1 Gas Absorption Draft Standard Operating Procedure R.C Scope Page 1 Equipment Overview Page 1 Safety Page 2 Operating Procedure Page 4 Equipment Description Page 16

2 Gas Absorption Experiment Draft Standard Operating Procedure R.Cox 9/2014 Scope This document is intended to serve as a guide to the operation of the gas absorption experiment located in the Senior Laboratory at the Department of Chemical Engineering, University of Utah. This procedure details system operation using column # 1 with blower # 2. Before operating this equipment, all personnel must receive equipment specific training from the lab manager. Be sure to read this entire document before beginning you experiment. Equipment description In gas absorption a soluble component is absorbed by contact with a liquid phase in which the component is soluble. This system is used for scrubbing gas streams of components such as sulfur dioxide, carbon dioxide and ammonia. In this experiment, a mixture of water and sodium hydroxide is used to remove CO2 from air. The system demonstrates mass transfer for two-phase systems. The gas absorption experiment consists of two columns, each filled with different packing material. The gas absorber experiment is comprised of the following systems: Absorption columns Column number 1 is packed with ceramic Berl saddles. Column number 2 is packed with metal Pahl Rings. Both columns have a six -inch inside diameter and a length of approximately nine and one-half feet. Liquid Circuit The liquid circuit consists of two 140-gallon tanks; an 80 gallon jacketed mixing tank, and associated pumps & valves. In addition, the liquid circuit includes two heat exchanges that are currently not operational. All piping for the liquid circuit is 1-inch schedule 80 CPVC, 1-inch schedule 40 PVC or 1-inch 304 stainless steel. 1

3 Air circuit The air circuit consists of two blowers, associated valves and 2-inch schedule 80 PVC rated to 400 PSI. The gas injection and analysis system consist of a CO2 cylinder, regulator, regulator heater, rotameter and associated gas analyzers. A detailed list of the equipment incorporated in the gas absorption experiment is included at the end of this document. Safety Safety glasses and hardhats must be worn when operating this equipment. Do not operate this equipment alone. Note that certain procedures require the coordinated efforts of two people. When filling the mixing tank do not exceed the 50-gallon level. Under no circumstances should this equipment be left unattended while in operation. The use of caustic solutions, compressed gas, large volumes of water and multiple sources of electrical power make attention to safety paramount when operating this equipment. Accidental flooding will result in caustic liquid exposure to equipment and personnel working on both floors below the gas absorber experiment. Sodium Hydroxide is extremely corrosive and highly reactive. Use Chloroflex gloves and wear safety glasses and a face shield when mixing sodium hydroxide and water. Never add water to a corrosive. Always add corrosives to water. When mixing with water, stir in small amounts of corrosives slowly. Label containers. All chemical containers must be clearly labeled with the chemical contents and concentrations. Keep containers closed when not in use. Empty containers may contain residues which are hazardous. Triple rinse all empty containers before discarding them to the trash. Anytime the basement neutralization tank is in use, a team member must remain in room 2505 to monitor the basement tank system for leaks. 2

4 Operating Procedure This procedure describes the operation of the gas absorber experiment with the following restrictions. Some valves are not labeled or mentioned in this SOP these valves should not be adjusted. Heat exchangers are not used Cooling water is not used This operating procedure details system operation using column # 1 with blower # 2. Prior to startup: Disconnect the gas sample lines from both the desiccant modules. Verify that all tanks are empty, including the basement neutralization tank. Both tanks have a sight glass indicating the tank level, however, the sight glass does not read to the bottom of the tank. If the sight glass does not indicate liquid in the tank, it is possible that the tank may contain liquid below the level of the sight glass. To confirm that the tanks are empty the tank pumps must be operated until no flow is observed. Care must be taken not to run the pumps without liquid in the line. Consult the lab manager for assistance. Verify that the column pressure transducers are connected to the column you will be using. Switch on the Validyne pressure sensor module located below the computer. Open both the 9500 and 9510 gas analyzer bypass needle valves. To feed column # 2 set the liquid circuit valves as listed above but close V8L and open V9L. A. Startup B. Log on to the computer control system. C. The password and user name are posted on the computer monitor. D. Double-click on the GAS ABSORBER icon located on desktop. E. The event log viewer screen is displayed, you will see a series of about five messages, close the event log viewer. F. The opening control window is displayed; note the information regarding system operation and data storage. G. Select start. The main control window is displayed. 3

5 H. Tank level alarms may be active depending on tank levels. I. If a high level alarm is active stop operation and neutralize and drain tanks as required. 2. Set Valves to fill mixing tank. A. Close V1L and V2L. B. Close V16L, basement tank main output valve. C. Before filling the mixing tank with water: The water supply line incorporates a totalizing meter, before opening the main water valve note the reading on the totalizer, once you have filled the mixing tank to the 50 gallon level shut of the main water feed valve and again note the reading on the totalizer. Use these totalizer readings to verify the amount of water in the mixing tank. Do not fill the mixing tank above the 50-gallon mark. 3. Fill the mixing tank. Before operating with caustic, the system should be tested with water. Once the correct flow rates are established using water, then the system may be operated with caustic. A. Place the water feed hose in the mixing tank, while one person is firmly holding the water hose a second person will slowly open the main water supply valve (green ball valve) located behind and to the left of the mixing tank. B. Fill the mixing tank to the 50-gallon mark. 4. Adding sodium hydroxide: o o o Never add water to a corrosive. Always add corrosives to water in small amounts. Wear lab coat, safety glasses, Chloroflex gloves and a face shield when mixing NaOH & water. Gently mix the solution using the detachable mixer located next to the mixing tank. 5. Set the valves to pump liquid from the mixing tank to the feed tank. Open: V1L Close: V2L 4

6 V3L V4L This valve must always be closed Once you are ready to pump the contents of the mixing tank to the feed tank, set the mixing / feed valves as indicated above. The mixing tank pump is controlled by two switches; 17C located on the rear switch panel and a second 17C switch located on the front switch panel. The 17C (mixing tank switches) must both be in the on position to power the mixing tank pump. 6. Pump from the mixing tank to the feed tank. A. Confirm that the mixing tank pump switch located on the rear panel is in the off position. B. Turn on the mixing tank pump switch located on the front switch panel. C. The mixing tank pump may now be controlled by switch 17C on the rear switch panel, this allows the operator to monitor the tank level and stop the pump before the mixing tank runs dry or before the feed tank is over-filled. D. Stop mixing tank pump as soon as the mixing tank is empty. E. Repeat procedures 1-3 as required to fill the feed tank to the desired level. F. Constantly monitor the level of the feed tank do not allow the feed tank to fill above the 115 gallon / 43 inch mark on the sight glass. 7. Set liquid flow valves to pump liquid from feed tank to column 1. Open V5L recycle valve V6L Close V9L V3L V8L V10L V12L V14L To feed column # 2 set the liquid circuit valves as listed above but close V8L and open V9L then adjust column 2 liquid input flow using V11L. Adjust column 2 output flow using V15L. 8. Set airflow valves 5

