CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

Size: px
Start display at page:

Download "CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)"

Transcription

1 Page 1 of 10 CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG) 1. SCOPE 1.1 To provide definitive requirements for HIGH PRESSURE PNEUMATIC testing of piping systems according to ASME B31.3. This test method shall not be applied to non-metallic piping materials. 1.2 The piping system as used herein is intended to include the pipe, valves and fittings. Vessels, process equipment, instruments, and relief devices are not included. 1.3 The acceptance of piping systems under this specification is for pressure tightness only. 2. CLASS DH--PNEUMATIC GREATER THAN 1 BAR (15 PSIG) 2.1 This test is performed by pressurizing the system with a gas, to a specified Test Pressure, but not less than 0.3 Bar (5 Psig) The Owner shall verify if site safety practices and/or local authorities impose additional requirements or restrictions The Owner is responsible to assure that all conditions and safety concerns identified in G4D are addressed Interim testing may use a sonic leak detector to listen for leaks. Refer to G4S and G8S for procedures The final test is when the system can sustain a specified pressure for a minimum period of 30 minutes plus the time to do the examination, without evidence of leaks. 2.2 A complete line or section of line containing several valves and branches shall be tested at one time Exemptions to 2.2 can include valves that are pre-cleaned for a specific service, lined, or specialty valves that do not meet the required line test pressure If the valves cannot be tested with a system test, the contractor shall ensure the valves are tested prior to installation per ASME B31.3. Contractor shall confirm allowable test pressure of valves prior to performing work.

2 Page 2 of A set of marked-up or highlighted drawings may be used. The purpose is to identify the boundaries of separate piping systems to be tested, the locations of isolation blanks, valve positions, double block and bleed valve arrangements, location of pressure injection or connection points, location of pressure gauge(s), recorders for pressure, temperature, and other instrumentation used to validate the test. 2.3 CAUTION: PNEUMATIC TESTING should be used only as a last alternative when hydrostatic testing is not practical or could damage the system. Pneumatic Testing involves the hazard of potential release of the energy stored as a compressed gas. Carefully planned and supervised procedures shall be followed. Persons responsible for the testing are to be informed of the procedures to be followed. In cold weather, care must be taken to minimize the chance of brittle fracture during the test Carbon Steel Pipe The metal temperature of carbon steel piping subjected to a pneumatic test shall not be colder than 15.5C (60F). Situations where the temperature could be colder than 15.5C (60F) may be acceptable, but must be analyzed by Owner prior to testing Non-Ferrous and Stainless Steel Pipe or Tubing (Including that with Carbon Steel Lap-Joint Flanges) The metal temperature of non-ferrous and stainless steel piping subjected to a pneumatic test shall not be colder than the minimum Design Temperature given in the pressure-temperature ratings of the governing CPPS Specification plus 16.7C (30F) A materials engineer shall conduct a review of installed equipment to ensure that the ductile to brittle transition temperatures of the materials are below the test temperature. 2.4 A Safe Work Procedure shall be written, and approved prior to beginning of a CLASS DH PNEUMATIC test. The procedure shall cover the following items as minimum requirements: a. Pretest visual inspection. The system to be tested shall be reviewed to ensure that the complete system can be depressurized at completion of the test. b. Areas to be roped off and minimum distances to be maintained, according to local site standards, government regulations, or Table 1 in EMETL G4D (as approved by Owner). c. Time schedule. d. Indoctrination of personnel on hazards involved.

3 Page 3 of 10 e. Form G4Q , Pneumatic Testing Safe Work Procedure Checklist, to be completed and signed. 3. TEST MEDIUM AND EQUIPMENT Pneumatic tests shall be made with air, nitrogen, or other nonflammable, nontoxic gases where applicable. 3.1 Nitrogen is the preferred fluid for pneumatic testing at a gage Pressure above 6.9 Bar (100 Psig). 3.2 Air shall not be used to test new piping at gage pressures above 20 Bar (300 Psig). 3.3 Air shall not be used to test unclean or used piping at any pressure, unless the piping has been cleaned, purged with inert gas, tested and sampled to verify that a combustible gas mixture is not present Air compressors shall be equipped with discharge filters for removal of water, oil, and foreign matter. Maximum discharge temperature of lubricated air compressors shall be 150C (300F) The sonic testing equipment shall be capable of detecting frequencies between 30KHz and 50KHz, and used in accordance with the manufacturer s recommendations. 4. PREPARATION FOR TEST 4.1 The line schedule issued should give the Common Product Piping Specification for each line and may include material, size, insulation, etc., and the required Test Pressure, Test Class (Method) and other requirements of the pipe specifications. 4.2 In the absence of a line schedule, the Test Pressure and Test Class (Method) required may be covered in the job project piping specification, contract technical job instructions, construction order, or for maintenance jobs, by Work Order. If not specified, refer to the appropriate Common Product Pipe Specifications. 4.3 Prior to testing, a thorough visual inspection shall be made for defects such as improper materials, poor gasket installation and loose joints. All bolts shall be made up tight in the system to be tested. Unless noted otherwise, gaskets per pipe specifications shall be used. All other mechanical joints shall also be examined.

