1 Stanford University Gas Cabinet Installation and Performance Criteria I. Application Gas cabinets are ventilated enclosures that are used to isolate hazardous gas cylinders from the surrounding work place. This protocol is to be used by Stanford University in-house personnel (e.g., HVAC Shop) and qualified contractors to certify ventilation performance of new gas cabinets during the commissioning phase of new buildings or renovations, and to annually re-certify gas cabinets in existing buildings. II. Regulations Gas cabinets are subject to the regulatory requirements of: Santa Clara County Toxic Gas Ordinance, Section B11-384(b) Fire Code, 2007 California Fire Code: and Cal/OSHA, 8 CCR 5143(a)(5) III. Operational Requirements A) Equipment Requirements: Gas cabinets shall have the following features: 1. be constructed of steel (12 gauge min.) and be appropriately listed by UL or FM, or approved by local fire authority 2. have interiors that are treated, coated, or constructed of materials that are compatible with material being stored used 3. have a corrosion-resistant fire sprinkler installed inside the cabinet, if used with Highly Toxic or Toxic materials 4. be provided with self-closing doors 5. be provided with self-closing access ports or fire-rated windows 6. be provided with automatic fire sprinkler systems, when required 7. be provided with continuous gas detection equipment, when required. B) Installation Requirements: When gas cabinets are installed, gas cabinets shall: 1. be connected to a treatment system (if used with Highly Toxic 1 or Toxic 2 materials) 2. be seismically anchored 3. labeled with chemical name, hazard class of gas, concentration of mixtures, indicate to tool or apparatus it feeds, along with NFPA 704 diamond sticker with hazard ratings. C) Storage Requirements: The maximum number of cylinders that may be stored/used in a gas cabinet is three. Exception: For lecture bottles which are less than 1 lb, 100 cylinders of Highly Toxic or Toxic materials may be stored/used in the gas cabinet. 1 Highly toxic gases as defined by the Fire Code have an LC50 (median lethal concentrations in air) no more than 200 ppm. 2 Toxic gases have an LC50 greater than 200 ppm and no more than 2000 ppm.
2 D) Performance Criteria: Gas cabinets shall operate: 1. with an average face velocity at face of access ports or windows of 200 fpm with no point less than 150 fpm 2. with inward flow 3. at negative pressure in relation to their surrounding area E) Frequency of Certification: The gas cabinet must be certified following Attachment A Stanford University Gas Cabinet Certification Protocol according the following schedule: 1. upon installation 2. annually 3. after alterations or maintenance F) Notification: Project managers are responsible for informing the appropriate department as indicated below when gas cabinets are coming on line so that the gas cabinet is integrated into the annual certification process: For main campus, contact: Stanford University s HVAC Shop: For School of Medicine, contact: Engineering & Maintenance at
3 Attachment A Stanford University Gas Cabinet Certification Protocol A. Qualitative Evaluation - Smoke Test (Note: This section demonstrates inward flow and that gas cabinet is under negative pressure in relation to area) Equipment/ Materials Required For Certification Titanium tetrachloride, dry ice in water, or other means of visualizing airflow Leather gloves if dry ice is used, latex gloves if other means are used 1) From open face of access port and location around gas valves, dispense smoke in direction perpendicular to exhaust flow. 2) Observe flow patterns to see if the smoke is contained within the gas cabinet. 3) Record all collected data on SU Gas Cabinet Certification Form, or equivalent. 4) If the smoke is contained, the gas cabinet fulfills this portion of the test. B. Quantitative Evaluation - Face velocity measurement Equipment/ Materials Required For Certification Thermal anemometer (calibrated as specified by manufacturer) Tape measure 1) Take face velocity measurements in the face plane (access port) of the opened window For square windows: a) divide the opening into quarters by bisecting the height and width; b) take velocity measurement in the center of each quarter; c) document measurements. For rectangular windows: a) divide the width into thirds and height into halves; b) measure the center of each sixth; c) document measurements. 2) Calculate average face velocity. 3) Record all collected data on SU Gas Cabinet Certification form, or equivalent. 4) If average face velocity is greater than or equal to 200 fpm; and minimum velocity is no less than 150 fpm, the gas cabinet fulfills this portion of the test. C) Equipment Inspection 1) Self Closing Doors: Open gas cabinet doors and observe that they close automatically and latch. 2) Self Closing Windows/Ports: Open gas cabinet windows/ports and observe that they close automatically close. 3) Record all findings on SU Gas Cabinet Certification Form, or equivalent. D) Passing/Failing Gas Cabinets For units that PASS: 1) If the gas cabinet meets sections A, B and C of this protocol: (a) document that unit has passed using SU Gas Cabinet Certification form, or equivalent, and (b) apply certification SU Gas Cabinet Certification Sticker, or equivalent. SU Gas Cabinet Survey
4 Gas Cabinet ID #: Average Face Velocity: Certified by/date: Certification Due: IH Report: ) Certification records are to be maintained 5 years by SU HVAC or E&M. [NOTE: If a qualified contractor conducts the certification, the project manager must transfer certification records to the SU HVAC Shop or E&M, as appropriate.] For units that FAIL, immediately: 1) Inform users and facility manager the unit has FAILED performance inspection and may not be used until the unit has been certified. Post signage on gas cabinet. 2) Document that unit has failed performance inspection. 3) Repeat performance evaluation after an authorized repair/ maintenance personnel has been able to make necessary adjustments/ repairs.