7 A. Open airflow vent valve 1A 100% B. Set air flow column select valve 2A to direct flow to the desired column. 9. Select blower -Only one air blower may be operated at a time A. Adjust the blower select valve (yellow ball valve located between the blowers) to select blower #2. B. Before operating the blowers make sure that there are no power cords or materials obstructing the rear intake side of the blower. C. Open the main airflow bleed valve V1A to 100% open. D. Verify that the blower #1 power switch (13A) and blower #2 power switch, located on the front panel, are in the off position. E. Insert the Blower # 2 power cord into the blower #2 (13A) outlet located on the wall above the blower. F. If you select blower #1, plug it into the outlet labeled blower #1. Read Section 10 and 11 Before Pumping Liquid into the Column. 10. Pump liquid from the feed tank to the column. A. Verify that the feed tank recycle valve - valve 5L is open 100 %. B. Switch on the feed tank (Tank 1) pump. The switch is located on the front switch panel. C. With the feed pump on, the column flow must be constantly monitored for flooding. Do not leave the column unattended. D. Monitor liquid flow to column 1 using the flow meter located below V10L. 11. Adjust the liquid feed flow-rate. Liquid flow is controlled by adjust the recycle / flow control valve V5L This procedure requires two people: one to adjust valve 5L and one to monitor the liquid flow rate on rotameter. 6

8 To adjust the flow rate to column 1, verify that feed valve V10L and drain valve V14L are open 100% then gradually close the recycle valvev5l on the feed tank until the desired flow rate is achieved. For fine flow rate adjustment use a combination of recycle valve 5L and valve 10L. It will take a few minutes for the liquid flow to stabilize within the column. Once the flows are reasonably stable, adjust V14L located at the bottom of column #1 by slightly closing valve V14L to maintain a level of liquid in the bottom of the column that just reaches the wide part of the column, about 4 inches of liquid in the bottom of the column. This will prevent gas from going out the bottom of the column. Monitor the liquid flow out of the column, watch for flooding at the bottom of the column, if liquid backs up at the bottom of the column to the point where it is about to enter the gas flow inlet immediately reduce the flow of liquid into the column and open V14L. 12. Switch on the air blower A. Once the liquid flows are stable, switch on the selected air blower. B. The blower are switched on and off from the switches located on the front panel. C. Monitor airflow by measuring the pressure drop across orifice plate # 1 as displayed on the Fluke 725 meter and on the computer. The system is generally operated at an airflow that is lower than the air flow rotameter range. D. The air flow is controlled by venting part of the blower output to atmosphere using valve 1A. E. Adjust air and liquid flow to the desired set points taking care not to flood the bottom of the column. F. Once the air and liquid flows have stabilized, adjust the CO2 flow as described in the next section. Gas sampling instruments System description The 9510 and 9500 gas analyzers measure volumetric percent of gas concentration, the range on both instruments is 0 25 %. Refer to the instrument documentation for further information. Exceeding the pressure and flow ratings for the gas analyzers will permanently damage the gas analyzers. 7

9 Follow the procedure below to insure that the sample gas pressures and flows are within the operating parameters for the gas analyzers. The maximum pressures and flow rates are: 9510 CO2 Monitor: ml/min at 2.0 psig (55.35 inches of water) maximum O2 & CO2 Monitor: L/min at 1 psig (27.68 inches of water) maximum. The gas flow to each analyzer is feed through a desiccant to remove moisture prior to entering the pressure and flow measurement apparatus. This pressure and flow measurement equipment which consist of a magnehelic pressure gauge and flow meter for each instrument, allows the user to measure the pressure and flow of the gas sample before it is fed to the gas analyzers. Before connecting the column pressure lines to the desiccant connection points make sure that the analyzer bypass valves are 100% open. 13. Connecting the gas sampling instruments All measurements should be taken with the air and liquid systems running at steady state. A. Before connecting the gas sample line to the analysis equipment. Open the gas analyzer bypass valves 100%, these valves are located on the back / inlet of each gas analyzer. With the bypass valves open monitor the pressure and flow gauges to insure the system does not exceed the analyzers maximum ratings. B. Once the gas and liquid flows have reached steady state connect the gas sample line labeled (Bottom of column 1) to the input of the desiccant labeled bottom of column to 9510 then connect the gas sample line labeled (Top of Column 1) to the input side of the small desiccant labeled top of column to C. Partially close both the 9500 and 9510 needle valves to establish optimal flow and pressure to the analyzers. Consult the lab manager for assistance if needed. 14. Adjust the CO2 flow. A. Plug the regulator heater into the power strip, turn on the power strip and set the regulator heater to 25 % power. The normal operating range for the heater is %. B. Verify that the CO2 regulator adjustment is rotated counter-clockwise such that the regulator output pressure will be zero when the main tank valve is opened. C. Open the CO2 flow needle valve 100%. This valve is located at the input to the CO2 rotameter. D. Open the main CO2 cylinder tank valve ½ turn. 8

10 E. Slowly rotate the regulator output pressure adjustment to the right until the tank outlet pressure displayed on the psi regulator gauge on the left- reads ~ 10 psi. F. Read the CO2 flow on the rotameter. Adjust the CO2 flow rate by adjusting the regulator outlet pressure and the needle valve at the input to the rotameter. The regulator is the primary means of flow the control the needle vale is for fine control. G. Monitor the CO2 regulator and copper feed line for accumulation of frost. If the regulator and line are becoming too cold increase the regulator heater out level. Consult the lab manager for more detailed information regarding regulator freezing. H. If the regulator becomes so cold that control of the CO2 flow is lost, immediately close the main CO2 cylinder valve. 15. Reading CO2 in the Gas Stream A. Once the CO2 flow has reached steady state and this might take a minute - you should see an increase on the CO2 meter displays. B. If the 9510 analyzer is not reading gas flow try turning on the 9510 sample pump to pull gas into the instrument, the pump switch is located on the top right side. C. Constantly monitor the pressure and flow to insure that you do not exceed the ratings for the gas analyzers. 16. A. Complete the run until the feed tank is empty. B. Constantly monitor the basement tank level to insure that it does not exceed 100 gallons. C. Constantly monitor the computer display to insure that a high level alarm is not triggered. If a high level alarm is triggered immediately shut off the pump, then neutralize the basement tank contents if required. Once neutralized the basement tank contents may be pumped to drain as outlined in the following steps. 17. Set valves to recycle basement / neutralization tank Verify that the ph of the liquid in the basement / neutralization tank is within disposal range. A. Set neutralization / basement tank valves to recycle the contents of the basement tank. 9