4 Page 4 of Joints shall NOT be insulated or covered in any manner, for this test. 4.5 Piping systems connected to equipment shall be isolated from the equipment by means of a line blind, prior to cleaning and testing. If a valve is connected to the equipment, the blind shall be between the valve and the equipment, with the valve in the open position Where piping can not be isolated from equipment for testing, or it is desirable to include equipment in leak testing, the equipment may be included in the test provided: The piping system Test Pressure does not exceed either manufacturer s test pressure or a pressure limit imposed by the position and condition of the equipment The equipment does not contain any internals or materials that may be damaged by testing No rotating equipment may be included in any piping system leak test. 4.6 Valves shall be left open during the testing. If a valve is located at the end of a line, a blind flange or plug shall be installed. Where a valve can not be tested in the open position, do one of the following: Blank the upstream side of the valve Remove the valve and install a blind flange Remove the valve and install a flanged test spool where continuity of the line is required for purpose of the test. 4.7 Test blinds shall be installed between existing piping and new piping to prevent introducing cleaning and testing medium into existing lines, or pressurizing the existing system When isolation and blanking is required for the purpose of leak testing, it shall be made using the blind flanges according to the CPPS for the pipe line, or using test blinds as described by Engineering Specification G4G or G4G Test blinds shall be capable of withstanding the test pressure Contractor fabricated appliances used for leak testing of pipe lines such as test stands, test blinds, blind flanges, etc. - shall be designed and fabricated in accordance with governing Codes and Standards, such as ASME B31.3, ASME B16.5, ASME B16.47,

5 Page 5 of 10 ASME B16.48, etc. This includes use of proper materials, as well as assembly, welding, post treatment, and inspection requirements. 4.8 Leak tests shall include as much instrument process piping and tubing as possible. Where an instrument process line contains more than one block valve, all valves shall be open except the one nearest the instrument. 4.9 If cleaning has a negative effect on control valves, pressure reducing valves, level controllers, level switches, orifice plates, turbine meters, massflow meters, vortex meters and other instruments or fittings, then remove these items only if designated by the Owner. These items shall be removed from the lines before cleaning and reinstalled before testing. All such items shall be cleaned separately after removal Where control valves are closed, the line shall not be tested until the valves have been opened by the Owner. The line bore orifice spacers and gaskets or spare rings furnished with meter runs shall be installed prior to cleaning and remain in place until after testing. If any instruments and similar special equipment cannot withstand the required test pressure, they shall be removed only if designated by the Owner. Direct operated or self-contained regulators and float actuated devices shall be removed, or blocked and vented Safety valves and rupture discs installed for fit-up shall be removed during the test and reinstalled only after successfully completing the test. Some inline equipment and valves, such as transflow or three-way valves, may not be able to be tested. The line shall then be tested with temporary spool in place Check available drawings for any specific installation or operating instruction pertaining to expansion joints. Test Pressure shall not exceed the maximum allowable specified test pressure of the expansion joint Expansion joints having tie-rods shall be tested as part of the piping system unless otherwise specified. The tie-rod nuts must be hand tight, with no slack under the outside nuts.

6 Page 6 of Expansion joints not having tie-rods shall be removed or isolated from the test Insulation will not be allowed on systems under test except on those parts which have had a documented certified shop or mill test Spring support travel stops shall not be removed until all testing has been completed Prior to administration of the test visually observe the piping system to assure it is properly prepared Care should be exercised to check and confirm that there are no sections of the piping system where gas can be trapped downstream of check valves, or sections isolated by other valves, such that the piping cannot be safely vented after testing. 5. ADMINISTRATION OF TEST 5.1 All tests shall be witnessed and accepted by the Owner or Owner designee The presence of the Owner or Owner designee is not necessary while initial checking of lines for leaks is in progress. 5.2 A Pressure Relief Device shall be provided, having a set pressure not higher than the test pressure plus the lesser of 3.4 BAR (50 psig) or 10% of the test pressure. 5.3 Special precautions shall be taken if testing is to be performed in the open air, with regard to weather such as wind, or background noise, or other influences which may affect the accuracy of the test results. 5.4 Pressure gauges shall be of a suitable scale capacity for the test pressure, having a dial at least 115 mm (4-1/2 ) in diameter. The test pressure should be approximately 60% of full scale. The maximum pressure capacity shall not exceed three times the particular test pressure. Gauges will have established traceable identities and shall be accurate to within 1% of full scale. There shall be a minimum of two pressure gauges for each test Pressure gages used for testing shall be calibrated at least every six months. Calibration shall be traceable to individual gages for verification. Records of calibration shall be made available upon request Prior to the Pneumatic Test, a pre-test shall be conducted

7 Page 7 of 10 according to Test Class D, G4S , at a pressure not to exceed 1 Bar (15 Psig). (Exceptions to G4S ) 1)Para 4.3 priming and/or Painting shall be permitted prior to the pre-test, as long as the pre-test is not considered a "Sensitive Leak Test" in accordance with ASME B31.3 para as part of the "Alternative Leak Test" ASME B31.3 para or requirements of Category M testing ASME B31.3 para. M345. 2)Para 2.1 is not mandatory to apply bubble forming solution to all joints, for this pre-test. 5.6 The pressure shall be raised slowly in stepwise fashion as described in the following table.

8 Page 8 of 10 TABLE 1. PNEUMATIC TEST PROCEDURE Preliminary Test Step 1 Primary Test Step 2 Primary Test Step 3 Primary Test Step 4 (Final) Raise pressure to 25 psig (172 kpag) or to 25% of primary test pressure, whichever is lower. Disconnect supply. Hold pressure for 10 minutes. Gradually increase the pressure to 50% of the primary test pressure. Do this in steps of approx. 20% of the primary test pressure,, holding at each step for 2 to 3 minutes for piping to equalize strains. Increase pressure in increments of 10% of the primary test pressure until primary test pressure is reached. At each increment, close test gas inlet valve at test manifold and observe test gage for 5 minutes. Maintain primary test pressure for 30 minutes. Hold for 10 minutes at 50% of the primary test pressure mark. Observe gage for loss of pressure (visual) inspection of the system is not required. If pressure loss is noted, release pressure and do necessary repair. Repeat preliminary test. Blowdown system to 80% of primary test pressure for final leak testing. Check for leaks. If pressure loss exceeds 10%, blowdown to preliminary test pressure and check for leaks. Proceed to next increment if pressure loss is not detected. See acceptance standard, Paragraph If leaks are found, release pressure and do necessary repair. Repeat preliminary test. If no leaks are found, proceed with primary test. Step 2. If no appreciable loss of pressure is detected (in the judgment of the inspector) after 10 minutes, proceed with Step 3. Proceed with Step 4. End

