DRAFT FOR PUBLIC CONSULTATION INTERCONNECTION AGREEMENT v.2.0 FOR IP KULATA/SIDIROKASTRO DEFINITIONS, BUSINESS RULES, EXCEPTIONAL EVENT

Size: px
Start display at page:

Download "DRAFT FOR PUBLIC CONSULTATION INTERCONNECTION AGREEMENT v.2.0 FOR IP KULATA/SIDIROKASTRO DEFINITIONS, BUSINESS RULES, EXCEPTIONAL EVENT"

Transcription

1 RAFT FOR PUBLIC CONSULTATION INTERCONNECTION AGREEMENT v.2.0 FOR IP KULATA/SIIROKASTRO EFINITIONS, BUSINESS RULES, EXCEPTIONAL EVENT ARTICLE 1: EFINITIONS All terms of the INTERCONNECTION AGREEMENT shall have the meanng assgned to them as follows, whle the rest of the terms used shall have the meanng defned n the Regulaton (EC) 715/2009, Regulaton (EU) 2015/703 and the rectve 2009/73/EC: Border Meterng Staton (BMS) Sdrokastron: shall mean the border meterng staton, owned and operated by ESFA. Confrmed uantty shall mean the quantty of Natural Gas confrmed to be scheduled to flow on a ay at the IP, takng nto account the nomnated quanttes for that ay at both sdes of the IP and the matchng process used for comparng and algnng the Natural Gas quantty requested by the Network Users to be transported at the IP. ay shall mean a perod from 7:00 a.m. local tme of any calendar day to 7:00 a.m. local tme of the next calendar day. aly Balance Poston (BP) shall mean a quantty calculated on a daly bass, for each ay of the perod of mplementaton of the Operatonal Balancng Account (OBA) allocaton procedure. The calculaton of BP for a specfc ay s performed untl 11:00 of the ay +1, accordng to the followng formula: Where: BP = TA M M s the measured quantty, expressed n kwh (reference combuston temperature 25 o C) of the physcal flow through the IP towards the Forward Flow recton (assumng that n case of physcal flow towards the Reverse Flow recton the measured quantty s expressed as a negatve value) durng the ay ; TA s the Total aly Allocated uantty durng the ay ; Exceptonal event shall mean any unplanned event that s not reasonably controllable or preventable and that may cause, for a lmted perod, capacty reductons, affectng thereby the quantty or qualty of Natural Gas at the IP, wth possble consequences on nteractons between ESFA and BULGARTRANSGAZ as well as between ESFA and/or BULGARTRANSGAZ and Network Users. Forecast GCV shall mean the flow weghted average Gross Calorfc Value, calculated n the BMS Sdrokastron by makng use of ISO 6976, on the ay -1, mmedately precedng the ay on whch the matchng process for the ay concerned (+1) takes place. The Forecast GCV s expressed n kwh/m 3 (n) (reference combuston temperature 25 o C). Gross Calorfc Value shall mean the quantty of heat produced by the full stochometrc combuston wth ar of one (1) Normal Cubc Meter of Natural Gas under stable absolute pressure of bara when the ntal temperature of the fuel mx and the fnal temperature of the combuston products s consdered to be twenty fve (25) degrees Celsus and the water produced durng combuston s found condensed n the lqud state.

2 Identfcaton Code (IC) shall mean the EIC or a unque dentfcaton code assgned by an Operator to a regstered Network User to be used for dentfcaton n the procedures and systems admnstered by the Operator. Interconnecton Pont Kulata (BG) / Sdrokastron (GR) (IP) shall mean the physcal nterconnecton between the Natural Gas Transmsson System operated by BULGARTRANSGAZ and the Natural Gas Transmsson System operated by ESFA at the Bulgaran Greek border n the area of Kulata (BG) and Promachonas (GR). The quantty and qualty measurements of the Natural Gas delvered at the IP shall be executed (performed) at the BMS Sdrokastron. Forward Flow recton shall mean the statstcally prevalng Natural Gas flow drecton, namely Natural Gas flow drecton from Bulgara to Greece. Lmtaton range (LR) shall mean the allowed range of values of the Total Balance Poston (TBP). Month shall mean a perod from 7:00 a.m. local tme on the frst day of each calendar month to 7:00 a.m. local tme on the frst day of the next calendar month. Network User shall mean a natural or legal entty that holds transportaton capacty at the IP, on the bass of a transportaton contract concluded ether wth ESFA and/or BULGARTRANSGAZ. Each Network User s assgned a unque Identfcaton Code (IC) by the respectve Operator. NGTS shall mean ether the Greek or the Bulgaran Natural Gas Transmsson System. Normal Cubc Meter (m 3 (n)) shall mean one cubc meter of Natural Gas at normal condtons of K (= 0 C) and 101,325 kpa (= bara). Operatonal Balancng Account (OBA) s a ont account where the aly Balance Poston of both TSOs at the IP s recorded. ESFA s the TSO responsble for calculatng, on a daly bass, the aly Balance Poston and the Total Balance Poston and update the Operatonal Balancng Account accordngly. Par of Network Users shall mean the mutually served, n lne wth correspondng transportaton contracts, Network Users at both sdes of the IP. Party shall mean one of the contractual PARTIES: ESFA or BULGARTRANSGAZ. Re-nomnaton Lead Tme shall mean the tme perod between the start of a re-nomnaton cycle and the start of the hour at whch change n gas flow, as a result of the re-nomnatons taken nto account n that re-nomnaton cycle, takes effect. Representatve shall mean a person authorzed to act on behalf of ESFA, BULGARTRANSGAZ or a Network User. Reverse Flow recton shall mean the Natural Gas flow drecton opposte to the Forward Flow recton ether n pure physcal or n vrtual way. Thrd Party shall mean any entty that sells or buys Natural Gas at the IP or any Network User at the IP. Total Balance Poston (TBP) shall mean the actual accumulaton of BP over a consecutve number of ays. The calculaton of TBP for each ay of the perod of mplementaton of the OBA allocaton procedure, s performed untl 11:00 of the ay +1, as follows: 1. For the frst ay of mplementaton of the OBA allocaton procedure, the TBP s set equal to the BP calculated for ths ay. 2. For each subsequent ay and up to (and ncludng) the last ay of the perod of mplementaton of the OBA allocaton procedure, the TBP for the ay shall be

3 calculated as the algebrac sum of the TBP of ay -1 and the BP for the ay concerned. Negatve TBP ndcates that ESFA s ndebted towards the zero balance poston, wth a quantty equals to the absolute value of TBP. Postve TBP ndcates that Bulgartransgaz EA s ndebted towards the zero balance poston, wth a quantty equals to the value of TBP. Total aly Allocated uantty (TA ) shall mean a quantty defned as: TA = Al,F, Al,R, Where: Al,F, s the allocated quantty, expressed n kwh (reference combuston temperature 25 o C) for a gven par of NUs n Forward Flow recton, durng the ay ; Al,R, s the allocated quantty, expressed n kwh (reference combuston temperature 25 o C) for a gven par of NUs n Reverse Flow recton, durng the ay ;, s the par of NUs actve n the Forward Flow recton durng the ay, s the par of NUs actve n the Reverse Flow recton durng the ay ARTICLE 4: BUSINESS RULES 4.1. Capacty The Capacty s expressed n kwh/ay Calculaton of nomnated / confrmed Natural Gas quantty The nomnated / confrmed Natural Gas quanttes are expressed n kwh (reference combuston temperature 25oC) Matchng process Bulgartransgaz shall be the Intatng Transmsson System Operator (ITSO) ESFA shall be the Matchng Transmsson System Operator (MTSO) The Network Users actve at ether (or both) sde(s) of the IP are enttled to submt to the respectve TSO(s): (a) nomnatons untl local tme of the ay (-1), mmedately precedng the ay concerned (), and (b) re-nomnatons, between 17:00 local tme of the ay (-1) mmedately precedng the ay concerned (), and 04:00 local tme of the ay concerned (). A re-nomnaton cycle starts at the start of every hour, between 18:00 local tme of day -1 and 04:00 local tme of day. urng each re-nomnaton cycle, the notfcaton and matchng procedure accordng to paragraphs 4.3.4, and shall apply.