5 Stanford University Gas Cabinet Certification Form Date: Technician/Company: Survey Equipment: Thermal anemometer Model # Unit # Last Date of Calibration Gas Cabinet Information Building, Room # Gas Cabinet Local ID Make/Model of Gas Cabinet Program ID # (assigned by Stanford) Fan System # 1. Qualitative Evaluation - Smoke Test: Smoke generated around face of perimeter contained? Y/N 2. Quantitative Evaluation - Velocity Measurements: Average Velocity (fpm): (or attach digital printout) Minimum Velocity (fpm) Accept (Y / N) Comments: 3. Equipment Inspection: Item Yes/No Comments Doors close and latch automatically? Y/N Self Closing Windows/Ports close automatically? Y/N 4. Overall Assessment: Gas Cabinet PASSES? Y/ N Comments:
Section 1.3: PRESSURE VESSEL COMPONENTS AND SYSTEMS AND COMPRESSED GAS CYLINDERS
Section 1.3: PRESSURE VESSEL COMPONENTS AND SYSTEMS AND COMPRESSED GAS CYLINDERS TABLE OF CONTENTS Page A. Regulations, Standards and References 1.3-2 B. Scope 1.3-2 C. Design Features for the Storage
More informationTYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS
TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility,
More informationKansas State University Fume Hood Operation
FUME HOODS 2009, PAGE 1 FUME HOODS Kansas State University Fume Hood Operation One of the primary safety devices in a laboratory is a chemical fume hood. A well-designed hood, when properly installed and
More informationLaboratory Safety Review Checklist One Shields Ave Davis, CA Phone: (530) Fax: (530)
http://safetyservices.ucdavis.edu Laboratory Safety Review Checklist One Shields Ave Davis, CA 95616 Phone: (530)752-1493 Fax: (530)752-4527 E-mail: researchsafety@ucdavis.edu U C Davis Environmental Health
More informationLaboratory Ventilation. Environmental, Health, and Safety
No.: BCF020.054 Page: 1 of 7 RECORD OF REVISIONS Date Rev # Details of Change 09/13 1 Updated job titles to reflect ICON job descriptions. Added a definition for Approved Ventilation Contractor and included
More informationMANAGEMENT PROCEDURE FOR LABORATORY VENTILATION
UNIVERSITY OF ALASKA FAIRBANKS SAFETY SYSTEM POLICY AND PROCEDURE DOCUMENT NUMBER: 508 ISSUE DATE: SEPTEMBER 1996 SUBJECT: Management Procedure for Laboratory Ventilation MANAGEMENT PROCEDURE FOR LABORATORY
More information2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A
2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A PROJECT ADDRESS TESTING AUTHORITY TELEPHONE Checked by/date Enforcement Agency Use GENERAL INFORMATION OF BLDG. PERMIT PERMIT # BLDG. CONDITIONED FLOOR
More informationGas Cabinets and Valve Manifold Boxes: Applying CGA G13- Rev 2015 to Gas Delivery Equipment
Gas Cabinets and Valve Manifold Boxes: Applying CGA G13- Rev 2015 to Gas Delivery Equipment The Standard Governing the Storage & Use of Silane: Compressed Gas Association s Publication CGA G-13 2015: Storage
More informationLaboratory Safety Review Checklist One Shields Ave Davis, CA Phone: (530) Fax: (530)
http://safetyservices.ucdavis.edu Laboratory Safety Review Checklist One Shields Ave Davis, CA 95616 Phone: (530)752-1493 Fax: (530)752-4527 E-mail: ehsdesk@ucdavis.edu U C Davis Environmental Health and
More informationCORROSION AT THE AIR-WATER INTERFACE REMOVE THE GAS
CORROSION AT THE AIR-WATER INTERFACE There are three (3) physical attributes of oxygen that explain why almost all corrosion in wet pipe fire sprinkler systems occurs in close proximity to trapped air
More informationPiped Air SCBA Refilling System Standard
WALT WHITE Fire Chief 5770 Freeport Blvd., Suite 200 Sacramento, CA 95822-3516 Ph: (916) 808-1300 Fax: (916) 808-1629 www.sacfire.org Piped Air SCBA Refilling System Standard SCOPE: This specification
More informationMott Manufacturing Limited
Mott Manufacturing Limited 452 Hardy Road, Brantford, Ontario, Canada, N3T 5L8. Telephone: 519-752-7825 Fax: 519-752-2895 Web Site: www.mott.ca Fume Hood Performance Test Test Date: 9-Sep-08 Model Number:
More informationTEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY
