1 Chapter 32 SHIPBOARD OPERATIONS This Chapter takes the reader through a complete cycle of tanker loading and discharging operations, from a gas-free condition until a change of cargo is planned. When a gas carrier first comes alongside a berth to carry out cargo handling operations, it is essential that the preliminary procedures be properly completed. In particular, the questions given in the Safety Check-List should always be addressed. In line with Check-List questions, cargo handling plans should be developed and agreed jointly. Furthermore, written procedures should be established for controlling ship/shore cargo flow rates and for procedures covering general emergencies. It is in accordance with these plans that safe operations, as outlined in this Chapter, can be ensured Sequence of Operations Assuming a gas carrier comes directly from a shipbuilder or drydock, the general sequence of cargo handling operations is as follows. Edition CCNR/OCIMF 2010 Page 469

2 32.2 Tank Inspection, Drying and Inerting Tank Inspection Drying Before any cargo operations are carried out, it is essential that cargo tanks are thoroughly inspected for cleanliness; that all loose objects are removed; and that all fittings are properly secured. In addition, any free water must be removed. Once this inspection has been completed, the cargo tank should be securely closed and air drying operations may start. Drying the cargo handling system in any refrigerated tanker is a necessary precursor to loading. This means that water vapour and free water must all be removed from the system. If this is not done, the residual moisture can cause problems with icing and hydrate formation within the cargo system. (The reasons are clear when it is appreciated that the quantity of water condensed when cooling down a 1000 m 3 tank containing air at atmospheric pressure, 30 C and 100% humidity to 0 C would be 25 litres.) Whatever method is adopted for drying, care must be taken to achieve the correct dew point temperature - see Table 27.3(b). Malfunction of valves and pumps due to ice or hydrate formation can often result from an inadequately dried system. While the addition of antifreeze may be possible to allow freezing point depression at deep-well pump suctions, such a procedure must not substitute for thorough drying. (Antifreeze is only used on cargoes down to -48 C; propanol is used as a de-icer down to -108 C but below this temperature no de-icer is effective.) Tank atmosphere drying can be accomplished in several ways. These are described below. Drying using inert gas from the shore Drying may be carried out as part of the inerting procedure when taking inert gas from the shore (see Section 31.7) and this is now commonly done. This method has the advantage of providing the dual functions of lowering the moisture content in tank atmospheres to the required dew point and, at the same time, lowering the oxygen content. A disadvantage of this and the following method is that more inert gas is used than if it is simply a question of reducing the oxygen content to a particular value. For pressurised tanks the procedure should include a leak test with some overpressure. Drying using inert gas from tanker s plant Drying can also be accomplished at the same time as the inerting operation when using the tanker s inert gas generator but satisfactory water vapour removal is dependent on the specification of the inert gas system. Here, the generator must be of suitable capacity and the inert gas of suitable quality - but the necessary specifications are not always a design feature of this equipment. The tanker s inert gas generator is sometimes provided with both a refrigerated dryer and an adsorption drier which, taken together, can reduce dew points at atmospheric pressure to -45 C or below. A shipboard nitrogen generator is much more efficient. Edition CCNR/OCIMF 2010 Page 470

3 On board air-drying systems An alternative to drying with inert gas is by means of an air-drier fitted on board. The principle of operation is shown in Figure In this method, air is drawn from the cargo tank by a compressor or provided by the on board inert gas blower (without combustion) and passed through a refrigerated drier. The drier is normally cooled by R22 refrigerant. Here the air is cooled and the water vapour is condensed out and drained off. The air leaving the drier is, therefore, saturated at a lower dew point. Further reduction of the dew point can be achieved by a silica gel after-drier fitted downstream. Thereafter, the air may be warmed back to ambient conditions by means of an air heater and returned to the cargo tank. This process is continued for all ship tanks (and pipelines) until the dew point of the in-tank atmosphere is appropriate to carriage conditions. Figure Air Drying operational cycle Inerting - Before Loading Inerting cargo tanks, cargo machinery and pipelines is undertaken primarily to ensure a non-flammable condition during subsequent gassing-up with cargo. For this purpose, oxygen concentration must be reduced from 20.9 per cent to a maximum of five per cent by volume although lower values are often preferred - see Table 27.3(b). However, another reason for inerting is that for some of the more reactive chemical gases, such as vinyl chloride or butadiene, levels of oxygen as low as 0.1 per cent may be required to avoid a chemical reaction with the incoming vapour. Such low oxygen levels can usually only be achieved by nitrogen inerting provided from the shore (see Sections 27.7 and ). Edition CCNR/OCIMF 2010 Page 471

4 There are two procedures which can be used for inerting cargo tanks: displacement or dilution. These procedures are discussed below. Figure Inerting cargo tanks by the displacement method Inerting by displacement Inerting by displacement, also known as piston purge, relies on stratification of the cargo tank atmosphere based on the difference in vapour densities between the gas entering the tank and the gas already in the tank. The heavier gas (see Table 27.5) is introduced beneath the lighter gas at a low velocity to minimise turbulence. If good stratification can be achieved, with little mixing at the interface, then just one tank volume of the incoming inert gas is sufficient to change the atmosphere. In practice mixing occurs and it is necessary to use more than one tank-volume of inert gas. This amount may vary by up to four times the tank volume, depending on the relative densities of the gases together with tank and pipeline configurations. There is little density difference between air and inert gas (see Table 27.4); inert gas from a combustion generator is slightly heavier than air while nitrogen is slightly lighter. These small density differences make inerting by displacement difficult to achieve and usually the process becomes part displacement and part dilution (discussed below). Edition CCNR/OCIMF 2010 Page 472

5 Inerting by displacement is an economical procedure as it uses the least amount of inert gas and takes the shortest time. However, it is only practical when mixing with the initial tank vapour can be limited. If the tank shape and the position of pipe entries are suitable for the displacement method, then results will be improved by inerting more than one tank at a time. This should be done with the tanks aligned in parallel. The sharing of the inert gas generator output between tanks reduces gas inlet speeds, so limiting vapour mixing at the interface. At the same time the total inert gas flow increases due to the lower overall flow resistance. Tanks being inerted in this way should be monitored to ensure equal sharing of the inert gas flow. Inerting by dilution When inerting a tank by the dilution method, the incoming inert gas mixes, through turbulence, with the gas already in the tank. The dilution method can be carried out in several different ways and these are described below: Dilution by repeated pressurisation In the case of Type C tanks, inerting by dilution can be achieved through a process of repeated pressurisation. Each repetition brings the tank nearer and nearer to the oxygen concentration of the inert gas. Thus, for example, to bring the tank contents to a level of five per cent oxygen within a reasonable number of repetitions, inert gas quality of better than five per cent oxygen is required. It has been found that quicker results will be achieved by more numerous repetitions, each at low pressurisation, than by fewer repetitions at higher pressurisation. Continuous dilution Inerting by dilution can be carried out as a continuous process. Indeed, this is the only diluting process available for Type A tanks which have very small over-pressure or vacuum capabilities. For a true dilution process, (as opposed to one aiming at displacement) it is relatively unimportant where the inert gas inlet or the tank efflux are located, provided that good mixing is achieved. Accordingly, it is usually found satisfactory to introduce the inert gas at high speed through the vapour connections and to discharge the gas mixture via the bottom loading lines. Where a number of tanks are to be inerted, it may be possible to achieve a reduction in the total volume of inert gas used, and the overall time taken, by inerting tanks one after the other in series. This procedure also inerts pipelines and equipment at the same time. (On some tankers, cargo and vapour pipeline arrangements may prevent more than two tanks being linked in series.) The extra flow resistance of a series arrangement will decrease the inert gas flow rate below that achievable when inerting tanks individually. As can be seen from the foregoing discussion, the optimum arrangement for inerting by dilution will differ from tanker to tanker and may be a matter of experience. Edition CCNR/OCIMF 2010 Page 473

6 Inert gas - general considerations It can be seen from the preceding paragraphs that inert gas can be used in different ways to achieve inerted cargo tanks. No one method can be identified as the best since the choice will vary with tanker design and gas density differences. Generally, each individual tanker should establish its favoured procedure from experience. As already indicated, the displacement method of inerting is the best but its efficiency depends upon good stratification between the inert gas and the air or vapours to be expelled. Unless the inert gas entry arrangements and the gas density differences are appropriate to stratification, it may be better to opt for a dilution method. This requires fast and turbulent entry of the inert gas, upon which the efficiency of dilution depends. Whichever method is used, it is important to monitor the oxygen concentration in each tank from time to time, from suitable locations, using the vapour sampling connections provided. In this way, the progress of inerting can be assessed and, eventually, assurance can be given that the whole cargo system is adequately inerted. While the above discussion on inerting has centered on using an inert gas generator, the same principles apply to the use of nitrogen. The use of nitrogen may be required when preparing tanks for the carriage of chemical gases such as vinyl chloride, ethylene or butadiene. Because of the high cost of nitrogen, the chosen inerting method should be consistent with minimum nitrogen consumption. Inerting prior to loading ammonia Modern practice demands that ships tanks be inerted with nitrogen prior to loading ammonia. This is so, even though ammonia vapour is not readily ignited. Inert gas from a combustion-type generator must never be used when preparing tanks for ammonia. This is because ammonia reacts with the carbon dioxide in inert gas to produce carbamates. Accordingly, it is necessary for nitrogen to be taken from the shore as shipboard nitrogen generators are of small capacity. The need for inerting a ship s tanks prior to loading ammonia is further underscored by a particular hazard associated with spray loading. Liquid ammonia should never be sprayed into a tank containing air as there is a risk of creating a static charge which could cause ignition. (Mixtures of ammonia in air also introduce an additional risk as they can accelerate stress corrosion cracking - see Section 27.5.) Edition CCNR/OCIMF 2010 Page 474