4 4.3.4 ITSO and MTSO shall calculate, ndependently of each other, the capacty whch could be nterrupted per each Network User and Natural Gas Flow drecton, by mplementng the procedure of paragraphs through below: Not later than 15 mnutes upon the nomnaton deadlne or the start of each renomnaton cycle, the Partes shall exchange nformaton on the quantty nomnated to flow through the IP, durng the ay, per each Par of Network Users and Natural Gas flow drecton, through a ELOR message, accordng to Edg@s XML format Based on the above nformaton, each Party shall calculate the prelmnary Processed uanttes per each Network User and Natural Gas flow drecton, by applyng the lesser rule on the Natural Gas quanttes nomnated (per each Par of Network Users and Natural Gas flow drecton) at ether sde of the IP. In case a Network User s part of more than one Par of Network Users, ts prelmnary Processed uantty, per each Natural Gas flow drecton, s calculated as the sum of the results of the applcaton of the "lesser rule" on the Natural Gas quanttes nomnated by the sad Network User and ts counterparty, actve at the other sde of the IP, at the specfc Natural Gas flow drecton Based on the results of paragraph above, each Party shall calculate the expected physcal Natural Gas flow through the IP (magntude, drecton) as the dfference of the prelmnary Processed uanttes of the Network Users, actve at ther sde of the IP, durng the ay, n Forward and Reverse Flow recton Each Party shall specfy the total capacty whch could be nterrupted durng the ay, by subtractng the techncal capacty of the IP (at Party s sde) at the expected physcal Natural Gas flow drecton, from the expected physcal Natural Gas flow (as t was calculated n paragraph above). In case the result s negatve or zero, no nterrupton s requred and the Processed uanttes wll be equal to the prelmnary ones. In any other case the next steps shall apply:. Each Party calculates the capacty whch could be nterrupted for each Network User, as the prelmnarly Processed uantty of the correspondng Network User mnus the frm capacty booked by the sad Network User, at the drecton of the expected physcal Natural Gas flow... In case of negatve or zero result, the capacty whch could be nterrupted for ths Network User equals to zero; otherwse the correspondng Party allocates the part of Network User s prelmnary Processed uantty, whch s n excess to the capacty booked by the sad Network User on a frm bass, to ts nterruptble capacty bookngs, startng from the one assgned the oldest tmestamp and movng to the most recent one. The Party shall calculate the capacty whch could be nterrupted per each Network User, as the sum of the Natural Gas uanttes assgned to each tmestamp, startng from the most recent one, and applyng the rule of art. 24 para 2 of EC Reg. 2013/984 (CAM NC),.e. decrease proportonally to the prelmnary Processed uanttes, whch are n excess of Network User's booked capacty on a frm bass, untl the sum of the Network Users capacty whch could be nterrupted s equal to the value of total capacty whch could be nterrupted Each Party calculates the Processed uantty per each Network User by reducng the prelmnary Processed uantty by the capacty whch could be nterrupted. In case one Network User s part of more than one Par of Network Users, each Party allocates the capacty whch could be nterrupted per each Par of Network Users the sad Network User s part of, pro rata to the prelmnary Processed uanttes, calculated as per paragraph

5 4.3.5 Not later than local tme of the ay (-1), mmedately precedng the ay concerned (), the ITSO shall send to the MTSO a ELOR message accordng to Edg@s- XML format regardng the Processed quanttes, per each Par of Network Users for the ay at the IP. The Processed quanttes are consdered to be equally dstrbuted to each hour of the ay Not later than 45 mnutes from the start of each re-nomnaton cycle, the ITSO shall send to the MTSO a ELOR message accordng to Edg@s-XML format regardng the Processed quanttes, per each Par of Network Users for the ay at the IP Per each Par of Network Users, the MTSO shall compare the Processed uantty that has been scheduled for delvery/offtake, at each sde of the IP and wthn 45 mnutes after the recept of the message under paragraph or 4.3.6, a ELRES message shall be sent to the ITSO accordng to the Edg@s-XML format. In case of dfferent Processed uanttes at ether sde of the IP, the lesser rule wll be appled (a) In case the ITSO has not sent to the MTSO, untl the expraton of the deadlne specfed n paragraph above, the Processed quanttes for a ay, these wll be consdered, by the MTSO, equal to zero (0), for the mplementaton of the matchng process. (b) In case the ITSO has not sent to the MTSO, untl the expraton of the deadlne specfed n paragraph above, the Processed quanttes for a ay, the MTSO shall consder, for the mplementaton of the matchng process, the last Processed quanttes of the ay, whch were sent by the ITSO to the MTSO (a) In case the MTSO has not sent the Confrmed quanttes for a ay to the ITSO, untl the expraton of the deadlne specfed n paragraph n relaton to paragraph above, the Confrmed quanttes shall be consdered equal to zero (0). (b) In case the MTSO has not sent the Confrmed quanttes for a ay to the ITSO, untl the expraton of the deadlne specfed n paragraph n relaton to paragraph above, the last Confrmed quanttes, shall be consdered as Confrmed quanttes for ths re-nomnaton cycle The matchng processes under paragraph 4.3.4, 4.3.5, and 4.3.7, shall be carred out usng Edg@s-XML data format and AS4 protocol. In case the above communcaton method s not avalable (.e. due to techncal problems) the data exchange shall take place va emal by usng the forms of Annex The Re-nomnaton Lead Tme s two (2) hours Network Users update The Partes shall exchange the lsts of ther Network Users IC, as soon as possble, and n any case not later than two (2) workng days before the ay a new Network User could start Natural Gas transmsson at the IP Rules for the allocaton of the transmtted gas quanttes In respect of the allocaton of gas quanttes, ESFA and BULGARTRANSGAZ establsh allocaton procedure ensurng consstency between the allocated quanttes at both sdes of the IP. Ths allocaton procedure shall be based on the Operaton Balancng Account (OBA), specfed below.

6 Under the OBA allocaton procedure the Natural Gas quantty allocated for a ay to a par of Network Users at the IP shall be equal to the Natural Gas quantty confrmed for delvery/off-take, for that ay, to the sad par of Network Users, accordng to artcle 4.3. where: Al,F, Al,R, = C,F, = C,R, and, C,F, s the confrmed quantty, for a gven Par of Network Users n the Forward Flow recton, durng the ay ; C,R, s the confrmed quantty, for a gven Par of Network Users n the Reverse Flow recton, durng the ay ; Al,F, s the quantty allocated, to a gven par of Network Users n the Forward Flow recton, durng the ay ; Al,R, s the quantty allocated, to a gven par of Network Users n the Reverse Flow recton, durng the ay ;, s the par of Network Users actve n the Forward Flow recton durng the ay ; and, s the Par of Network Users actve n the Reverse Flow recton durng the ay ; The OBA allocaton procedure shall not be appled n the event that: The condtons of paragraph () and / or () are met; The gas qualty parameters are not n accordance wth Art. 5.7 of the Agreement and the Partes are not able to perform ther daly confrmatons; The pressure s not accordng to the specfcatons n Art. 5.7 of the Agreement and the Partes are not able to perform ther daly confrmatons For each ay, when any of the condtons n paragraph s n effect, the daly measured quantty, ncreased by the Natural Gas quantty confrmed n the opposte to the gas flow drecton, s allocated to the pars of NUs proportonally to ther confrmed Natural Gas quanttes, n the gas flow drecton through the IP. The quanttes allocated to the pars of NUs n the opposte to the gas flow drecton s equal to the respectve confrmed quanttes. The OBA allocaton procedure shall be re-appled on the next ay +1 after the ay n whch all of the condtons n paragraph are no longer n effect, unless both Partes mutually agree to postpone the applcaton of the OBA for a specfc perod. Pro-rata allocated quanttes n Forward drecton shall be calculated by usng the followng formulas: Where: Subscrpts: Al, F, C, F, * Al, R, C, R, M, F nf nr 1 Al, R, 1 C, F,

