Outside Air Nonresidential HVAC Stakeholder Meeting #2 California Statewide Utility Codes and Standards Program

Size: px
Start display at page:

Download "Outside Air Nonresidential HVAC Stakeholder Meeting #2 California Statewide Utility Codes and Standards Program"

Transcription

1 1 Outside Air Nonresidential HVAC Stakeholder Meeting #2 California Statewide Utility Codes and Standards Program Jim Meacham, CTG Energetics

2 Agenda 2 In Situ Testing Results Reduced Ventilation after Economizing Study Results Recommended changes to Nonresidential Compliance Manual and Acceptance Test Forms Future Code Change

3 In Situ Testing Results 3 Part 1: Determine best practice for field measurements of outside air flow Part 2: Test existing systems with DCV to compare with Title 24 ventilation rates

4 Best Practice Method - Approach 4 Conduct research with stakeholders, literature, and industry providers to determine methods to evaluate in the field. Temperature Split Velocity Matrix Traverse Hot Wire Anemometer Traverse Flow Hood Traverse

5 Best Practice Method Test Matrix 5 Test configurations Exterior Intake Shrouding With/without Measurement Location Interior/Exterior Fan Mode Minimum/Maximum Methodology Velocity Matrix Hot Wire Anemometer Flow Hood Temp. Split Measurement Location Interior Exterior Exterior Interior Exterior Exterior Exterior N/A Intake Shrouded? No Yes No No Yes No No No Fan Mode Number of Tests Minimum Maximum

6 Best Practice Method - Results 6 Notes: 1) Coefficient of variation = Standard deviation / average 2) Measurement from installed, flow sensing dampers used as reference

7 Best Practice Method - Conclusions 7 Hot Wire and Velocity Matrix measurements are best performers Velocity matrix not appropriate for flows nominally less than 250 fpm Use hot wire for flows below 250 fpm No significant difference between exterior and interior msmts given above conditions

8 Best Practice Method - Conclusions 8 Rule out flow hood due to added pressure drop Rule out temperature split due to reliance on large T and error stacking of supply flow measurement

9 In Situ Testing Systems Description 9 System Type No. Systems No. Total Tested Tests Multi Zone Built Up Multi Zone 6 12 OA Control: Fixed Min Damper 5 10 OA Control: Dynamic 1 2 Packaged Multi Zone 7 14 OA Control: Fixed Min Damper 6 12 OA Control: Dynamic 1 2 Single Zone 4 7 OA Control: Fixed Min Damper 4 7 Total All systems VAV, both min & max fan mode

10 In Situ Testing - Results 10 In general, systems are significantly over-ventilating System Type Average % Relative 1 Deviation from Title 24 OA Requirement Average % Absolute 2 Deviation from Title 24 OA Requirement Multi Zone 50% 60% Built Up Multi Zone 84% 89% OA Control: Dynamic 11% 40% OA Control: Fixed Min Damper 98% 99% Packaged Multi Zone 21% 36% OA Control: Dynamic 1% 23% OA Control: Fixed Min Damper 25% 38% Single Zone 108% 138% OA Control: Fixed Min Damper 108% 138% Total 62% 77% 1. Relative deviation includes both under and over performance values from individual tests 2. Absolute deviation considers only the magnitude of the deviation, regardless of whether it is over or under ventilation

11 In Situ Testing - Results 11 Systems are compliant if measured air flow is within 10% of the Title 24 requirement (per acceptance testing requirements of MECH-2A )

12 In Situ Testing Dynamic Controls 12 Dynamic controls are effective Only two of 17 VAV units (12%) had dynamic controls

13 In Situ Testing Dynamic Controls 13 Fixed damper control causes significant over ventilation in max. vent. mode

14 Reduced Ventilation After Economizing 14 Study the potential for reducing vent rates after economizing Studied potential for energy savings based on CO2 generation rates in worst case climate zones Analyzed on worst case days high ambient temp ramp rates after moderate night temps

15 15 T-24 Minimum Typical Economizing Range Outside CO 2 concentration Based on office occupancy setting, outdoor CO2 concentration 400ppm, activity level =1.2 Met In normal operating conditions, the space will maintain at a certain ppm above outdoor levels based on the amount of outside air being brought in During Economizing, outside air volumes/person increase to take advantage of free cooling with the side effect of bringing down CO 2 concentration

16 Minutes 80 Minutes 44 Minutes 8 Minutes The blue line represents a normal situation where the space will gradually reach its equilibrium offset from outdoor CO2 concentration All other lines represent CO2 concentration given varying starting space concentration. The ventilation system will need to turn on when the space system reaches its equilibrium concentration. A starting space concentration of 400 ppm is likely unobtainable, but represents the theoretical best case scenario

17 Minutes 57Minutes 16 Minutes 11 Minutes Based on outdoor CO 2 concentration 400ppm, activity level =1.2 Met, staring CO 2 concentration of 400ppm In higher occupancy spaces, the equilibrium CO 2 concentration does not change, but the time it takes to reach equilibrium decreases with an increase in occupancy

18 Potential Energy Savings 18 Temp Temp Potential Energy Savings Economizer Shut at 11:08 Hour Ventilation system on to maintain CO 2 levels Economizer Shut at 7:51 Ventilation system on to maintain CO 2 levels Best case climate zone have fast temperature rise after economizing More typical climate zones and days have limited energy savings potential due to mild temperatures after economizing mode is exited Hour

19 19 On best case day (May 7 th ) in best case climate zone (CZ10), with best case load (office space, starting CO2 ppm = outdoor ppm), a savings of 0.5 btuh/sf is achieved If this savings is applied to every day that the economizer cuttoff is reached, annual energy savings are less than 0.25% for all climate zones.

20 Recommended Code Changes 20 Eliminate Field Calibration Option for CO2 sensors Add Field Verification of CO2 Sensors to Acceptance Testing Confirm Dynamic Control of Outside Air Confirm Pre-occupancy purge for all system types

21 Recommended Code Changes 21 Verify proper location of OA ducts in plenum systems Add guidance for measuring OA flow Correct CO2 sensor mounting height in Compliance Manual

22 Eliminate CO2 Sensor Field Calibration 22 Due to inaccuracy of field calibrations, only allow factory calibrations CO2 sensors are critical control inputs to any DCV system and must be calibrated in order to prevent under or over ventilation. Changes required to MECH-6A and Nonresidential Compliance Manual.

23 Eliminate CO2 Sensor Field Calibration 23 Changes to MECH-6A, Construction Inspection Block Existing Block Modify language of Item 3 under the Construction Inspection section to read: Documentation of all carbon dioxide control sensor includes factory-calibration certificate (calibration certificate must be attached) Remove field calibration option.

