1 EXPERIMENT 2 LEVEL CONTROL SYSTEM 1.0 OBJECTIVE To study the response of level control process in open tank using the PID controller. 2.0 INTRODUCTION TO THE APPARATUS (MODEL WLF922). a) The process consists of a level tank T31 and a collection tank T32 connected with the appropriate pumps and piping system. b) T31 as an Open or Closed Tank To operate T31 as an Open tank, the top vent (V) and overflow drain (D) manual valves are opened, so that the top space of T31 is at atmospheric pressure. CONTROL SYSTEM AND INSTRUMENTATION Field-Mount Instruments Transmitters, Control Valve, Gauges, etc LT31 FE31 FT31 Differential Pressure (DP) Level Transmitter Measures level of tank T31, Open or Closed. Calibrated Range = -800 to 0mm Water Gauge (WG) Impulse line from the top space of T31 to the low pressure chamber of LT31 must always be completely filled with water. Transmitted to LIC31. Orifice plate connected to FT31 Differential Pressure (DP) Flow Transmitter with square root function Calibrated for m 3 /Hr Transmitted to FIC31 LCV31 PP 1 Control Valve, Air-to-Open (ATO) Pneumatic Positioner (PP) for LCV31, with By-pass. LCY31 Current-to-Air Converter Converts 4-20 ma to 3-15 psig proportionally for PP/LCV31 LS32 Conductivity Level Switch with three conductivity probes 1
2 PG31, PG32 SV31 Pressure Gauges Solenoid Valve, normally open (NO) PRV31, PRV32, PRV33 Pressure Relief Valves Panel-Mount Instruments and Annunciators LIC31/FIC31 One unit panel Controller configured for- LIC31-Loop 1, PID1, Level PID Controller FIC31-Loop 2, PID2, Flow PID Controller In Cascade mode, LIC31 is the primary, FIC31 is the secondary. Three control strategies can be operated as described earlier LIC31, Level Single Loop, PID1, Loop 1 LT31-LIC31-LCY31/PP/LCV31 Selector switch in Position 1 LIC31. LIC31 in Auto (A) or Manual (M) mode. FIC31, Flow Single Loop, PID2, Loop 2 FE31/FT31-FIC31-LCY31/PP/LCV31 Selector switch in Position 2 CASCADE LIC31-FIC31. FIC31 in Auto (A) or Manual (M) mode. LFR31 2-Pen Recorder with pen/bar graph and selective display in engineering units. Red pen (Channel 1) Level, Calibrated Range mm WG Green pen (Channel 2) Flow, Calibrated Range 0-3 m 3 /Hr Analog display in % x Maximum (calibrated range), engineering units = Actual reading, engineering units. The chart drive is set for fast speed (500 mm/hr). The recorder chart drive is started by pressing ON the RCD button with the front swing cover opened. The Annunciators are- LAH31 FAL31 LAH32 Tank level at T31 measured by LT31 exceeds the preset High level alarm limit. The High alarm limit is set at PH1 at the PID1 page Inflow to T31 measured by FE31/FT31 is below the preset Low alarm limit. The Low alarm limit is set at PL2 at the PID2 page Tank level at T32 exceeds the High level limit (shortest probe) of the Level Switch LS32. 2
3 3.0 EXPERIMENTAL PROCEDURE 1. Tank T32 should be filled with water up to and just below the level of the shortest level probe (not visible) of the Level Switch LS32 which is slightly below the tank (T32) overflow pipe outlet. Top up the water later whenever necessary. 2. Operate Model WLF922 independently. Open the by-pass manual valve B33 of pump P33 to divert any flow back into T32. Shut the interconnecting pipeline from Model WLF922 to Model WT922 at the appropriate manual valve MV-T. Also shut the manual valve MV-D at the discharge of pump P33, leading to the drain. 3. Quickly check the various manual valves as follows- All pumps (P31, P32, P33) suction, discharge and by-pass valves are fully opened. Operate T31 as an Open tank with the top vent (V) and overflow drain valves fully opened. The pressurizing air inlet to T31 is isolated at its inlet manual valve (with the valve handle at 90 to the air supply inlet tubing), located next to the preset Air Regulator AR31 near the top of tank T31. Operate T31 as a Self Regulating process. Open only the manual GATE valve at the gravity discharge pipe at the tank bottom. The second manual globe valve at the second gravity discharge pipe must remain shut, thus operating only one gravity discharge pipeline at the bottom of tank T31. Shut the two manual discharge valves of pump P31, one of which is at the strainer inlet. For a Self Regulating process, pump P31 must be OFF. The manual by-pass valve around the control valve LCV31 should be always shut but its two adjacent manual valves should be always opened. The bottom manual drain valve of T32 is always shut. 4. Compressed air is required to operate the control valve system LCY31/PP/LCV31 and to pressurize tank T31. Check that the pressure is in accordance to the pressure indicated at the air pressure regulator (IAS. Do not pressurize T31 yet. Shut the pressurizing air inlet manual isolation valve. 