7 Al : Allocated uantty C : Confrmed uantty M : Measured nf : Number of par of NUs n the recton (F) gas flow drecton nr : Number of par of NUs n the recton (R) opposte to drecton (F) The same formula apples n case the measurement occurs n the Flow recton (R). by swtchng the ndces (F) and (R). Each ay for whch the pro-rata allocaton procedure apples, the OBA s updated by calculatng the TBP, consderng BP that equals to zero (0) The ndcatve allocaton of Natural Gas quanttes shall be carred out va an ALOCAT message accordng to the Edg@s-XML format for each Par of Network Users, on a daly bass, untl a.m. local tme for the prevous ay. The excel document-based data exchange method shall be used temporarly by the Partes as a back-up soluton n case of falure of the above mentoned data exchange method The fnal allocaton of Natural Gas quanttes for each ay of the Month M, and for each Par of Network Users, based on valdated measurements, shall be carred out untl 15:00 of the thrd calendar day of the Month mmedately succeedng the Month M.The Monthly quantty allocaton protocol shall be ssued by ESFA and sgned by BULGARTRANSGAZ and shall be n accordance wth the prelmnarly approved forms as n Annex 2C. The Natural Gas quanttes, expressed n volume unts (0 and 20 C), are regstered n the allocaton protocol for reference purposes only. The quantty allocaton protocol shall be accompaned wth the respectve measurement protocols for gas quantty and qualty, where Natural Gas quanttes are also expressed n volume unts (0 and 20 C), for reference purposes only The data n the quantty allocaton protocol shall be used by ESFA and BULGARTRANSGAZ to prepare and sgn quantty allocaton protocols per each NUP actve at the IP Operatonal Balancng Account The Partes undertake to put effort so as to mantan TBP as close as possble to zero, n order to ensure that the LR specfed n paragraph s not volated The LR s specfed by ts lower lmt value (LR low), whch s set to -8,500,000 kwh and ts upper lmt value (LR up) whch s set to 8,500,000 kwh. The lower and / or upper value of the LR may be changed upon mutual agreement of ESFA and BULGARTRANSGAZ, n case of ustfed operatonal needs, ncludng but not lmted to: (a) (b) (c) (d) Exceptonal events Unplanned mantenance works Scheduled flow below the BMS Sdrokastron mnmum measurement and / or flow control lmts. Increase or decrease of the IP s techncal capacty.

8 Upon wrtten request ssued by one of the Partes, the Partes may agree to expand the lmts of the LR, pror to the executon of the ndcatve and / or the fnal allocaton of the Natural Gas quanttes for a ay or for a certan number of ays In order to carry out the ndcatve allocaton of the Natural Gas quanttes to each Par of Network Users, for a ay, the Partes shall check whether the LR, applcable for that ay, s volated. () If for the ay or TBP 1 + C,F, TBP 1 + C,F, C,R, C,R, M > LR up M < LR low the Partes shall carry out the ndcatve allocaton of Natural Gas quanttes n accordance wth the provsons of paragraph () If for the ay LR low TBP 1 + C,F, C,R, M LR up the Partes shall carry out the ndcatve allocaton of Natural Gas quanttes n accordance wth the provsons of paragraph In order to carry out the fnal allocaton of the Natural Gas quanttes to each Par of Network Users, for each ay of the Month M, the Partes shall check, based on valdated measurements, whether the LR, applcable for that ay, s volated. () If for the ay or TBP 1 + C,F, TBP 1 + C,F, C,R, C,R, M > LR up M < LR low the Partes shall carry out the fnal allocaton of Natural Gas quanttes n accordance wth the provsons of paragraph () If for the ay LR low TBP 1 + C,F, C,R, M LR up the Partes shall carry out the fnal allocaton of Natural Gas quanttes n accordance wth the provsons of paragraph Pror to the termnaton of the Interconnecton Agreement, the Partes shall endeavour to settle n knd the TBP by adustng the flow through the IP approprately. If the TBP, that wll be calculated at the last ay of mplementaton of the Interconnecton Agreement s dfferent than zero (0), then the Partes shall settle the TBP fnancally, wthn 30 days upon the ay of termnaton of the Interconnecton Agreement, usng as TBP unt prce the arthmetc average of the margnal buy and margnal sell unt prces of balancng gas,

9 wthout adustments (f such adustments are applcable), vald for the natural gas market of the credtor, for the ay of termnaton of the Interconnecton Agreement. In case there are no applcable margnal prces of the balancng gas vald for natural gas market of the credtor, then the applcable daly prce of balancng gas wthout adustments wll be used as a TBP unt prce. The daly prce of the balancng gas wll be publshed on the nternet ste of the credtor. The balancng gas unt prce, publshed and calculated by the credtor shall be n accordance wth the methodology approved by the competent Natonal Regulatory Authorty ESFA shall ssue and forward to BULGARTRANSGAZ the monthly OBA protocol untl 15:00 of the thrd calendar day of the Month mmedately succeedng the Month M The ΟΒΑ Protocol shall be n accordance wth the standard form of Annex 9 of the Interconnecton Agreement ESFA shall send daly to BULGARTRANSGAZ an Account Stuaton ocument (ACCSIT) notfcaton contanng the TBP, n accordance wth the Edg@s-XML format, not later than 11:00 local tme on the ay +1. The excel document-based data exchange method shall be used temporarly by the Partes as a back-up soluton n case of falure of the above mentoned data exchange method Exceptonal Event Should an Exceptonal event occur n the ESFA s or BULGARTRNSGAZ s Natural Gas Transmsson System whch nfluences or may nfluence the Natural Gas flow through the IP, the Party whose system s affected shall nform the other Party wthn thrty (30) mnutes and take the necessary actons to mnmze possble nfluence of such event on ts Natural Gas Transmsson System Wthn one (1) day from an Exceptonal event occurrence, the affected Party shall prepare a report ncludng as a mnmum the followng: a) escrpton of the Exceptonal event and the causes of ts occurrence; b) Hour of occurrence of the Exceptonal event and the estmated tme of ts elmnaton; c) Avalable IP capacty untl the Exceptonal event s elmnaton; and d) Operatons necessary for the restoraton of the IP capacty; The affected Party n whose system the Exceptonal event occurred shall nform the other Party of the progress of the remedal actons. Mutual remedal actons wll be agreed upon and appled, f needed Upon completon of the Exceptonal event repar works, the affected Party shall nform the other Party of the restoraton of the IP capacty.

PLAYERS AGENT REGISTRATION REGULATIONS

PLAYERS AGENT REGISTRATION REGULATIONS PLAYERS AGENT REGISTRATION REGULATIONS 1 DEFINITIONS 1.1 In these Players Agent Regstraton Regulatons, the followng terms shall have the followng meanngs: Agency Actvty means actng n any way and at any

More information

ADDITIONAL INSTRUCTIONS FOR ISU SYNCHRONIZED SKATING TECHNICAL CONTROLLERS AND TECHNICAL SPECIALISTS

ADDITIONAL INSTRUCTIONS FOR ISU SYNCHRONIZED SKATING TECHNICAL CONTROLLERS AND TECHNICAL SPECIALISTS A ADDITIONAL INSTRUCTIONS FOR ISU SYNCHRONIZED SKATING TECHNICAL CONTROLLERS AND TECHNICAL SPECIALISTS DIFFICULTY GROUPS OF FEATURES 1 DEFINITIONS: Change of Rotaton: Refers to TURNS or LINKING STEPS rotatng

More information

Terminating Head

Terminating Head Termnatng Head 58246-1 Instructon Sheet for MTA- 100 Receptacle Connectors 408-6929 Usng Dscrete Wre 07 APR 11 Locatng Pawl Feed Slde Tool Base Wre Inserter Adjuster (Inserton Rod) Mass Termnaton Assembly

More information

Evaluation of a Center Pivot Variable Rate Irrigation System

Evaluation of a Center Pivot Variable Rate Irrigation System Evaluaton of a Center Pvot Varable Rate Irrgaton System Ruxu Su Danel K. Fsher USDA-ARS Crop Producton Systems Research Unt, Stonevlle, Msssspp Abstrat: Unformty of water dstrbuton of a varable rate center

More information

Reduced drift, high accuracy stable carbon isotope ratio measurements using a reference gas with the Picarro 13 CO 2 G2101-i gas analyzer

Reduced drift, high accuracy stable carbon isotope ratio measurements using a reference gas with the Picarro 13 CO 2 G2101-i gas analyzer Reduced drft, hgh accuracy stable carbon sotope rato measurements usng a reference gas wth the Pcarro 13 CO 2 G2101- gas analyzer Chrs Rella, Ph.D. Drector of Research & Development Pcarro, Inc., Sunnyvale,