7 32.3 Gassing-up Gassing-up is absolutely necessary if a cooling plant is to be used since cooling plants cannot handle inert gases. Gassing-up operations are undertaken using cargo supplied from the shore. At certain terminals, facilities exist to allow the operation to be carried out alongside but these terminals are in a minority. This is because the venting of hydrocarbon vapours alongside a jetty may present a hazard and is, therefore, prohibited by most terminals and port authorities. Thus, well before a tanker arrives in port with tanks inerted, the following points must be considered by the Master: Is venting allowed alongside? If so, what is permissible? Is a vapour return facility to a flare available? Is liquid or is vapour provided from the terminal for gassing-up? Will only one tank be gassed-up and cooled down initially from the shore? How much liquid must be taken on board to gas-up and cool-down the remaining tanks? Where can the full gassing-up operation be carried out? Before commencing gassing-up operations alongside, the terminal will normally sample tank atmospheres to check that the oxygen is less than five per cent for LPG cargoes (some terminals require as low as 0.5 per cent) or the much lower concentrations required for chemical gases such as vinyl chloride - see Table 27.3(b). Figure 32.3(a) - Gassing-up cargo tanks using liquid from shore Edition CCNR/OCIMF 2010 Page 475

8 Figure 32.3(b) - Gassing-up cargo tanks using vapour from shore Where no venting to atmosphere is permitted, a vapour return facility must be provided and used throughout the gassing-up operation. In this case, either the tanker s cargo compressors or a jetty vapour blower can be used to handle the efflux. Some terminals, while prohibiting the venting of cargo vapours, permit the efflux to atmosphere of inert gas. Thus, if a displacement method of gassing-up is used - see Section the need for vapour return to shore may be postponed until cargo vapours are detected at the vent riser. This point may be considerably postponed if tanks are gassed-up one after the other in series. Where a terminal supplies a liquid for gassing-up, it should be loaded at a carefully controlled rate. It is then passed through the tanker s vaporiser. Alternatively, the liquid may be allowed to vaporise in the ship s tanks. If vapour is supplied, this can be introduced into the tank at the top or bottom depending on the vapour density (see Table 27.5). Figures 32.3(a) and 32.3(b) show typical gassing-up operations using liquid from shore and vapour from shore, respectively. When a tanker arrives alongside with tanks containing a cargo vapour which requires to be replaced with the vapour of a different grade, then the terminal will normally provide a vapour return line. The vapours taken to the shore will be flared until the desired vapour quality is achieved in the tanks. At this point cool-down can begin. Edition CCNR/OCIMF 2010 Page 476

9 Recent developments have been made in LPG vapour recovery systems. Such systems are using the energy obtained from vapourising liquid nitrogen to reliquefy the cargo vapour returned from the tanker, either during gassing-up operations or during inerting operations, (see Section ) thus avoiding any venting of hydrocarbon gases. The skid mounted unit would recieve liquid nitrogen from a truck, vapourise it for delivery to the tanker and at the same time reliquefy the return cargo vapour for storage and further usage Cool-Down Cool-down - refrigerated tanker Cooling down is necessary to avoid excessive tank pressures (due to flash evaporation) during bulk loading. Cool-down consists of spraying cargo liquid into a tank at a slow rate. The lower the cargo carriage temperature, the more important the cool down procedure becomes. Before loading a refrigerated cargo, the cargo tanks must be cooled down slowly in order to minimise thermal stresses. The rate at which a cargo tank can be cooled, without creating high thermal stress, depends on the design of the containment system and is typically 10 C per hour. Reference should always be made to the tanker s operating manual to determine the allowable cool-down rate. The normal cool-down procedure takes the following form. Cargo liquid from shore (or from deck storage) is gradually introduced into the tanks either through spray lines, if fitted for this purpose, or via the cargo loading lines. The vapours produced by rapid evaporation may be taken ashore or handled in the tanker s reliquefaction plant. Additional liquid is then introduced at a rate depending upon tank pressures and temperatures. If the vapour boiloff is being handled in the tanker s reliquefaction plant, difficulties may be experienced with incondensibles, such as nitrogen, remaining from the inert gas. A close watch should be kept on compressor discharge temperatures and the incondensible gases should be vented from the top of the condenser as required (see Section 32.6). Edition CCNR/OCIMF 2010 Page 477

10 Figure Cargo tank cool-down using liquid from shore: vapour returned to shore As the cargo containment system cools down, the thermal contraction of the tank combined with the drop in temperature around it tend to cause a pressure drop in the hold and interbarrier spaces. Normally, pressure control systems supplying air or inert gas will maintain these spaces at suitable pressures but a watch should be kept on appropriate instruments as the cool-down proceeds. Cool-down should continue until boil-off eases and liquid begins to form in the bottom of the cargo tanks. This can be seen from temperature sensors. At this stage, for fully refrigerated ammonia for example, the pool of liquid formed will be at approximately -34 C while the top of the tank may still be at -14 C. This gives a temperature difference of 20 C. The actual temperature difference depends on the size of the cargo tank and the spray nozzles positions. Difficulties that may occur during cool-down can result from inadequate gassing-up (too much inert gas remaining) or from inadequate drying. In this latter case, ice or hydrates may form and ice-up valves and pump shafts. In such cases, antifreeze can be added, provided the cargo is not put off specification, or the addition will not damage the electrical insulation of a submerged cargo pump. Throughout the cool-down, deepwell pump shafts should be turned frequently by hand to prevent the pumps from freezing up. Edition CCNR/OCIMF 2010 Page 478

11 32.5 Loading Once the cargo tanks have been cooled down, cargo pipelines and equipment should be cooled down. Figure 32.4 shows the pipeline arrangement for tank cool-down using liquid supplied from the shore. Cool-down - semi-pressurised tankers Most semi-pressurised ships have cargo tanks constructed of steels suitable for the minimum temperature of fully refrigerated cargoes. However, care must be taken to avoid subjecting the steel to lower temperatures. It is necessary to maintain a pressure within the cargo tank at least equal to the saturated vapour pressure corresponding to the minimum allowable steel temperature. This can be done by passing the liquid through the cargo vaporiser and introducing vapour into the tank with the cargo compressor. Alternatively, vapour can be provided from the shore Loading - Preliminary Procedures Before loading operations begin, the pre-operational ship/shore procedures must be thoroughly discussed and carried out. Appropriate information exchange is required and the relevant parts of the Safety Check List should be completed. Particular attention should be paid to: The setting of cargo tank relief valves and high alarm pressures. Remotely operated valves. Reliquefaction equipment. Gas detection systems. Alarms and controls, and The maximum loading rate. This should all be carried out taking into account restrictions in ship/shore systems. The terminal should provide the necessary information on the cargo, including inhibitor certificates where inhibited cargoes are loaded (see Section 27.8). Any other special precautions for specific cargoes should be made known to tanker personnel. This may include the lower compressor discharge temperatures required for some chemical gas cargoes (see Section 32.6). Where fitted, variable setting pressure relief valves, high tank pressure alarms and gas detection sample valves should be correctly set. The ballast system for gas carriers is totally independent of the cargo system. Deballasting can, therefore, take place simultaneously with loading, subject to local regulations. Tanker stability and stress are of primary importance during loading. Procedures for these matters are in accordance with normal tanker practice. Edition CCNR/OCIMF 2010 Page 479

12 The tanker s safety Trim, stability and stress The cargo plan should allow for distribution within the tanker in order to achieve acceptable structural stress and the required trim to meet safe stability conditions when underway. For these purposes, the weight of the cargo in each tank will need to be known. For tanker stability purposes, the weight in question is the true weight-in-air. The weight-in-air of liquefied gases, calculated for cargo custody purposes, is not exact in that the cargo vapour in these calculations is assumed to be liquid of the same mass as the vapour. Thus, the air buoyancy of the cargo vapour spaces has been neglected. However, for practical purposes concerning a tanker s stability calculation, this may be ignored. Often gas carriers, as part of the statutory requirements, are provided with stability data, including worked examples showing cargo loaded in a variety of ways. In conjunction with consumables such as fresh water, spare parts and bunkers on board, these conditions provide cargo storage guidelines to tanker s personal in order to maintain the tanker in a safe and stable condition. Additionally, as part of the requirements to obtain a Certificate of Fitness in compliance with the Gas Codes, the stability conditions must be such that, in specified damaged conditions, the tanker will meet certain survival requirements. It is, therefore, essential that all relevant guidance concerning the filling of cargo tanks be observed. Figure Loading with vapour return Edition CCNR/OCIMF 2010 Page 480