9 Page 9 of All personnel shall be kept clear of the immediate area while the test pressure is being raised. See EMETL G4D for the Safe Distance Table requirements Acceptance A commercially available bubble forming solution (not soap and water) such as SNOOP or SHERLOCK shall be applied to all joints under examination including valve stem and packing glands Flanges joints (except at wafer valves and similar items) may be taped with duct or masking tape and punched with a small hole so leakage can be observed at the hole After holding the piping system at the Test Pressure for the specified time, all joints not previously tested shall be examined for leaks with the piping system under not less than 80% of the specified Test Pressure. When no indication of leakage of the test fluid is observed, the piping system is acceptable. 5.7 Interim testing for leaks may be done using a sonic leak detector The testing shall continue in increments until the final test pressure is reached and held for 30 minutes minimum without evidence of any leakage. 5.8 Variations of pressure and volume due to temperature changes will be taken into account in determining whether pressure during test is satisfactory. All attempts shall be made to stabilize the temperature of the test, prior to starting the test. 6. RETESTS 6.1 In the event that a piping system or any part fails to pass the test prescribed, a new test shall be applied after repairs and corrections have been made. This retest shall include all parts of a connected system which may have passed a test previously, but have been affected by the corrections made or by a delay attending to the corrections. 7. POST TEST 7.1 At the completion of the test, all blinds, plugs and caps used to isolate equipment, vessels and instruments shall be removed, flange faces and threads inspected for damage, and piping reconnected. Special care is required when reconnecting these

10 points to avoid leaks. Page 10 of New gaskets shall be used when reinstalling flanged items or reconnecting to flanged equipment. Gaskets removed after tests shall not be reused. 7.3 Vents and drains shall be capped, plugged or blanked after completion of test according to pipe specifications or job instructions. 7.4 All valves shall be placed in the open or closed position as determined by the Owner. i i 10/24/2012, MOC2012_12142, By: Dan Devine, Supersedes Issue Date: 29-AUG- 2006, Fully reviewed and revisions made

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. Page 1 of 7 CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD 1. SCOPE 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. 1.2 The piping system as used herein is

More information

HYDROSTATIC LEAK TEST PROCEDURE

HYDROSTATIC LEAK TEST PROCEDURE This information is proprietary and shall not be disclosed outside your organization, nor shall it be duplicated, used or disclosed for purposes other than as permitted under the agreement with Kinetics

More information

Standard Pneumatic Test Procedure Requirements for Piping Systems

Standard Pneumatic Test Procedure Requirements for Piping Systems the pressure equipment safety authority Standard Pneumatic Test Procedure Requirements for Piping Systems AB-522 Edition 2, Rev. 1 Issued 2016-10-24 Table of Contents FOREWORD... 1 1.0 INTRODUCTION...

More information

Perform Pressure & Leak Test, Tubing & Piping. Module 12306

Perform Pressure & Leak Test, Tubing & Piping. Module 12306 Perform Pressure & Leak Test, Tubing & Piping Module 12306 Instrumentation Trainee Task Module 12306 PERFORM PRESSURE AND LEAK TEST, TUBING AND PIPING Objectives Upon completion of this module, the trainee

More information

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax: 2 Table Of Contents 1. Introduction 3 2. About this Manual 3 3. Contacting YZ Systems 3 4. Vessel Components 4 5. Specifications 5 6. Application 6 7. Theory of Operation 7 8. DuraSite Installation & Use

More information

TEST SPECIFICATION NYT-909-C

TEST SPECIFICATION NYT-909-C 748 Starbuck Ave, Watertown, NY 13601 Phone: +1-315-786-5200 Engineering Fax: +1-315-786-5673 TEST SPECIFICATION NYT-909-C CODE OF TESTS FOR TESTING "AB" TEST RACK P/N 702546 & 702612 ISSUE NO. 5 1.0 THE

More information

ANDERSON GREENWOOD SERIES 9000 POSRV INSTALLATION AND MAINTENANCE INSTRUCTIONS

ANDERSON GREENWOOD SERIES 9000 POSRV INSTALLATION AND MAINTENANCE INSTRUCTIONS Procedure-assembly-functional test and performance requirements 1 SCOPE 1.1 This document establishes the general procedure for assembly, functional testing and normal performance requirements of low Series

More information

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow Model: FP 450-80 Installation Operation Maintenance PAGE 1 OF 5 1. Safety First BERMAD believes that the safety of personnel

More information

PIP PNE00012 Piping Examination and Leak Test Guide

PIP PNE00012 Piping Examination and Leak Test Guide October 2017 Piping PIP PNE00012 Piping Examination and Leak Test Guide PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has

More information

Installation, Operation and Maintenance Manual for Back Pressure Regulator

Installation, Operation and Maintenance Manual for Back Pressure Regulator Installation, Operation and Maintenance Manual for Back Pressure Regulator Model 8860 2009 Groth Corporation IOM-8860 Rev. B 12541 Ref. ID: 95565 Page 2 of 13 Table of Contents I. INTRODUCTION 3 II. DESIGN

More information

Flange Bolt Torquing. for Resistoflex Plastic-Lined Piping Products. Torquing. Retorquing. Hydrotesting. Annual retorquing

Flange Bolt Torquing. for Resistoflex Plastic-Lined Piping Products. Torquing. Retorquing. Hydrotesting. Annual retorquing Flange Bolt Torquing for Resistoflex Plastic-Lined Piping Products Torquing When assembling flange connections, always use a full complement of clean, new high strength A193-B7 bolting. If using stainless

More information

Fisher DVI Desuperheater Venturi Inline

Fisher DVI Desuperheater Venturi Inline Instruction Manual DVI Desuperheater Fisher DVI Desuperheater Venturi Inline Contents Introduction... 1 Scope of Manual... 1 Description... 1 Principle of Operation... 2 Installation... 3 Operating Instructions...