Page 1 of 9 ISSUED: 5/00 REVISED: 08/06 Introduction Purpose: In accordance with applicable regulations and Temple University, this policy was developed to minimize exposure to Ethylene Oxide. Applicability
More informationMott Manufacturing Limited
Mott Manufacturing Limited 452 Hardy Road, PO Box 1120, Brantford, Ontario, Canada, N3T 5T3. Telephone: 519-752-7825 Fax: 519-752-2895 Web Site: www.mott.ca Fume Hood Performance Test Test Date: January
More informationSTORAGE OF COMPRESSED GAS CYLINDERS (SAF-SPI-15)
1. PURPOSE: This SPI has been developed to ensure compliance to government regulations and to provide clear standards for storage of compressed gases. 2. CONTEXT The storage of compressed gases is legislated
More informationGUIDELINES FOR CONDUCTING HYDROGENATION REACTIONS
Page 1 of 5 GUIDELINES FOR CONDUCTING 1. Definition of Hydrogenation and Hydrogenolysis Reactions Hydrogenation reactions are synthetic transformations involving hydrogen, metallic catalysts (such as nickel,
More informationResearch Laboratory Safety Self-Inspection: Chemical & Physical Safety Checklists
Research Laboratory Safety Self-Inspection: Chemical & Physical Safety Checklists Principal Investigator: Lab Building: Lab Rooms: Department: Inspector Name: Inspection Date: Question Y N NA Comments
More informationCTG Certification Protocol -- Version 3.0 SUMMARY
Date of Test: Test Report Number: SUMMARY Date of Prior Certification: Certified by: Re-certification Due Date: Unit Description: Make : Model: Serial Number: Location: CERTIFIER INFORMATION Name: Client
More informationUTMB RESPIRATORY CARE SERVICES GUIDELINES Respiratory Care Services Medical Gas Cylinder Storage, Use and Transport
Page 1 of 4 I. Title Medical Gas. II. III. IV. Policy This policy applies to all departments and areas where medical gases are used, stored or transported for patient care activities. Respiratory Care
More informationFumehood Performance Test Report
Fumehood Performance Test Report 6' Protector ECHO IPA Modified NIH Test Prepared For Labconco Corporation Prepared By Report Date: 02-12-2015 Project No.: 142327 AccuTec Services, Inc*320 NW Capital Dr*Lee's
More informationA. Evaluation of the written program
A. Evaluation of the written program Begin your audit with an evaluation of the written respiratory protection program. In addition to the operating procedures describing respirator selection and use in
More informationBasic & Controlled Atmosphere Glove Boxes
I N T R O D U C T I O N Precise Basic and Controlled Atmosphere Glove Boxes provide a leak-tight environment for work with contamination-sensitive materials. Precise Basic Glove Boxes are simple, economical
More informationESTATES OFFICE OPERATIONS WORKS INSTRUCTIONS WI 6. Fume Cupboards, Ventilated Cabinets, Local Exhaust Ventilation
ESTATES OFFICE OPERATIONS WORKS INSTRUCTIONS WI 6 ISSUE RECORD Revision Description Updated Date Compiled by Review date 01 Modified Mar 2010 J Cummins Mar 2011 02 Reviewed Aug 2011 J Cummins Aug 2012
More informationDangerous Gas Standard
Dangerous Gas Standard Purpose The purpose of this standard is to establish the minimum standards required for researchers at Clemson University that utilize dangerous gases (i.e., toxic, highly toxic,
More informationVision Painting Inc Safety Management System
Abrasive Blasting 1. PURPOSE The purpose of this program is to provide training and qualification guidelines for the safe operation of Abrasive Blasting. The Safety Officer is responsible for facilitating
More informationTECHNICAL DATA Q= C. Table 1 - Specifications
September 25, 2013 Pressure Regulation 537a 1. Description The Model B-3 Pilot Operated Pressure Control Valve is a factory assembled unit. The unit consists of a Model J-2 Halar coated Flow Control Valve,
More informationInstallation of Ballast Water Management Systems
(Sept 2015) (Rev.1 May 2016) Installation of Ballast Water Management Systems 1. Application In addition to the requirements contained in BWM Convention (2004), the following requirements are applied to
More informationThe primary purpose of laboratory fume hoods is to keep toxic or irritating vapors out of the general laboratory working area.
