Viking 6 Model G-6000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler

More information

Fault Diagnosis based on Particle Filter - with applications to marine crafts

Fault Diagnosis based on Particle Filter - with applications to marine crafts 1 Fault Diagnosis based on Particle Filter - with applications to marine crafts Bo Zhao CeSOS / Department of Marine Technology Norwegian University of Science and Technology 2 Faults Danger and harm Pollution

More information

15ME-014 INSTRUCTION MANUAL OF STERN TUBE SEALING TYPE EVK2RV. URL

15ME-014 INSTRUCTION MANUAL OF STERN TUBE SEALING TYPE EVK2RV. URL 15ME-014 E INSTRUCTION MANUAL OF STERN TUBE SEALING TYPE EVK2RV URL http://www.kemel.com CONTENTS [A] Installation [B] Piping [C] Inspection [D] Handling [E] Parts replacement intervals [F] Handling check

More information

Case studies from classes led by Dr. Ron Fulbright, University of South Carolina Upstate. IMPROVED BLOWOUT PREVENTER

Case studies from classes led by Dr. Ron Fulbright, University of South Carolina Upstate. IMPROVED BLOWOUT PREVENTER INNOVATIVE ANALYSIS IMPROVED BLOWOUT PREVENTER 1. BRIEF DESCRIPTION OF THE SITUATION The blowout preventer (BOP) is a valve assembly usually mounted on the sea floor at the mouth of an oil well to control

More information

(12) United States Patent

(12) United States Patent (12) United States Patent US007137200B2 (10) Patent No.: US 7,137,200 B2 Shepherd et al. (45) Date of Patent: Nov. 21, 2006 (54) METHOD OF CONSTRUCTING A BUOY 3,665,882 A * 5/1972 Georgiev et al.... 114,226

More information

Grouped SLOR Deep Water Riser System and Installation Assessment

Grouped SLOR Deep Water Riser System and Installation Assessment Grouped SLOR Deep Water Riser System and Installation Assessment Daniel Karunakaran, Dan Lee, Subsea 7 Stephen Hatton, Nick Dale, 2H Offshore Engineering Ltd John Mair, Subsea 7 Abstract The growing trend

More information

INCLINOMETER DEVICE FOR SHIP STABILITY EVALUATION

INCLINOMETER DEVICE FOR SHIP STABILITY EVALUATION Proceedings of COBEM 2009 Copyright 2009 by ABCM 20th International Congress of Mechanical Engineering November 15-20, 2009, Gramado, RS, Brazil INCLINOMETER DEVICE FOR SHIP STABILITY EVALUATION Helena

More information

Technical Diving Equipment

Technical Diving Equipment POMMEC LARS SYSTEM EASILY CONVERTED TO WET BELL SYSTEM POMMEC 2 DIVER LAUNCH AND RECOVERY SYSTEM WITH DIVING BASKET This Launch and Recovery System is specifically designed to provide a compact option

More information

Learn more at

Learn more at STRIDE JIP Phase III SUT Talk 15th November 2 Offshore VIV monitoring (vortex induced vibration) Catenary riser interaction with deepwater seabeds 3 Full Scale Riser Monitoring To get real measurements

More information

Lockout/Tagout Program

Lockout/Tagout Program Purpose Hazardous energy appears in the workplace in the form electrical, mechanical, pneumatic, hydraulic and thermal energy and includes chemical, water, steam and gaseous energy systems. Lockout/Tagout

More information

Aquavar SOLO 2 Frequently Asked Questions

Aquavar SOLO 2 Frequently Asked Questions Aquavar SOLO 2 Frequently Asked Questions How do I size the Aquavar SOLO 2 for the appropriate pump/motor combination? Can I use a 208 Volt motor? Can I run the Aquavar SOLO 2 up to 80HZ? What are the

More information

NAVIGATION AND SEAMANSHIP Secure vessel at mooring, anchor, and berth

NAVIGATION AND SEAMANSHIP Secure vessel at mooring, anchor, and berth 1 of 5 level: 3 credit: 4 planned review date: December 2005 sub-field: purpose: entry information: accreditation option: moderation option: Maritime People credited with this unit standard are able to:

More information

Structural Assessment. USS Yorktown CV-10

Structural Assessment. USS Yorktown CV-10 Structural Assessment of USS Yorktown CV-10 Assessment Team USS Yorktown History Constructed December 1941- January 1943 Essex Class CV-10 10 th USS Navy Aircraft Carrier Served in WWII Modified in 1955

More information

USER MANUAL. Beach volleyball posts BEACH CHAMP ID:

USER MANUAL. Beach volleyball posts BEACH CHAMP ID: USER MANUAL Beach volleyball posts BEACH CHAMP ID: 111203 INDEX USER MANUAL FOR BEACH VOLLEYBALL POSTS BEACH CHAMP General information Overview Overview: Floor mounting options City Beach - for a freestanding

More information

Manual Actuated Boiler Blowdown Valves

Manual Actuated Boiler Blowdown Valves Manual Actuated Boiler Blowdown Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Operation 5. Maintenance 6. Spare parts p.1 1. Safety