More information

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES PBV-USA,Inc. 12735 Dairy Ashford. Stafford, Texas USA 77477 281-340-5400; 800-256-6193 FAX: 281-340-5499 INDUSTRIAL BALL VALVES IM0 69 April 2001 Rev 9 INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS

More information

Type Testing of Rising Stem Valves Equipped with Graphite Packing for Fugitive Emissions

Type Testing of Rising Stem Valves Equipped with Graphite Packing for Fugitive Emissions Type Testing of Rising Stem Valves Equipped with Graphite Packing for Fugitive Emissions 1 Scope This standard specifies the requirements and acceptance criteria (100 ppmv) for fugitive emission type testing

More information

SECTION PRESSURE TESTING OF PIPING

SECTION PRESSURE TESTING OF PIPING SECTION 15044 PRESSURE TESTING OF PIPING PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: This section specifies the leakage and pressure testing of piping. B. Testing Records: PART 2 - PRODUCTS 2.01

More information

OPERATING AND MAINTENANCE MANUAL

OPERATING AND MAINTENANCE MANUAL Series 4300 Engineered Performance TABLE OF CONTENTS 0 INTRODUCTION 1 1 Scope 1 2 Description 1 3 Specifications 1 0 INSTALLATION 1 1 Mounting 1 2 Piping 1 1 Connecting Process Pressure 2 2 Vent Connections

More information

Safety. April 2018 Supersedes all previous publications 2018 Chevron Phillips Chemical Company LP

Safety. April 2018 Supersedes all previous publications 2018 Chevron Phillips Chemical Company LP Technical Note 802 Leak Testing of Polyethylene Pipe For Municipal and Industrial Applications Part 1 Pre-Test Considerations Leak testing may be used to find leaks in a newly constructed or newly modified

More information

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS STORAGE INSTRUCTIONS Until it is time to install a new or reconditioned valve on the car, the valve must be kept in its original packaging in order to protect it from dirt and damage. INSTALLATION INSTRUCTIONS

More information

Ontario ENGINEERING STANDARD SPECIFICATION 1.0 PURPOSE

Ontario ENGINEERING STANDARD SPECIFICATION 1.0 PURPOSE SPEC-5044 1/6 1.0 PURPOSE This specification describes the minimum requirements for the cleaning, handling and packaging of oxygen service piping and components. This applies to new installations, repairs,

More information

Oxygen Usage Best Practice Guide

Oxygen Usage Best Practice Guide Oxygen Usage Best Practice Guide 1. Introduction Oxygen enriched systems possess a risk of fire and explosion since ignition and combustion hazards are present in all oxygen systems, and oxygen related

More information

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection February 9, 1998 Foam 201a 1. DESCRIPTION A Deluge Bladder Tank Foam/Water System is a standard deluge system capable of discharging a foam/water solution automatically through open sprinklers, spray nozzles,

More information

1800C and 1800C-HC Series Service Regulators

1800C and 1800C-HC Series Service Regulators 1800C and 1800C-HC Series Service Regulators Installation Instructions www.elster-americanmeter.com General Information: The 1800C and 1800C-HC Regulators are available as Full Capacity Internal Relief

More information

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator. RS(H)10,15 USER MANUAL Read the complete manual before installing and using the regulator. WARNING INCORRECT OR IMPROPER USE OF THIS PRODUCT CAN CAUSE SERIOUS PERSONAL INJURY AND PROPERTY DAMAGE. Due to

More information

2 Sentry MCL Installation, Operation & Maintenance

2 Sentry MCL Installation, Operation & Maintenance Gas Liquid & Slurry Solid & Powder Steam & Water Installation, Operation & Maintenance Manual Original Instructions Liquid Sampling Manual Low-Emission Samplers S-GA-IOM-00249-7 11-17 Sentry MCL 966 Blue

More information

Pressure Regulators. Operating Instructions. Instrumentation

Pressure Regulators. Operating Instructions. Instrumentation Pressure Regulators Operating Instructions FAILURE OR IMPROPER SELECTION OR IMPROPER USE OF THIS PRODUCT CAN CAUSE DEATH, PERSONAL INJURY AND PROPERTY DAMAGE. This document and other information from the

More information

Design DSA Steam-Atomized Desuperheater

Design DSA Steam-Atomized Desuperheater Instruction Manual DSA Desuperheater Design DSA Steam-Atomized Desuperheater Contents Introduction............................... 1 Scope of Manual......................... 1 Description..............................