11 B. Set V19L flow output to the right C. Open V16L 18. Switch OFF the basement tank pump power switch located next to the neutralization tank. Switch ON the neutralization tank switch that is located on the front system control panel. Once the operator is in front of the basement neutralization tank you can now switch the tank pump onn and off as desired suing the switch next to the tank. Switch on the basement / neutralization tank pump. Monitor the ph reading on the computer, if the ph does 19. Set valves to pump from neutralization tank in basement to mixing tank Do not pump more that 50 gallons at a time into the mixing tank. Open V16L V18L Close V2L V4L Set V19L to the left Set V20 L to PVC pipe 20. Neutralizing caustic prior to disposals Wear Chloroflex gloves, lab coat and face mask when working with concentrated acid. Mix all concentrated acid solutions in the fume hood. A. Set neutralization / basement tank valves to recycle the contents of the basement tank. B. Set V19L flow output to the right C. Open V16L D. Calculate the amount of acid required to lower the ph of the liquid in the basement tank to within the safe disposal range of (5 10pH). E. Disconnect the acid container from the metering pump located next to the feed tank. Take the acid container to a fume hood and add the required amount of acid. 10

12 F. Cap the acid container and return it to the the metering pump. Connect the metering pump acid feed line to the acid container. G. Verify that the metering pump output line is connected to the PVC acid line. H. Start the basement neutralization pump. I. Start the acid metering pump at 10 ml/min. J. Monitor the ph in the basement neutralization tank. K. Adjust the flow rate of the acid metering pump as required. L. Stop the acid metering pump as soon as the ph of the neutralization tank drops below a ph of 10. M. Disconnect the acid metering pump line from the acid container and cap the acid container. N. Place the acid metering pump feed line and cap on an 8 liter water container that is 50 % full of water. O. Label the water container. P. Store any remaining acid in the 8-liter Nalgene container remember to label the container with the contents and concentration. 21. Set the neutralization tank valves to pump the contents of the neutralization tank to drain. A. Open V16L B. Set V19L to flow to the left, towards V20L. C. Set V20L to flow to the hose. D. Verify that V16L is open. 22. Pump liquid from the neutralization / basement tank to drain Two person procedure: Coordinate with team to switch on the basement /neutralization tank pump, while the pump is on, a team member must remain in room 2505 to monitor the flow of liquid until the tank is empty. Once the tank is empty, immediately notify the pump operator to shut off the pump. 23. Final Shutdown: 11

13 A. Verify that all pump and blower power switches on both the outlet panel and the equipment control panel are in the off position B. Close the main CO2 tank valve C. Close basement tank main valve V16L D. Set basement valve V19L to flow output to the right E. Close Feed tank main valve V6L F. Unplug all blowers G. Close the mixing tank outlet valves V1L, V2L and V3L H. Properly label and store any chemicals in use I. Exit the Opto22 control software; do not log off the computer J. Switch off the power to the Validyne pressure module. K. Check out with the lab manager Gas Absorber Valve Directory Do not adjust equipment valves that are not listed Liquid Circuit Valves Location Function Comments V1L Main Mixing tank out V2L V3L Mixing tank drain Mixing tank to feed tank V4L Mixing tank to heat exchanger ALWAYS CLOSED V5L V6L V7L V8L V9L Feed tank recycle Feed tank main output valve Not Used Column # 1 feed Column # 2 feed 12

14 V10L V11L Column #1 flow control Column #2 flow control V12L Column # 1 feed ALWAYS OPEN V13L Column # 2 feed ALWAYS OPEN V14L V15L Column #1 drain Column #2 drain V16L Basement- Room 2505 Neutralizing tank, (tank 2) main output valve V17L Basement Not Used V18L Basement Basement pump output : Refer to flow indicator arrows on valve V19L Basement Basement pump output: 3-way: Recycle / To Mixing Tank / To Drain Location Function Comments Main Air Blower Selection Yellow Ball Valve Air flow control Main Air Flow Control 13

15 Gas Absorption Experiment Equipment Description Air Flow Circuit Blower #1 Spencer Turbo-Compressor 30 CFM - 64 oz, s/n 51219, lot # Blower motor: Black & Decker 2 HP, 60 cycle, 240 VAC, 10 Amp, 10,000 RPM, Type CSC Blower #2 Spencer Turbo-Compressor 12 CFM - 35 oz, s/n 43903, lot # Rotometer: Air Flow Omega Engineering FL45200A series Range: SCFM Air velocity transmitter: JLC International model EE66 Range ft/min Orifice Plate #1: inches i.d, no bevel - Pipe Size 1.9 inch o.d, 1.5 inch i.d Orifice Plate # 2: inches i.d, no bevel - Pipe size 1.4 inch o.d, 1.0 inch i.d Liquid Circuit Rotometer: Liquid Flow 14

16 Omega Engineering FL46300 series Range: 0-17 GPM Mixing tank Capacity: 80 Gal Maximum allowable level - mixing tank: 50 Gal Capacity of feed & neutralization tanks: 115 Gal ph transmitter - neutralization tank: Alpha ph 500 transmitter ph probe: Cole-Parmer p/n Pump data Mixing tank pump motor: AMT Model , Pump head # Feed Tank Pump: Eastern Industries, model B 34 Max flow rate into column #1 = 10 GPM adjustable from 1-10 GPM Neutralization Tank Pump: Same as feed pump Metering Pump: Pulsatron E Plus Series, Maximum flow mil/min, Min flow 6.3 mil/min CO2 Flow Control CO2 gas feed system Mass Flow Controller Omega model FMA5542 / Rotameter - manual valve 15