24 Eliminate CO2 Sensor Field Calibration 24 Changes to Nonresidential Compliance Manual, Section , Construction Inspection CO2 sensor is either factory calibrated or field calibrated. A calibration certificate from the manufacturer will satisfy this requirement. Field calibration of CO2 sensors does not comply with Title 24. In order to perform a field calibration check, follow the calibration procedures provided by the manufacturer. Some sensor manufacturers may require using equipment-specific calibration kits (kits may include trace gas samples and other hand-held devices) whereas others may be calibrated simply by using a pre-calibrated hand-held CO2 measuring device and making proper adjustments through the sensor or ventilation controller.

25 Add Field Verification of CO2 Sensors 25 Require field verification of factory calibrated sensors CO2 sensors can be unreliable, even with factory calibration Changes required to MECH-6A and Nonresidential Compliance Manual.

26 Add Field Verification of CO2 Sensors 26 Changes to MECH-6A, Functional Testing Block Existing Block Recommended Block A. Functional Testing Results a. Verify in the field that all CO 2 sensors at both zone and system level are accurate to within +/- 75 PPM. All CO 2 sensors must be verified, no sampling is allowed. Indicate PASS/FAIL for all CO 2 sensors. b. Disable economizer controls c. Outside air CO 2 concentration (select one of the following) Measured dynamically using CO 2 sensor PPM Interior CO 2 concentration setpoint (Outside CO 2 concentration ppm) PPM

27 Add Field Verification of CO2 Sensors 27 Changes to MECH-6A, Testing Results Block Existing Block Recommended Block B. Testing Results PASS/FAIL All CO 2 sensors verified to be accurate to within +/- 75 PPM Step 1: Simulate a high CO 2 load (check box complete) Step 2: Simulate a low CO 2 load (check box complete)

28 Add Field Verification of CO2 Sensors 28 Changes to Nonresidential Compliance Manual Section Estimated Time to Complete Existing Text Functional testing: 1 to 2 hours (depending on how ambient CO2 concentration levels are manipulated, system response time to variations in CO2) Recommended Text Functional testing: 1 to 2 3 hours (depending on number of CO2 sensors to be verified and how ambient CO2 concentration levels are manipulated, system response time to variations in CO2)

29 Confirm Dynamic Control of Outside Air 29 Section of the Compliance Manual indicates that confirmation of dynamic controls is intended to be part of acceptance testing, but this protocol is currently omitted on MECH-2A. Changes required to MECH-2A and Nonresidential Compliance Manual.

30 Confirm Dynamic Control of Outside Air 30 Changes to MECH-2A, Construction Inspection Block Existing block does not mention dynamic controls

31 Confirm Dynamic Control of Outside Air 31 Changes to MECH-2A, Construction Inspection Block Add the following verifications to the VAV portion of Item 2. b. Fixed Minimum Damper Setpoint is NOT being utilized to control OSA. c. One of the following dynamic controls is being utilized to control OSA. Dual Minimum Setpoint Design Energy Balance Method Return Fan Tracking Airflow Measurement of the Entire Outdoor Air Inlet Injection Fan Method Dedicated Minimum Ventilation Damper with Pressure Control Other Active Control, Describe

32 Confirm Dynamic Control of Outside Air 32 Nonresidential Compliance Manual Section Purpose of the Test Existing Text This test ensures that adequate outdoor air ventilation is provided through the variable air volume air handling unit at two representative operating conditions. The test consists of measuring outdoor air values at maximum flow and at or near minimum flow. Recommended Text This test ensures that adequate outdoor air ventilation is provided through the variable air volume air handling unit at two representative operating conditions. The test consists of confirming dynamic control methods and measuring outdoor air values at maximum flow and at or near minimum flow.

33 Confirm Dynamic Control of Outside Air 33 Nonresidential Compliance Manual Section Acceptance Criteria Add the following acceptance criteria. Variable air volume systems use some form of active controls to modulate outdoor air rates. Fixed minimum damper setpoint CANNOT be used.

34 Confirm Dynamic Control of Outside Air 34 Nonresidential Compliance Manual Section Construction Inspection Existing Text There are a number of means to dynamically control minimum OSA. A survey of common methods is presented in Chapter 4 of the Nonresidential Compliance Manual. After validating that the sequence of control will dynamically control outdoor air check the System is designed to dynamically control minimum OSA box in the Construction Inspection section of MECH-2A. Note: check box for confirming dynamic controls does not currently exist on the MECH-2A form

35 Confirm Dynamic Control of Outside Air 35 Nonresidential Compliance Manual Recommended Text There are a number of means to dynamically control minimum OSA. A survey of common methods is presented in Chapter 4 of the Nonresidential Compliance Manual. After validating that the sequence of control will dynamically control outdoor air check the System is designed to dynamically control minimum OSA box in the Construction Inspection section of MECH-2A. Furthermore, fixed minimum damper setpoint, which is common industry practice, is not compliant with Title 24. After validating that the sequence of control will dynamically control outdoor air check the Fixed Minimum Damper Setpoint is NOT being utilized to control OSA box in the Construction Inspection section of MECH-2A. Also, indicate in this section what type of dynamic control is being used.

36 Confirm Pre-occupancy Purge for all systems 36 Confirm pre-occupancy purge for all system types as required in 121(c)2. No significant cost to verify schedule Low barriers to adoption Current compliance issues Currently, verification only completed for single zone and unitary systems in NA Modifications needed to the MECH-2A acceptance form and Nonresidential Compliance Manual

37 Confirm Pre-occupancy Purge for all systems 37 Changes to MECH-2A, Construction Inspection Block Add the following confirmation to the end of the existing block. 3. Programming, check the following: Pre-occupancy purge has been programmed to meet the requirements of Standards Section 121(c)2.

38 Confirm Pre-occupancy Purge for all systems 38 Changes to Compliance Manual Section (VAV) AND Section (CV) Add the following text to the end of the existing Construction Inspection text. Confirm that pre-occupancy purge has been programmed to meet the requirements of Standards Section 121(c)2. This is most easily accomplished by scheduling the unit to start one hour prior to actual occupancy.

39 Add guidance for measuring OA flow 39 Outdoor air flow measurements can be very inaccurate if not done properly Add guidance for Choosing instrumentation Avoiding turbulence Measuring free area Averaging multiple measurements

40 Add guidance for measuring OA flow 40 Change to Nonresidential Compliance Manual Intent: add mention of multi-point velocity pressure probes (i.e. velocity matrix) Section Instrumentation Modify existing list of instrumentation to read: An airflow measurement probe (e.g. hot-wire anemometer or single/multi-point velocity pressure probe)

41 Add guidance for measuring OA flow 41 Change to Nonres Compliance Manual Add the following text to the end of the existing Verify and Document portion of Section and Section Follow the best practice guidelines below in order to increase accuracy of outdoor air flow measurements: Traverse measurements taken in supply, return or outdoor air ducts should be located in an area of steady, laminar flow. If possible, take measurements at least six to eight duct diameters away from turbulence, air intakes, bends, or restrictions.