13 Control of Vapours During Loading The control of cargo vapours during loading can be carried out by using: A vapour return line to the shore coupled to a gas compressor. The tanker s reliquefaction plant for liquid return to the ship s tanks, or Both of the above. When loading with a vapour return line in use, the loading rate is independent of the capacity of the ship s reliquefaction plant and is governed by: The flow rate acceptable to the tanker and terminal, and The capacity of the cargo vapour compressor. For fully refrigerated or semi-pressurised LPG tankers, a vapour return line is normally connected to the tanker s vapour manifold but this is most often put in place for safety relief purposes. Normal loading practice on such tankers is to load through the liquid header, to draw off excess vapour via the vapour header, to operate the reliquefaction plant and to return the liquid to the ship s tank via the condensate return line. Figure Loading without vapour return Edition CCNR/OCIMF 2010 Page 481

14 This operation controls cargo boil-off and ensures that tank pressure limits are not exceeded. The pipeline arrangement is shown in Figure The introduction of a reliquefaction plant in the system can mean that loading rates are restricted by the capacity of the machinery. It is in this sense that the vapour return line acts as a safety device; should tank pressures become excessive, the tanker s vapour manifold valve can be opened to relieve the situation. (For pressurised LPG carriers, the system should be similar to that described in this paragraph, and a vapour return should be fitted for safety relief purposes. However, a reliquefaction system is not fitted to such tankers and loading is normally achieved by shore pumps creating sufficient pressure to allow cargo tank vapour to continuously condense into the bulk liquid.) Where refrigerated storage is found in a terminal, the terminal s reliquefaction capacity is usually greater than that provided on board tanker. As a result, where an LPG vapour return is used loading rates can be higher than those described in the previous paragraph. However, while advantageous, such systems for LPG are relatively rare. A problem experienced when using vapour returns in the LPG trades is that terminals can be concerned about the vapour quality to be returned to the shore. This is especially so at the early stages of loading. Terminal personnel can be concerned about residual nitrogen which acts as an incondensible during reliquefaction. They may also be concerned about contamination with vapours from previous cargoes. It is also difficult to account for the vapour returned to shore, especially if it is flared. This can lead to an overstatement of the Bill of Lading quantity, unless credit is given for the returned vapour. For these reasons it is unusual to find LPG terminals accepting return gas other than for safety reasons and then only to a flare Loading - Early Stages Loading refrigerated tankers When liquefied gas is being loaded, it is necessary to consider the location, pressure, temperature and volume of the shore tanks as well as the terminal s pumping procedures. Fully refrigerated tankers usually load from fully refrigerated storage where tanks typically operate at a pressure of approximately 60 millibars. This pressure will allow the cargo at the bottom of a full shore tank to sustain a temperature perhaps one degree Centrigrade warmer than its atmospheric boiling point. When this cargo is pumped to the jetty, the pumping energy required for transfer is dissipated in the liquid as heat, to which must be added the heat flow into the liquid through the pipelines. The cargo may, therefore, arrive on the tanker at an even warmer temperature. When loading without a vapour return line being used, the vapour which is displaced by the incoming liquid must be reliquefied on board. The power required for this, and to compensate for the pumping energy and the heat flux through the insulation, may leave little capacity for cooling the cargo during loading. Edition CCNR/OCIMF 2010 Page 482

15 Therefore, as can be seen from the foregoing paragraphs, the early stages of loading can be critical, particularly where significant distances exist between the storage tank and jetty. The ship s tank pressures must be regularly checked and on no account should relief valves be allowed to lift. Loading rates should be reduced, and if necessary stopped, when difficulties are experienced in maintaining acceptable tank pressures. In some ports in hot countries, where the terminal has long pipelines, this feature can be difficult to overcome. Under these circumstances, cargo stoppage would allow the pipeline contents once again to rise in temperature. Accordingly, in such ports, cargo flow should be maintained as long as it is safe to do so until cold product can be received on board at which time tank pressures will fall. A rise in ship s tank pressure in the early stages of loading can also be controlled to some extent by loading limited quantities of liquid into the cargo tank via the top sprays, if fitted. This will help to condense some of the cargo vapours. Loading pressurised tankers Pressurised tankers normally arrive at a loading terminal having cargo tanks at atmospheric pressure. Firstly, the tanker requests vapours from the shore to purge any remaining nitrogen or contaminants from the tanks. This also allows the equalisation of tanker and shore pressures. Thereafter, the method used is to start loading in one tank at a high flow rate via the bottom line to avoid local low temperatures. In this case, as the liquid is allowed through, local flash-cooling can occur and it is important to ensure that at no time, tank or pipeline temperatures are allowed to fall below design limitations. Loading pressurised tankers from refrigerated storage The cargo tanks on fully pressurised tankers are made from carbon steel which is only suitable for a minimum temperature of between 0 C and 10 C. In contrast, LPG when stored in the fully refrigerated condition is maintained at the temperatures given in Table Consequently, some refrigerated cargoes require considerable heating prior to loading on such tankers. Given that fully pressurised tankers may not have cargo heaters fitted on board, all heat input must be provided by pumping through heaters fitted on shore. Of course, on a pressurised tanker, having loaded a cargo at close to 0 C, the cargo may warm up further during the voyage in accordance with ambient conditions. The Gas Codes only allow cargo to be loaded to such a level that the tank filling limit will never be more than 98 per cent at the highest temperature reached during the voyage. This means that, during pre-loading discussions, tank topping-off levels must be established to allow sufficient room for liquid expansion into the vapour space while on voyage. Edition CCNR/OCIMF 2010 Page 483

16 Loading semi-pressurised tankers from refrigerated storage The cargo tanks on semi-pressurised tankers are usually constructed of low temperature sheets able to accommodate fully refrigerated propane at temperatures of between -40 C and -50 C - or even for ethylene carriers at -104 C. Refrigerated cargoes can therefore be loaded directly to such tankers without heating. In addition, these tankers can usually maintain fully refrigerated temperatures on voyage and this is often done to gain more space so that a greater weight of cargo can be carried. The tank pressure must however always be maintained slightly above atmospheric. Temperatures of sub-cooled products under vacuum conditions can reach levels much lower than what is acceptable for the tank material. However, when discharge to pressurised storage is planned, this is conditional on the tanker having suitable equipment to warm the cargo. On semi-pressurised tankers, the cargo is occasionally allowed to warm up during the loaded voyage and in this case, a similar procedure to that described for fully pressurised tankers applies. Terminal pipeline system and operation Where a terminal can expect to load fully pressurised tankers not fitted with their own heaters, in-line equipment fitted to terminal pipeline systems is needed. This usually comprises the following: Shore tank. Cargo pump. Booster pump. Cargo heater. Suitably sized loading arm. When considering a refrigerated terminal loading a fully pressurised tanker, given that loading temperatures on these tankers are limited to about 0 C, loadings can normally be managed by pumping through the refrigerated pipelines rated at 19 bar. Operation of the system takes the following form: Firstly, until back pressure starts to build up from the tanker, loading is carried out by pumping only through the cargo heater then, as the back pressure increases, the booster pump is also brought into operation. At the start of loading, the pressure in a ship s tank should be at least 3 bar. This pressure will limit flashing-off and sub-cooling as the first liquid enters the tank. At this time, in-tank cargo temperatures should be carefully watched. Practical observation is also of value, with the sighting of ice formation on pipelines acting as a warning that temperatures on board the tanker are falling below safe levels. In such cases, loading must be stopped until temperatures increase and the problem is resolved. Small tanker problems at large berths A primary concern for the loading of small tankers is that refrigerated storage is most often designed for large ship/shore operations. At the jetty, this means that mooring plans must be properly adapted to accommodate the very different mooring patterns from small tankers and that loading arms or hoses are of a size suited to the operation. Edition CCNR/OCIMF 2010 Page 484

17 Large loading arms can introduce difficulties on small tankers. If the berth is in an exposed area, a small tanker (being more sensitive, than a larger tanker, to the sea state) may roll and pitch at the berth. The loading arm has to keep pace with these fast movements and this is quite a different question from any slow changes (say tidal) which may be accommodated under normal design considerations. Here, the inertia of the loading arm has to be taken into account. At present, such dynamic forces are not considered in loading arm design and manufacturers leave this for terminal managers to address in operational procedures. In such cases, a possible solution is the use of cargo hose Bulk Loading Depending on the efficiency of the earlier gassing-up operation, significant quantities of incondensible gases may be present in tank atmospheres and, without vapour return to shore, these incondensibles will have to be vented via the tanker s purge-gas condenser (where fitted) or, alternatively, from the top of the cargo condenser. Figure shows a purge-gas condenser arrangement. Care must be taken when venting incondensibles to minimise venting of cargo vapours to the atmosphere. As the incondensibles are vented, the condenser pressure will drop and the vent valve should be throttled and eventually closed. A close watch should be kept on the ship s cargo tank pressures, temperatures, liquid levels and interbarrier space pressures, throughout the loading operation. Monitoring of liquid levels may present difficulties when the reliquefaction plant is in operation. This is because the liquid in the tank is boiling heavily at these times and, as a result, vapour bubbles within the liquid increase its volume, thus giving false readings when using floattype ullage gauges. Accurate level monitoring can be achieved by suppressing boiling and this can be done by temporarily closing the vapour suction from the tank. Towards the end of loading, transfer rates should be reduced as previously agreed with shore personnel in order to accurately top-off tanks. On completion of loading, tanker s pipelines should be drained back to the cargo tanks. Remaining liquid residue can be cleared by blowing ashore with vapour, using the tanker s compressor. Alternatively, this residue may be cleared by nitrogen injected into the loading arm to blow the liquid into the ship s tanks. Once liquid has been cleared and pipelines have been depressurised, manifold valves should be closed and the hose or loading arm disconnected from the manifold flange. In many ports it is a requirement, before disconnection takes place, for the hard arm, hose and pipelines at the manifold to be purged free from flammable vapour. The relief valves of some tankers have dual settings to allow higher tank pressures during the loading operation. If relief valve settings are altered by changing the pilot spring, then the procedure must be properly documented and logged and the current MARVS must be prominently displayed. Relief valves must be reset before the tanker departs. When relief valve pressure settings are changed, high pressure alarms have to be readjusted accordingly. Edition CCNR/OCIMF 2010 Page 485