More information

For models: 660 EF/EFO

For models: 660 EF/EFO Installaton Instructons Gas converson kts For models: 660 EF/EFO Part no. 660NGKIT/660LPKIT Warnng: Ths kt must be nstalled by a qualfed nstaller n accordance wth these nstructons and all applcable codes

More information

THE STATE OIL AND GAS BOARD OF MISSISSIPPI ORDER. This day this cause came on to be heard on the petition

THE STATE OIL AND GAS BOARD OF MISSISSIPPI ORDER. This day this cause came on to be heard on the petition BLED FOR RECORD J Jf\H 6 1978 OIL AND GAS BOARD Clyde R. Davs, State Ol & Gas Supervsor THE STATE OIL AND GAS BOARD OF MISSISSIPPI ^ DOCKET NO. 251-77-56 ORDER NO. ORDER Ths day ths cause came on to be

More information

it500 Internet Thermostat

it500 Internet Thermostat T500 User Manual 16pp 025_Layout 1 03/09/2013 12:00 Page 1 T500 Internet Thermostat U S E R M A N U A L T500 User Manual 16pp 025_Layout 1 03/09/2013 12:00 Page 2 Product complance & safety nformaton These

More information

Contractor's Material and Test Certificate for Underground Piping

Contractor's Material and Test Certificate for Underground Piping UNDERGROUND PPNG 13-97 Contractors Materal and Test Certfcate for Underground Ppng PROCEDURE Upon completon of work, nspecton and tests shall be made by the contractors representatve and wtnessed by an

More information

No TRINIDAD AND TOBAGO.

No TRINIDAD AND TOBAGO. r)( /6 / 2 TRNDAD AND TOBAGO. General Loan and nscrbed Stock. No. 25.-1912. 6th May. AN ORDNANCE to declare the terms and condtons applcable to Loans authorsed to be rased by the Government of Trndad and

More information

Planning of production and utility systems under unit performance degradation and alternative resource-constrained cleaning policies

Planning of production and utility systems under unit performance degradation and alternative resource-constrained cleaning policies 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Plannng of producton and utlty systems under unt performance degradaton

More information

Engineering Analysis of Implementing Pedestrian Scramble Crossing at Traffic Junctions in Singapore

Engineering Analysis of Implementing Pedestrian Scramble Crossing at Traffic Junctions in Singapore Engneerng Analyss of Implementng Pedestran Scramble Crossng at Traffc Junctons n Sngapore Dr. Lm Wee Chuan Eldn Department of Chemcal & Bomolecular Engneerng, Natonal Unversty of Sngapore, 4 Engneerng

More information

2018 GIRLS DISTRICT-SPECIFIC PLAYER DEVELOPMENT GUIDE

2018 GIRLS DISTRICT-SPECIFIC PLAYER DEVELOPMENT GUIDE 2018 GIRLS DISTRICT-SPECIFIC PLAYER DEVELOPMENT GUIDE GENERAL OVERVIEW USA Hockey Grls Player Development Dstrct-Specfc Gude The USA Hockey Grls Player Development Dstrct-Specfc Gude outlnes the 2018 grls

More information

Decomposition guide Technical report on decomposition

Decomposition guide Technical report on decomposition June 2013 Decomposton gude Techncal report on decomposton Erasmus MC Start date of project: 20 Aprl 2012 Duraton: 36 months 1 Table of contents Abstract... 4 Acknowledgements... 5 Introducton... 6 Part

More information

The impact of foreign players on international football performance

The impact of foreign players on international football performance MPRA Munch Personal RePEc Archve The mpact of foregn players on nternatonal football performance Orhan Karaca Ekonomst Magazne, Research Department October 008 Onlne at http://mpra.ub.un-muenchen.de/11064/

More information

Methodology for ACT WorkKeys as a Predictor of Worker Productivity

Methodology for ACT WorkKeys as a Predictor of Worker Productivity Methodology for ACT WorkKeys as a Predctor of Worker Productvty The analyss examned the predctve potental of ACT WorkKeys wth regard to two elements. The frst s tme to employment. People takng WorkKeys

More information

Risk analysis of natural gas pipeline

Risk analysis of natural gas pipeline Rsk analyss of natural gas ppelne Y.-D. Jo 1, K.-S. Park 1, J. W. Ko, & B. J. Ahn 3 1 Insttute of Gas Safety Technology, Korea Gas Safety Corporaton, South Korea Department of Chemcal Engneerng, Kwangwoon

More information

2017 GIRLS CENTRAL DISTRICT PLAYER DEVELOPMENT GUIDE

2017 GIRLS CENTRAL DISTRICT PLAYER DEVELOPMENT GUIDE 2017 GIRLS CENTRAL DISTRICT PLAYER DEVELOPMENT GUIDE GENERAL OVERVIEW USA Hockey Grls Player Development Dstrct-Specfc Gude The USA Hockey Grls Player Development Dstrct-Specfc Gude outlnes the 2017 grls

More information

JIMAR ANNUAL REPORT FOR FY 2001 (Project ) Project Title: Analyzing the Technical and Economic Structure of Hawaii s Pelagic Fishery

JIMAR ANNUAL REPORT FOR FY 2001 (Project ) Project Title: Analyzing the Technical and Economic Structure of Hawaii s Pelagic Fishery 1 JIMAR ANNUAL REPORT FOR FY 2001 (Project 653540) P.I. Name: PngSun Leung, Khem Sharma and Sam Pooley Project Research Assstant: Naresh Pradhan Project Ttle: Analyzng the Techncal and Economc Structure

More information

M.H.Ahn, K.J.Lee Korea Advance Institute of Science and Technology 335 Gwahak-ro, Yuseong-gu, Daejeon , Republic of Korea

M.H.Ahn, K.J.Lee Korea Advance Institute of Science and Technology 335 Gwahak-ro, Yuseong-gu, Daejeon , Republic of Korea The Methodology on Exposure Dose Evaluaton Modelng Related to Arbtrary Accdent n the Temporary Storage Faclty for Low and Intermedate Level Waste - 9133 M.H.Ahn, K.J.Lee Korea Advance Insttute of Scence

More information

AGA / API Auditing Requirements of Fiscal Gas Metering Systems and FCRI Experiences

AGA / API Auditing Requirements of Fiscal Gas Metering Systems and FCRI Experiences AGA / API Audtng Requrements of Fscal Gas Meterng Systems and FCRI Experences R.Mascoman 1, Vjay Bhaskar 2, C.B.Suresh 3, P.N.Unnkrshnanan 4, Pambavasan 5 Dr Jacob Chandaplla 6 1 DD, 2 CM, G(I)L, 3 SRE,

More information

NSPAA SLOW PITCH SOFTBALL POLICY AND PROCEDURES HANDBOOK

NSPAA SLOW PITCH SOFTBALL POLICY AND PROCEDURES HANDBOOK NSPAA SLOW PITCH SOFTBALL POLICY AND PROCEDURES HANDBOOK Revsed January 1, 2017 The Slow Ptch Softball Board (upon approval by the NSPAA Board) reserves the rght to edt, modfy, or change any polcy and/or

More information

Combustion Manager W-FM / Installation and operating instruction. info. V esc SIEMENS LMV27.210A2WH W-FM5 VSD X64 AIR X56 VSD X74

Combustion Manager W-FM / Installation and operating instruction. info. V esc SIEMENS LMV27.210A2WH W-FM5 VSD X64 AIR X56 VSD X74 BC X56 VD X74 CO X92 FUEL X54 X53 AIR X64 VD V h mn s esc 1 nfo 1 1 1 1 1 1 1 1 X75 X10-05 X10-06 X3-02 X5-03 X8-04 X8-02 X7-01 X3-04 E N L F A + X75 X10-05 X10-06 X3-02 X5-03 X8-0 X8-02 X7-01 L L N E

More information

ST70+ User Reference Manual. Document reference: Date: January 2009

ST70+ User Reference Manual. Document reference: Date: January 2009 ST70+ User Reference Manual Document reference: 85024-1 Date: January 2009 Autohelm, HSB, RayTech Navgator, Sal Plot, SeaTalk and Sportplot are UK regstered trademarks of Raymarne UK Lmted. Pathfnder and