42 Add guidance for measuring OA flow 42 If using face velocity measurements to calculate outdoor air flow, care should be taken to accurately measure free area dimensions of intake. If velocity measurements are taken at the plane of the intake between damper blades where flow is restricted (i.e. to achieve faster flows), free area should be measured as the actual open space between dampers and should not include frames or damper blades. Hot wire anemometers are more appropriate than velocity pressure probes for measuring low speed flows (i.e. less than 250 feet per minute). Take multiple measurements and average results in order to minimize affects of fluctuations in system operation and environmental conditions (i.e. wind).

43 Verify location of OA ducts in plenum systems 43 No significant cost to verify location Low barriers to adoption Need changes to MECH-2A and Nonresidential Compliance Manual

44 Verify location of OA ducts in plenum systems 44 Changes to MECH-2A Add the following confirmation item 3. Outside air supply (check one of the following) Return air plenum is used to distribute outside air to a zonal heating or cooling unit Check as appropriate: a. Confirm that outside air supply is connected either: Within five ft. of the unit Within 15 ft. of the unit, with the air directed substantially toward the unit, and with a discharge velocity of at least 500 ft. per minute. Return air plenum is used NOT to distribute outside air to a zonal heating or cooling unit.

45 Verify location of OA ducts in plenum systems 45 Changes to Compliance Manual Section (VAV) and Section (CV) Add the following text to the end of the existing Construction Inspection text. For systems where return air plenum is used to distribute outside air to a zonal heating or cooling unit, confirm that outside air supply is connected either: Within five ft. of the unit Within 15 ft. of the unit, with the air directed substantially toward the unit, and with a discharge velocity of at least 500 ft. per minute.

46 Correct CO2 Sensor Mounting Height 46 Correction needed in Nonresidential Compliance Manual Currently lists 1 foot as the minimum mounting height. Section Acceptance Criteria, corrected text: Each CO2 sensor is located correctly within the space 1 3 to 6 feet above the floor. Note: The minimum mounting height is reported accurately as 3 feet on the MECH-6A form.

47 Future Consideration 47 Require dedicated minimum OA intake for systems with economizers Require FPM face velocity More accurate flow measurement better dynamic control Easier acceptance testing Further study required to determine net cost benefit Energy savings from more accurate flow measurements

48 Future Code Change 48 Require dedicated minimum OA intake for systems req d to have economizers Require integrated dynamic control Injection fan Pressure control Direct OA airflow measurement

49 Future Code Change 49 Further study required Energy performance savings of reduced over ventilation observed in the field Cost, design and space impacts of dedicated flow sensing intake on packaged and built-up units of various sizes Cover all CA climate zones

50 Energy Savings and Cost Effectiveness for Acceptance Testing Measures 50 Finalizing approach for quantifying savings from improved Acceptance Testing Not expecting significant changes to Acceptance Testing costs o Main impact is time for CO2 sensor calibration verification Estimated completion by mid Jan Results will be disseminated by to stakeholder group

51 Next Steps 51 Complete in situ testing (3 sites) Finalize Compliance Manual language Finalize energy savings and cost effectiveness for Acceptance Testing changes Consider future code changes for requiring: o Dedicated minimum outside air dampers o Dynamic minimum outside air flow control

2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A

2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A 2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A PROJECT ADDRESS TESTING AUTHORITY TELEPHONE Checked by/date Enforcement Agency Use GENERAL INFORMATION OF BLDG. PERMIT PERMIT # BLDG. CONDITIONED FLOOR

More information

COMPARISON OF DIFFERENTIAL PRESSURE SENSING TECHNOLOGIES IN HOSPITAL ISOLATION ROOMS AND OTHER CRITICAL ENVIRONMENT APPLICATIONS

COMPARISON OF DIFFERENTIAL PRESSURE SENSING TECHNOLOGIES IN HOSPITAL ISOLATION ROOMS AND OTHER CRITICAL ENVIRONMENT APPLICATIONS COMPARISON OF DIFFERENTIAL PRESSURE SENSING TECHNOLOGIES IN HOSPITAL ISOLATION ROOMS AND OTHER CRITICAL ENVIRONMENT APPLICATIONS APPLICATION NOTE LC-136 Introduction Specialized spaces often times must

More information

Application Note AN-107

Application Note AN-107 SPEC Sensor TM Characterization & Calibration Considerations Scope This document is provided to describe the considerations needed to characterize, calibrate, verify and validate the measurement performance

More information

HAP e-help. Obtaining Consistent Results Using HAP and the ASHRAE 62MZ Ventilation Rate Procedure Spreadsheet. Introduction

HAP e-help. Obtaining Consistent Results Using HAP and the ASHRAE 62MZ Ventilation Rate Procedure Spreadsheet. Introduction Introduction A key task in commercial building HVAC design is determining outdoor ventilation airflow rates. In most jurisdictions in the United States, ventilation airflow rates must comply with local

More information

SERIES 100 PACKAGED ROOFTOP UNIT WITH IPU CONTROL

SERIES 100 PACKAGED ROOFTOP UNIT WITH IPU CONTROL Supersedes: 100.50-CL1 (1014) Form 100.50-CL1 (517) MECHANICAL CONTRACTOR INSTALLATION CHECKLIST AND UNIT SETUP DATA SHEET CUSTOMER: ADDRESS: PHONE: SERIES 100 PACKAGED ROOFTOP UNIT WITH IPU CONTROL 035-21780-030

More information

REQUIREMENTS AND HAND-OVER DOCUMENTATION FOR ENERGY-OPTIMAL DEMAND-CONTROLLED VENTILATION

REQUIREMENTS AND HAND-OVER DOCUMENTATION FOR ENERGY-OPTIMAL DEMAND-CONTROLLED VENTILATION REQUIREMENTS AND HAND-OVER DOCUMENTATION FOR ENERGY-OPTIMAL DEMAND-CONTROLLED VENTILATION Mads Mysen* 1, Axel Cablé 1, Peter G. Schild 1, and Kari Thunshelle 1 1 SINTEF Building and Infrastructure Forskningsveien

More information

Kansas State University Fume Hood Operation

Kansas State University Fume Hood Operation FUME HOODS 2009, PAGE 1 FUME HOODS Kansas State University Fume Hood Operation One of the primary safety devices in a laboratory is a chemical fume hood. A well-designed hood, when properly installed and

More information

INTERPRETATION IC OF ANSI/ASHRAE STANDARD VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY

INTERPRETATION IC OF ANSI/ASHRAE STANDARD VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY INTERPRETATION IC 62-2001-06 OF ANSI/ASHRAE STANDARD 62-2001 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY REVISION APPROVED: 1/12/2002 Originally issued as interpretation of Standard 62-1989 (IC 62-1989-23)

More information

Statesville, NC. Results of AM ASHRAE 110 Laboratory Fume Hood Performance Evaluations Venturi Hood