5. Note the following switches and pushbuttons but do not switch ON any pump yet. Pump P32 Pump P31 Pumping inflow from T32 to T31. To be switched ON during operation. Do not use unless T31 is to be operated as a Non-Self Regulating process, in which case the bottom gravity discharge pipes of T31 must be all shut. Check that the two manual discharge valves of pump P31 are shut. 3
4 Pump P33 Pump P33 can be selected to either the AUTO or MAN position. MAN position is the OVER-RIDE P33 position. 6. Check the Positioner (PP) manual By-pass switch at LCV31/PP. Make sure the Positioner (PP) is connected to LCV31 i.e. do not by-pass it, but use the Positioner (PP). Set the 1-2 Selector switch to Position 1 to operate LIC31 and display LIC31, Loop 1 accordingly. With LIC31 in Manual (M) mode, adjust MV = 25%. Check that LCV31 is about 25% OPENED (see the indicator scale at the valve stem). Also note that the control valve LCV31 is Air-to-Open (ATO). 7. Start the recorder, LFR31 by pressing the RCD button ON, with the front swing cover opened. Check the recorder chart speed (500mm/Hr) which is regularly printed out on the chart. The recorder chart drive should be stopped (press RCD) when its chart recording is not required. 8. With the controller Selector switch in Position 1, display LIC31 faceplate at the controller. Note that Position 1, PV1, SV1 and MV1 are displayed as PV, SV and MV in the main display page (faceplate). Set the setpoint (SV1) of LIC31 to 400 mm. Note that SV1 should be operated from 200 (25%) to 640mm (80%) only. Set the first (I) trial PID values at the PID1 page or panel as follows- LIC31 (PID1, Loop1) PB1 = 30%, TI1 = 25secs, TD1 = 0 9. When the level is near to the setpoint SV1, switch LIC31 to Auto (A) mode.quickly change to the FIC31(PID2) page and make sure the Cascade(C) mode indicator for FIC31 is lit up. Else press C once. Switch back to LIC31(PID1) page. Throughout the following test and observation, LIC31 is to remain in Auto (A) mode and the control valve Positioner (PP) must be used and connected unless instructed otherwise. 10. The recorder LFR31 chart drive should be at fast speed (500 mm/hr) with RCD ON. Check the chart speed which is regularly printed out on the chart. Observe the level response at the red pen until the response is almost steady to with ±1.0 mm or it displays oscillatory response even after 3 cycles. Write down the setpoint (SV2) and PID values on the recorder chart paper beside its response. These chart recordings constitute the results of your experiment and should be kept for your reports. 11. Repeat the flow (green pen) observation by using the following TEST DISTURBANCE, one test at a time. Start and end each test when the flow response is reasonably steady or remains oscillating even after 3 cycles. (i) Switch LIC31 to Manual (M) mode and quickly step change MV (inflow) by about 10% to 20%. Then quickly switch LIC31 back to Auto (A) mode. This simulates a load step test at the inflow. Observe the level (red pen) response similarly. 4
5 (ii) Open 1½-turn, hold for 30 seconds and shut fully the pump by-pass manual valve B32. This simulates a load pulse disturbance test at the inflow. Observe similarly. Repeat the test with any of the above disturbances such as above, using the second (II) trial PID values as follows- LIC31 (PID1, Loop1) PB1 = 10%, TI1 = 15 secs, TD1 = 0 secs *LIC31 must be in Auto (A) mode. 12. Level PID control with only Proportional (P) control mode Repeat the test with only Proportional control mode. Integral control can be removed by setting TI1 to its maximum (9999 secs). Proceed as follows Set LIC31 (PID1, Loop1) PB1 = 10%, TI1 = 9999 secs (Max), TD1 = 0 sec. Apply disturbance test. Repeat with PB = 5%. 