More information

SUPPLEMENTAL MEMORANDUM. TRANCHE l

SUPPLEMENTAL MEMORANDUM. TRANCHE l SUPPLEMENTAL MEMORANDUM TRANCHE l Prvate Placement of upto 500 (Fve Hundred) Secured, Rated, Lsted, Redeemable, Non-Convertble Debentures ("Debentures" or "NCDs") of the face value of Rs. 10,00,0001- (Rupees

More information

2017 GIRLS DISTRICT-SPECIFIC PLAYER DEVELOPMENT GUIDE

2017 GIRLS DISTRICT-SPECIFIC PLAYER DEVELOPMENT GUIDE 2017 GIRLS DISTRICT-SPECIFIC PLAYER DEVELOPMENT GUIDE GENERAL OVERVIEW USA Hockey Grls Player Development Dstrct-Specfc Gude The USA Hockey Grls Player Development Dstrct-Specfc Gude outlnes the 2017 grls

More information

Product Information. Long-stroke gripper PFH-mini

Product Information. Long-stroke gripper PFH-mini Product Informaton PFH-mn PFH-mn Loadable. Flexble. Relable. PFH-klen long-stroke grpper 2-fnger parallel grpper wth large jaw stroke for large parts and / or a broad range of parts Feld of applcaton clean

More information

Product Information. Gripper for small components MPG 50

Product Information. Gripper for small components MPG 50 Product Informaton MPG 50 MPG Precse. Compact. Relable. MPG grpper for small components 2-fnger parallel grpper wth smooth roller gudes of the base jaws Feld of applcaton Grppng and movng of small to medum-szed

More information

Muscle drain versus brain gain in association football: technology transfer through

Muscle drain versus brain gain in association football: technology transfer through Muscle dran versus bran gan n assocaton football: technology transfer through player emgraton and manager mmgraton G. J. Allan a * and J. Moffat b a Correspondng Author: Department of Economcs, Sr Wllam

More information

Product Information. Long-stroke gripper PSH 42

Product Information. Long-stroke gripper PSH 42 Product Informaton PSH 42 PSH Compact. Flexble. Fully encapsulated. PSH long-stroke grpper 2-fnger parallel grpper wth long jaw stroke and drt-resstant round gudance Feld of applcaton n contamnated work

More information

Product Information. Gripper for small components MPG 32

Product Information. Gripper for small components MPG 32 Product Informaton MPG 32 MPG Precse. Compact. Relable. MPG grpper for small components 2-fnger parallel grpper wth smooth roller gudes of the base jaws Feld of applcaton Grppng and movng of small to medum-szed

More information

RBS 6 NATIONS 2013 DECISION OF THE DISCIPLINARY COMMITTEE. Held at Sofitel Hotel, Heathrow, England. 19 March 2013

RBS 6 NATIONS 2013 DECISION OF THE DISCIPLINARY COMMITTEE. Held at Sofitel Hotel, Heathrow, England. 19 March 2013 RBS 6 NATIONS 2013 DECISION OF THE DISCIPLINARY COMMITTEE Held at Softel Hotel, Heathrow, England 19 March 2013 In respect of: Bran O Drscoll ( the Player ) and A ctng complant ( the Ctng Complant ) brought

More information

Product Information. Gripper for small components MPG 80

Product Information. Gripper for small components MPG 80 Product Informaton MPG 80 MPG Precse. Compact. Relable. MPG grpper for small components 2-fnger parallel grpper wth smooth roller gudes of the base jaws Feld of applcaton Grppng and movng of small to medum-szed

More information

Development of Accident Modification Factors for Rural Frontage Road Segments in Texas

Development of Accident Modification Factors for Rural Frontage Road Segments in Texas Development of Accdent Modfcaton Factors for Rural Frontage Road Segments n Texas Domnque Lord* Zachry Department of Cvl Engneerng & Center for Transportaton Safety Texas Transportaton Insttute Texas A&M

More information

ALASKA DEPARTMENT OF FISH AND GAME DIVISION OF COMMERCIAL FISHERIES NEWS RELEASE

ALASKA DEPARTMENT OF FISH AND GAME DIVISION OF COMMERCIAL FISHERIES NEWS RELEASE ALASKA DEPARTMENT OF FISH AND GAME DIVISION OF COMMERCIAL FISHERIES NEWS RELEASE Cora Campbell, Commssoner Jeff Regnart, Drector Contact: Cordova ADF&G Steve Mofftt, PWS Fnfsh Research Bologst 401 Ralroad

More information

STATE COMPETITION. General Regulations. Effective 1 st January 2019

STATE COMPETITION. General Regulations. Effective 1 st January 2019 STATE COMPETITION General Regulatons 2019 Effectve 1 st January 2019 Contents CONTENTS... 1 INTRODUCTION... 3 PONY CLUB WA STATE COMPETITION... 3 1 RALLY QUALIFICATION REQUIREMENTS FOR STATE COMPETITION...

More information

Coastal Engineering Technical Note

Coastal Engineering Technical Note Coastal Engneerng Techncal Note CETN V-10 Even-Odd Functon Analyss of Shorelne Poston and Volume Change by Jule Dean RoSllt and Nchollls C. Kraus Purpose: To present the background and methodology for

More information

1.1 Noise maps: initial situations. Rating environmental noise on the basis of noise maps. Written by Henk M.E. Miedema TNO Hieronymus C.

1.1 Noise maps: initial situations. Rating environmental noise on the basis of noise maps. Written by Henk M.E. Miedema TNO Hieronymus C. TIP4-CT-2005-516420 Page 1 of 34 DELIVERABLE D 1.5 CONTRACT N PROJECT N ACRONYM TITLE TIP4-CT-2005-516420 FP6-516420 QCITY Quet Cty Transport Subproject 1 Nose mappng & modellng Work Package 1.1 Nose maps:

More information

SOME OBSERVATIONS ON THE CO-ORDINATION DIAPHRAGMATIC AND RIB MOVEMENT IN RESPIRATION

SOME OBSERVATIONS ON THE CO-ORDINATION DIAPHRAGMATIC AND RIB MOVEMENT IN RESPIRATION Thorax (199),, 65. SOME OBSERVATONS ON THE CO-ORDNATON DAPHRAGMATC AND RB MOVEMENT N RESPRATON BY HERBERT HERXHEMER Surgcal Unt, Unversty College Hosptal, London Daphragm and ntercostal muscles together

More information

This document is downloaded from DR-NTU, Nanyang Technological University Library, Singapore.

This document is downloaded from DR-NTU, Nanyang Technological University Library, Singapore. Ths document s downloaded from DR-NTU, Nanyang Technologcal Unversty Lbrary, Sngapore. Ttle capacty analyss usng smulaton Author(s) Ctaton Huang, Shell Yng; Hsu, Wen Jng; He, Yuxong; Song, Tancheng; De

More information

Product Information. Radial gripper PRG 52

Product Information. Radial gripper PRG 52 Product Informaton PRG More flexble More powerful. Slm. PRG unversal grpper 180 radal grpper wth powerful 1-shft slotted lnk gear and oval pston. Feld of applcaton For areas of applcaton whch, n addton

More information

RCBC Newsletter. September Richmond County Baseball Club. Inside this issue: Johnny Ray Memorial Classic. RCBC on You Tube

RCBC Newsletter. September Richmond County Baseball Club. Inside this issue: Johnny Ray Memorial Classic. RCBC on You Tube September 2016 Rchmond County Baseball Club 1400 Travs Ave. Staten Island, NY 10314 RCBC Newsletter If you have any nterestng nfo or news you would lke ncluded n a future newsletter, please emal to jm@rcbclub.com.

More information

Transportation Research Forum

Transportation Research Forum Transportaton Research Forum On the Impact of HOT Lane Tollng Strateges on Total Traffc Level Author(s): Sohel Sbdar and Mansoureh Jehan Source: Journal of the Transportaton Research Forum, Vol. 48, No.