Statesville, NC. Results of AM ASHRAE 110 Laboratory Fume Hood Performance Evaluations Venturi Hood Statesville, NC Results of AM ASHRAE 11 Laboratory Fume Hood Performance Evaluations Venturi Hood January, 217 Prepared By: Exposure Control Technologies Inc. 231-C East Johnson Street Cary, NC 27513 Phone:

More information

VAV SYSTEM INDOOR AIR QUALITY CONSIDERATIONS FOR OFFICE SPACES

VAV SYSTEM INDOOR AIR QUALITY CONSIDERATIONS FOR OFFICE SPACES Proceedings: Indoor Air 005 A SYSTEM INDOOR AIR QUALITY CONSIDERATIONS FOR OFFICE SPACES PH Zhang * Jacobs Civil, Inc. 60 Madison Avenue, 1 th Floor, NYC, NY10016, USA ABSTRACT This paper discusses indoor

More information

Mott Manufacturing Limited

Mott Manufacturing Limited Mott Manufacturing Limited 452 Hardy Road, Brantford, Ontario, Canada, N3T 5L8. Telephone: 519-752-7825 Fax: 519-752-2895 Web Site: www.mott.ca Fume Hood Performance Test Test Date: 9-Sep-08 Model Number:

More information

4 Testing Agency Guide. 4.1 U.S. Army Corps of Engineers (USACE) Standard for Air Leakage

4 Testing Agency Guide. 4.1 U.S. Army Corps of Engineers (USACE) Standard for Air Leakage 10 4 Testing Agency Guide 4.1 U.S. Army Corps of Engineers (USACE) Standard for Air Leakage The USACE requires all new buildings and major renovation projects to pass an air leakage test where the results

More information

Laboratory Ventilation. Environmental, Health, and Safety

Laboratory Ventilation. Environmental, Health, and Safety No.: BCF020.054 Page: 1 of 7 RECORD OF REVISIONS Date Rev # Details of Change 09/13 1 Updated job titles to reflect ICON job descriptions. Added a definition for Approved Ventilation Contractor and included

More information

CTG Certification Protocol -- Version 3.0 SUMMARY

CTG Certification Protocol -- Version 3.0 SUMMARY Date of Test: Test Report Number: SUMMARY Date of Prior Certification: Certified by: Re-certification Due Date: Unit Description: Make : Model: Serial Number: Location: CERTIFIER INFORMATION Name: Client

More information

INTERACTION BETWEEN WIND-DRIVEN AND BUOYANCY-DRIVEN NATURAL VENTILATION Bo Wang, Foster and Partners, London, UK

INTERACTION BETWEEN WIND-DRIVEN AND BUOYANCY-DRIVEN NATURAL VENTILATION Bo Wang, Foster and Partners, London, UK INTERACTION BETWEEN WIND-DRIVEN AND BUOYANCY-DRIVEN NATURAL VENTILATION Bo Wang, Foster and Partners, London, UK ABSTRACT Ventilation stacks are becoming increasingly common in the design of naturally

More information

HVAC Air Duct Leakage. Tech University 2013 Presented By: Mark Terzigni Project Manager Technical Services SMACNA

HVAC Air Duct Leakage. Tech University 2013 Presented By: Mark Terzigni Project Manager Technical Services SMACNA HVAC Air Duct Leakage Tech University 2013 Presented By: Mark Terzigni Project Manager Technical Services SMACNA Learning Objectives Understand the difference between System leakage and Duct leakage Understand

More information

University of North Florida Performance Requirements For Laboratory Fume Hoods. As Manufactured Performance Tests. As Installed Performance Tests

University of North Florida Performance Requirements For Laboratory Fume Hoods. As Manufactured Performance Tests. As Installed Performance Tests University of North Florida Performance Requirements For Laboratory Fume Hoods As Manufactured Performance Tests As Installed Performance Tests As Used Performance Tests October 27, 2010 University of

More information

APPENDIX A SAMPLE FHT SPECIFICATION (This recommended FHT specification is available from

APPENDIX A SAMPLE FHT SPECIFICATION (This recommended FHT specification is available from SAMPLE FHT SPECIFICATION (This recommended FHT specification is available from www.nebb.org) NEBB recommends that these FHT Specifications be referenced as related documents in other appropriate sections

More information

acculink platinum zv zoning system

acculink platinum zv zoning system acculink platinum zv zoning system Components: AZONE950AC52ZA ZZONEPNLAC52ZA AZONE940 ZZONEEZPAC52ZB Platinum 950 Control Zone Panel Kit up to 4 zones Included: Discharge Air Temp sensor Static Pressure

More information

Fire safety of staircases in multi-storey buildings The results of measurements in Buildings and Simulations

Fire safety of staircases in multi-storey buildings The results of measurements in Buildings and Simulations Fire safety of staircases in multi-storey buildings The results of measurements in Buildings and Simulations Grzegorz Kubicki, Ph.D. Department of Environmental Engineering, Warsaw University of Technology

More information

Appendix D: SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor. Description and Principle of Operation

Appendix D: SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor. Description and Principle of Operation Page 1 of 19 : SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor Description and Principle of Operation The photoacoustic multi-gas monitor (INNOVA 1412, Innova AirTech Instruments, Denmark) is a highly

More information

Improve Process Reliability

Improve Process Reliability Convenient Conductivity Calibration to Meet Pharmacopeia Regulations Pharmacopeias require that conductivity measurement systems be periodically calibrated to ensure their precision. The range of accessories

More information

L 100. Bubble-Tube Level System. Installation, Operation and Maintenance Instructions

L 100. Bubble-Tube Level System. Installation, Operation and Maintenance Instructions L 100 Bubble-Tube Level System Installation, Operation and Maintenance Instructions Figure 1 Contents Section Description Page 1.0 Introduction 2 2.0 Specifications 3 3.0 Installation 3 4.0 Warranty 6

More information

ATTACHMENT O WIPP MINE VENTILATION RATE MONITORING PLAN

ATTACHMENT O WIPP MINE VENTILATION RATE MONITORING PLAN ATTACHMENT O WIPP MINE VENTILATION RATE MONITORING PLAN (This page intentionally blank) ATTACHMENT O WIPP MINE VENTILATION RATE MONITORING PLAN TABLE OF CONTENTS O- Definitions... O- Objective... O- Design

More information

CSC-2000 SERIES. Reset Volume Controllers MADE IN U.S.A. DESCRIPTION MODELS SPECIFICATIONS ORDERING

CSC-2000 SERIES. Reset Volume Controllers MADE IN U.S.A. DESCRIPTION MODELS SPECIFICATIONS ORDERING CSC-2000 SERIES Reset Volume Controllers MADE IN U.S.A. DESCRIPTION The CSC-2000 series are designed for use on VAV terminal units in HVAC systems. These are submaster air velocity controllers whose velocity

More information

Series 3000 Layout Guidelines

Series 3000 Layout Guidelines Series 3000 Layout Guidelines Open circuit cooling towers, closed circuit cooling towers, and evaporative condensers all depend upon an adequate supply of fresh, ambient air to provide design capacity.