18 Cargo Tank Filling Limits The goal of filling limits is: Economical and safe use of tank capacity. To avoid overfilling of tanks, in this respect more than 98 % is seen as overfilling. To avoid tank failure in the exceptional case of fire conditions. The use of different settings of safety valves should be avoided as far as practical or only with additional safety procedures. Tanks should be provided with double safety valves with a manual valve under each safety valve. Both safety valves should be in the open position under normal conditions. There should be means to avoid the possibility to close both valves at the same time. Chapter 15 (amended 1994) of the IGC code gives guidance for best practice on how to determine the maximum filling limits. This includes the required technical lay-out and procedures. Short description of the IGC Code regulation: The large thermal coefficient of expansion of liquefied gas necessitates requirements for maximum allowable filling limits for cargo tanks in order to avoid over filling of the cargo tanks. Filling limits differ and depend on: product, transport conditions and regions. For particular regions there may be prescribed filling conditions which must be adhered to. The latest developments for determining filling limits are laid down in the amended Chapter 15 of the IGC code. For the purpose of this Chapter the following definitions apply: 1. Reference Temperature means the highest temperature which may be reached upon termination of loading, during transport, or during unloading, under the ambient design temperature conditions. 2. Filling limit (FL) expressed in % means the maximum allowable liquid volume in a cargo tank relative to the tank volume when the liquid cargo has reached the reference temperature. 3. Loading limit (LL) expressed in % means the maximum allowable liquid volume relative to the tank volume to which a tank may be loaded in order to avoid the liquid volume exceeding the allowable filling limit in service. The administration may allow a higher filling limit than the limit of FL = 98% specified at the reference temperature, taking into account the shape of the tank, arrangements of pressure relief valves, accuracy of level and temperature gauging and the difference between the loading temperature and the reference temperature, provided the conditions specified in the IGC Code, Chapter are maintained. Edition CCNR/OCIMF 2010 Page 486

19 The maximum loading limit (LL) to which a cargo tank may be loaded is determined by the following formula: ρr LL = FL ρl where: FL = filling limit as specified ρr = relative density of the cargo at the reference temperature. ρl = relative density of the cargo at the loading temperature and pressure. Information to be provided to the Master The maximum allowable tank loading (LL) for each tank should be indicated for each product which may be carried, for each loading temperature which may be applied and for the applicable maximum reference temperature, on a list to be provided by the administration. The pressure at which the pressure relief valves have been set shoud also be stated on the list. A copy of the list should be permanently kept on board by the Master. The use of the above formula requires a special layout of the venting system which is laid down in Chapter 8 of the Gas Code. There are good safety reasons for minimising cargo shut-out. The concept is very simple. The fuller the tank, the longer the tank structure will be able to withstand fire conditions. The tank contents, when exposed to a fire, will boil at a constant temperature until the bulk of the liquid has been vented through the relief valve system. After this, the upper regions of the tank become exceedingly hot and eventually fail. However, the greater the mass of liquid inside the tank, the longer the tank can withstand unacceptable external temperatures. General Local requirements may have different approaches to the prescription of maximum filling limits but, in any event, the temperature influences on liquefied gases should not be ignored. Edition CCNR/OCIMF 2010 Page 487

20 Example Case 1 (amended Gas Code regulation) A fully pressurised ship loading propane at 5 C. ρr LL = FL ρl Reference temperature as calculated under amended Gas Code 20 C Density of liquid propane at 20 C = 500 kg/m 3 Loading temperature 5 C Density of liquid propane at 5 C = 522 kg/m LL = 98 x = 93.9% 522 Thus, the tank can be loaded to 93.9% of tank volume. Case 2 (amended Gas Code regulation) A fully-pressurised tanker loading propane at -10 C. Reference temperature as calculated under amended Gas Code +15 C Density of liquid propane at 15 C = 508 kg/m 3 Loading temperature = -10 C Density of liquid propane at -10 C = 542kg/m LL = 98 x = 91.9% 542 Thus, the tank can be loaded to 91.9% of tank volume The Loaded Voyage Cargo temperature control For all refrigerated and semi-pressurised gas carriers, it is necessary to maintain strict control of cargo temperature and pressure throughout the loaded voyage. This is achieved by reliquefying cargo boil-off and returning it to the tanks (see also Sections 32.5 and 31.5). During these operations, incondensibles must be vented as necessary to minimise compressor discharge pressures and temperatures. Frequently, there are occasions when it is required to reduce the temperature of an LPG cargo on voyage. This is necessary so that the tanker can arrive at the discharge port with cargo temperatures below that of the shore tanks, thus minimising the amount of flash gas. Depending on the cargo and reliquefaction plant capacity, it can often take several days to cool the cargo by one or two degrees centigrade, but this may be sufficient. The need for this will often depend on the contractual terms in the charter party. Edition CCNR/OCIMF 2010 Page 488

21 In this respect, poor weather conditions can sometimes present problems. Although most reliquefaction plants have a suction knock-out drum to remove liquid, there is a risk, in gale conditions, that entrained liquid can be carried over into the compressor. For this reason, it is preferable not to run compressors when the tanker is rolling heavily, if there is risk of damage. In calm weather conditions, if the condensate returns are passed through the top sprays, because of the small vapour space and poor circulation in the tank, it is possible that a cold layer can form on the liquid surface. This enables the compressors to reduce the vapour pressure after only a few hours running, when in fact the bulk of the liquid has not been cooled at all. To achieve proper cooling of the bulk liquid, the reliquefaction plant should be run on each tank separately and the condensate should be returned through a bottom connection to ensure proper circulation of the tank contents. After the cargo has been cooled, reliquefaction capacity can be reduced to a level sufficient to balance the heat flow through the tank insulation. Figure 32.7 shows the arrangement for cooling down cargoes on a loaded voyage. If the reliquefaction plant is being run on more than one tank simultaneously, it is important to ensure that the condensate returns are carefully controlled in order to avoid the overfilling of any one tank. Figure Cargo refrigeration at sea Edition CCNR/OCIMF 2010 Page 489

22 Prevention of polymerisation Where butadiene cargoes are being carried, the compressor discharge temperature must not exceed 60 C and the appropriate high discharge temperature switch must be selected. Similarly, in the case of vinyl chloride, compressor discharge temperatures should be limited to 90 C to prevent polymerisation (see also Section 27.8). Condition inspections Throughout the loaded voyage, regular checks should be made to ensure there are no defects in cargo equipment and no leaks in nitrogen or air supply lines. Such inspections must comply with all relevant safety procedures for entry into enclosed spaces and due regard must be given to hazardous atmospheres in adjacent spaces Operation of the Reliquefaction Plant As already mentioned in Section 31.5, the reliquefaction plant is used during cargo loading to handle the vapours formed by evaporation and displacement. At this time, it is likely that the maximum compressor capacity will be required. On the loaded voyage, and depending on cargo temperature, ambient temperature, and the design of tank insulation, the plant may be operated continuously or intermittently. If it is necessary to reduce the temperature of the cargo before reaching the discharge port, for example, to comply with the receiving terminal requirements or charter party stipulations, the plant will again be operating continuously. Before starting the reliquefaction plant, it is necessary to ensure that oil levels in the compressors are correct and that the glycol/water cooling system is ready for operation (see Section ). This will require a check to make sure the header tank is full and that the cooling fluid is circulating. The lubricating oil in compressors must be compatible with the cargo being handled and must be changed if necessary. (When changing from butane/propane mixtures to other grades, it will be necessary to change the oil.) Before starting a cargo compressor, the condenser cooling system must be operating with harbour water circulating or the R22 system running. Compressors should always be started and stopped in accordance with the manufacturer s instructions. Compressor discharge valves should be opened and suction valves opened slowly to minimise damage from liquid carry-over (see Section ). The cooling water outlet temperature should be adjusted in accordance with the manufacturer s instructions. The following details should be checked regularly: Suction, inter-stage (see Section 31.5) and discharge pressures. Lubricating oil pressures. Gas temperatures on the suction and delivery side of compressor (high discharge temperature switches protect the compressor). Here, inspection of the appropriate Mollier diagram will assist in gaining maximum benefit from the compressor by ensuring that it operates along the appropriate line of constant entropy (see Section 27.21). Current drawn by electric motor. Oil leakage from shaft seal, and Cooling water temperature. Edition CCNR/OCIMF 2010 Page 490