More information

ENTRY PACK. Oulton Park Little Budworth, Tarporley, Cheshire, CW6 9BW. Rounds 8 & 9 29 th July Enclosed:

ENTRY PACK. Oulton Park Little Budworth, Tarporley, Cheshire, CW6 9BW. Rounds 8 & 9 29 th July Enclosed: ENTRY PACK Rounds 8 & 2 th July 201 Oulton Park Lttle Budworth, Tarporley, Cheshre, CW BW Enclosed: Fnal Instructons Supplementary Regulatons Paddock Plan Tmetable Entry Lst Ste Map Thank you for enterng

More information

OPTIMAL LINE-UPS FOR A YOUTH SOCCER LEAGUE TEAM. Robert M. Saltzman, San Francisco State University

OPTIMAL LINE-UPS FOR A YOUTH SOCCER LEAGUE TEAM. Robert M. Saltzman, San Francisco State University OPTIMAL LINE-UPS FOR A YOUTH SOCCER LEAGUE TEAM Robert M. Saltzman, San Francsco State Unversty ABSTRACT Coaches n some dvsons of the Amercan Youth Soccer Organzaton (AYSO) are asked to fll out ther team

More information

Report No. FHWA/LA.13/508. University of Louisiana at Lafayette. Department of Civil and Environmental Engineering

Report No. FHWA/LA.13/508. University of Louisiana at Lafayette. Department of Civil and Environmental Engineering TECHNICAL REPORT STANDARD PAGE Report No. FHWA/LA.13/508 4. Ttle and Subttle A Comprehensve Study on Pavement Edge Lne Implementaton 7. Author(s) Xaoduan Sun, Ph.D., P.E. Subassh Das 9. Performng Organzaton

More information

ASSEMBLY INSTRUCTIONS. TECHART roof spoiler

ASSEMBLY INSTRUCTIONS. TECHART roof spoiler Part no. 070.100.650.009 Roof spoler Contents I Important safety nformaton...3 II Preparaton...5 III Installaton...6 1 Preparng the vehcle...6 2 Fttng the...6 3 Fnal nspecton...6 TECHART Verson 01 Page

More information

FK240 FLAT SOLAR COLLECTORS ROOF-TOP INSTALLATION FOR WORCESTER SOLAR SYSTEMS

FK240 FLAT SOLAR COLLECTORS ROOF-TOP INSTALLATION FOR WORCESTER SOLAR SYSTEMS FK240 FLAT SOLAR COLLECTORS ROOF-TOP INSTALLATION FOR WORCESTER SOLAR SYSTEMS G INSTALLATION INSTRUCTIONS About ths manual Ths nstallaton manual contans mportant nformaton for the safe and approprate nstallaton

More information

Product Information. Universal gripper PZN-plus

Product Information. Universal gripper PZN-plus Product Informaton Unversal grpper PZN-plus PZN-plus Unversal grpper Relable. Robust. Flexble. PZN-plus unversal grpper Unversal 3-Fnger Centrc Grpper wth hgh grppng force and maxmum moments due to mult-tooth

More information

Autumn Antics Open Play Day Horse Show

Autumn Antics Open Play Day Horse Show Slver Knolls Spurs 4-H Club Presents The Twenty Frst Annual Autumn Antcs Open Play Day Horse Show Saturday, October 7, 2017 Start Tme: 9:00 AM UNR Equestran Center 1290 Valley Rd, Reno, NV 89512 Corner

More information

BETHANY TAX INCREMENT FINANCING DISTRICT NO. 1 NOTICE OF TWO PUBLIC HEARINGS

BETHANY TAX INCREMENT FINANCING DISTRICT NO. 1 NOTICE OF TWO PUBLIC HEARINGS BETHANY TAX NCREMENT FNANCNG DSTRCT NO. 1 NOTCE OF TWO PUBLC HEARNGS On December 12, 2017 at 7:00 P.M., at Bethany Cty Hall, 6700 N.W. 36th Street, Bethany, Oklahoma, the Cty Councl of the Cty of Bethany

More information

Comparative Deterministic and Probabilistic Analysis of Two Unsaturated Soil Slope Models after Rainfall Infiltration

Comparative Deterministic and Probabilistic Analysis of Two Unsaturated Soil Slope Models after Rainfall Infiltration Jordan Journal of Cvl Engneerng, Volume 11, No. 1, 2017 Comparatve Determnstc and Probablstc Analyss of Two Unsaturated Sol Slope Models after Ranfall Infltraton Manoj Kr. Sahs 1) and Partha Pratm Bswas

More information

BRAIN INJURY CONFERENCE Tuesday 13 March 2018 Copthorne Hotel, Cardiff

BRAIN INJURY CONFERENCE Tuesday 13 March 2018 Copthorne Hotel, Cardiff BRAIN INJURY CONFERENCE 2018 Tuesday 13 March 2018 Copthorne Hotel, Cardff Bran Injury Conference 2018 The Hugh James Bran Injury Conference wll be of nterest to all healthcare professonals workng wth

More information

CIVL Paragliding and Hang-Gliding Committees CIVL GAP. Centralised Cross-Country Competition Scoring for Hang-Gliding and Paragliding

CIVL Paragliding and Hang-Gliding Committees CIVL GAP. Centralised Cross-Country Competition Scoring for Hang-Gliding and Paragliding CIVL Paragldng and Hang-Gldng Commttees CIVL GAP Centralsed Cross-Country Cometton Scorng for Hang-Gldng and Paragldng 2016 Edton Revson 1.0 Publshed February 26, 2017 CIVL GAP Centralsed Cross-Country

More information

Price Determinants of Show Quality Quarter Horses. Mykel R. Taylor. Kevin C. Dhuyvetter. Terry L. Kastens. Megan Douthit. and. Thomas L.

Price Determinants of Show Quality Quarter Horses. Mykel R. Taylor. Kevin C. Dhuyvetter. Terry L. Kastens. Megan Douthit. and. Thomas L. Prce Determnants of Show Qualty Quarter Horses Mykel R. Taylor Kevn C. Dhuyvetter Terry L. Kastens Megan Doutht and Thomas L. Marsh* The authors would lke to thank Professonal Aucton Servces, Inc. for

More information

Evolutionary Sets of Safe Ship Trajectories: Evaluation of Individuals

Evolutionary Sets of Safe Ship Trajectories: Evaluation of Individuals Internatonal Journal on Marne Navgaton and Safety of Sea Transportaton Volume 6 Number 3 September 2012 Evolutonary Sets of Safe Shp Trajectores: Evaluaton of Indvduals R. Szlapczynsk Gdansk Unversty of

More information

Underground Natural Gas Storage

Underground Natural Gas Storage CHAPTER 8 Underground Natural Gas Storage 8.1 Introducton In the Unted States and a few other countres, the underground storage of natural gas has become ncreasngly mportant after World War II. The obvous

More information

ITRS 2013 Silicon Platforms + Virtual Platforms = An explosion in SoC design by Gary Smith

ITRS 2013 Silicon Platforms + Virtual Platforms = An explosion in SoC design by Gary Smith ITRS 2013 Slcon Platforms + Vrtual Platforms = An exploson n SoC desgn by Gary Smth 2013 2013 Gary Gary Smth Smth EDA, EDA, Inc. Inc. All All Rghts Rghts Reserved. Reserved. 1 The Fve Desgn Constrants

More information

Product Information. Gripper for small components MPG-plus

Product Information. Gripper for small components MPG-plus Product Informaton Grpper for small components MPG-plus MPG-plus Grpper for small components More powerful. Faster. Longer fngers. MPG-plus grpper for small components 2-fnger parallel grpper wth smooth

More information

Aalborg Universitet. Published in: 9th ewtec Publication date: Document Version Publisher's PDF, also known as Version of record

Aalborg Universitet. Published in: 9th ewtec Publication date: Document Version Publisher's PDF, also known as Version of record Aalborg Unverstet Predctablty of the Power Output of Three Wave Energy Technologes n the Dansh orth Sea Chozas, Jula Fernandez; Jensen,. E. Helstrup; Sørensen, H. C.; Kofoed, Jens Peter; Kabuth, Alna Krstn

More information

Experimental And Numerical Investigation Of The Flow Analysis Of The Water-Saving Safety Valve

Experimental And Numerical Investigation Of The Flow Analysis Of The Water-Saving Safety Valve Expermental And Numercal Investgaton Of The Flow Analyss Of The Water-Savng Safety Valve Muhammed Safa KAMER s PhD Student n Department of Mechancal Engneerng n Kahramanmaras Sutcu Imam Unversty, Turkey.