More information

CORESTA RECOMMENDED METHOD N 6

CORESTA RECOMMENDED METHOD N 6 CORESTA RECOMMENDED METHOD N 6 DETERMINATION OF VENTILATION DEFINITIONS AND MEASUREMENT PRINCIPLES (2015 Revision September 2016) 1. SCOPE This CORESTA Recommended Method specifies a method for the determination

More information

Airtightness Testing in Large Buildings: NESEA 2016

Airtightness Testing in Large Buildings: NESEA 2016 Airtightness Testing in Large Buildings: NESEA 2016 Dr John Straube, P.Eng. Associate Professor, University of Waterloo Principal, RDH Building Science This session: why would one invest in airtightness

More information

CSC-2000 SERIES. Reset Volume Controllers MADE IN U.S.A. DESCRIPTION MODELS SPECIFICATIONS ORDERING

CSC-2000 SERIES. Reset Volume Controllers MADE IN U.S.A. DESCRIPTION MODELS SPECIFICATIONS ORDERING CSC-2000 SERIES Reset Volume Controllers MADE IN U.S.A. DESCRIPTION The CSC-2000 series are designed for use on VAV terminal units in HVAC systems. These are submaster air velocity controllers whose velocity

More information

Field Evaluation of ASTM E in Relation to Control Room Habitability Testing and Boundary Maintenance in Nuclear Power Plants.

Field Evaluation of ASTM E in Relation to Control Room Habitability Testing and Boundary Maintenance in Nuclear Power Plants. Field Evaluation of ASTM E741-00 in Relation to Control Room Habitability Testing and Boundary Maintenance in Nuclear Power Plants. Presented By Clinton B. Summers Eric M. Banks NUCON International, Inc.

More information

B. Diagnostic Equipment Information 01 Number of Manometers Used to Measure Home Pressurization Manometer Make. Manometer Serial Number

B. Diagnostic Equipment Information 01 Number of Manometers Used to Measure Home Pressurization Manometer Make. Manometer Serial Number STATE OF CALIFORNIA BUILDING LEAKAGE WORKSHEET CEC-CF2R-MCH-24-H (Revised 06/14) CERTIFICATE OF INSTALLATION Building Leakage Worksheet CALIFORNIA ENERGY COMMISSION Project Name: Enforcement Agency: Permit

More information

Instruction Manual VCG-6

Instruction Manual VCG-6 Specifications Amps / Volts requirements 400 ma @ 24 VDC Propane pressure (VCG-6LP) 11 WC / 2.8 kpa Natural Gas pressure (VCG-6NG) 4.5 WC / 1.15 kpa Cu ft per hour / CO2 3-6 SCFH BTU Rating (Variable)

More information

Fumehood Performance Test Report

Fumehood Performance Test Report Fumehood Performance Test Report 6' Protector ECHO IPA Modified NIH Test Prepared For Labconco Corporation Prepared By Report Date: 02-12-2015 Project No.: 142327 AccuTec Services, Inc*320 NW Capital Dr*Lee's

More information

Mott Manufacturing Limited

Mott Manufacturing Limited Mott Manufacturing Limited 452 Hardy Road, PO Box 1120, Brantford, Ontario, Canada, N3T 5T3. Telephone: 519-752-7825 Fax: 519-752-2895 Web Site: www.mott.ca Fume Hood Performance Test Test Date: January

More information

TESTING OF BELIMO PRESSURE INDEPENDENT CHARACTERIZED CONTROL VALVES

TESTING OF BELIMO PRESSURE INDEPENDENT CHARACTERIZED CONTROL VALVES TESTING OF BELIMO PRESSURE INDEPENDENT CHARACTERIZED CONTROL VALVES November, 25 Submitted by: Iowa Energy Center Address: DMACC, 26 S. Ankeny Blvd. Ankeny, IA 521 Phone: 515.965.755 Fax: 515.965.756 Web

More information

Model 106 DPI "Micro-switch" Installation and Operating Instructions

Model 106 DPI Micro-switch Installation and Operating Instructions Mid-West Instrument Model 106 DPI "Micro-switch" Installation and Operating Instructions BULLETIN NO. IM116DPImicro/09A Replaces --- INSPECTION Before installation carefully check the Model Number on each

More information

Measuring range Δp (span = 100%) Pa

Measuring range Δp (span = 100%) Pa 4.4/ RLE 5: Volume-flow controller, continuous How energy efficiency is improved Enables demand-led volume flow control for the optimisation of energy consumption in ventilation systems. Areas of application

More information

Domestic ventilation systems

Domestic ventilation systems A BSRIA Guide www.bsria.co.uk A guide to measuring airflow rates EXPOSURE DRAFT In Association with ED46/2013 This publication has been printed on Nine Lives Silk recycled paper. The guidance given in

More information

Title: Standard Operating Procedure for Elemental and Organic Carbon (EC and OC) using Non-Dispersive Infrared Detection (NDIR)

Title: Standard Operating Procedure for Elemental and Organic Carbon (EC and OC) using Non-Dispersive Infrared Detection (NDIR) Procedure No: SOP-025 Revision No: 1.0 (January 21, 2011) Page No.: 1 of 8 1. INTRODUCTION AND SCOPE To obtain timely data for the purpose of air quality assessment, air quality trend reporting and to

More information

Next Generation Quartz Pressure Gauges

Next Generation Quartz Pressure Gauges Next Generation Quartz Pressure Gauges Rick Puccio, Ph.D. Senior Scientist Quartzdyne Houston, TX March 2, 2016 Outline Quartz Pressure Gauge Introduction Gauge Size Reduction Long Term Pressure Drift

More information

973-SF 6 Analyzer. Precise and Stable SF 6 Gas Analyzer REFLECTING YOUR STANDARDS

973-SF 6 Analyzer. Precise and Stable SF 6 Gas Analyzer REFLECTING YOUR STANDARDS Precise and Stable SF 6 Gas Analyzer Simultaneous measurement of humidity, SF 6 purity and SO 2 concentration Integrated gas recovery system with automatic pump back Fully automated SF 6 gas testing Fundamental

More information

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards. 1. Scope Description of requirements and procedures for compact provers to be used as verification standards. 2. Reference documents Trade Metrology Act SANS1698 3. Policy A. BASIC REQUIREMENTS Compact

More information

B. Diagnostic Equipment Information 01 Number of Manometers Used to Measure Home Pressurization Manometer Make. Manometer Serial Number

B. Diagnostic Equipment Information 01 Number of Manometers Used to Measure Home Pressurization Manometer Make. Manometer Serial Number (Page 1 of 3) A. Building Air Leakage General Information 01 Test Procedure Used: 02 Indoor temperature during test (degreef) 03 Outdoor temperature during test (degreef) 04 Blower door location 05 Building

More information

CDS-2000 CO 2 Sensor Verification, Calibration, and Troubleshooting Bulletin

CDS-2000 CO 2 Sensor Verification, Calibration, and Troubleshooting Bulletin Electronic Control Manual 216 Sensors and Stats Section S Technical Bulletin CDS-2000 Issue Date 0393 CDS-2000 CO 2 Sensor Verification, Calibration, and Troubleshooting Bulletin Introduction 3 Pre-Verification

More information

Wind Flow Validation Summary

Wind Flow Validation Summary IBHS Research Center Validation of Wind Capabilities The Insurance Institute for Business & Home Safety (IBHS) Research Center full-scale test facility provides opportunities to simulate natural wind conditions

More information

DTG - LCD Digital Temperature Gauge USER MANUAL

DTG - LCD Digital Temperature Gauge USER MANUAL DTG - LCD USER MANUAL Page 1 of 7 USERS GUIDE page 1. Description 3 2. Function 3 3. Safety Instruction 3 3.1. Safety Conventions 3 3.2. Proper Use 3 4. Installation 4 4.1. Unpacking 4 4.2. Storage 4 4.3.