Introduction Welcome to the Biosafety Cabinets and Fume Hoods Training Course (OHS_BIO304). This training is required for anyone that will be conducting work and/or research that requires the use of a
More informationRespiratory Protection
Respiratory Protection Purpose The purpose is to establish a set of guidelines for the selection of respiratory protection equipment, situations for its use, and training in the use of the respirator required.
More informationLaboratory Inspection Checklist
Date: Time: Inspector(s): Laboratory Information Department Principal Investigator (PI)/Laboratory Instructor PI telephone number PI e-mail address Building Laboratory room number(s) Backup Safety Contact
More informationCompressed Gas Cylinders - Guideline
Environmental Health and Safety Compressed Gas Cylinders - Guideline Date of Issuance: 1/10/18 Revision Number: Initial Revision Date: Prepared by: EH&S 1. Purpose Carnegie Mellon University has developed
More informationChemical Feed Equipment Floor-Mounted Gas Dispenser - Series CH4200
Specification Bulletin (rev.01) Series CH4200 Chemical Feed Equipment Floor-Mounted Gas Dispenser - Series CH4200 Easy, fast& accurate digital with 11 points calibration Laser sensor offering actual feed
More informationClass 2 Gases Learning Tool
Class 2 Gases Learning Tool This work has been produced by DGL (Aust) Pty Ltd This Learner s Guide is about the skills and knowledge required to store and warehouse Class 2 Gases at DGL (Aust) facilities.
More informationCommon Discrepancies Uncovered on ADCI Diving Contractor & Training Program Audits
Common Discrepancies Uncovered on ADCI Diving Contractor & Training Program Audits Ways to Set Your Company or School Up For Success on ADCI Audits and Reduce Costs In most instances, all discrepancies
More informationThis written Compressed Gas Plan is kept at the corporate office and in the written Safety & Health Program.
Safety & Health Program 10627 Midwest Industrial Boulevard, St. Louis, MO Phone: 314-785-6425 Fax: 314-785-6426 Compressed Gas Plan Purpose It is the policy of EMA to permit only trained and authorized
More informationAPPENDIX A SAMPLE FHT SPECIFICATION (This recommended FHT specification is available from
SAMPLE FHT SPECIFICATION (This recommended FHT specification is available from www.nebb.org) NEBB recommends that these FHT Specifications be referenced as related documents in other appropriate sections
More informationSafety Procedures on Vacating Premises
Safety Procedures on Vacating Premises Policy From time to time Departments, Units and Centres of HKU vacate accommodation as a result of relocation or major refurbishment. When any accommodation is vacated,
More information1.0 PURPOSE 2.0 SCOPE 3.0 DEFINITIONS. ANSI: American National Standards Institute. CCC: Chemical Control Centre
Revision Date: 5/17/2016 Page: 1 of 13 Health & Safety has developed the emergency eyewash & safety shower equipment procedure which will be implemented in 3 phases over the next four years. Phase 1 will
More informationTitle: Abrasive Blasting Effective Date: 11/17/2014 Control Number: THG_0034 Revision Number: 1 Date: 10/22/2015 Annual Review Completed: 5/13/2015
Title: Abrasive Blasting Effective Date: 11/17/2014 Control Number: THG_0034 Revision Number: 1 Date: 10/22/2015 Annual Review Completed: 5/13/2015 Abrasive Blasting CONTENTS I. PURPOSE II. SCOPE III.