17 Range = 0-80 L/min CO2 insertion points: Multiple locations CO2 Measurement System Alpha Omega Instruments: Series 9510 CO2 Analyzer Maximum input sample pressure: < 2.0 psi Sample flow rate: ml/min, 300 ml/min maximum Range 0-25 % Alpha Omega Instruments: Series 9500 CO2 / O2 monitor: O2 / CO2 range: 0-25 % Sample flow rate L/min Maximum input sample pressure < 1.0 psi Calibration standard: 20% CO2 in nitrogen balance Temperature Measurement Type T Thermocouples Control & data logging Opto22 16

Armfield Distillation Column Operation Guidelines

Armfield Distillation Column Operation Guidelines Armfield Distillation Column Operation Guidelines 11-2016 R.Cox Safety SAFETY GLASSES ARE REQUIRED WHEN OPERATING THE DISTILLATION COLUMN Wear gloves when mixing alcohol feedstock The column will become

More information

2. Determine how the mass transfer rate is affected by gas flow rate and liquid flow rate.

2. Determine how the mass transfer rate is affected by gas flow rate and liquid flow rate. Goals for Gas Absorption Experiment: 1. Evaluate the performance of packed gas-liquid absorption tower. 2. Determine how the mass transfer rate is affected by gas flow rate and liquid flow rate. 3. Consider

More information

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289 3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS Item #31289 The EASTWOOD 3 GALLON, OILLESS PANCAKE COMPRESSOR, with an Integral Air Regulator, efficiently supplies all compressed air requirements for

More information

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments Pegas 4000 MF Gas Mixer InstructionManual Contents I Table of Contents Foreword Part I Introduction 1 2 1 System overview... 2 2 Specifications... 3 Part II Installation 4 1 Rear panel connections...

More information

Operating Instructions

Operating Instructions Operating Instructions Before operating the thin film evaporator, please be aware of all safety concerns associated with this experiment: Burn hazard from the column and steam lines, Chemical hazards associated

More information

OPERATING MANUAL LO-CROSS-FLOW CF M

OPERATING MANUAL LO-CROSS-FLOW CF M VA FILTRATION USA 110 Dodd Court American Canyon, CA 94503 Tel : (707) 552 2616 Fax :(707) 552 3871 Web : www.vafiltration.com OPERATING MANUAL LO-CROSS-FLOW CF8-2-200M January, 2017 TECHNICAL SPECIFICATIONS

More information

Cover Page for Lab Report Group Portion. Pump Performance

Cover Page for Lab Report Group Portion. Pump Performance Cover Page for Lab Report Group Portion Pump Performance Prepared by Professor J. M. Cimbala, Penn State University Latest revision: 02 March 2012 Name 1: Name 2: Name 3: [Name 4: ] Date: Section number:

More information

1. Study the performance of a binary distillation column operated in batch mode.

1. Study the performance of a binary distillation column operated in batch mode. Goals for batch distillation using the East distillation column: 1. Study the performance of a binary distillation column operated in batch mode. 2. Determine the overall and local efficiency of the column

More information

OPERATION MANUAL NTF-60 Plus

OPERATION MANUAL NTF-60 Plus OPERATION MANUAL NTF-60 Plus Nitrogen Tire Filling Valve Stem Caps (Qty=200) Order P/N 436075 RTI Technologies, Inc 10 Innovation Drive York, PA 17402 800-468-2321 www.rtitech.com 035-81264-00 (Rev A)

More information

TECHNICAL DATA. Q= Cv S

TECHNICAL DATA. Q= Cv S Page 1 of 13 1. DESCRIPTION The Viking 4 inch Model G-4000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S Page 1 of 13 1. DESCRIPTION The Viking 6 Model G-6000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler

More information

OPERATION MANUAL NTF-15

OPERATION MANUAL NTF-15 OPERATION MANUAL NTF-15 Nitrogen Tire Filling Valve Stem Caps (Qty=200) Order P/N 436075 RTI Technologies, Inc 10 Innovation Drive York, PA 17402 800-468-2321 www.rtitech.com 035-81235-00 (Rev B) TABLE

More information

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY Page 1 of 13 1. DESCRIPTION The Viking 3 Model G-3000 Dry Valve Riser Assembly is equipped with a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry

More information

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC. 4075 East Market Street York, PA 17402 Manual P/N 035-80589-02 Table of Contents Components... 2 Test... 4 Recovery/Recycling... 5 Evacuation... 7 Charging...

More information

COMPRESSOR REPLACEMENT PROCEDURE (R-134A)

COMPRESSOR REPLACEMENT PROCEDURE (R-134A) 372 ROUTE 4 BARRINGTON, NH 03825 USA TEL (603) 868-5720 FAX (603) 868-1040 1-800-435-6708 COMPRESSOR REPLACEMENT PROCEDURE (R-134A) [ ] If possible operate the compressor with proper charge for 5 minutes

More information

Manual for continuous distillation

Manual for continuous distillation Manual for continuous distillation 1. Week 1: Objectives: Run the column at total reflux. When steady state is reached, take the sample from the top and bottom of the column in order to determine the overall

More information

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13 Page 1 of 13 1. Description The Viking 2 Model G-2000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler

More information

accidents which arise due to non-observance of these instructions and the safety information herein.

accidents which arise due to non-observance of these instructions and the safety information herein. 3 GALLON PANCAKE COMPRESSOR Model: 50959 CALIFORNIA PROPOSITION 65 WARNING: You can create dust when you cut, sand, drill or grind materials such as wood, paint, metal, concrete, cement, or other masonry.