More information

Table of Contents. Sensor Calibration and Troubleshooting CDS4000 CO 2. Introduction 1. Handling Information. Calibration 2.

Table of Contents. Sensor Calibration and Troubleshooting CDS4000 CO 2. Introduction 1. Handling Information. Calibration 2. FANs 216, 1628.3 Technical Bulletin CDS4000 Issue Date 0797 CDS4000 CO 2 Sensor Calibration and Troubleshooting Table of Contents Introduction 1 Handling Information 1 Calibration 2 Preparation 2 Cautions

More information

TExT Thorough Examination & Test of LEV Local Exhaust Ventilation Systems

TExT Thorough Examination & Test of LEV Local Exhaust Ventilation Systems ILEVE -Institute of LEV Engineers CPD & Information Day TExT Thorough Examination & Test of LEV Local Exhaust Ventilation Systems Jane Bastow CMIOSH Chartered Safety and Health Practitioner OSCHR Registered

More information

Deborah Houssin-Agbomson, Jean-Yves Letellier, Philippe Renault, Simon Jallais

Deborah Houssin-Agbomson, Jean-Yves Letellier, Philippe Renault, Simon Jallais AN EXPERIMENTAL STUDY DEDICATED TO WIND INFLUENCE ON HELIUM BUILD-UP AND CONCENTRATION DISTRIBUTION INSIDE A 1-M 3 SEMI-CONFINED ENCLOSURE CONSIDERING HYDROGEN ENERGY APPLICATIONS CONDITIONS OF USE. Deborah

More information

Gas Accumulation Potential & Leak Detection when Converting to Gas

Gas Accumulation Potential & Leak Detection when Converting to Gas Gas Accumulation Potential & Leak Detection when Converting to Gas Coal to Gas / PCUG Conference Chattanooga, TN October 29, 2013 Robert G. Mudry, P.E. Airflow Sciences Corporation Introduction Coal to

More information

IS YOUR FLAP VALVE IN COMPLIANCE WITH NFPA ?

IS YOUR FLAP VALVE IN COMPLIANCE WITH NFPA ? IEP Technologies 417-1 South Street, Marlborough, MA, 01752 ph 855.793.8407 fax 508.485.3115 www.ieptechnologies.com IS YOUR FLAP VALVE IN COMPLIANCE WITH NFPA 69-2014? Introduction Dust explosions can

More information

LENNOX SLP98UHV DIAGNOSTIC CODES

LENNOX SLP98UHV DIAGNOSTIC CODES Code Status of Equipment Action required to clear and recover - Idle mode (Decimal blinks at 1 Hertz -- 0.5 second ON, 0.5 second OFF) A Cubic feet per minute (cfm) setting for indoor blower (1 second

More information

Modulating Valves for Atmospheric, Infrared, and Direct Fired Burners

Modulating Valves for Atmospheric, Infrared, and Direct Fired Burners BULLETIN MT2035-07/05 Modulating Valves for Atmospheric, Infrared, and Direct Fired Burners M/MR Series M411, M511, M611 M420, M520, M620, MR410, MR510, MR610 MR212D, MR212E, MR212G and MR212J (Flanged),

More information

Reset Volume Controller 2 Reversing Relay 3 Air Valve Actuator 4 Lower-of-Two-Pressures Relay 4 Diverting Relay 5 Higher-of-Two-Pressures Relay 5

Reset Volume Controller 2 Reversing Relay 3 Air Valve Actuator 4 Lower-of-Two-Pressures Relay 4 Diverting Relay 5 Higher-of-Two-Pressures Relay 5 Item Page Reset Volume Controller 2 Reversing Relay 3 Air Valve Actuator 4 Lower-of-Two-Pressures Relay 4 Diverting Relay 5 Higher-of-Two-Pressures Relay 5 Gradual Switch 6 Electric / Pneumatic (E.P.)

More information

Digiquartz Water-Balanced Pressure Sensors for AUV, ROV, and other Moving Underwater Applications

Digiquartz Water-Balanced Pressure Sensors for AUV, ROV, and other Moving Underwater Applications Digiquartz Water-Balanced Pressure Sensors for AUV, ROV, and other Moving Underwater Applications Dr. Theo Schaad Principal Scientist Paroscientific, Inc. 2002 Paroscientific, Inc. Page 1 of 6 Digiquartz

More information

HUMOR 20. High-precision Humidity Calibrator HUMOR 20. Operation

HUMOR 20. High-precision Humidity Calibrator HUMOR 20. Operation High-precision Humidity Calibrator The role of humidity calibrations that are accurate, reproducible, and documentable is becoming more and more important. ISO quality guidelines and regulations according

More information

BGA244 Binary Gas Analyzer

BGA244 Binary Gas Analyzer Quick Start Guide Revision 1.0 Certification Warranty Service certifies that this product met its published specification at the time of shipment. This product is warranted against defects in materials

More information

UBEC 1AT. AUTO TANK Fill System Installation, Operation, & Setup Instructions

UBEC 1AT. AUTO TANK Fill System Installation, Operation, & Setup Instructions Document Number: XE-ATA5PM-R1A UBEC 1AT AUTO TANK Fill System 08899155 Installation, Operation, & Setup Instructions Rev170906-EB-FRC PHYSICAL: 1302 WEST BEARDSLEY AVE ELKHART, IN 46514 WWW.ELKHARTBRASS.COM

More information

OBJECTIVE 22: EMERGENCY WORKERS, EQUIPMENT, AND VEHICLES - MONITORING AND DECONTAMINATION

OBJECTIVE 22: EMERGENCY WORKERS, EQUIPMENT, AND VEHICLES - MONITORING AND DECONTAMINATION OBJECTIVE Demonstrate the adequacy of procedures for the monitoring and decontamination of emergency workers, equipment, and vehicles. INTENT This objective is derived from NUREG-0654 which provides that