23 Stopping the cargo compressor should always be carried out in accordance with the manufacturer s instructions. Generally, the first action is to stop the compressor. This is followed by closure of the suction and discharge valves. The glycol/water system (see Section ) is left running to provide crankcase heating or, alternatively, the lubricating oil heater should be left switched on Discharging When a tanker arrives at the discharge terminal, cargo tank pressures and temperatures should be in accordance with terminal requirements. This will help maximum discharge rates to be achieved. Before the discharge operation begins, the pre-operational ship/shore procedures should be carried out along similar lines to the loading operation previously outlined. The method of discharging the tanker will depend on the type of tanker, cargo specification and terminal storage. Three basic methods may be used: Discharge by pressurising the vapour space. Discharge with or without booster pumps. Discharge via booster pump and cargo heater. These methods are discussed in , and below Discharge by Pressurising the Vapour Space Discharge by pressure using either a shore vapour supply or a vaporiser and compressor on board is only possible where Type C tanks are fitted. It is an inefficient and slow method of discharge and is restricted to small tankers of this type. Using this system, the pressure above the liquid is increased and the liquid is transferred to the terminal. An alternative method is to pressurise the cargo into a small deck tank from which it is pumped to the shore Discharge by Pumps Starting cargo pumps A centrifugal pump should always be started against a closed, or partially open, valve in order to minimise the starting load. Thereafter, the discharge valve should be gradually opened until the pump load is within safe design parameters and liquid is being transferred ashore. As the discharge proceeds, the liquid level in the cargo tanks should be monitored. Discharge and ballasting operations should be carefully controlled, bearing in mind tanker stability and hull stress. Edition CCNR/OCIMF 2010 Page 491

24 Removal of liquid from the cargo tank may cause changes in interbarrier space pressures and these should be monitored throughout the discharge. Figure Combined tanker and shore cargo pumping characteristics - single pump Discharging by centrifugal cargo pumps, either alone or in series with booster pumps, is the method adopted by most tankers and an understanding of the centrifugal pump characteristic (as outlined in Section 31.2) is essential for efficient cargo discharge. Figure 32.8 shows a cargo pump Q/H curve (flow against head) superimposed on a system resistance curve (or system characteristic). The graph shows the head or back pressure in mlc (metres liquid column) in the terminal pipeline system against flow rate measured in cubic metres per hour. Increasing the flow rate increases the back pressure. This varies approximately as the square of the flow rate, giving the shape of system characteristic curve as shown. The point where the two curves intersect is the flow rate and head at which the pump will operate. Some of the above points are further demonstrated by inspection of Figure This diagram shows a gas carrier alongside a jetty discharging to shore storage set at some elevation. The elevation of the tank introduces the concept of static head - this being the back pressure exerted at the pump even when pumps are not running. It can be seen that the static head changes as the tanker moves up and down with the tide and as the level in the shore tank alters. The diagram also indicates that the friction head loss is largely dependant on the length of the pipeline system. Edition CCNR/OCIMF 2010 Page 492

LNG Cargo Operations. Juan Manuel Martín Ordax

LNG Cargo Operations. Juan Manuel Martín Ordax Juan Manuel Martín Ordax If we consider that the gas carrier is coming directly from a shipbuilder or a drydock, the sequence of cargo operations would be as follows: Source: Liquefied Gas Handling Principles

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

17. CARGO MEASUREMENT AND CALCULATION

17. CARGO MEASUREMENT AND CALCULATION Page 1 17. CARGO MEASUREMENT AND CALCULATION 17.1 GENERAL Liquefied gas cargoes are measured and calculated in a similar manner to that of other bulk liquid cargoes such as crude oils and petroleum products.

More information

Minimum standard of competence in advanced training for liquefied gas tanker cargo operations (STCW Reg V/1-2)

Minimum standard of competence in advanced training for liquefied gas tanker cargo operations (STCW Reg V/1-2) Minimum standard of in advanced training for liquefied gas tanker cargo operations (STCW Reg V/1-2) Column 2 Knowledge, understanding and proficiency Design and characteristics of a liquefied gas tanker

More information

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS INTERNATIONAL MARITIME ORGANIZATION A 14/Res.567 16 January 1986 Original: ENGLISH ASSEMBLY - 14th session Agenda item lo(b) IMO RESOLUTION A.567(14) adopted on 20 November 1985 THE ASSEMBLY, RECALLING

More information

OIL IN NAVIGABLE WATERS REGULATIONS [L.N. 101 of 1968.] under sections 5 and 7. [22nd April, 1968] [Comrnencernent.]

OIL IN NAVIGABLE WATERS REGULATIONS [L.N. 101 of 1968.] under sections 5 and 7. [22nd April, 1968] [Comrnencernent.] OIL IN NAVIGABLE WATERS REGULATIONS [L.N. 101 of 1968.] under sections 5 and 7 [Comrnencernent.] [22nd April, 1968] 1. Short title and interpretation (1) These Regulations may be cited as the Oil in Navigable

More information

Bulletin TCR-104 & 109 Filling and adding to the Glycol pressure system

Bulletin TCR-104 & 109 Filling and adding to the Glycol pressure system Bulletin 061013 TCR-104 & 109 Filling and adding to the Glycol pressure system 1. Glycol System and air On this model the glycol system is a closed system, the glycol is not exposed to the air. No external

More information

FV Flash Vessel Installation and Maintenance Instructions

FV Flash Vessel Installation and Maintenance Instructions 4041050/5 IM-P404-10 EMM Issue 5 FV Flash Vessel Installation and Maintenance Instructions 1. Safety information 2. Specific product safety information 3. Product information 4. Installation 5. Commissioning

More information

Cargo pumps shall not be operated in excess of their designed maximum working parameters.

Cargo pumps shall not be operated in excess of their designed maximum working parameters. Page: 1 of 9 4.1. SCOPE This section provides operating instructions and procedures to be complied with in order to ensure that discharging operations are conducted safely and in accordance with the best

More information

APPENDIX 4 STANDARD FORMAT FOR THE PROCEDURES AND ARRANGEMENTS MANUAL

APPENDIX 4 STANDARD FORMAT FOR THE PROCEDURES AND ARRANGEMENTS MANUAL Page 42 APPENDIX 4 STANDARD FORMAT FOR THE PROCEDURES AND ARRANGEMENTS MANUAL Note 1: Note 2: The format consists of a standardized introduction and index of the leading paragraphs to each section. This

More information

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk (June 1999) (Rev.1 Mar 2006) (Rev.2 May 2007) (Rev.3 Mar 2010) (Corr.1 Feb 2011) (Rev.4 Oct 2013) Periodical surveys of cargo installations on ships carrying liquefied gases in bulk 1 General 1.1 Scope

More information

RESOLUTION MSC.397(95) (adopted on 11 June 2015) AMENDMENTS TO PART A OF THE SEAFARERS' TRAINING, CERTIFICATION AND WATCHKEEPING (STCW) CODE

RESOLUTION MSC.397(95) (adopted on 11 June 2015) AMENDMENTS TO PART A OF THE SEAFARERS' TRAINING, CERTIFICATION AND WATCHKEEPING (STCW) CODE RESOLUTION MSC.397(95) (adopted on 11 June 2015) THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization concerning the functions of the Committee,

More information

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks 1. Scope This document describes procedures for determining or confirming the fill condition of

More information

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply 4.1.1 General The primary function of a system for handling fuel oil is to transfer oil from the storage tank to the oil burner at specified conditions

More information

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap 1250650/6 IM-P125-07 ST Issue 6 MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation

More information

INTERTANKO GAS FORUM Athens 8th of June 2016

INTERTANKO GAS FORUM Athens 8th of June 2016 INTERTANKO GAS FORUM Athens 8 th of June 2016 Co-Mingling of Cargoes on LPG Vessels BACKGROUND TO CO-MINGLING SOLAS REGULATION Discussion Points REASONS FOR CO-MINGLING CO-MINGLING ON DIFFERENT LPG VESSELS

More information

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the. IGF Code

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the. IGF Code INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES s of the IGF Code CONTENTS GF1 Test for gas fuel tank s high level alarm Rev.1 July 2017 GF2 Ship Steel Protection against Liquefied Gas Fuel (Part

More information

MOL LNG Transport (Europe) Ltd File: 02 Checklists 6 pages Rev. No. 1 Loading Plan Part Two (2) (Line UP) Loading Plan Part Two (2) (Line Up)

MOL LNG Transport (Europe) Ltd File: 02 Checklists 6 pages Rev. No. 1 Loading Plan Part Two (2) (Line UP) Loading Plan Part Two (2) (Line Up) Loading Plan Part Two (2) (Line Up) Arm Cool Down; Line Cool Down Line Up: Set up the port manifold as follows:. Open 20% No.1 tank filling valve CL100 Open 20% No. 2 tank filling valve CL200 Open 20%

More information

This test shall be carried out on all vehicles equipped with open type traction batteries.

This test shall be carried out on all vehicles equipped with open type traction batteries. 5.4. Determination of hydrogen emissions page 1 RESS-6-15 5.4.1. This test shall be carried out on all vehicles equipped with open type traction batteries. 5.4.2. The test shall be conducted following

More information

TSS21 Sealed Thermostatic Steam Tracer Trap

TSS21 Sealed Thermostatic Steam Tracer Trap 1255050/4 IM-P125-10 ST Issue 4 TSS21 Sealed Thermostatic Steam Tracer Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning

More information

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Compressed Gas Safety Standard

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Compressed Gas Safety Standard CITY AND COUNTY OF DENVER CR&CF RISK UNIT 65.5.11 Compressed Gas Safety Standard 1.0 Introduction 2.0 Scope This standard has been developed to protect all City and County of Denver employees and contractors

More information

Spirax Compact FREME Flash Recovery Energy Management Equipment

Spirax Compact FREME Flash Recovery Energy Management Equipment IM-UK-cFREME UK Issue 1 Spirax Compact FREME Flash Recovery Energy Management Equipment Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4.