More information

Air Operated Hydraulic Pumping Systems to 50,000 psi

Air Operated Hydraulic Pumping Systems to 50,000 psi High Pressure Equipment Air Operated Hydraulic Pumping Systems to 50,000 psi PS-10: 10,000 psi PS-20: 20,000 psi PS-30: 30,000 psi PS-40: 40,000 psi PS-50: 50,000 psi PS-90: 90,000 psi High Pressure air

More information

Cover Page for Lab Report Group Portion. Head Losses in Pipes

Cover Page for Lab Report Group Portion. Head Losses in Pipes Cover Page for Lab Report Group Portion Head Losses in Pipes Prepared by Professor J. M. Cimbala, Penn State University Latest revision: 02 February 2012 Name 1: Name 2: Name 3: [Name 4: ] Date: Section

More information

Operating Instructions

Operating Instructions Operating Instructions ProMinent CO2 Feeder CO2 - ProMinent P/N: 7746944 (Revision C), Date 09-14-12 Please completely read through these operating instructions first! Do not discard! The warranty shall

More information

Adsorption Unit Operating Procedures: CO2 Adsorption on to Activated Carbon

Adsorption Unit Operating Procedures: CO2 Adsorption on to Activated Carbon Adsorption Unit Operating Procedures: CO2 Adsorption on to Activated Carbon Background Safety Concerns Description of the Unit Switching the Unit On Preparation of the Unit Configuration of the Unit for

More information

FAULT CODE TROUBLESHOOTING INDEX

FAULT CODE TROUBLESHOOTING INDEX FAULT CODE TROUBLESHOOTING INDEX 1. Display indicates Change Filters 2. Display indicates Drip Tray Full Continuous Alarm will Sound 3. Display indicates Cold Fault 4. Display indicates Hot Fault 5. Display

More information

ECS Protector Nitrogen Generator PGEN-30 (PGEN-30E)

ECS Protector Nitrogen Generator PGEN-30 (PGEN-30E) ECS Protector PGEN-30 (PGEN-30E) Specifications For use under U.S. Patents 8,720,591, 9,144,700 and 9,186,533 Dimensions (cabinet): 24.5 (W) x 52.5 (H) x 8.5 (D) (622mm(W) x 1,334mm(H) x 216mm(D)) Dimensions

More information

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor) 1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor) 1. According to NFPA 99, SCFM is an acronym for. a) Surface Conditions at Fahrenheit Mercury b) Standard Conditions

More information

WATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL

WATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL Capital Controls Series 71V3000 The Series 71V3000 electrically-heated vaporizer automatically vaporizes and superheats liquid chlorine, sulfur dioxide or ammonia at a rate controlled by the gas feed system.

More information

Generating Calibration Gas Standards

Generating Calibration Gas Standards Technical Note 1001 Metronics Inc. Generating Calibration Gas Standards with Dynacal Permeation Devices Permeation devices provide an excellent method of producing known gas concentrations in the PPM and

More information

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel TANK MANAGER FOR TWO TANKS OPERATING MANUAL 10/31/11 C-More T6C L color touch panel 1 TABLE OF CONTENTS GENERAL...3 INSTALLATION...4 STONE TEST PROCEDURE...7 OPERATIONAL SUMMARY...7 AUTO CARBONATION...10

More information

BIOGAS COMBUSTION PLANT MAINTENANCE MANUAL

BIOGAS COMBUSTION PLANT MAINTENANCE MANUAL BIOGAS COMBUSTION PLANT MAINTENANCE MANUAL (PLANT MAINTENANCE MANUAL) Puente Gallego Landfill, Rosario (Argentina) ARIA.BIZ S.A. Montevideo 589, 7 floor 1019 Capital federal Argentina Tel: +54 11 5171

More information

TECHNICAL INFORMATION

TECHNICAL INFORMATION TECHNICAL INFORMATION Installation, Operation, and Maintenance Balston 75-96 and 75-98 Nitrogen Generation System Tower Pressure Gauge 5'-1" 3'-6" 7'-4" 6'-10 1/2" PLAN VIEW Figure 1 - Balston 75-96 and

More information

LNG Regulator Test Kit

LNG Regulator Test Kit OVERVIEW Chart provides a LNG Economizer/Regulator Test Kit to help save money and time by allowing a technician to more accurately and easily diagnose the operability of the pressure control regulator/economizer

More information

NTF-515. Operation Manual

NTF-515. Operation Manual NTF-515 Operation Manual RTI Technologies, Inc. 10 Innovation Drive York, Pennsylvania 17402 USA Phone: 717-840-0678 Toll Free: 800-468-2321 Web-site: www.rtitech.com Manual P/N: 035-81474-00 (RevA) TABLE

More information

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems Corporation Issued: 5/09 P/N: 600104 Rev. 2 Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems The Gas Addition Accessory permits the

More information

LAMINAR FLAME SPEED ANALYSIS USING PIV (PARTICLE IMAGE VELOCIMETRY)

LAMINAR FLAME SPEED ANALYSIS USING PIV (PARTICLE IMAGE VELOCIMETRY) LAMINAR FLAME SPEED ANALYSIS USING PIV (PARTICLE IMAGE VELOCIMETRY) OPERATIONAL PROCEDURES Venue: Project Room, Hopkinson Lab, CUED Experimental date: 25 March 2008 Prepared by: Cheng Tung Chong (ctc31@camacuk)

More information

SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL

SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL www.modsafe.com SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL WARNING: Do not attempt to operate this equipment without first reading and understanding the service manual enclosed with this device.

More information

Operating Instructions

Operating Instructions Operating Instructions Preparation for Start-up 1. If the computer system is logged off, log into the computer system. Log into the operator account on the computer. Please ask your TA for username and

More information

Technical Service Bulletin March 2015 TSB142.01

Technical Service Bulletin March 2015 TSB142.01 Technical Service Bulletin March 2015 TSB142.01 Commissioning Procedure for HYDRAcap This Technical Service Bulletin provides information for commissioning of a HYDRAcap membrane system in a water treatment

More information

Workhorse-15 Oxygen Generator

Workhorse-15 Oxygen Generator 11436 Sorrento Valley Road, San Diego CA 92121 USA 858-558-0202 Fax 858-558-1915 Workhorse-15 Oxygen Generator Model No. 5719, 5727, 5735 for Domestic and International Units Part number 1432 Revision

More information

VERTICAL AIR COMPRESSORS

VERTICAL AIR COMPRESSORS VERTICAL AIR COMPRESSORS MODEL NO: VE11C150, VE15C150, VE18C150 PART NO: 2226005, 2226000, 2226015 OPERATION & MAINTENANCE INSTRUCTIONS LS0615 INTRODUCTION Thank you for purchasing this CLARKE Vertical

More information

Inert Air (N2) Systems Manual

Inert Air (N2) Systems Manual INSTRUCTION MANUAL Inert Air (N2) Systems Manual N2-MANUAL 2.10 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT. GENERAL INFORMATION Positive pressure nitrogen gas pressurizing

More information

product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels

product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels 12.09 product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels Introduction: This manual covers the installation and operation of Humboldt FlexPanels for Triaxial and Permeability

More information

Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION

Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION Install your Blue River Technologies Port-A-Poly mixing system in a clean dry area.