More information

'!' CORDOVA BRANDON GREEN

'!' CORDOVA BRANDON GREEN STERLNG HWY FOREST SERVCE- REGON TEN CHUGACH NATONAL FOREST CORDOVA RANGER DSTRCT PLANS FOR PROPOSED CONSTRUCTON SAND ROAD TRAL PARKNG AREA LEGAL DESCRPTON T. 16 S., R. 2 W., COPPER RVER MERDAN SHEET NDEX

More information

High Speed 128-bit BCD Adder Architecture Using CLA

High Speed 128-bit BCD Adder Architecture Using CLA Hgh Speed 128-bt BCD Archtecture Usng CLA J.S.V.Sa Prasanth 1, Y.Yamn Dev 2 PG Student [VLSI&ES], Dept. of ECE, Swamy Vvekananda Engneerng College, Kalavara, Andhrapradesh, Inda 1 Assstant Professor, Dept.

More information

COMPENSATING FOR WAVE NONRESPONSE IN THE 1979 ISDP RESEARCH PANEL

COMPENSATING FOR WAVE NONRESPONSE IN THE 1979 ISDP RESEARCH PANEL COMPENSATING FOR WAVE NONRESPONSE IN THE 1979 ISDP RESEARCH PANEL 1. Introducton Graham Kalton, Unversty of Mchgan ames Lepkowsk, Unversty of Mchgan Tng-Kwong Ln. Natonal Unversty of Sngapore The choce

More information

Product Information. Gripper for small components MPG-plus 40

Product Information. Gripper for small components MPG-plus 40 Product Informaton MPG-plus 40 MPG-plus More powerful. Faster. Longer fngers. MPG-plus grpper for small components 2-fnger parallel grpper wth smooth roller gudes of the base jaws Feld of applcaton Grppng

More information

CIVL Paragliding and Hang-Gliding Committees CIVL GAP. Centralised Cross-Country Competition Scoring for Hang-Gliding and Paragliding

CIVL Paragliding and Hang-Gliding Committees CIVL GAP. Centralised Cross-Country Competition Scoring for Hang-Gliding and Paragliding CIVL Paragldng and Hang-Gldng Commttees CIVL GAP Centralsed Cross-Country Cometton Scorng for Hang-Gldng and Paragldng 2014 Edton Revson 1.1 Publshed March 23, 2014 CIVL GAP Centralsed Cross-Country Cometton

More information

GUIDE TO CYCLING ON THE ROAD

GUIDE TO CYCLING ON THE ROAD CODE/DISCIPLINE: STAGE/LEVEL: GUIDE TO CYCLING ON STAGE 1 STAGE 2 STAGE 3 STAGE 4 As a body, Cyclng Ireland has grown dramatcally n recent years, reflectng an exploson of cyclst numbers on the roads. Wth

More information

SECOND-ORDER CREST STATISTICS OF REALISTIC SEA STATES

SECOND-ORDER CREST STATISTICS OF REALISTIC SEA STATES SECOND-ORDER CREST STATISTICS OF REALISTIC SEA STATES MARIOS CHRISTOU Shell Internatonal Exploraton and Producton, 2288 GS Rjswjk, The Netherlands. E-mal: maros.chrstou@shell.com PETER TROMANS Ocean Wave

More information

Product Information. Universal gripper PZN-plus 40

Product Information. Universal gripper PZN-plus 40 Product Informaton PZN-plus 40 PZN-plus Relable. Robust. Flexble. PZN-plus unversal grpper Unversal 3-Fnger Centrc Grpper wth hgh grppng force and maxmum moments due to mult-tooth gudance Feld of applcaton

More information

Chlorine ball-valve. Operating instructions. Read the operating manual! The user is responsible for installation and operation related mistakes!

Chlorine ball-valve. Operating instructions. Read the operating manual! The user is responsible for installation and operation related mistakes! Chlorne ball-valve Read the operatng manual! The user s responsble for nstallaton and operaton related mstakes! Orgnal operatng nstructons Dosng Conveyng Control Lquds Gases Systems Table of Contents

More information

Aalborg Universitet. Published in: 9th ewtec Publication date: Document Version Accepted author manuscript, peer reviewed version

Aalborg Universitet. Published in: 9th ewtec Publication date: Document Version Accepted author manuscript, peer reviewed version Aalborg Unverstet Predctablty of the Power Output of Three Wave Energy Technologes n the Dansh orth Sea Chozas, Jula Fernandez; Jensen,. E. Helstrup; Sørensen, H. C.; Kofoed, Jens Peter; Kabuth, Alna Krstn

More information

CAUTION When using any equipment, always follow the manufacturer s instructions for safe operation.

CAUTION When using any equipment, always follow the manufacturer s instructions for safe operation. Cleanng 3M Controltac Decorated Graphc Vnyl Awnng Flmand Sgn Facngs Instructon Bulletn 6.1 Release I, Effectve March 2017 (replaces H, Oct 03) These cleanng nstructons are furnshed as a gude. The end-user

More information

Research and Application of Work Roll Contour Technology on Thin Gauge Stainless Steel in Hot Rolling

Research and Application of Work Roll Contour Technology on Thin Gauge Stainless Steel in Hot Rolling Send Orders for Reprnts to reprnts@benthamscence.ae The Open Mechancal Engneerng Journal, 215, 9, 111-116 111 Open Access Research and Applcaton of Work Roll Contour Technology on Thn Gauge Stanless Steel

More information

Evaluating the Effectiveness of Price and Yield Risk Management Products in Reducing. Revenue Risk for Southeastern Crop Producers * Todd D.

Evaluating the Effectiveness of Price and Yield Risk Management Products in Reducing. Revenue Risk for Southeastern Crop Producers * Todd D. Evaluatng the Effectveness of Prce and Yeld Rsk Management Products n Reducng Revenue Rsk for Southeastern Crop Producers * Todd D. Davs ** Abstract A non-parametrc smulaton model ncorporatng prce and

More information

Pedestrian Facilities Planning on Tianjin New Area program

Pedestrian Facilities Planning on Tianjin New Area program Avalable onlne at www.scencedrect.com ScenceDrect Proceda - Socal and Behavoral Scenc es 96 ( 2013 ) 683 692 13th COTA Internatonal Conference of Transportaton Professonals (CICTP 2013) Pedestran Facltes

More information

Power Generation Scheduling of Thermal Units Considering Gas Pipelines Constraints

Power Generation Scheduling of Thermal Units Considering Gas Pipelines Constraints ower Generaton Schedulng of Thermal Unts Consderng Gas pelnes Constrants Sara Mohtasham and Habb Raab Mashhad Abstract W e grow of electrcty generaton from gas energy gas ppelne relablty can substantally

More information

Mechanical Engineering Journal

Mechanical Engineering Journal 56789 Bulletn of the JSME Mechancal Engneerng Journal Vol., o., 6 Measurement of three-dmensonal orentaton of golf club head wth one camera Wataru KIMIZUKA* and Masahde OUKI* * DULOP SPORTS CO. LTD. Waknohama-cho

More information

Equilibrium or Simple Rule at Wimbledon? An Empirical Study

Equilibrium or Simple Rule at Wimbledon? An Empirical Study Equlbrum or Smple Rule at Wmbledon? An Emprcal Study Shh-Hsun Hsu, Chen-Yng Huang and Cheng-Tao Tang Revson: March 2004 Abstract We follow Walker and Wooders (200) emprcal analyss to collect and study

More information

LTC Vacuum Blasting Machine (Metal) Baseline Report: Greenbook (Chapter) Topical Report July 31,1997

LTC Vacuum Blasting Machine (Metal) Baseline Report: Greenbook (Chapter) Topical Report July 31,1997 DOEVMCY32260 -- 5851 (DE98002056) LTC Vacuum Blastng Machne (Metal) Baselne Report: Greenbook (Chapter) Topcal Report July 31,1997 For U.S. Department of Energy Offce of Envronmental Management Offce of

More information

First digit of chosen number Frequency (f i ) Total 100

First digit of chosen number Frequency (f i ) Total 100 1 4. ANALYSING FREQUENCY TABLES Categorcal (nomnal) data are usually summarzed n requency tables. Contnuous numercal data may also be grouped nto ntervals and the requency o observatons n each nterval