More information

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual WHEATLEY SERIES 500 SWING CHECK VALVE STANDARD INTEGRAL SEAT & OPTIONAL REMOVABLE SEAT 2" FP - 6" FP 150# - 1500# 8" FP - 12" FP 150# - 900# API 6D and B16.34 2" FP - 4" FP 5000# DRILLING PRODUCTION VALVE

More information

Atmospheric relief valve type 1100 Installation and maintenance instructions

Atmospheric relief valve type 1100 Installation and maintenance instructions SAPAG 1. Description Sapag atmospheric relief valves type 1100 have been selected for installation because of their performance features, reliability and ease of maintenance. They are designed to protect

More information

Installation Operation Maintenance

Installation Operation Maintenance 682 Seal Cooler New generation seal cooler to meet and exceed the seal cooler requirements stated in the 4th Edition of API Standard 682 Installation Operation Maintenance Experience In Motion Description

More information

Type 1367 High-Pressure Instrument Supply System with Overpressure Protection

Type 1367 High-Pressure Instrument Supply System with Overpressure Protection Instruction Manual D100343X012 Type 1367 November 2017 Type 1367 High-Pressure Instrument Supply System with Overpressure Protection TYPE 252 FILTER 2ND-STAGE TYPE 67CF FILTER-STYLE REGULATOR INLET TYPE

More information

GILMONT ACCUCAL FLOWMETERS

GILMONT ACCUCAL FLOWMETERS OPERATING MANUAL GILMONT ACCUCAL FLOWMETERS 28W092 Commercial Ave. Barrington, IL U.S.A. 60010-2392 (847) 381-4888 (847) 381-7053 (Fax) 800-962-7142 www.barnant.com e-mail: barnant@barnant.com A-1299-0766

More information

OPERATION MANUAL NTF-15

OPERATION MANUAL NTF-15 OPERATION MANUAL NTF-15 Nitrogen Tire Filling Valve Stem Caps (Qty=200) Order P/N 436075 RTI Technologies, Inc 10 Innovation Drive York, PA 17402 800-468-2321 www.rtitech.com 035-81235-00 (Rev B) TABLE

More information

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following: TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE For technical questions, please contact the following: Engineering Department 1537 Grafton Road Millbury, MA 01527 Phone: (508) 887-9400

More information

1. Preface Important Safety Notes Brief Product Information Product Working Principle Installation Guidelines...

1. Preface Important Safety Notes Brief Product Information Product Working Principle Installation Guidelines... Table of Contents 1. Preface...1 2. Important Safety Notes...1 3. Brief Product Information...3 4. Product Working Principle...5 5. Installation Guidelines...6 6. Startup and Commissioning...8 7. Maintenance

More information

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS Before installation these instructions must be fully read and understood SECTION 1 - STORAGE 1.1 Preparation and preservation for storage All valves should be properly packed in order to protect the parts

More information

INSTALLATION, OPERATION and MAINTENANCE MANUAL

INSTALLATION, OPERATION and MAINTENANCE MANUAL INSTALLATION, OPERATION and MAINTENANCE MANUAL TRUNNION MOUNTED BALL VALVE NEXTECH I ValvTechnologies, Inc. 5904 Bingle Road Houston, Texas 77092 U.S.A. Email: sales@valv.com www.valv.com 705_Nextech IOM

More information

PROCEDURE TWO-PLY TESTABLE BELLOWS D 1 OF 5 TWO PLY BELLOWS TEST PROCEDURE

PROCEDURE TWO-PLY TESTABLE BELLOWS D 1 OF 5 TWO PLY BELLOWS TEST PROCEDURE PROCEDURE TWO-PLY TESTABLE BELLOWS D 1 OF 5 TWO PLY BELLOWS TEST PROCEDURE Prepared by: Pathway Piping Solutions Daniel L. Edgar, PE Pine Valley, Ca 91962 Phone: (619) 473-8248 FAX: (619) 473-8148 Pathway

More information

OPERATION MANUAL NTF-60 Plus

OPERATION MANUAL NTF-60 Plus OPERATION MANUAL NTF-60 Plus Nitrogen Tire Filling Valve Stem Caps (Qty=200) Order P/N 436075 RTI Technologies, Inc 10 Innovation Drive York, PA 17402 800-468-2321 www.rtitech.com 035-81264-00 (Rev A)

More information

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL Index 1. List of components / General arrangement 2. Description 3. Handling 4. Installation 5. Actuators / Operation 6. Maintenance a. Changing

More information

CARTRIDGE FILTERS TECHNICAL MANUAL MT 080. Installation, commissioning and maintenance instructions. 08/02 Edition

CARTRIDGE FILTERS TECHNICAL MANUAL MT 080. Installation, commissioning and maintenance instructions. 08/02 Edition CARTRIDGE FILTERS TECHNICAL MANUAL MT 080 Installation, commissioning and maintenance instructions 08/02 Edition 1 2 CONTENTS 1.0 PAGE INTRODUCTION 1.1 MAIN FEATURES 1.2 OPERATION 1.3 CLOSING OF HEAD WITH

More information

TECHNICAL DATA CAUTION

TECHNICAL DATA CAUTION Page 1 of 6 1. DESCRIPTION The Viking Model D-2 Accelerator is a quick-opening device, with an integral anti-flood assembly, used to increase the operating speed of a differential type dry pipe valve.

More information

In addition to this SOP, the policies and procedures of each operating company will be strictly observed by Rockwater personnel.

In addition to this SOP, the policies and procedures of each operating company will be strictly observed by Rockwater personnel. SOP FB-10 (Revised MAR 2014) STANDARD OPERATING PROCEDURES-FLOWBACK Test Separator Operations Section 1.0 Introduction and Background Rockwater Energy Solutions, Inc. (and all its affiliated and subsidiary

More information

TECHNICAL DATA. than the water inlet pressure to the concentrate

TECHNICAL DATA. than the water inlet pressure to the concentrate Foam102a 1. DESCRIPTION The Viking Low Flow Foam/Water proportioning system, is a UL Listed and FM Approved system, for use with 3M foam concentrates. This system consists of a standard wet pipe sprinkler

More information

GM Series Dual-Block Multi-Function Gas Control Valves

GM Series Dual-Block Multi-Function Gas Control Valves Installation Sheets Manual 121 Gas Combustion Combination Controls and Systems Section G Technical Bulletin GM Issue Date 0297 GM Series Dual-Block Multi-Function Gas Control Valves Figure 1: GM Series