More information

5890II GC Standard Operating Procedure 9/2/2005

5890II GC Standard Operating Procedure 9/2/2005 5890II GC Standard Operating Procedure 9/2/2005 This procedure is for the analysis of natural gas using the HP 5890II GC with the Restek ShinCarbon column. Detector Type: TCD Column Type: Restek Micropacked,

More information

HORIZONTAL BLADDER TANK

HORIZONTAL BLADDER TANK Balanced Pressure Proportioning System Reliable Foam System Requiring Only Water Power Perfect For Low Ceilings UL Listed, ASME, National Board Registered Bladder-UL162 Approved, High Tensile Pressure

More information

Operation Manual - PN A MENSOR MODEL 73 SHOP AIR BOOSTER

Operation Manual - PN A MENSOR MODEL 73 SHOP AIR BOOSTER Operation Manual - PN 0017946001 A MENSOR MODEL 73 SHOP AIR BOOSTER Mensor Model 73 Shop Air Booster System (750 psi Version) April 23, 2012 Trademarks / Copyright Mensor is a registered trademark of Mensor

More information

SUBSTATION MAINTENANCE ELECTRICAL OPERATING PROCEDURE

SUBSTATION MAINTENANCE ELECTRICAL OPERATING PROCEDURE Page 1 of 6 A. PURPOSE AND SCOPE This procedure establishes safe working practices for handling sulfur hexafluoride (SF 6 ) gas and release minimization practices. This document also specifies methods

More information

STANDARD OPERATING PROCEDURES. Andersen Instruments Federal Reference Method (FRM) Ambient Particulate (PM 10 /PM 2.

STANDARD OPERATING PROCEDURES. Andersen Instruments Federal Reference Method (FRM) Ambient Particulate (PM 10 /PM 2. STANDARD OPERATING PROCEDURES Andersen Instruments Federal Reference Method (FRM) Ambient Particulate (PM 10 /PM 2.5 ) Sampler (RAAS) AMBIENT AIR MONITORING PROGRAM for the 130 LIBERTY STREET DECONSTRUCTION

More information

Glove Box Installation Manual

Glove Box Installation Manual Glove Box Installation Manual 1998 by M. Braun Company File: GB-UNI-INS.DOC! Edition 08-00 by M. Boutin! Subject to be changed without notice Glovebox Installation Your Glove box has been fully assembled,

More information

Installation of Your SprayMaster System

Installation of Your SprayMaster System Installation of Your SprayMaster System 1. At the installation site, remove all equipment from the corrugated box and the polyethylene drum and replace the drum lid. Check the picture to identify each

More information

Standard Operating Procedure Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) - Thermo Scientific icap 6300

Standard Operating Procedure Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) - Thermo Scientific icap 6300 Standard Operating Procedure Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) - Thermo Scientific icap 6300 The Thermo Scientific icap 6300 Inductively Coupled Plasma Optical Emission

More information

Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat. Version 5.1

Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat. Version 5.1 Project: Novel Electron Bubble Particle Detector Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat Version 5.1 (Using side filling line) Hand Processed Changes HPC No. Date

More information

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1 Dry 131h 1. DESCRIPTION The Viking Model G-1 Maintenance Air Compressor is an electric motor-driven, aircooled, single-stage, oil-less compressor. The unit is equipped with a check valve and provides a

More information

Exercise 2-3. Flow Rate and Velocity EXERCISE OBJECTIVE C C C

Exercise 2-3. Flow Rate and Velocity EXERCISE OBJECTIVE C C C Exercise 2-3 EXERCISE OBJECTIVE C C C To describe the operation of a flow control valve; To establish the relationship between flow rate and velocity; To operate meter-in, meter-out, and bypass flow control

More information

ACV-10 Automatic Control Valve

ACV-10 Automatic Control Valve ACV-10 Automatic Control Valve Installation, Operation & Maintenance General: The Archer Instruments ACV-10 is a precision automatic feed rate control valve for use in vacuum systems feeding Chlorine,

More information

ABRASIVE REGULATOR II

ABRASIVE REGULATOR II ABRASIVE REGULATOR II 13096 Abrasive Regulator II TABLE OF CONTENTS Contact Information and Customer & Technical Service... 1 1 Introduction... 1 2 Abrasive Regulator... 1 Description:... 1 2.1 Regulator

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 333a 1. Description Viking supervised Surefire Preaction Systems Utilize the Viking G-3000P Valve. The small profile, lightweight, pilot-operated Viking G-3000P Valve comes complete

More information

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE February 9, 1998 Foam 101a A BLADDER TANK WITH 1. DESCRIPTION A Wet Pipe Bladder Tank Foam/Water System is a standard wet pipe automatic sprinkler system capable of discharging a foam/water solution automatically

More information

Capital Controls Series NXT3000 Modular design gas feed system with self-contained automatic switchover capability.

Capital Controls Series NXT3000 Modular design gas feed system with self-contained automatic switchover capability. Capital Controls Series NXT3000 Modular design gas feed system with self-contained automatic switchover capability. The Series NXT3000 Gas Feed System is a family of vacuum-operated, solution-feed gas

More information

Chapter 3 EXPERIMENTAL: EQUIPMENT, SET-UP, AND PROCEDURE

Chapter 3 EXPERIMENTAL: EQUIPMENT, SET-UP, AND PROCEDURE Chapter 3 EXPERIMENTAL: EQUIPMENT, SET-UP, AND PROCEDURE 72 3.0 Introduction The experimental work was carried out in three stages. First stage: a laboratory scale single nozzle horizontal jet ejector

More information

VERTICAL AIR COMPRESSORS

VERTICAL AIR COMPRESSORS VERTICAL AIR COMPRESSORS MODEL NO: VE15C150, VE18C150, VE25C150 PART NO: 2226010, 2226020, 2226025 OPERATION & MAINTENANCE INSTRUCTIONS LS0715 INTRODUCTION Thank you for purchasing this CLARKE Vertical

More information

Portable Hydrostatic Electric Test Pump. Procedure Manual. Dixon 800 High Street Chestertown, MD Fax: dixonvalve.

Portable Hydrostatic Electric Test Pump. Procedure Manual. Dixon 800 High Street Chestertown, MD Fax: dixonvalve. Portable Hydrostatic Electric Test Pump Procedure Manual Dixon 800 High Street Chestertown, MD 21620 800-355-1991 Fax: 800-283-4966 dixonvalve.com Dixon's Portable Electric Hydrostatic Test Pump (E.T.P.)