More information

GLS New Technology Rising to the Challenge of Subsea lifting. Subsea 2012 Paddy Collins

GLS New Technology Rising to the Challenge of Subsea lifting. Subsea 2012 Paddy Collins GLS New Technology Rising to the Challenge of Subsea lifting Subsea 2012 Paddy Collins Introductions Aubin Design, Develop and Supply own chemical technical technology Cement and Stimulation Pipeline products

More information

Saab Seaeye Cougar XT Compact

Saab Seaeye Cougar XT Compact The Seaeye Cougar-XT Compact is a highly flexible and extremely powerful electric ROV with working depths of 300 metres. This system comes with almost all of the specifications of the very reliable Couger-XT

More information

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0 () 30.0 The purpose of the Energy Control Policy (Lockout/Tagout) is to ensure that before any employee performs any servicing and/or maintenance on machinery or equipment, where the unexpected energizing,

More information

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift INSTRUCTIONS Dominator Lake Lift PHONE:251-986-3882 * FAX:251-986-3136 QABLDOMINATORINST.2014 P a g e 1 Quality Aluminum Boat Lifts, INC. Installation Instructions: Dominator Lake Lift Thank you for your

More information

GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE

GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE GUIDANCE NOTES GD03-2017 CHINA CLASSIFICATION SOCIETY GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE 2017 Effective from 1 March 2017 BEIJING Chapter 1 GENERAL 1.1 Application

More information

Premium PowerPoint Presentation. Rigging Review

Premium PowerPoint Presentation. Rigging Review Premium PowerPoint Presentation Rigging Review Chapter 1 Hoisting Safety Review: What about the CG Symmetrical vs. Asymmetrical Balanced and Unbalanced Lifting Lug Hooks Angle Deformation Safety Gates

More information

"RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS"

RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS PRESENTER'S GUIDE "RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS" Part of the "CONSTRUCTION SAFETY KIT" Series Quality Safety and Health Products, for Today...and Tomorrow OUTLINE OF MAJOR PROGRAM POINTS

More information

From the Wellhead to the Tanker Offshore Production Systems. 28/03/2014 Instituto Superior Técnico

From the Wellhead to the Tanker Offshore Production Systems. 28/03/2014 Instituto Superior Técnico From the Wellhead to the Tanker Offshore Production Systems Index Offshore Installations Subsea Systems Field overview Christmas Trees Manifolds Templates Mid-Water Arches Topsides FPSOs The Oil Production

More information

Dealing with Entrapment of a Sailor Under a boat/and or in rigging

Dealing with Entrapment of a Sailor Under a boat/and or in rigging Dealing with Entrapment of a Sailor Under a boat/and or in rigging Entrapment happens when a sailor becomes stuck (connected unintentionally) to, or under a boat and is at risk during an emergency situation.

More information

Dolly wheels in slot #8 for Boat #10.

Dolly wheels in slot #8 for Boat #10. Rigging: Laser SAIL SELECTION: The International Laser Class has three different official rigs. Each sail is designed for sailors of different weights. The Standard Rig was designed for sailors weighing

More information

Learn more at

Learn more at Bottom Weighted Riser A Novel Design for Re-location and Disconnection Frank Lim and John McGrail 2H Offshore Engineering Ltd. Woking, Surrey, United Kingdom ABSTRACT Flexible pipe risers have limitations

More information

C Crane. Installation & Operation Manual. SWL 120kg. The Hansa CRANE ID#: Davit ISO/DIS June 2000 Sling AS Sept 2000

C Crane. Installation & Operation Manual. SWL 120kg. The Hansa CRANE ID#: Davit ISO/DIS June 2000 Sling AS Sept 2000 The Hansa C Crane CRANE ID#: Installation & Operation Manual Ideal for the safe and dignified transference of sailors with disabilities from a wharf to the boat. The crane is also suited to many other

More information

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914 Installation, Operating and Maintenance Instructions V914 Cast Iron Flanged Swing Check Valve V914 THE PRESSURE EQUIPMENT DIRECTIVE 97/23/EC and CE MARKING The Pressure Equipment Regulations 1999 (SI 1999/2001)

More information

Focus on Operational Efficiency and Crew Safety - Introducing Advanced ROV Technology in Marine Towed Streamer Seismic

Focus on Operational Efficiency and Crew Safety - Introducing Advanced ROV Technology in Marine Towed Streamer Seismic Focus on Operational Efficiency and Crew Safety - Introducing Advanced ROV Technology in Marine Towed Streamer Seismic R. Tonnessen* (Petroleum Geo-Services) & T. Skadberg (Petroleum Geo- Services) SUMMARY

More information

MANUAL SEALLESS STEEL STRAPPING TOOL MODEL A

MANUAL SEALLESS STEEL STRAPPING TOOL MODEL A OPERATION MANUAL / SPARE PARTS LIST MANUAL SEALLESS STEEL STRAPPING TOOL MODEL A337.0001 13.1912.01 13191201.en/MAS/ 10.02 INDEX PAGE 1 SAFETY INSTRUCTIONS 2 2 WARRANTY CONDITIONS AND LIABILITY 4 3 APPROPRIATE