More information

Layout Guidelines. Overview

Layout Guidelines. Overview TECHNICA RESOURCES ayout Guidelines Included are the design layout guidelines for evaporative cooling products in several situations typically encountered by designers. These guidelines represent minimum

More information

Demand Control Ventilation Using CO 2

Demand Control Ventilation Using CO 2 ASHRAE Journal Ventilation Demand Control Ventilation Using By Mike Schell and Dan Int-Hout Member ASHRAE Member ASHRAE Carbon dioxide ( )-based demand controlled ventilation (DCV) is increasingly used

More information

Best Practice for Calibrating LTH Conductivity Instruments

Best Practice for Calibrating LTH Conductivity Instruments Application Note Best Practice for Calibrating LTH Conductivity Instruments As accurate process measurement becomes an everyday requirement it is vital to be able to calibrate conductivity instruments

More information

Application Block Library Fan Control Optimization

Application Block Library Fan Control Optimization Application Block Library Fan Control Optimization About This Document This document gives general description and guidelines for wide range fan operation optimisation. Optimisation of the fan operation

More information

MIL-STD-883G METHOD

MIL-STD-883G METHOD STEADY-STATE LIFE 1. PURPOSE. The steady-state life test is performed for the purpose of demonstrating the quality or reliability of devices subjected to the specified conditions over an extended time

More information

Series 7250 Ruska High-Speed Digital Pressure Controller. GE Sensing. Features

Series 7250 Ruska High-Speed Digital Pressure Controller. GE Sensing. Features Features Pressure ranges from 0 to 5 and 0 to 3000 psi (0 to 400 mbar and 0 to 210 bar) xi and 7250i provide advanced precision of 0.005% of reading provides 0.003% of full scale precision Stability: 0.0075%

More information

Air Eliminators and Combination Air Eliminators Strainers

Air Eliminators and Combination Air Eliminators Strainers Description Air Eliminators and Combination Air Eliminator Strainers are designed to provide separation, elimination and prevention of air in piping systems for a variety of installations and conditions.

More information

The routine maintenance and inspection of local exhaust ventilation (LEV)

The routine maintenance and inspection of local exhaust ventilation (LEV) The routine maintenance and inspection of local exhaust ventilation (LEV) This document details the standards for inspection and maintenance that should be achieved for all local exhaust ventilation owned

More information

LEV Inspection & Test Report

LEV Inspection & Test Report LEV Inspection & Test Report CLIENT: SITE: XXXXXXX LTD XXXXXXX Report Reference: Hinge Room-LEV System Identification: BeCu ESTA Survey Conducted By: Name: Position: Signed: XXXX Environmental Consultant

More information

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel TANK MANAGER FOR TWO TANKS OPERATING MANUAL 10/31/11 C-More T6C L color touch panel 1 TABLE OF CONTENTS GENERAL...3 INSTALLATION...4 STONE TEST PROCEDURE...7 OPERATIONAL SUMMARY...7 AUTO CARBONATION...10

More information

How to specify a product. Process Sensors and Mechanical Instruments

How to specify a product. Process Sensors and Mechanical Instruments How to specify a product Process Sensors and Mechanical Instruments Keep the overview. Here is some guideline information on how to specify our products. Intended as supplementary help to specification

More information

A Semi-Automated Functional Test Data Analysis Tool

A Semi-Automated Functional Test Data Analysis Tool A Semi-Automated Functional Test Data Analysis Tool Peng Xu, Philip Haves, Moosung Kim Lawrence Berkeley National Lab Synopsis The growing interest in commissioning is creating a demand that will increasingly

More information

SECTION TESTING ADJUSTING AND BALANCING FOR HVAC

SECTION TESTING ADJUSTING AND BALANCING FOR HVAC SECTION 23 05 93 - TESTING ADJUSTING AND [Note to PSC: Existing System Coordination When connecting to an existing system, it is the PSC s Responsibility to examine existing documents, field verify existing

More information

Biography. Abstract. Keywords. Body box, garments, validation, calibration, clean garments, IEST-RP-CC003.3, garment. Introduction and Scope

Biography. Abstract. Keywords. Body box, garments, validation, calibration, clean garments, IEST-RP-CC003.3, garment. Introduction and Scope NEW METHOD CALIBRATION FOR CALIBRATION OF A BODY BOX [Paper presented at IEST s ESTECH 2003 Conference, Phoenix, AZ, May 18-21] Rajan Jaisinghani, Technovation Systems, Inc. Biography Rajan (Raj) Jaisinghani

More information

1 PIPESYS Application

1 PIPESYS Application PIPESYS Application 1-1 1 PIPESYS Application 1.1 Gas Condensate Gathering System In this PIPESYS Application, the performance of a small gascondensate gathering system is modelled. Figure 1.1 shows the

More information

Testing the Vented, 7-Liter Induction Chamber. Report 6 April 2008

Testing the Vented, 7-Liter Induction Chamber. Report 6 April 2008 Report 6 April 2008 Page 1 of 11 Report 6 April 2008 The final review and approval of this document before its release to the client is the responsibility of the following person at Technical Safety Services.

More information

Title: Standard Operating Procedure for R&R Environmental Devices Model MFC201 Gas Dilution Calibrator

Title: Standard Operating Procedure for R&R Environmental Devices Model MFC201 Gas Dilution Calibrator Procedure No: SOP-029 Revision No: 1.1 (December 29, 2010) Page No.: 1 of 7 1. INTRODUCTION AND SCOPE To obtain timely data for the purpose of air quality assessment, air quality trend reporting, air quality

More information

OC Panel High Limit Aquastat Kit, Manual Reset p/n

OC Panel High Limit Aquastat Kit, Manual Reset p/n OC Panel High Limit Aquastat Kit, Manual Reset p/n 233202 Instruction Sheet APPLICATION The OC (Option Control) Panel High Limit Aquastat Kit provides electronic temperature sensing in a UL limit-rated

More information

Simple Set. Pressure Independent Control Valves 2 Way 1/2-2

Simple Set. Pressure Independent Control Valves 2 Way 1/2-2 The Bray Simple Set is a threaded pressure independent control (PIC) valve designed for a wide variety of hot water and chilled water control applications. The SS Series combines high rangeability control

More information

AMS 2710 PCB pressure sensor module with V output

AMS 2710 PCB pressure sensor module with V output FEATURES Universal pressure sensor module with 0.. 10 V voltage output Fully calibrated and temperature compensated sensor module Variants for (bidirectional) differential, gage, absolute and barometric

More information

LK-SX CO 2 +VOC. Application. Security Advice Caution. Notes on Disposal

LK-SX CO 2 +VOC. Application. Security Advice Caution. Notes on Disposal LK-SX CO 2 +VOC Sensor for detection of carbon dioxide (CO 2) and mixed gas content in air ducts Data sheet Subject to technical alteration Issue date: 24.08.2015 Application For detection of CO2 and VOC.