More information

1200B2 Series Service Regulators. Instruction Manual

1200B2 Series Service Regulators. Instruction Manual 00B Series Service Regulators Instruction Manual 00B Series Service Regulators 0 Elster American Meter 00B Series Service Regulators General Information The 00B Series Service Regulators are available

More information

Anti-flood device Model B-1

Anti-flood device Model B-1 December 4, 2009 Dry Systems 123a 1. DESCRIPTION The Anti-flood Device is required when Viking accelerators are installed on dry systems according to Viking Model E-1 Accelerator Trim Charts. In the SET

More information

Pipeline Systems PIP PLSC0019 Specification for Pressure Testing HDPE Plastic Pipeline Systems

Pipeline Systems PIP PLSC0019 Specification for Pressure Testing HDPE Plastic Pipeline Systems November 2017 Pipeline Systems PIP PLSC0019 Specification for Pressure Testing HDPE Plastic Pipeline Systems PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry

More information

WHEATLEY Series 500 Swing Check Valve

WHEATLEY Series 500 Swing Check Valve Document Number: TC003001-13 Revision: 02 WHEATLEY Series 500 Swing Check Valve Installation, Operation, and Maintenance Manual TABLE OF CONTENTS BILL OF MATERIALS...3 SCOPE...5 INSTALLATION AND OPERATION

More information

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A APCO ARV CLEAN WATER AIR RELEASE VALVES Model 50A Instruction D12013 February 2017 Instructions These instructions provide installation, operation and maintenance information for APCO ARV Clean Water Air

More information

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator.

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator. RHPS Series RD(H)F40 User Manual Read the complete manual before installing and using the regulator. 2 WARNING Before removing a regulator from the system for service, you must depressurize system purge

More information

English. Introduction. Safety Instructions. All Products. Inspection and Maintenance Schedules. Parts Ordering. Specifications WARNING WARNING

English. Introduction. Safety Instructions. All Products. Inspection and Maintenance Schedules. Parts Ordering. Specifications WARNING WARNING Contents All Products... Gb-1 Control Valves... Gb-2 Control Valve Actuators... Gb-3 Regulators... Gb-3 Relief Valves... Gb-4 Instruments, Switches, and Accessories... Gb-4 Products Covered by Battery

More information

TESCOM 50-4X Series Safety, Installation & Start-Up Procedures

TESCOM 50-4X Series Safety, Installation & Start-Up Procedures Operations & Service Manual TESCOM 50-4X Series Safety, Installation & Start-Up Procedures Do not attempt to select, install, use or maintain this product until you have read and fully understood this

More information

TABLE OF CONTENTS PART 2 - CONFINED SPACES

TABLE OF CONTENTS PART 2 - CONFINED SPACES May 11, 2006 TABLE OF CONTENTS PART 2 - CONFINED SPACES Page DEFINITIONS... 2-1 GENERAL... 2-2 RESPONSIBILITIES... 2-2 HAZARD ASSESSMENT AND WORK PROCEDURES... 2-3 IDENTIFICATION AND ENTRY PERMITS... 2-3

More information

METHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS. 1.2 Scope. This method is applicable for the

METHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS. 1.2 Scope. This method is applicable for the 1151 METHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS 1.0 Scope and Application. 1.1 Analytes. Analyte Volatile Organic Compounds (VOC) CAS No. No CAS number assigned 1.2 Scope. This method

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S Page 1 of 13 1. DESCRIPTION The Viking 6 Model G-6000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler

More information

Fisher DSA Steam-Atomized Desuperheater

Fisher DSA Steam-Atomized Desuperheater Instruction Manual DSA Desuperheater Fisher DSA Steam-Atomized Desuperheater Contents Introduction... 1 Scope of Manual... 1 Description... 1 Principle of Operation... 2 Installation... 2 Operating Instructions...

More information

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION INSTALLATION INSTRUCTIONS CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION The CVS Controls 67CFR Filter regulator is a pressure reducing supply regulator typically used for pneumatic

More information

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6 Sub Section INDEX Page Number 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6 6. INSTALLATION AND OPERATION 6 7. MAINTENANCE 8 8. REPAIR 9 9. ASSEMBLY 10 10.

More information

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE February 9, 1998 Foam 101a A BLADDER TANK WITH 1. DESCRIPTION A Wet Pipe Bladder Tank Foam/Water System is a standard wet pipe automatic sprinkler system capable of discharging a foam/water solution automatically

More information

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual Installation, Operation, and Maintenance Manual Welker Sampler Model GSS-1 The information in this manual has been carefully checked for accuracy and is intended to be used as a guide to operations. Correct

More information

TITAN FLOW CONTROL, INC.

TITAN FLOW CONTROL, INC. PREFACE: This manual contains information concerning the installation, operation, and maintenance of Titan Flow Control (Titan FCI) Simplex Basket Strainers. To ensure efficient and safe operation of Titan

More information

Types S100K and S102K Pressure Regulators

Types S100K and S102K Pressure Regulators Instruction Manual Form 5624 Types S0K and S2K 01/01 Types S0K and S2K Pressure Regulators W7478-1 Figure 1. Types S0K and S2K Pressure Regulator Introduction Scope of Manual This manual provides instructions

More information

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual Fisher Controls Instruction Manual Type S301 & S302 Gas Regulators October 1981 Form 5180 WARNING Fisher regulators must be installed, operated, and maintained in accordance with federal, state, and local

More information

TECHNICAL DATA. Page 1 of 12

TECHNICAL DATA. Page 1 of 12 Page 1 of 12 1. DESCRIPTION The Viking Regulating Valve is a direct-acting, single-seated, spring-loaded diaphragm valve. When installed as a pilot regulating valve on a Viking Model H or J Flow Control