More informationCITY AND COUNTY OF DENVER CR&CF RISK UNIT Compressed Gas Safety Standard
CITY AND COUNTY OF DENVER CR&CF RISK UNIT 65.5.11 Compressed Gas Safety Standard 1.0 Introduction 2.0 Scope This standard has been developed to protect all City and County of Denver employees and contractors
More informationTEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY
Purpose In accordance with applicable regulations and Temple University, this policy was developed to minimize exposure to glutaraldehyde. Applicability This policy is applicable to all Temple University
More informationCarnegie Mellon University. Toxic and Highly Toxic Gas Handling Program
Carnegie Mellon University Toxic and Highly Toxic Gas Handling Program Toxic and Highly Toxic Gas Handling Program Scope and Background The Carnegie Mellon University Toxic and Highly Toxic Gas Handling
More informationCOMPRESSED GASES CHAPTER 53
CHAPTER 53 COMPRESSED GASES SECTION 5301 GENERAL 5301.1 Scope. Storage, use and handling of compressed gases in compressed gas containers, cylinders, tanks and systems shall comply with this chapter, including
More informationStatesville, NC. Results of AM ASHRAE 110 Laboratory Fume Hood Performance Evaluations Venturi Hood
Statesville, NC Results of AM ASHRAE 11 Laboratory Fume Hood Performance Evaluations Venturi Hood January, 217 Prepared By: Exposure Control Technologies Inc. 231-C East Johnson Street Cary, NC 27513 Phone:
More informationLaboratory and Satellite Rodent Housing
University of Louisville Institutional Animal Care and Use Committee Policies and Procedures Laboratory and Satellite Rodent Housing Policy: Although strongly discouraged, the IACUC acknowledges that there
More informationTECHNICAL DATA. Table 1 - Specifications
Page 1 of 6 1. DESCRIPTION Model A-3 Pilot Operated Pressure Control Valves are factory assembled units. Each unit consists of a Model H-2 Halar coated Flow Control Valve, a Speed Control Valve, a Model
More informationTECHNICAL DATA. the Viking Pilot Pressure Regulating Valve 1 Model A-1 Speed Control Assembly: OBSOLETE. the Viking Speed Control Assembly 1
November 30, 1994 534 a 1. PRODUCT NAME VIKING 2" (50mm), 3" (75mm), 4" (100mm), 6" (150mm) 2. MANUFACTURER THE VIKING CORPORATION 210 N. Industrial Park Road Hastings, Michigan 49058 U.S.A. Telephone:
More informationUse of Hazardous Gases Standard Operating Procedure
Use of Hazardous Gases Standard Operating Procedure 1. Purpose This standard operating procedure (SOP) details the requirements for ordering, storing, using, and disposing of toxic, highly toxic, pyrophoric,
More informationFLAMMABLE & COMBUSTIBLE LIQUIDS PROGRAM
FLAMMABLE & COMBUSTIBLE LIQUIDS PROGRAM 1.0 PURPOSE This program applies to employees, visitors and contractors (persons) for the purpose of articulating safe work practices when working with and around
More informationWorking in Gas Hazard Areas
/ Health & Safety OPERATIONS STANDARDS Ref.: Aperam Safety ST 012 Working in Gas Hazard Areas Issue: 15.05.2012 Vers.: v0 Rev.: AM Safety ST 012 v1.2 08.05.2012 Working in Gas Hazard Areas Controlled Updated
More informationChapter 4: Implementing Effective Exposure Controls
Chapter 4: Implementing Effective Exposure Controls Implementing effective controls to protect workers from health hazards requires attention and dedication. For example, equipment needs to be purchased,
More informationOCCUPATIONAL SAFETY AND ENVIRONMENTAL HEALTH GUIDELINE
OCCUPATIONAL SAFETY AND ENVIRONMENTAL HEALTH GUIDELINE Subject: Installation, Use and Maintenance of Gas Source Semiconductor Tools Date: 5/28/03 Revision: 00 SUMMARY: Individuals working with gas source
More informationUniversity of California Berkeley Toxic Gas Program
University of California Berkeley Toxic Gas Program (covering California Fire Code Regulated Toxic and Highly Toxic Gases and other Health Hazard Compressed Gases) May 2011 Prepared by: EH&S TOXIC GAS
More informationGetting the Most From Your Diagnostic Equipment
Getting the Most From Your Diagnostic Equipment Tuesday, February 20, 2007 2007 Annual RESNET Conference San Diego, CA Joe Kuonen Building Performance Institute Learning Objectives Diagnostic tools and
More informationI. Subject: Compressed gas cylinders, regulators, and portable liquid systems.