More information

Managing Dynamic Positioning (DP) Operations

Managing Dynamic Positioning (DP) Operations Managing Dynamic Positioning (DP) Operations Captain Andy Goldsmith, IMCA Technical Adviser IOSH Offshore Conference Tools for the trade 19 October 2017 1 2 IMCA OPERATIONAL STRUCTURE BOARD CEO SECRETARIAT

More information

32374 R. Jazowski 4/4/ D. W. Mudge G. Sivik 1 of 8 ODN TITLE: Installation & Operation Manual for Nautilus G2 Connectors

32374 R. Jazowski 4/4/ D. W. Mudge G. Sivik 1 of 8 ODN TITLE: Installation & Operation Manual for Nautilus G2 Connectors PER CO # Approved By: 32374 R. Jazowski Originator: Checked By: W. Mudge G. Sivik 1 of 8 ODN-342-23 23 TITLE: Installation & Operation Manual for Nautilus Teledyne Oil & Gas 1026 North Williamson Blvd.

More information

An airbag was attached to the WCR tool and inflated to allow the WCR tool to rotate on the pipeline and free the diver.

An airbag was attached to the WCR tool and inflated to allow the WCR tool to rotate on the pipeline and free the diver. AB Safety Flash IMCA Safety Flash 03/09 March 2009 These flashes summarise key safety matters and incidents, allowing wider dissemination of lessons learnt from them. The information below has been provided

More information

GUIDELINES FOR USE GUARD

GUIDELINES FOR USE GUARD GUIDELINES FOR USE GUARD G Guard Range of Load Arrestors Retractable Fall Arrest Safety Line for Protection of Machinery & Sensitive Loads GLOBESTOCK MILE OAK INDUST. ESTATE, MAESBURY ROAD, OSWESTRY, SHROPSHIRE

More information

THE CHALLENGES OF DEEPWATER MOORING

THE CHALLENGES OF DEEPWATER MOORING THE CHALLENGES OF DEEPWATER MOORING The deepwater mooring challenge and industry attempts to develop the solution D. Cuthill, Operations Director M. Kobiela, Technical Manager Trident Offshore Ltd, 34

More information

OTC MS ABSTRACT

OTC MS ABSTRACT OTC-24714-MS The Use of Direct Tension Monitoring of Mooring Lines in Reducing Conservatisms in Design and Analysis Models Steven Gauthier, Edward Elletson; Pulse Structural Monitoring Copyright 2014,

More information

The Impact of Composites on Future Deepwater Riser Configurations

The Impact of Composites on Future Deepwater Riser Configurations The Impact of Composites on Future Deepwater Riser Configurations Thomas Brown 2H Offshore Engineering Ltd NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Deepwater Riser Technology Today s deepwater

More information

Cathodic Protection Retrofit Options Comparison of Current Distribution

Cathodic Protection Retrofit Options Comparison of Current Distribution Cathodic Protection Retrofit Options Comparison of Current Distribution 1.0 Introduction There are three basic methods available for the deployment of anode systems when considering an offshore cathodic

More information

LESSONS LEARNED FROM MARINE CASUALTIES. Very serious marine casualty: tug master struck by a falling stores container

LESSONS LEARNED FROM MARINE CASUALTIES. Very serious marine casualty: tug master struck by a falling stores container LESSONS LEARNED FROM MARINE CASUALTIES 1 FATALITY Very serious marine casualty: tug master struck by a falling stores container While discharging a routine parcel of crude oil alongside an oil terminal,

More information

OIL & GAS INSTRUMENTATION LOAD-FORCE-TORQUE SENSORS

OIL & GAS INSTRUMENTATION LOAD-FORCE-TORQUE SENSORS OIL & GAS INSTRUMENTATION LOAD-FORCE-TORQUE SENSORS LOAD CELL MANUFACTURER FROM DESIGN TO AFTER-SALES SUPPORT, SENSY IS DEDICATED TO SERVING THE OIL & GAS INDUSTRY OUR STRENGTHS SENSY S.A. develops and

More information

Steel Lazy Wave Risers A Step Change in Riser Technology for the NWS

Steel Lazy Wave Risers A Step Change in Riser Technology for the NWS Steel Lazy Wave Risers A Step Change in Riser Technology for the NWS Tze King Lim, Dhyan Deka, Elizabeth Tellier, Hugh Howells AOG 2018, Perth 15 th March 2018 Agenda Lazy wave risers an enabling technology

More information

Flexible Spools Solution at Hybrid Risers Base A. Karnikian, Total and S. Tarbadar, M. Bonnissel, S. Legeay, Technip France

Flexible Spools Solution at Hybrid Risers Base A. Karnikian, Total and S. Tarbadar, M. Bonnissel, S. Legeay, Technip France DOT-2014 Flexible Spools Solution at Hybrid Risers Base A. Karnikian, Total and S. Tarbadar, M. Bonnissel, S. Legeay, Technip France Copyright 2014, Deep Offshore Technology International This paper was

More information