More information

8.1 Calibration of gas sensors

8.1 Calibration of gas sensors 8.1 Calibration of gas sensors! CAUTION! Calibration gas handling and precautions Observe safety regulation and accident prevention regulations when using or handling test gases. Use test gases in well-ventilated

More information

NTF-230 OPERATION MANUAL

NTF-230 OPERATION MANUAL NTF-230 OPERATION MANUAL MAHLE Aftermarket Inc., Service Solutions 10 Innovation Drive York, Pennsylvania 17402 USA Phone: 717-840-0678 Toll Free: 800-468-2321 Web-site: www.servicesolutions.mahle.com

More information

AIR COMPRESSOR. Failure to follow all instructions as listed below may result in electrical shock, fire, and/or serious personal injury.

AIR COMPRESSOR. Failure to follow all instructions as listed below may result in electrical shock, fire, and/or serious personal injury. 2 GALLON AIR COMPRESSOR Model: 7517 DO NOT RETURN TO STORE. Please CALL 800-348-5004 for parts and service. CALIFORNIA PROPOSITION 65 WARNING: You can create dust when you cut, sand, drill or grind materials

More information

Standard Operating Procedure #COE-SOP-0001 Chemical Fume Hood Operation

Standard Operating Procedure #COE-SOP-0001 Chemical Fume Hood Operation Standard Operating Procedure # Chemical Fume Hood Operation Facility: NMSU College of Engineering Laboratories Written by: Juanita Miller, Safety Specialist, miljgh@nmsu.edu (575)-646-1292 Scope: This

More information

FX134, FX1234, FX3030 Problem and Solutions

FX134, FX1234, FX3030 Problem and Solutions FX134, FX1234, FX3030 Problem and Solutions Unit Will Not Power Up Turn the power switch on. The unit LCD will display revision program and filter life within 3 to 5 seconds after turning on unit. If this

More information

VERTICAL BLADDER TANK

VERTICAL BLADDER TANK Balanced Pressure Proportioning System Reliable Foam System Requiring Only Water Power Perfect For Tight Spaces UL Listed, ASME, National Board Registered Bladder-UL162 Approved, High Tensile Pressure

More information

CAPITAL CONTROLS SERIES NXT3000

CAPITAL CONTROLS SERIES NXT3000 CAPITAL CONTROLS SERIES NXT3000 Modular design gas feed system with self contained automatic switchover capability. The Series NXT3000 Gas Feed System is a family of vacuumoperated, solution-feed gas dispensing

More information

Appendix D: SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor. Description and Principle of Operation

Appendix D: SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor. Description and Principle of Operation Page 1 of 19 : SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor Description and Principle of Operation The photoacoustic multi-gas monitor (INNOVA 1412, Innova AirTech Instruments, Denmark) is a highly

More information

ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS

ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS READ ALL INSTRUCTIONS PRIOR TO INSTALLATION AND OPERATION TO AVOID POSSIBLE INJURY Warning: Always consider any accumulator to contain pressure until proven

More information

HGC-200 Hydro Gas Chlorinator

HGC-200 Hydro Gas Chlorinator HGC-200 Hydro Gas Chlorinator ProMinent Fluid Controls Pty Ltd Head Office: Unit 4, 4 Narabang Way BELROSE NSW 2085 AUSTRALIA (PO Box 85, BELROSE WEST NSW 2085) Phone: (02) 9450 0995 Fax: (02) 9450 0996

More information

Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System. Dwg. No

Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System. Dwg. No Rev. ECO Description Checked Approval Date 01 32- Release M. Smith Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System Dwg. No. 32-06003.05 Revision 01 June 18, 2007 1 1. Introduction 1.1.

More information

The Discussion of this exercise covers the following points:

The Discussion of this exercise covers the following points: Exercise 3-2 Orifice Plates EXERCISE OBJECTIVE In this exercise, you will study how differential pressure flowmeters operate. You will describe the relationship between the flow rate and the pressure drop

More information

Modeling Case Study: Surge Tanks, Valves, Level sensors, and modeling

Modeling Case Study: Surge Tanks, Valves, Level sensors, and modeling Modeling Case Study: Surge Tanks, Valves, Level sensors, and modeling By Peter Woolf (pwoolf@umich.edu) University of Michigan Michigan Chemical Process Dynamics and Controls Open Textbook version 1.0

More information

MANUAL BE SERIES Test Benches

MANUAL BE SERIES Test Benches The CustomCrimp Manual BE Series Test Benches are designed with features that make proof and burst testing of hydraulic hose assemblies a quick and easy procedure. CUSTOMIZED AND SPECIAL DESIGN BENCHES

More information

Table of Contents Want full page pictures with most important parts labeled in the beginning.

Table of Contents Want full page pictures with most important parts labeled in the beginning. 1 Table of Contents Want full page pictures with most important parts labeled in the beginning. Precool Procedures (Perform before cooling down): 1. Check N2 and 4He gas tanks to be sure that there is

More information

OVERVIEW pg 3. Major Points to Consider pg 3 Minor Points to Consider pg 3. INSTRUCTIONS pg 4

OVERVIEW pg 3. Major Points to Consider pg 3 Minor Points to Consider pg 3. INSTRUCTIONS pg 4 TABLE OF CONTENTS OVERVIEW pg 3 Major Points to Consider pg 3 Minor Points to Consider pg 3 INSTRUCTIONS pg 4 How Does Nordic Freeze Work pg 4 How Long Will the Ice Plug Take to Form pg 4 How Do I Know

More information

I. Subject: Compressed gas cylinders, regulators, and portable liquid systems.

I. Subject: Compressed gas cylinders, regulators, and portable liquid systems. I. Subject: Compressed gas cylinders, regulators, and portable liquid systems. II. Objective: To provide safe and effective use, storage, and transport of therapeutic gases. II. Procedure: A. Compressed

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

Winter Shut Down Procedure

Winter Shut Down Procedure Winter Shut Down Procedure Although we live in Beautiful BC, we still experience freezing temperatures. To minimize the risk of freeze damage to your irrigation system, you ll need to winterize it. Our

More information

SERVICE MANUAL MODEL BA600AMST-S1 BREATHING AIR PANEL

SERVICE MANUAL MODEL BA600AMST-S1 BREATHING AIR PANEL SERVICE MANUAL MODEL BA600AMST-S1 BREATHING AIR PANEL WARNING: Do not attempt to operate this equipment without first reading and understanding the service manual enclosed with this device. 2/05 GENERAL

More information

SERVICE MANUAL MODEL BA100BMST 100 SCFM PORTABLE AIR PANEL

SERVICE MANUAL MODEL BA100BMST 100 SCFM PORTABLE AIR PANEL Product Manual MST Portable Air Filtration System SERVICE MANUAL MODEL BA100BMST 100 SCFM PORTABLE AIR PANEL WARNING: Do not attempt to operate this equipment without first reading and understanding the

More information

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching Standard Operating Procedure for PlasmaQuest ECR II Etching Authors: Rev. 00: Al Schmalz, Vighen Pacradouni and Jeff Young, December 21, 1998 Rev. 01: Dr. Andras G. Pattantyus-Abraham, May 24, 2005 Rev.