More information

Chapter 7. Coal Cargoes. Properties and Characteristics 7.1

Chapter 7. Coal Cargoes. Properties and Characteristics 7.1 Chapter 7 Coal Cargoes This chapter, and all of the chapters in Part 2, should be read in conjunction with the booklet Carrying Solid Bulk Cargoes Safely (Reference 16), published by Lloyd s Register/UK

More information

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels (Jan 2017) Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels CONTENTS 1. Application 2. Special Survey 2.1 Schedule 2.2 Scope

More information

HARBOUR MASTER S WRITTEN INSTRUCTIONS FOR THE HANDLING OF BULK FLAMMABLE LIQUIDS...1

HARBOUR MASTER S WRITTEN INSTRUCTIONS FOR THE HANDLING OF BULK FLAMMABLE LIQUIDS...1 HARBOUR MASTER S WRITTEN INSTRUCTIONS, 2007 Issued in terms of the National Ports Act No. 12 of 2005, Section (74)(3) HARBOUR MASTER S WRITTEN INSTRUCTIONS FOR THE HANDLING OF BULK FLAMMABLE LIQUIDS...1

More information

NEW IGC CODE AND IGF CODE

NEW IGC CODE AND IGF CODE NEW IGC CODE AND IGF CODE SAFETY ASPECTS Raffaele Piciocchi Gas Center - Greece SAFETY4SEAS - Athens 1 October 2014 Content NEW IGC CODE DRAFT IGF CODE 2 The New IGC Code A new IGC Code has been approved

More information

SLOP RECEPTION AND PROCESSING FACILITIES

SLOP RECEPTION AND PROCESSING FACILITIES RULES FOR CLASSIFICATION OF SHIPS NEWBUILDINGS SPECIAL SERVICE AND TYPE ADDITIONAL CLASS PART 5 CHAPTER 8 SLOP RECEPTION AND PROCESSING FACILITIES JANUARY 2011 CONTENTS PAGE Sec. 1 General Requirements...

More information

BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications

BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications 1800350/6 IM-P180-12 ST Issue 6 BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications Installation and Maintenance Instructions 1. Safety information 2. General

More information

Guide for PlanNing. Introduction Purpose of Gas Trials Delivery Condition of the Vessel. Pre-Gas Trials Preparation. Glossary

Guide for PlanNing. Introduction Purpose of Gas Trials Delivery Condition of the Vessel. Pre-Gas Trials Preparation. Glossary Guide for PlanNing GAS TRIALS FOR LNG VESSELS Contents Introduction Purpose of Gas Trials Delivery Condition of the Vessel Onboard testing of Cargo Handling Equipment Cold Testing with LN 2 Pre-Gas Trials

More information

DF1 and DF2 Diffusers

DF1 and DF2 Diffusers 1550650/4 IM-P155-07 ST Issue 4 and Diffusers Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Operation 6. Maintenance

More information

Inert Air (N2) Systems Manual

Inert Air (N2) Systems Manual INSTRUCTION MANUAL Inert Air (N2) Systems Manual N2-MANUAL 2.10 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT. GENERAL INFORMATION Positive pressure nitrogen gas pressurizing

More information

ANNEX 2 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE,

ANNEX 2 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE, Page 1 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article 38(a) of the Convention on the International

More information

LNG Marine Loading Arms and Manifold Draining, Purging and Disconnection Procedure

LNG Marine Loading Arms and Manifold Draining, Purging and Disconnection Procedure LNG Marine Loading Arms and Manifold Draining, Purging and Disconnection Procedure i The Society of International Gas Tanker and Terminal Operators (SIGTTO) The Society of International Gas Tanker and

More information

Tanker Familiarisation IMO Model Course Chapter 1-9

Tanker Familiarisation IMO Model Course Chapter 1-9 IMO Model Course 1.01 Chapter 1-9 - Courseware Specification - MarineSoft Entwicklungs- und Logistikgesellschaft mbh Friedrich-Barnewitz-Straße 2 18119 Rostock GERMANY +49 381 12835-0 +49 381 12835-55

More information

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER SUPPLIMENT TO eom IMPORTANT READ THIS MANUAL BEFORE PRODUCT INSTALLATION, OPERATION, INSPECTION & MAINTENANCE Tougher and more rigid guidelines are being established

More information

FUNDAMENTALS OF PRESSURE REGULATORS ROBERT BENNETT MANAGER OF TRAINING ELSTER AMERICAN METER

FUNDAMENTALS OF PRESSURE REGULATORS ROBERT BENNETT MANAGER OF TRAINING ELSTER AMERICAN METER FUNDAMENTALS OF PRESSURE REGULATORS ROBERT BENNETT MANAGER OF TRAINING ELSTER AMERICAN METER SUPPLY = DEMAND FUNCTION OF A REGULATOR A regulator may be defined as a "mechanism for controlling or governing

More information

POP Safety Valve. POP Safety Valve INTRODUCTION DEFINITIONS

POP Safety Valve. POP Safety Valve INTRODUCTION DEFINITIONS POP Safety Valve POP Safety Valve INTRODUCTION The effects of exceeding safe pressure levels in an unprotected pressure vessel or system, can have catastrophic effects on both plant and personnel. Safety

More information

THE COMPARISON OF THEORETICAL TO PRACTICAL CARGO LOADING RATE OF BUTANE - ANALYSIS OF LPG CARRIER RELIQUEFACTION PLANT

THE COMPARISON OF THEORETICAL TO PRACTICAL CARGO LOADING RATE OF BUTANE - ANALYSIS OF LPG CARRIER RELIQUEFACTION PLANT Journal of KONES Powertrain and Transport, Vol. 20, No. 1 2013 THE COMPARISON OF THEORETICAL TO PRACTICAL CARGO LOADING RATE OF BUTANE - ANALYSIS OF LPG CARRIER RELIQUEFACTION PLANT Dariusz Nanowski Gdynia

More information

Installation of Ballast Water Management Systems

Installation of Ballast Water Management Systems (Sept 2015) (Rev.1 May 2016) Installation of Ballast Water Management Systems 1. Application In addition to the requirements contained in BWM Convention (2004), the following requirements are applied to

More information

NORMAL OPERATING PROCEDURES Operating Parameter Information

NORMAL OPERATING PROCEDURES Operating Parameter Information Operating Parameter Information Each operator performing the normal operating procedures (routine checks) of the facility should be familiar with the current normal operating parameters of all systems

More information

F All types of inert gas systems are to comply with the following:

F All types of inert gas systems are to comply with the following: (1974) (Rev.1 1983) (Rev.2 1987) (Rev.3 May 1998) (Corr. Sept 2001) (Rev.4 May 2004) (Rev.5 Nov 2005) (Rev.6 May 2012) (Rev.7 May 2015) Inert Gas Systems.1 General Requirements.1.1 All types of inert gas

More information

Pipeline Flooding, Dewatering and Venting Dr Aidan O'Donoghue, Pipeline Research Limited, Glasgow, Scotland

Pipeline Flooding, Dewatering and Venting Dr Aidan O'Donoghue, Pipeline Research Limited, Glasgow, Scotland Pipeline Flooding, Dewatering and Venting Dr Aidan O'Donoghue, Pipeline Research Limited, Glasgow, Scotland Abstract Flooding, cleaning, gauging, dewatering and venting of offshore oil and gas pipelines

More information

International Safety Guide Chapter 23 for Inland Navigation Tank-barges and Terminals. Chapter 23 MOORING

International Safety Guide Chapter 23 for Inland Navigation Tank-barges and Terminals. Chapter 23 MOORING Chapter 23 MOORING This Chapter deals with the preparations and procedures necessary to provide and maintain an efficient mooring arrangement whilst the tanker is berthed at a jetty. Exchange of information

More information

Tanker Officer Training Standards (TOTS) 4C Product Tanker Simulator Training Course

Tanker Officer Training Standards (TOTS) 4C Product Tanker Simulator Training Course Tanker Officer Training Standards (TOTS) 4C Product Tanker Simulator Training Course Tanker Officer Training Standards (TOTS) 4C Product Tanker Simulator Training Course CONTENTS Prerequisites...1 TOTS

More information

INTERNATIONAL MARITIME ORGANIZATION

INTERNATIONAL MARITIME ORGANIZATION Page 1 of 16 INTERNATIONAL MARITIME ORGANIZATION IMO Resolution A.586(14) REVISED GUIDELINES AND SPECIFICATIONS FOR OIL DISCHARGE MONITORING AND CONTROL SYSTEMS FOR OIL TANKERS. ANNEX This document quote

More information

UIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors

UIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors 1130050/4 IM-P113-02 ST Issue 4 UIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors Installation and Maintenance Instructions 1. Safety information 2. General product information

More information

SAFETY MANUAL PURGING, VENTING & DRAINING PROCEDURE TABLE OF CONTENTS 1. INTRODUCTION SCOPE DEFINITIONS PROCEDURE...