More information

Pneumatic level indicator Unitel

Pneumatic level indicator Unitel Pneumatc level ndcator Untel Reference ponter for easy consumpton montorng Zero correcton possble Page 28 pplcaton For contnuous level measurement n tanks contanng fuel ol, desel fuel and ranwater. For

More information

Power Generation Scheduling of Thermal Units Considering Gas Pipelines Constraints

Power Generation Scheduling of Thermal Units Considering Gas Pipelines Constraints World Academy of Scence, Engneerng and Technology Internatonal Journal of Electrcal and Computer Engneerng Vol:3, No:1, 29 ower Generaton Schedulng of Thermal Unts Consderng Gas pelnes Constrants Sara

More information

Modeling the Performance of a Baseball Player's Offensive Production

Modeling the Performance of a Baseball Player's Offensive Production Brgham Young Unversty BYU ScholarsArchve All Theses and Dssertatons 006-03-09 Modelng the Performance of a Baseball Player's Offensve Producton Mchael Ross Smth Brgham Young Unversty - Provo Follow ths

More information

Automated External Defibrillators DESIGNED FOR UNEXPECTED HEROES

Automated External Defibrillators DESIGNED FOR UNEXPECTED HEROES Automated External Defbrllators DESIGNED FOR UNEXPECTED HEROES HOPE IS IN YOUR HANDS It happens n a splt second. A person collapses the vctm of sudden cardac arrest (SCA) and the clock starts tckng n the

More information

Product Information. Gripper for small components MPG-plus 32

Product Information. Gripper for small components MPG-plus 32 Product Informaton MPG-plus 32 MPG-plus More powerful. Faster. Longer fngers. MPG-plus grpper for small components 2-fnger parallel grpper wth smooth roller gudes of the base jaws Feld of applcaton Grppng

More information

Availability assessment of a raw gas re-injection plant for the production of oil and gas. Carlo Michelassi, Giacomo Monaci

Availability assessment of a raw gas re-injection plant for the production of oil and gas. Carlo Michelassi, Giacomo Monaci 16 th IMEKO TC4 Symposum Explorng New Fronters of Instrumentaton and Methods for Electrcal and Electronc Measurements Avalablty assessment of a raw gas re-njecton plant for the producton of ol and gas

More information

Product Information. Universal gripper PGN-plus 200

Product Information. Universal gripper PGN-plus 200 Product Informaton PGN-plus 200 PGN-plus Relable. Robust. Flexble. PGN-plus unversal grpper Unversal 2-Fnger Parallel Grpper wth large grppng force and hgh maxmum moments due to mult-tooth gudance. Feld

More information

Peculiarities of the Major League Baseball Posting System

Peculiarities of the Major League Baseball Posting System Peculartes of the Major League Baseball Postng System Duane W. Rockerbe Unversty of Lethbrdge Revsed July 2007 Abstract The postng system used n major league baseball to obtan free agent players from Japan

More information

COMPARATIVE ANALYSIS OF WAVE WEATHER WINDOWS IN OPERATION AND MAINTENANCE OF OFFSHORE WIND FARMS AT HSINCHU AND CHANGHUA, TAIWAN

COMPARATIVE ANALYSIS OF WAVE WEATHER WINDOWS IN OPERATION AND MAINTENANCE OF OFFSHORE WIND FARMS AT HSINCHU AND CHANGHUA, TAIWAN Journal of Marne Scence and Technology, Vol. 5, No. 5, pp. 563-570 (07) 563 DOI: 0.69/JMST-07-0703- COMPARATIVE ANALYSIS OF WAVE WEATHER WINDOWS IN OPERATION AND MAINTENANCE OF OFFSHORE WIND FARMS AT HSINCHU

More information

Numerical Study of Occupants Evacuation from a Room for Requirements in Codes

Numerical Study of Occupants Evacuation from a Room for Requirements in Codes Numercal Study of Occupants Evacuaton from a Room for Requrements n Codes HL MU JH SUN Unversty of Scence and Technology of Chna State Key Laboratory of Fre Scence Hefe 2300326, CHINA muhl@mal.ustc.edu.cn

More information

Nonvoting. A.J. Bartosic, Rohm & Haas Go., PA Herman H. Spaeth, Novato, CA (Member Emeritus) Staff Liaison: Waiter P. Sterling

Nonvoting. A.J. Bartosic, Rohm & Haas Go., PA Herman H. Spaeth, Novato, CA (Member Emeritus) Staff Liaison: Waiter P. Sterling Report of the Commtte on Fre Tests jessej. Betel, Char Hughes Assocates nc., MD PeterJ. Barbadoro, Westnghouse Savannah Rver Co., SC Aprl L. Berkol, TT Sheraton Corp., MA Rep. Amercan Hotel & Motel Assn.

More information

Product Information. Long-stroke gripper PHL 50

Product Information. Long-stroke gripper PHL 50 Product Informaton PHL 50 PHL Flexble. Precse. Powerful. PHL long-stroke grpper 2-fnger parallel grpper wth large jaw stroke for large parts and / or a broad range of parts Feld of applcaton Optmum standard

More information

An intro to PCA: Edge Orientation Estimation. Lecture #09 February 15 th, 2013

An intro to PCA: Edge Orientation Estimation. Lecture #09 February 15 th, 2013 An ntro to PCA: Edge Orentaton Estmaton Lecture #09 February 15 th, 2013 Revew: Edges Convoluton wth an edge mask estmates the partal dervatves of the mage surface. The Sobel edge masks are: " #!1 0 1!2

More information

11. Contract or Grant No. Lubbock, Texas

11. Contract or Grant No. Lubbock, Texas Tee hnalr c eport D ocwnentaton Page 1. ReportNo. 2. Government Accesson No.. Recpent's Catalog No. TX -917-951-S. Ttle and Subttle 5. Report Date Proposed Geometrc Desgn for Two-Lane, Two-Way Hghway ntermttent

More information

AMP-O-MATIC* Side-Feed Stripper-Crimper III Machine No [ ] customer manual TOOLING ASSISTANCE CENTER

AMP-O-MATIC* Side-Feed Stripper-Crimper III Machine No [ ] customer manual TOOLING ASSISTANCE CENTER AMP-O-MATIC* Sde-Feed Strpper-Crmper III Machne No. 1320895-[ ] Customer Manual 409-10012 28 DEC 11 SAFETY A. PRECAUTIONS READ THIS FIRST!............................ 2 customer manual 1. INTRODUCTION.......................................................

More information

Product Information. Long-stroke gripper PHL

Product Information. Long-stroke gripper PHL Product Informaton PHL PHL Flexble. Precse. Powerful. PHL long-stroke grpper 2-fnger parallel grpper wth large jaw stroke for large parts and / or a broad range of parts Feld of applcaton Optmum standard

More information

Product Information. Universal gripper PGN-plus-P 100

Product Information. Universal gripper PGN-plus-P 100 Product Informaton PGN-plus-P 100 PGN-plus-P Relable. Robust. Flexble. PGN-plus-P unversal grpper Unversal 2-Fnger Parallel Grpper wth permanent lubrcaton, large grppng force and hgh maxmum moments thanks

More information

A ROMAN ROAD AT OTLEY

A ROMAN ROAD AT OTLEY A ROMAN ROAD AT OTLEY By ELIZABETH J. OWLES, B.A., F.S.A. Mr. Ivan Margary, the great authorty on Roman roads, has commented on the apparent poverty of ther constructon n East Angla whch makesthe task

More information

Safety Impact of Gateway Monuments

Safety Impact of Gateway Monuments *Manuscrpt Clck here to vew lnked References Ye, Venezano, and Lord 1 Safety Impact of Gateway Monuments Zhru Ye a,*, Davd Venezano a, Domnque Lord b a Western Transportaton Insttute, Montana State Unversty,

More information

Product Information. Long-stroke gripper PHL 63

Product Information. Long-stroke gripper PHL 63 Product Informaton PHL Flexble. Precse. Powerful. PHL 2-fnger parallel grpper wth long jaw stroke for large parts and/or a broad range of parts Feld of applcaton Optmum standard soluton for many felds

More information