More information

STANDARD OPERATING PROCEDURE

STANDARD OPERATING PROCEDURE TO BE USED BY PROPERLY TRAINED AND AUTHORIZED PERSONNEL ONLY This document serves as a guide for the probable hazards of this space and how to remediate those hazards. It is important to remember that

More information

Running the LiCor 6400 Infra Red Gas Analyzer (IRGA) with 4 whole-plant cuvettes attached

Running the LiCor 6400 Infra Red Gas Analyzer (IRGA) with 4 whole-plant cuvettes attached Running the LiCor 6400 Infra Red Gas Analyzer (IRGA) with 4 whole-plant cuvettes attached Note: You must read the Primer manual Sections 1-6 before using the IRGA. The manual is located in the wall cabinet

More information

Mass Spec will not Autotune

Mass Spec will not Autotune Mass Spec will not Autotune Applies to 5973A/N MSD What could be the problem? There could be several things that would cause your Mass Spec not to Autotune. The most common, easily corrected Autotune problems

More information

Irrigation System Winterization and Pressurization Procedures

Irrigation System Winterization and Pressurization Procedures Irrigation System Winterization and Pressurization Procedures Introduction Any time that an irrigation system is filled and pressurized, or when the system is drained and water flushed from the system,

More information

INSTRUCTION MANUAL FOR MODEL 7360V VERTICAL CURING CHAMBER Revision E May

INSTRUCTION MANUAL FOR MODEL 7360V VERTICAL CURING CHAMBER Revision E May INSTRUCTION MANUAL FOR MODEL 7360V VERTICAL CURING CHAMBER Revision E May 2015 98-0520 S/N 2001 N. Indianwood Ave. Tulsa, Oklahoma 74012 U.S.A. TEL: (918) 250-7200 FAX: (918) 459-0165 E-mail: chandler.sales@ametek.com

More information

B. Assemble the Method-25 sample train with a heated probe/filter.

B. Assemble the Method-25 sample train with a heated probe/filter. 6/30/2015 VOC Reporting, Inc. Method 25 Heated Controller Operating Instructions. pg. 1 of 5 INSTRUCTIONS FOR EPA METHOD-25 FIELD SAMPLE COLLECTION USING A VRi HEATED PROBE AND FILTER ASSEMBLY Introduction:

More information

ABRASIVE REGULATOR II

ABRASIVE REGULATOR II ABRASIVE REGULATOR II 13096 Abrasive Regulator II TABLE OF CONTENTS 1 Introduction... 1 2 Abrasive Regulator... 2 2.1 Regulator Installation... 2 Location... 2 Attaching the Regulator to the Machine...

More information

Copyright, 2005 GPM Hydraulic Consulting, Inc.

Copyright, 2005 GPM Hydraulic Consulting, Inc. Troubleshooting and Preventive Maintenance of Hydraulic Systems Learning to Read the Signs of Future System Failures Instructed by: Al Smiley & Alan Dellinger Copyright, 2005 GPM Hydraulic Consulting,

More information

Exercise 2-2. Second-Order Interacting Processes EXERCISE OBJECTIVE DISCUSSION OUTLINE. The actual setup DISCUSSION

Exercise 2-2. Second-Order Interacting Processes EXERCISE OBJECTIVE DISCUSSION OUTLINE. The actual setup DISCUSSION Exercise 2-2 Second-Order Interacting Processes EXERCISE OBJECTIVE Familiarize yourself with second-order interacting processes and experiment with the finer points of controller tuning to gain a deeper

More information

INTENDED USE TECHNICAL SPECIFICATIONS

INTENDED USE TECHNICAL SPECIFICATIONS 1/2IN. HEAVY-DUTY AIR IMPACT WRENCH OWNER S MANUAL WARNING: Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result

More information

OWNER S MANUAL. Page: 1 of 8

OWNER S MANUAL. Page: 1 of 8 Air Needle Scaler OWNER S MANUAL WARNING: Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result in serious personal

More information

User Manual for the Mars Calibration Bench

User Manual for the Mars Calibration Bench User Manual for the Mars Calibration Bench Fall 2013 Table of Contents Table of Contents Table of Contents... iii Introduction... v Chapter 1: The Mars Calibration Bench... 1 What Is the Mars Calibration

More information

TECHNICAL DATA. than the water inlet pressure to the concentrate

TECHNICAL DATA. than the water inlet pressure to the concentrate Foam102a 1. DESCRIPTION The Viking Low Flow Foam/Water proportioning system, is a UL Listed and FM Approved system, for use with 3M foam concentrates. This system consists of a standard wet pipe sprinkler

More information

High Pressure Chem-SCAN Operating Manual

High Pressure Chem-SCAN Operating Manual GAS INLET VALVES REACTIVE GAS PRESSURE RELIEF VALVE INERT GAS VENT VENT VALVE REACTOR INLET VALVES PRESSURE TRANSDUCERS REACTORS STIRRER & THERMOWELL HEATING JACKET STIRRER MOTORS High Pressure Chem-SCAN

More information

The Discussion of this exercise covers the following points: Range with an elevated or suppressed zero Suppressed-zero range Elevated-zero range

The Discussion of this exercise covers the following points: Range with an elevated or suppressed zero Suppressed-zero range Elevated-zero range Exercise 4-3 Zero Suppression and Zero Elevation EXERCISE OBJECTIVE In this exercise, you will learn the effect that mounting a pressure transmitter above or below the reference level has on the hydrostatic

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 331a 1. Description Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilize the Viking G-3000P Valve. The small profile, lightweight, pilot-operated

More information

Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology

Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology Jim Woodard Vice President of Sales Bryant Woods Lead Project Engineer 4/3/18 Page 1 Objectives Impact

More information