I. Subject: Compressed gas cylinders, regulators, and portable liquid systems. II. Objective: To provide safe and effective use, storage, and transport of therapeutic gases. II. Procedure: A. Compressed
More informationTesting the Vented, 2-Liter Induction Chamber. Report 14 October 2004
Report 156August 2004 Page 1 of 17 Report 14 October 2004 The final review and approval of this document before its release to the client is the responsibility of the following person at Technical Safety
More informationBGA244 Binary Gas Analyzer
Quick Start Guide Revision 1.0 Certification Warranty Service certifies that this product met its published specification at the time of shipment. This product is warranted against defects in materials
More informationUse of Biosafety II cabinets
RISK ASSESSMENT FORM Use this form to assist you to complete risk assessments for hazardous activities and processes. Any serious or ongoing hazards should be reported via RiskWare to ensure that appropriate
More informationGuidance on room integrity testing and its interpretation
Guidance Note Guidance on room integrity testing and its interpretation Guidance on room integrity testing and its interpretation 1. SCOPE... 6 2. INTRODUCTION AND BACKGROUND... 6 2.1. DEVELOPMENT OF INTEGRITY
More informationExhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)
1 APPLICABILITY Exhibit 4 Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N) Definitions common to all certification and test procedures
More informationLockout/Tagout - Energy Control Program
Lockout/Tagout - Energy Control Program Lockout and Tagging of ELECTRICAL Circuits This portion of the K.R. Miller Contractors, Inc. safety program has been created to maintain a written copy of procedures
More informationSAFETY AND HEALTH IN THE USE OF CHEMICALS AT WORK
THEME nº44: RESPONSIBLE: Basics Principles of Prevention FOUR PRINCIPLES OF OPERATIONAL CONTROL The general objective in the control of hazards relating to chemicals in the workplace is to eliminate or
More informationINSTALLATION MANUAL Matheson Tri-Gas Cabinet Enclosures
INSTALLATION MANUAL Matheson Tri-Gas Cabinet Enclosures MINT-0289-XX TABLE OF CONTENTS Limited Warranty... 3 User Responsibility... 3-4 General Service... 4 Safety Precautions.... 5 Physical Dimensions..
More informationCal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848
Cal/OSHA Gas Systems for Welding GAS WELDING Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848 When performing gas welding, the following precautions, work procedures,
More informationThis program shall contain, as a minimum, the following components:
Section 1: Introduction 1.1 Policy It is the policy of the Pemberton Township Fire Department to maintain comprehensive safety and occupational health programs predicted upon sound engineering, education,
More informationBPB26-1 AND SSPB26-1 PATIO BASE INSTALLATION INSTRUCTIONS
BPB26-1 AND SSPB26-1 PATIO BASE INSTALLATION INSTRUCTIONS WARNING: THIS PATIO BASE IS NOT DESIGNED FOR USE WITH AN LP GAS CYLINDER. WARNING: SEE YOUR GRILL OWNER'S MANUAL FOR PROPER LOCATION, MINIMUM CLEARANCES,
More informationFRS 105. Firefighters Intermediate Skills II. 45 clock hours 3 credit hours
FRS 105 Firefighters Intermediate Skills II 45 clock hours 3 credit hours Course Title Lecture/Skill Total Fractional FRS 1051 Fire Department Organization II 4 0 4 0.3 FRS 1052 Fire Behavior II 6 0 6
More informationMINIMUM SAFETY REGULATIONS
MINIMUM SAFETY REGULATIONS These rules are intended to apply to all students, postdoctoral fellows, and staff engaged in laboratory work in a working lab. A working laboratory is a room used for any purpose
More informationRespiratory Protection Self-Inspection Checklist
Respiratory Protection Self-Inspection Checklist Guidelines: This checklist applies to the use of either atmosphere-supplying or air-purifying respirators being worn, voluntarily or otherwise, for comfort
More informationGood things come in threes
3 Hardware for specialty gases Equipment, supply systems and services for specialty gases Good things come in threes 02 Hardware for specialty gases Everything under one roof The complete equipment range
More informationTECHNICAL DATA. Trimpac 251a. Spetember 16, 2013
Spetember 16, 2013 Trimpac 251a 1. DEsCrIpTION DESCRIPTION TRIMPAC Model B-6 and B-6B is a factory assembled trim package for a double interlocked preaction system with an electric/pneu-lectric release
More informationCITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT
Reference: IFC, Denver Amendments, NFPA Approved: Joseph L. Gonzales, Division Chief, Fire Prevention and Investigation Division Number: IFC- 3001-1 Effective Date: February 1, 2012 Page 1 of 5 This policy
More informationHorizontal Bladder Tanks
DATA SHEET Horizontal Bladder Tanks Features UL Listed and FM Approved for use with various ANSUL proportioners and foam concentrates 175 psi (12.1 bar) maximum allowable working pressure (design pressure)
More informationSTANDARD OPERATING PROCEDURES (SOP) FOR REPRODUCTIVE HAZARDS
STANDARD OPERATING PROCEDURES (SOP) FOR REPRODUCTIVE HAZARDS INTRODUCTION: Standard operating procedures (SOP) are intended to provide you with general guidance on how to safely work with a specific class
More informationSafety Manual > Safety Checklist for Labs
Safety Manual > Safety Checklist for Labs Safety Checklist For Labs Where Infectious Agents And Recombinant DNA Research Is Performed This Checklist is to be used for research labs using infectious agents
More informationRespiratory Protection Self Inspection Checklist
Optional Information Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: Respiratory Protection Self Inspection Checklist Guidelines: This checklist covers some
More informationOxygen Usage Best Practice Guide
Oxygen Usage Best Practice Guide 1. Introduction Oxygen enriched systems possess a risk of fire and explosion since ignition and combustion hazards are present in all oxygen systems, and oxygen related
More informationLEV Inspection & Test Report
LEV Inspection & Test Report CLIENT: SITE: XXXXXXX LTD XXXXXXX Report Reference: Hinge Room-LEV System Identification: BeCu ESTA Survey Conducted By: Name: Position: Signed: XXXX Environmental Consultant
More informationLaboratory Guidelines and Standards Application Note LC-125
Laboratory Guidelines and s Application Note LC-125 Introduction This publication provides excerpts from some of the many guidelines and standards that pertain to the construction and operation of laboratory
More informationThis test shall be carried out on all vehicles equipped with open type traction batteries.
5.4. Determination of hydrogen emissions page 1 RESS-6-15 5.4.1. This test shall be carried out on all vehicles equipped with open type traction batteries. 5.4.2. The test shall be conducted following
More informationMidwest Consortium 8HR Modular Exam Inspect/Don/Doff
8HR Modular Exam Inspect/Don/Doff 1. Important reasons to inspect respirators include: A. All of the following B. Make sure the elastic parts are still stretchy C. Valves have not been removed or damaged
More information11/7/2011. Chemical Hazards and Controls for Rehabilitation Professionals. What is a chemical hazard? Toxicology. Module 3
Chemical Hazards and Controls for Rehabilitation Professionals Module 3 What is a chemical hazard? A chemical hazard is a chemical that, because of its characteristics and effects, may cause harm to an
More informationFXT. FXT Cooling Tower RIGGING & ASSEMBLY INSTRUCTIONS
FXT FXT Cooling Tower RIGGING & ASSEMBLY INSTRUCTIONS FXT Cooling Towers should be rigged and assembled as outlined in this bulletin. These procedures should be thoroughly reviewed prior to the actual
More informationDESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE
February 9, 1998 Foam 101a A BLADDER TANK WITH 1. DESCRIPTION A Wet Pipe Bladder Tank Foam/Water System is a standard wet pipe automatic sprinkler system capable of discharging a foam/water solution automatically
More informationEVALUATION SUBJECT: DIVISION: HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SECTION: HVAC DUCTS AND CASINGS.
ICC-ES Report PMG-1171 Reissued 11/2018 This report is subject to renewal 11/2019 EVALUATION SUBJECT: UNDERGROUND SINGLE WALL & DOUBLE WALL INSULATED DUCT FOR HVAC DIRECT BURIAL APPLICATIONS AND UNDERGROUND
More informationOVERVIEW pg 3. Major Points to Consider pg 3 Minor Points to Consider pg 3. INSTRUCTIONS pg 4
TABLE OF CONTENTS OVERVIEW pg 3 Major Points to Consider pg 3 Minor Points to Consider pg 3 INSTRUCTIONS pg 4 How Does Nordic Freeze Work pg 4 How Long Will the Ice Plug Take to Form pg 4 How Do I Know
More informationCOMPANY MEMBERS: All privates, engineers, lieutenants, and captains who are assigned to fire and/or rescue companies.