More information

BUBBLER CONTROL SYSTEM

BUBBLER CONTROL SYSTEM BUBBLER CONTROL SYSTEM Description: The LDBCS is a fully automatic bubbler system, which does liquid level measurements in water and wastewater applications. It is a dual air compressor system with, air

More information

VARIABLE AIR FLOW REGULATOR

VARIABLE AIR FLOW REGULATOR The RCV regulator is a variable air flow self-regulated system (VAV type). It is used to regulate the air flow in an area or room of a building according to a setpoint. The RCV regulator is also available

More information

Sontek RiverSurveyor Test Plan Prepared by David S. Mueller, OSW February 20, 2004

Sontek RiverSurveyor Test Plan Prepared by David S. Mueller, OSW February 20, 2004 Sontek RiverSurveyor Test Plan Prepared by David S. Mueller, OSW February 20, 2004 INTRODUCTION Sontek/YSI has introduced new firmware and software for their RiverSurveyor product line. Firmware changes

More information

Burner Management System DEMO Operating instructions

Burner Management System DEMO Operating instructions Burner Management System DEMO Operating instructions Burner Management System DEMO Operating Instructions Startup Summary - Normal startup is accomplished in four basic steps: 1. Leak Test a. Safety Valve

More information

Dynamic Positioning Control Augmentation for Jack-up Vessels

Dynamic Positioning Control Augmentation for Jack-up Vessels DYNAMIC POSITIONING CONFERENCE October 9-10, 2012 Design and Control Session Dynamic Positioning Control Augmentation for Jack-up Vessels By Bradley Deghuee L-3 Communications 1 Introduction Specialized

More information

Demand Responsive Lighting Control Acceptance Document (Page 1 of 5)

Demand Responsive Lighting Control Acceptance Document (Page 1 of 5) Demand Responsive Lighting Control Acceptance Document (Page 1 of 5) Note: Submit one Certificate of Acceptance for each system that Enforcement Agency Use: Checked by/date must demonstrate complianc Demand

More information

AUK Environmental Sensor. Determining the refractive index of the air. AUK Environmental Sensor

AUK Environmental Sensor. Determining the refractive index of the air. AUK Environmental Sensor AUK Environmental Sensor Environmental influences can be compensated in two ways: 1. "Manual" input of the current data for air temperature, humidity and pressure and the material temperature of the testpiece

More information

General Accreditation Guidance. User checks and maintenance of laboratory balances

General Accreditation Guidance. User checks and maintenance of laboratory balances General Accreditation Guidance User checks and maintenance of laboratory balances January 2018 Copyright National Association of Testing Authorities, Australia 2010 All intellectual property rights in

More information

Technical Data Sheet MF010-O-LC

Technical Data Sheet MF010-O-LC Technical Data Sheet MF010-O-LC - 1 - 1. Properties The oxygen measuring system MF010-O-LC determines the oxygen content in gas mixtures up to a temperature of 250 C. It is particularly suitable for the

More information

Flare Gas Composition Analysis and QA/QC Lessons Learned and Lessons Lost SPECTRUM ENVIRONMENTAL SOLUTIONS, LLC 1

Flare Gas Composition Analysis and QA/QC Lessons Learned and Lessons Lost SPECTRUM ENVIRONMENTAL SOLUTIONS, LLC 1 Flare Gas Composition Analysis and QA/QC Lessons Learned and Lessons Lost HERMAN HOLM SPECTRUM ENVIRONMENTAL SOLUTIONS, LLC 4C CONFERENCE APRIL 2018 SAN ANTONIO, TX SPECTRUM ENVIRONMENTAL SOLUTIONS, LLC

More information

Title: Standard Operating Procedure for Dasibi Model 5008 Gas Dilution Calibrator

Title: Standard Operating Procedure for Dasibi Model 5008 Gas Dilution Calibrator Procedure No: SOP-034 Revision No: 1.0 Revised Dec. 29, 2010 Page No.: 1 of 10 1. INTRODUCTION AND SCOPE This procedure is intended to describe the operations of the Dasibi model 5008 calibrator. The Dasibi

More information

AMS 6915 Board mount pressure sensor with digital output (I²C)

AMS 6915 Board mount pressure sensor with digital output (I²C) Board mount pressure sensor with digital output (I²C) FEATURES Calibrated and temperature compensated pressure sensor with digital output (I²C) Differential, relative (gage), bidirectional differential,

More information

NEW: CO2 incubator with sterilizable sensor

NEW: CO2 incubator with sterilizable sensor CB series - NEW 160 C2 incubators NEW: C2 incubator with sterilizable sensor The new CB series offers optimal growth conditions for cell cultures. The ANTI.PLENUM concept, the 180 C sterilization routine

More information

Built-in Purge Control Functions

Built-in Purge Control Functions Built-in Purge Control Functions Why clean a sensor? As the velocity sensor was calibrated clean, operating it clean also preserves the best calibration. Any build up of material on a thermal sensor tends

More information

DANGER WARNING IMPORTANT

DANGER WARNING IMPORTANT BWC Series Instructions for Field Conversion From: Natural Gas to LP LP to Natural Gas D E S I G N E D T O L E A D DANGER These instructions include a procedure for adjusting the air-fuel mixture on this

More information

Calibration Requirements for Direct Reading Confined Space Gas Detectors

Calibration Requirements for Direct Reading Confined Space Gas Detectors : Calibration Requirements for Direct Reading Confined Space Gas Detectors However, the definition of bump test has always been a little slippery. Some manufacturers differentiate between a bump test that

More information

Fail Operational Controls for an Independent Metering Valve

Fail Operational Controls for an Independent Metering Valve Group 14 - System Intergration and Safety Paper 14-3 465 Fail Operational Controls for an Independent Metering Valve Michael Rannow Eaton Corporation, 7945 Wallace Rd., Eden Prairie, MN, 55347, email:

More information

AMS 6916 Board mount pressure sensor with ratiometric analog output

AMS 6916 Board mount pressure sensor with ratiometric analog output FEATURES Piezoresistive pressure sensor with amplified analog output Calibrated and temperature compensated Ratiometric voltage output, 0.5 4.5 V Digital signal conditioning, 12 bit output resolution Differential,

More information

Radiator thermostats type RA2000, valve bodies type RA-FN (series D) and RA-G

Radiator thermostats type RA2000, valve bodies type RA-FN (series D) and RA-G Data sheet Radiator thermostats type RA2000, valve bodies type RA-FN (series D) and RA-G EN 215 Application RA2000 013G2910 Built-in sensor RA2000 013G2920 tamperproof RA2000 013G5062 remote temperature

More information

Operating Instructions METTLER TOLEDO Pipette Check Application for AX and MX/UMX Balances Version 1.xx

Operating Instructions METTLER TOLEDO Pipette Check Application for AX and MX/UMX Balances Version 1.xx Operating Instructions METTLER TOLEDO Pipette Check Application for AX and MX/UMX Balances Version 1.xx Contents 1 Introducing the Pipette Check application... 3 2 important notes... 3 3 Selecting the

More information