SAFETY MANUAL PURGING, VENTING & DRAINING PROCEDURE TABLE OF CONTENTS 1. INTRODUCTION SCOPE DEFINITIONS PROCEDURE... Page 1 of 11 TABLE OF CONTENTS 1. INTRODUCTION... 2 2. SCOPE... 2 3. DEFINITIONS... 2 4.... 3 5. RESPONSIBILTIES... 10 6. REFERENCES... 10 7. ATTACHMENTS... 11 8. APPENDICES... 11 Rev. Issue Date Amendment

More information

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection 1170850/1 IM-P117-36 ST Issue 1 MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection Installation and Maintenance Instructions 1. Safety information 2. General product information

More information

PV4 and PV6 Piston Valves

PV4 and PV6 Piston Valves 1181250/1 IM-P118-05 ST Issue 1 PV4 and PV6 Piston Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Operation 6.

More information

Focus on VOC Emissions Reduction Using an Oxygen Based Inerting Control System For Inert Gas Blanketing of Chemical Process Vessels

Focus on VOC Emissions Reduction Using an Oxygen Based Inerting Control System For Inert Gas Blanketing of Chemical Process Vessels Inerting Control Systems by NTRON PROCESS ANALYZER DIVISION of NEUTRONICS INC. EXTON. PA. 19341 RJN Rev. A June 2001 Focus on VOC Emissions Reduction Using an Oxygen Based Inerting Control System For Inert

More information

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Office of Deputy Commissioner of Maritime Affairs THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Marine Notice POL-010 Rev. 04/10 TO: SUBJECT: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT

More information

I. CHEM. E. SYMPOSIUM SERIES NO. 85 MULTI-STAGE OVER PRESSURE PROTECTION AND PRODUCT CONTAINMENT ON HIGH PRESSURE POLYMERISATION REACTORS

I. CHEM. E. SYMPOSIUM SERIES NO. 85 MULTI-STAGE OVER PRESSURE PROTECTION AND PRODUCT CONTAINMENT ON HIGH PRESSURE POLYMERISATION REACTORS MULTI-STAGE OVER PRESSURE PROTECTION AND PRODUCT CONTAINMENT ON HIGH PRESSURE POLYMERISATION REACTORS P.W. Thomas* The manufacture of ethylene-vinyl acetate-vinyl chloride polymer emulsions in equipment

More information

OPERATION MANUAL NTF-15

OPERATION MANUAL NTF-15 OPERATION MANUAL NTF-15 Nitrogen Tire Filling Valve Stem Caps (Qty=200) Order P/N 436075 RTI Technologies, Inc 10 Innovation Drive York, PA 17402 800-468-2321 www.rtitech.com 035-81235-00 (Rev B) TABLE

More information

ANNEX 4 ALTERNATIVE TEXT FOR OPERATIONAL GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS

ANNEX 4 ALTERNATIVE TEXT FOR OPERATIONAL GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS Annex 4, page 1 ANNEX 4 ALTERNATIVE TEXT FOR OPERATIONAL GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY FOR TANKERS PART 2 OPERATIONAL

More information

LAKOS Waterworks. PWC Series Sand Separators. Installation & Operation Manual LS-829 (10/12)

LAKOS Waterworks. PWC Series Sand Separators. Installation & Operation Manual LS-829 (10/12) LAKOS Waterworks PWC Series Sand Separators Installation & Operation Manual LS-829 (10/12) Table of Contents Separator Operation... 3 Individual Model Details.... 4 Flow vs. Pressure Loss Chart 4 Installation

More information

TRAINING RECORD BOOK LNG SHIPPING

TRAINING RECORD BOOK LNG SHIPPING TRAINING RECORD BOOK LNG SHIPPING Training Record Book for LNG Shipping - Deck Training Record Book This document is provided as an example of a training record book. Users are free to modify this document

More information

Manual Actuated Boiler Blowdown Valves

Manual Actuated Boiler Blowdown Valves Manual Actuated Boiler Blowdown Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Operation 5. Maintenance 6. Spare parts p.1 1. Safety

More information

TITAN FLOW CONTROL, INC.

TITAN FLOW CONTROL, INC. PREFACE: This manual contains information concerning the installation, operation, and maintenance of Titan Flow Control (Titan FCI) Simplex Basket Strainers. To ensure efficient and safe operation of Titan

More information

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1 Dry 131h 1. DESCRIPTION The Viking Model G-1 Maintenance Air Compressor is an electric motor-driven, aircooled, single-stage, oil-less compressor. The unit is equipped with a check valve and provides a

More information

POWER FLUSH KIT INSTRUCTIONS

POWER FLUSH KIT INSTRUCTIONS 1 GENERAL INFORMATION POWER FLUSH KIT INSTRUCTIONS ACE Power Flush is an ozone-safe solvent engineered specifically for flushing refrigeration and air conditioning systems. Used exactly like the old R-11

More information

Refrigeration Scroll For Parallel Applications

Refrigeration Scroll For Parallel Applications Refrigeration Scroll For Parallel Applications Application Guideline 1 Scroll Compressors in Parallel for Refrigeration Applications 1. Introduction The concept of parallel operation for refrigeration

More information

+Port: LOADPORT Voyage No.: 03 Date: 01-Aug-2016 No. Description Remarks [ ]

+Port: LOADPORT Voyage No.: 03 Date: 01-Aug-2016 No. Description Remarks [ ] ARRIVAL Cargo loading &de-ballasting plan prepared & signed by all Deck and Engine officers and approved by Master Cargo operation monitoring record sheets printed out and available Vessel s liquid header

More information

Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848

Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848 Cal/OSHA Gas Systems for Welding GAS WELDING Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848 When performing gas welding, the following precautions, work procedures,

More information

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys (Feb 2010) PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys Contents 1 Introduction 2 Preparations for Survey 2.1 General 2.2 Conditions for survey 2.3 Access to structures 2.4 Survey

More information

HM and HM34 Inverted Bucket Steam Traps Installation and Maintenance Instructions

HM and HM34 Inverted Bucket Steam Traps Installation and Maintenance Instructions 0670350/4 IM-S03-11 ST Issue 4 HM and HM34 Inverted Bucket Steam Traps Installation and Maintenance Instructions 1. Safety information 2. General product information HM Series 3. Installation 4. Commissioning

More information

M-06 Nitrogen Generator (Nitrogen Making Machine)

M-06 Nitrogen Generator (Nitrogen Making Machine) Guideline No.M-06 (201510) M-06 Nitrogen Generator (Nitrogen Making Machine) Issued date: 20 th October, 2015 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains

More information

RULES PUBLICATION NO. 119/P

RULES PUBLICATION NO. 119/P RULES PUBLICATION NO. 119/P PERIODIC SURVEYS OF FUEL INSTALLATIONS ON SHIPS OTHER THAN LIQUEFIED GAS CARRIERS UTILIZING GAS OR OTHER LOW FLASH POINT FUELS 2019 January Publications P (Additional Rule Requirements)

More information

RLPG Terminals, Ras Tanura, Ju aymah, Yanbu

RLPG Terminals, Ras Tanura, Ju aymah, Yanbu RLPG Terminals, Ras Tanura, Ju aymah, Yanbu 1 Table of Contents 1 General... 1 1.1 Application... 1 1.2 Jurisdiction... 1 1.3 Unsafe Conditions... 1 1.4 Berth Assignment... 1 1.5 Acceptability... 1 1.6

More information

Port: DISPORT Voyage No.:03 Date: 10-Aug-2016 No. Description Remarks [ ]

Port: DISPORT Voyage No.:03 Date: 10-Aug-2016 No. Description Remarks [ ] LNG Simulator LNG Carrier Rev. No.: 1 Discharging ARRIVAL loading &ballasting plan prepared & signed by all Deck and Engine officers and approved by Master operation monitoring record sheets printed out

More information

OPERATION MANUAL NTF-60 Plus

OPERATION MANUAL NTF-60 Plus OPERATION MANUAL NTF-60 Plus Nitrogen Tire Filling Valve Stem Caps (Qty=200) Order P/N 436075 RTI Technologies, Inc 10 Innovation Drive York, PA 17402 800-468-2321 www.rtitech.com 035-81264-00 (Rev A)

More information

GUIDANCE IN-SERVICE INSPECTION PROCEDURES

GUIDANCE IN-SERVICE INSPECTION PROCEDURES GUIDANCE IN-SERVICE INSPECTION PROCEDURES Number: PEC 13 Prepared by: Pressure Equipment Committee (TC1) Status: Issue: 07 Date: 16 th January 2018 Reference: Guidance for safety valve examination. SITUATION:

More information

Design. Pompetravaini-NSB API SB Liquid Ring Compressor for Gas Processing. Working Principle

Design. Pompetravaini-NSB API SB Liquid Ring Compressor for Gas Processing. Working Principle SB Pompetravaini-NSB API SB Liquid Ring Compressor for Gas Processing A family of API liquid ring compressors has been developed and has been in the market for nearly a decade, they are specifically made

More information

200 PSI HIGH-FLOW AIR SOURCE KIT

200 PSI HIGH-FLOW AIR SOURCE KIT 200 PSI HIGH-FLOW AIR SOURCE KIT 50% Duty Compressor on 2.0 Gallon Air Tank PART NO. 20008 IMPORTANT: It is essential that you and any other operator of this product read and understand the contents of

More information

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions 4059051/3 IM-P405-48 EMM Issue 3 KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4.