DECATUR TOWNSHIP FIRE DEPARTMENT GENERAL ORDER TITLE: MANDATORY USE OF SCBA NUMBER: 9.01 EFFECTIVE: May 1, 2016 THIS ORDER SUPERSEDES ALL PREVIOUS GENERAL ORDERS, POLICIES, RULES, S.O.G S & S.O.P S UPDATED:
More informationTesting the Vented, 7-Liter Induction Chamber. Report 6 April 2008
Report 6 April 2008 Page 1 of 11 Report 6 April 2008 The final review and approval of this document before its release to the client is the responsibility of the following person at Technical Safety Services.
More informationBP48-1 AND SSP48-1 IN-GROUND POST INSTALLATION INSTRUCTIONS
BP48-1 AND SSP48-1 IN-GROUND POST INSTALLATION INSTRUCTIONS WARNING: THIS IN-GROUND POST IS NOT DESIGNED FOR USE WITH AN LP GAS CYLINDER. WARNING: SEE YOUR GRILL OWNER S MANUAL FOR PROPER LOCATION, MINIMUM
More informationASTATT10 Carry out air tightness testing on large and complex, high rise and phased hand over zonal buildings
Carry out air tightness testing on large and complex, high rise and phased Overview This standard is for those who carry out air tightness testing and inspection of large and complex buildings, high rise
More informationHAZWOPER 8-Hr Refresher Aug. 20, 2012
Institute for Tribal Environmental Professionals Tribal Lands and Environment: A National Forum on Solid Waste, Emergency Response, Contaminated Sites and USTs August 20-23, 2012 Coos Bay, Oregon HAZWOPER
More informationTECHNICAL DATA CAUTION
Page 1 of 6 1. DESCRIPTION The Viking Model D-2 Accelerator is a quick-opening device, with an integral anti-flood assembly, used to increase the operating speed of a differential type dry pipe valve.
More informationNavy Guidance and Tips for Using DOEHRS-IH Ventilation NAVY & MARINE CORPS PUBLIC HEALTH CENTER
Navy Guidance and Tips for Using DOEHRS-IH Ventilation NAVY & MARINE CORPS PUBLIC HEALTH CENTER October 2010 Purpose This document is a supplemental Navy guide to the DOEHRS Student Guide/User Manual Version
More informationFALL PROTECTION
115500 FALL PROTECTION PART 1 GENERAL 1.01 General A. Cornell University seeks to prevent exposures to fall hazards whenever possible and protect personnel that may be exposed to fall hazards. Therefore,
More informationConfined Space Entry Program 8 CCR 5157
TABLE OF CONTENTS 1. POLICY... 2 2. PURPOSE... 2 3. SCOPE... 2 4. DEFINITIONS... 2 5. CONFINED SPACES IN THE SACRAMENTO STATE... 4 6. PERMIT SPACE ENTRY - PERSONNEL RESPONSIBILITIES... 4 6.1. CONFINED
More informationHAZCOM 2012 RIGHT-TO-UNDERSTAND. Helping you comply with 29 CFR
HAZCOM 2012 RIGHT-TO-UNDERSTAND Helping you comply with 29 CFR 1910.1200 INTRODUCTION REVISED HAZARD COMMUNICATION STANDARD 29 CFR 1910.1200 First major technical revision in 29 years HazCom is more than
More informationCALIFORNIA STATE UNIVERSITY, LOS ANGELES WELDING, CUTTING, AND HOT WORK OPERATIONS. October 2007
CALIFORNIA STATE UNIVERSITY, LOS ANGELES WELDING, CUTTING, AND HOT WORK OPERATIONS October 2007 PROGRAM APPROVAL AND AUTHORIZATION James M. Rosser, President Date TABLE OF CONTENTS TITLE SECTION PURPOSE
More informationMETHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS. 1.2 Scope. This method is applicable for the
1151 METHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS 1.0 Scope and Application. 1.1 Analytes. Analyte Volatile Organic Compounds (VOC) CAS No. No CAS number assigned 1.2 Scope. This method
More informationTECHNICAL DATA. TRIMPAC Model B-5 & B-5B
September 16, 2013 Trimpac 250a 1. DESCRIPTION DEsCRIPTIoN is a factory assembled trim package for a ed an electric/pneumatic release module in a metal enclosure. The standard trim normally required on
More informationTECHNICAL DATA. Q = C v P S
Preaction 346a 1. Description The 6 Model G-6000P Electric Release Preaction System Riser Assembly can be used as a Single Interlock Preaction System with Electric Release, or as a Double Interlock Preaction
More information