More information

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13 Page 1 of 13 1. Description The Viking 2 Model G-2000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler

More information

VALVE MANUFACTURERS ASSOCIATION API 622 API 624

VALVE MANUFACTURERS ASSOCIATION API 622 API 624 VALVE MANUFACTURERS ASSOCIATION API 622 API 624 Written by Rich Davis Manager Business Development Western Hemisphere & China Flexitallic L.P., Deer Park, Texas Presented By: Steve Butler, Shell Global

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 347a 1. Description Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilize the Viking G-6000P Valve. The small profile, lightweight, pilot operated

More information

Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1

Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1 Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1 Page 16, Section 4.6, delete the entire section and renumber all subsequent

More information

NAVSEA STANDARD ITEM. 2.2 T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods

NAVSEA STANDARD ITEM. 2.2 T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods NAVSEA STANDARD ITEM ITEM NO: 009-53 DATE: 29 JUL 2011 CATEGORY: II 1. SCOPE: 1.1 Title: Bolted Bonnet Steam Valve; repair (shop) 2. REFERENCES: 2.1 S9086-CJ-STM-010/CH-075, Fasteners 2.2 T9074-AS-GIB-010/271,

More information

GREIG FILTERS, INC. OPERATION MANUAL

GREIG FILTERS, INC. OPERATION MANUAL GREIG FILTERS, INC. OPERATION MANUAL MODEL DCFH 3P 15/3 100 S4 DOE/222 DUAL CARTRIDGE FILTER HOUSING TABLE OF CONTENTS I. INTRODUCTION II. CARTRIDGE FILTER HOUSING UNIT A. OPERATION B. INSTALLATION C.

More information

Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger

Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger OM008 Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger The operating and maintenance instructions contained within this package are for Pacific water/water

More information

INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES

INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES THIS BOOKLET CONTAINS PROPRIETARY INFORMATION OF ADVANCED SPECIALTY GAS EQUIPMENT CORP. AND IS PROVIDED TO THE PURCHASER SOLELY FOR USE

More information

Welker Constant Pressure Cylinders With Welker Solid Indicator, Syringe T-Handle, or Vortex Mixer

Welker Constant Pressure Cylinders With Welker Solid Indicator, Syringe T-Handle, or Vortex Mixer Installation, Operation, & Maintenance Manual Welker Constant Pressure Cylinders With Welker Solid Indicator, Syringe T-Handle, or Vortex Mixer CP2SI CP52SY CP2M Models CP5SI CP5SY CP5M CP35SI CP35SY CP35M

More information

Eaton Filtration, LLC

Eaton Filtration, LLC Eaton Filtration, LLC 900 Fairmount Avenue, Elizabeth, NJ 07207 Phone: 908-787-1000 Fax: 908-351-7893 E-Mail: filtration@eaton.com Web: www.filtration.eaton.com Installation, Operation & Service Manual

More information

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE INSTALLATION, OPERATION & MAINTENANCE MANUAL INTERFACE DEVICES, INC. 230 Depot Road, Milford, CT 06460 Ph: (203) 878-4648, Fx: (203) 882-0885, E-mail: info@interfacedevices.com

More information

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY Page 1 of 13 1. DESCRIPTION The Viking 3 Model G-3000 Dry Valve Riser Assembly is equipped with a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry

More information

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE March 22, 2013 RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE Regulators: Symptom: Pressure Drop Cause: External leaks detected at pigtail hose MPT fitting connection(s) to regulator body

More information

FPD175 Compact orifice carrier assembly

FPD175 Compact orifice carrier assembly ABB MEASUREMENT & ANALYTICS OPERATING INSTRUCTION FPD175 Compact orifice carrier assembly The smart solution for remote applications. Measurement made easy Installation, commissioning and operating / maintenance

More information

TECHNICAL DATA ANTI-FLOOD DEVICE MODEL B-1 1. DESCRIPTION

TECHNICAL DATA ANTI-FLOOD DEVICE MODEL B-1 1. DESCRIPTION Page 1 of 6 1. DESCRIPTION The Model B-1 Anti-flood Device is required when Viking accelerators are installed on dry systems according to Viking Model E-1 Accelerator Trim Charts. In the SET condition,

More information

Operating Procedures for GripTight 15.5 SDR & IPS Test Plugs

Operating Procedures for GripTight 15.5 SDR & IPS Test Plugs EST Group DC2518 08/01 REV 3 12/12 Page 1 of 6 Operating Procedures for GripTight SDR & IPS Test Plugs WARNING For proper operation, GripTight plugs must be assembled as shown in Figure 1. Pressure testing

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 333a 1. Description Viking supervised Surefire Preaction Systems Utilize the Viking G-3000P Valve. The small profile, lightweight, pilot-operated Viking G-3000P Valve comes complete

More information

TECHNICAL DATA OBSOLETE

TECHNICAL DATA OBSOLETE April 9, 2009 Preaction 326a 1. DESCRIPTION Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilizing the Viking G-4000P Deluge Valve. The small profi le, lightweight,

More information

CAST IRON SAFETY VALVE TYPE 6301

CAST IRON SAFETY VALVE TYPE 6301 CHARACTERISTICS The 6301 safety valve is dedicated to protect the equipment from potential overpressure. This is an automatic device that closes when the pressure conditions are back to normal. It is a

More information

TECHNICAL DATA. Q= Cv S

TECHNICAL DATA. Q= Cv S Page 1 of 13 1. DESCRIPTION The Viking 4 inch Model G-4000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry

More information

Your safety and the safety of others are very important.