More information

Reclaim Basic Set Up

Reclaim Basic Set Up This purpose of the document is to simplify the set up and understand the Gas Services reclaim system functions. The Gas Services Reclaim Manual is to be used for reference, maintenance, and servicing.

More information

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE February 9, 1998 Foam 101a A BLADDER TANK WITH 1. DESCRIPTION A Wet Pipe Bladder Tank Foam/Water System is a standard wet pipe automatic sprinkler system capable of discharging a foam/water solution automatically

More information

Chlorinator MODEL MK-I

Chlorinator MODEL MK-I Chlorinator MODEL MK-I The New model MK- I is semi automatic gas type. Vacuum operated Solution feed Chlorinator designed to provide a continues & measured quantity of gas while in operation. It is suitable

More information

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax: 2 Table Of Contents 1. Introduction 3 2. About this Manual 3 3. Contacting YZ Systems 3 4. Vessel Components 4 5. Specifications 5 6. Application 6 7. Theory of Operation 7 8. DuraSite Installation & Use

More information

INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES

INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES THIS BOOKLET CONTAINS PROPRIETARY INFORMATION OF ADVANCED SPECIALTY GAS EQUIPMENT CORP. AND IS PROVIDED TO THE PURCHASER SOLELY FOR USE

More information

Guideline No.M-05(201510) M-05 AIR COMPRESSOR. Issued date: 20 October China Classification Society

Guideline No.M-05(201510) M-05 AIR COMPRESSOR. Issued date: 20 October China Classification Society Guideline No.M-05(201510) M-05 AIR COMPRESSOR Issued date: 20 October 2015 China Classification Society Foreword This Guideline constitutes the CCS rules, and establishes the applicable technical requirements

More information

nert Gas: Inert gas systems on ships

nert Gas: Inert gas systems on ships Inert Gas: Inert gas systems on ships Inert gas is produced on board of mainly crude of oil carriers, gas carriers and Chemical carriers, and in Bulk carriers when carrying fish flower, and in refrigerating

More information

Interpretations of the IMCO code for the Construction and Equipment of Ships carrying Liquefied Gases in Bulk

Interpretations of the IMCO code for the Construction and Equipment of Ships carrying Liquefied Gases in Bulk INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES Interpretations of the IMCO code for the Construction and Equipment of Ships carrying Liquefied Gases in Bulk IACS Int. 2008 Contents, Page 1 CONTENTS

More information

KBV21i and KBV40i Air Actuated Boiler Blowdown Valves

KBV21i and KBV40i Air Actuated Boiler Blowdown Valves 4059051/1 IM-P405-48 AB Issue 1 KBV21i and KBV40i Air Actuated Boiler Blowdown Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning

More information

QuickHeat TM Packaged Heat Exchanger Solutions

QuickHeat TM Packaged Heat Exchanger Solutions 4831999/1 IM-P483-03 CH Issue 1 QuickHeat TM Packaged Heat Exchanger Solutions Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning

More information

Chapter 2 Preparations for Tank Cleaning Work

Chapter 2 Preparations for Tank Cleaning Work Chapter 2 Preparations for Tank Cleaning Work Preparatory Procedures for Tank Cleaning Work Make preparations for tank cleaning work according to the procedures given below. 1. Formulating the tank cleaning

More information

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2)

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2) UN-GTR PART A INSERTION Stand 09.02.2011, 17:20 Uhr A.3.3 HYDROGEN STORAGE SYSTEM The hydrogen storage system consists of all components that form the primary pressure boundary of the stored hydrogen in

More information

THE INFLUENCE OF INCONDENSIBLE GASES ON THE REFRIGERATION CAPACITY OF THE RELIQUEFACTION PLANT DURING ETHYLENE CARRIAGE BY SEA

THE INFLUENCE OF INCONDENSIBLE GASES ON THE REFRIGERATION CAPACITY OF THE RELIQUEFACTION PLANT DURING ETHYLENE CARRIAGE BY SEA Journal of KONES Powertrain and Transport, Vol. 23, No. 3 2016 THE INFLUENCE OF INCONDENSIBLE GASES ON THE REFRIGERATION CAPACITY OF THE RELIQUEFACTION PLANT DURING ETHYLENE CARRIAGE BY SEA Dariusz Nanowski

More information

GAS FORM-C. LOA LBP Breadth Depth Air draft (fm Summer LL) Draft (m)

GAS FORM-C. LOA LBP Breadth Depth Air draft (fm Summer LL) Draft (m) 1. PREAMBLE Ship s name LPG/C MISR GAS Owners STERLING SHIP HOLDING S.A. Flag Registry ST. VINCENT & THE GRINADINES - KINGSTOWN Builder JOHN L. MEYER, PAPENBURG, GERMANY Delivery 02.06.1976 Class RUSSIAN

More information

Oxygen Usage Best Practice Guide

Oxygen Usage Best Practice Guide Oxygen Usage Best Practice Guide 1. Introduction Oxygen enriched systems possess a risk of fire and explosion since ignition and combustion hazards are present in all oxygen systems, and oxygen related

More information

CARGO OPERATIONS (TANKER) MANUAL CH.05 BALLAST HANDLING. Rev. No: 2. Page: 1 of PURPOSE

CARGO OPERATIONS (TANKER) MANUAL CH.05 BALLAST HANDLING. Rev. No: 2. Page: 1 of PURPOSE Page: 1 of 5 5.1. PURPOSE To ensure that: The vessel, as applicable, meets MARPOL requirements; There is adequate trim and the propeller is immersed; Stress conditions are within allowable limits during

More information

CARRIAGE OF DIRECT REDUCED IRON (DRI) BY SEA CHANGES TO THE IMO CODE OF SAFE PRACTICE FOR SOLID BULK CARGO

CARRIAGE OF DIRECT REDUCED IRON (DRI) BY SEA CHANGES TO THE IMO CODE OF SAFE PRACTICE FOR SOLID BULK CARGO The Shipowners Protection Limited St Clare House, 30-33 Minories London EC3N 1BP TO ALL MEMBERS March 2010 Managers of The Shipowners Protection Mutual Protection Limited and Indemnity St Clare House,

More information

A large Layer of Protection Analysis for a Gas terminal scenarios/ cause consequence pairs

A large Layer of Protection Analysis for a Gas terminal scenarios/ cause consequence pairs A large Layer of Protection Analysis for a Gas terminal 2000+ scenarios/ cause consequence pairs Richard Gowland European process Safety Centre The scope of the study was a large gas terminal handling

More information

COMPARING PLUG & SEAT REGULATORS & CONTROL VALVES. Lamar Jones. Equipment Controls Company 4555 South Berkeley Lake Road Norcross, GA 30071

COMPARING PLUG & SEAT REGULATORS & CONTROL VALVES. Lamar Jones. Equipment Controls Company 4555 South Berkeley Lake Road Norcross, GA 30071 COMPARING PLUG & SEAT REGULATORS & CONTROL VALVES Lamar Jones Equipment Controls Company 4555 South Berkeley Lake Road Norcross, GA 30071 INTRODUCTION The purpose of this paper will be to compare a plug

More information

Remark: When calling at especially tank cleaning installations located outside the yard area, a certificate of call is not required.

Remark: When calling at especially tank cleaning installations located outside the yard area, a certificate of call is not required. 1 Annex 1 Safety regulations for certain activities on vessels with tanks for oil, etc. (TANK REGULATIONS) Drawn up in accordance with section 29 of act no. 226 of 11 June 1954 on general protection of

More information

HANDBOOK SAFETY DEVICES. Ed SAFETY DEVICES DS-ED 01/ ENG 1

HANDBOOK SAFETY DEVICES. Ed SAFETY DEVICES DS-ED 01/ ENG 1 HANDBOOK Ed. 2017 DS-ED 01/2017 - ENG 1 CHAPTER 9 BURSTING DISC DEVICES IN SERIES 3070 SCOPE Use: protection against possible overpressure of the apparatuses listed below, with regard to the operating

More information

Drum / cylinder handling

Drum / cylinder handling Page 1 of 8 Drum / cylinder handling This Technical Measures Document covers the storage and handling of toxic and flammable substances in drums and cylinders and refers to relevant codes of practice and

More information

Vehicle-mounted meters, pump supplied

Vehicle-mounted meters, pump supplied Purpose This inspection procedure outline (IPO) defines the minimum tests which must be performed to ensure that basic volumetric measuring devices comply with the legislation. Application Vehicle-mounted

More information

Pressure on Demand. Air Pressure Amplifiers

Pressure on Demand. Air Pressure Amplifiers Pressure on Demand Air Pressure Amplifiers Introduction Haskel air pressure amplifiers offer the most comprehensive range in the industry combining simple principles of operation with rugged construction

More information

Crab and Lobster Live Holding System Part II (Water Pumps, Air Pumps and Pipework)

Crab and Lobster Live Holding System Part II (Water Pumps, Air Pumps and Pipework) Crab and Lobster Live Holding System Part II (Water Pumps, Air Pumps and Pipework) 1990/2/SF/AM The increased demand for crabs and lobsters, and the requirement to export live shellfish has led to the

More information

GAS FUELLED ENGINE INSTALLATIONS

GAS FUELLED ENGINE INSTALLATIONS RULES FOR CLASSIFICATION OF SHIPS NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 13 GAS FUELLED ENGINE INSTALLATIONS JANUARY 2001 CONTENTS PAGE Sec. 1 General Requirements...

More information