Your safety and the safety of others are very important. NATURAL GAS TO PROPANE CONVERSION KIT ALPKT57- INSTALLATION INSTRUCTIONS PROPANE CONVERSION KIT SAFETY... INSTALLATION REQUIREMENTS... Tools and Parts... LP Gas Requirements... Table of Contents INSTALLATION

More information

High-Pressure Boiler Inspection Procedures: A Complete Checklist

High-Pressure Boiler Inspection Procedures: A Complete Checklist High-Pressure Boiler Inspection Procedures: A Complete Checklist Inspecting high-pressure boilers is a complex process requiring preparation, planning, and a multitude of safety precautions. Regular inspections

More information

TECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve.

TECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve. Foam 302 a 1. DESCRIPTION (Refer to Figure 1 on page 302 e.) The Viking Low-Flow Foam/Water Proportioning System is a UL Listed and FM Approved system, for use with 3M and Viking brand foam concentrate.

More information

INSTRUCTIONS FOR MODEL SSC LOW DELIVERY PRESSURE GAS REGULATORS

INSTRUCTIONS FOR MODEL SSC LOW DELIVERY PRESSURE GAS REGULATORS INSTRUCTIONS FOR MODEL SSC LOW DELIVERY PRESSURE GAS REGULATORS THIS BOOKLET CONTAINS PROPRIETARY INFORMATION OF ADVANCED SPECIALTY GAS EQUIPMENT CORP. AND IS PROVIDED TO THE PURCHASER SOLELY FOR USE IN

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 348a 1. Description Viking supervised Surefire Preaction Systems utilize the Viking G-6000P Valve. The small profile, lightweight, pilot operated Viking G-6000P Valve comes complete

More information

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator. LRS(H)4 USER MANUAL Read the complete manual before installing and using the regulator. WARNING INCORRECT OR IMPROPER USE OF THIS PRODUCT CAN CAUSE SERIOUS PERSONAL INJURY AND PROPERTY DAMAGE. Due to the

More information

Components for air preparation and pressure adjustment. OUT port position ( ) connected Rear side. of IN port. Air tank. directly.

Components for air preparation and pressure adjustment. OUT port position ( ) connected Rear side. of IN port. Air tank. directly. Components preparation and pressure adjustment ABP Overview ABP is a component that enables boosting by s only up to twice primary pressure (.0MPa max.) in combination with using air tank but not using

More information

SAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions. IMPORTANT NOTICE

SAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions.  IMPORTANT NOTICE SAPAG IMPORTANT NOTICE Contents Important notice 1 0 Valve identification 2 1 Storage 2 2 Installation 2 3 Operation 2 4 Maintenance 3 4.1 Dismantling 3 4.2 Inspection 3 4.3 Repair 3 4.4 Assembly 4 4.5

More information

Un-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs

Un-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs Un-Pressurized Orefice Fittings FIO EZ Parts List and Operation Instructions TECHNICAL MANUAL Dn 2-6 Class 150-600 Lbs US US 2 FIO EZ - MT 108-US - 05-2016 FIO EZ Important Instructions US Pietro Fiorentini

More information

SCA Series Inverted Bucket Steam Traps

SCA Series Inverted Bucket Steam Traps 0770050/5 IM-P077-06 ST Issue 5 SCA Series Inverted Bucket Steam Traps Installation and Maintenance Instructions 1. General safety information 2. General product information 3. Installation 4. Commissioning

More information

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM ASSE STANDARD #1048 - REVISED: 2009 Double Check Detector Fire Protection Backflow Prevention Assemblies Separate, complete laboratory

More information

Telefon (+45) Telefax (+45)

Telefon (+45) Telefax (+45) Uni-Valve A /S VENTILER & INSTRUMENTER Telefon (+45) 43 43 82 00 Telefax (+45) 43 43 74 75 mail@uni-valve.com www.uni-valve.com UNI-S83 / S84 3/4-way ball valve Installation and Operating manual 3/4-WAY

More information

Pibiviesse High Performance Control Ball Valve

Pibiviesse High Performance Control Ball Valve Pibiviesse High Performance Control Ball Valve Sizes 2 to 48 Pressure rating up to ANSI 2500# Anti-cavitation and low noise trim available High turndown High rangeability Unique self-cleaning effect Single

More information

4-W GAS ODORIZER WITH POSITIVE ACTION INDICATOR GAUGE (300 PSIG) 2014 INFORMATION MANUAL SUBMITTED BY:

4-W GAS ODORIZER WITH POSITIVE ACTION INDICATOR GAUGE (300 PSIG) 2014 INFORMATION MANUAL SUBMITTED BY: 4-W GAS ODORIZER WITH POSITIVE ACTION INDICATOR GAUGE (300 PSIG) 2014 INFORMATION MANUAL SUBMITTED BY: #3, 1470 28 Street NE Calgary, Alberta Canada, T2A 7W6 Phone: (403) 569-8566 Fax: (403) 207-5110 Submitted

More information

TECHNICAL DATA. Page 1 of 8. model f /2 (dn40) & 2 (dn50)

TECHNICAL DATA. Page 1 of 8. model f /2 (dn40) & 2 (dn50) Page 1 of 8 1. DESCRIPTION The Viking Model F-1 Deluge Valve is a quick opening, differential diaphragm, flood valve with one moving mechanism. The Deluge Valve is used to control water flow in Deluge

More information

DuraSite 500(1) Portable Sample Vessel User's Guide. Version (1) = 90 Duro Wetted O-Rings

DuraSite 500(1) Portable Sample Vessel User's Guide. Version (1) = 90 Duro Wetted O-Rings DuraSite 500(1) Portable Sample Vessel User's Guide Version 11142003 (1) = 90 Duro Wetted O-Rings 2 Table Of Contents 1. Introduction 3 2. About this Manual 3 3. Contacting YZ Systems 3 4. Vessel Components

More information