13. Level PID control with Derivative (D) control mode Repeat the test with Proportional (P), Integral (I) and Deviation (D) control modes as follows, using the same test disturbance. PB1 = 10%, TI1 = 25secs, TD1 = 5secs Double the PB1 to say 20% and observe the damping at both the inflow (Green pen) and level (Red pen) response and at the control valve LCV31. When the level is almost steady at its setpoint again, apply test disturbance. STOP ALL THE PUMPS. MAKE SURE BOTH THE MANUAL DISCHARGE VALVES OF PUMP P31 ARE FULLY SHUT. 4.0 RESULTS/DISCUSSION The recorder LFR31 records the results of the experiments. Relevant portions of the recorder chart responses should be submitted as results of the experiment, with the following pertinent data marked on the corresponding chart recording- Setpoints and PID values SV1, PB1, TI1, TD1. NOTE The Recorder chart speed is occasionally printed on the chart, for example at 500 mm or mm or 7.2 secs Hr sec mm 5
6 Provide your results and discussion by answering the following questions a) Study and compare the level responses at different PID. Use the following terms to explain the dynamics of process i.e. Rise time, Settling time, Overshoot and Period of oscillation. b) Note that from the recorder chart response that even though the inflow (green pen) is fluctuating, the level is held almost steady. Explain why. c) Discuss the response of P-control only. d) Discuss the response when adding derivative (D) control mode.observe the fluctuation of the flow(green pen) and level(red pen). Is derivative control suitable?eplain why. 6
EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM
EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM 1.0 OBJECTIVE To study the response of gas pressure control using PID controller. 2.0 INTRODUCTION TO THE APPARATUS a) The process plant consists of two air vessels
More informationCHEMICAL ENGINEERING LABORATORY CHEG 239W. Control of a Steam-Heated Mixing Tank with a Pneumatic Process Controller
CHEMICAL ENGINEERING LABORATORY CHEG 239W Control of a Steam-Heated Mixing Tank with a Pneumatic Process Controller Objective The experiment involves tuning a commercial process controller for temperature
More informationExercise 2-2. Second-Order Interacting Processes EXERCISE OBJECTIVE DISCUSSION OUTLINE. The actual setup DISCUSSION
Exercise 2-2 Second-Order Interacting Processes EXERCISE OBJECTIVE Familiarize yourself with second-order interacting processes and experiment with the finer points of controller tuning to gain a deeper
More informationNATIONAL UNIVERSITY OF SINGAPORE. EE3302/EE3302E Industrial Control Systems E1: ADVANCED CONTROL SYSTEMS
NATIONAL UNIVERSITY OF SINGAPORE EE3302/EE3302E Industrial Control Systems E1:. OBJECTIVES: Before embarking on this hands-on session, you should have been introduced to the concepts of cascade and feedforward
More informationExercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.
Exercise 5-2 Bubblers EXERCISE OBJECTIVE Learn to measure the level in a vessel using a bubbler. DISCUSSION OUTLINE The Discussion of this exercise covers the following points: Bubblers How to measure
More informationGerald D. Anderson. Education Technical Specialist
Gerald D. Anderson Education Technical Specialist The factors which influence selection of equipment for a liquid level control loop interact significantly. Analyses of these factors and their interactions
More informationDigital Level Control One and Two Loops Proportional and Integral Control Single-Loop and Cascade Control
Digital Level Control One and Two Loops Proportional and Integral Control Single-Loop and Cascade Control Introduction This experiment offers a look into the broad field of process control. This area of
More informationLevel Process Control. Penn State Chemical Engineering
Level Process Control Penn State Chemical Engineering Revised Spring 2015 1 Table of Contents LEARNING OBJECTIVES... 3 EXPERIMENTAL OBJECTIVES AND OVERVIEW... 3 Pre-lab study... 3 Experiments in the lab...
More informationThe Discussion of this exercise covers the following points:
Exercise 5-3 Wet Reference Leg EXERCISE OBJECTIVE Learn to measure the level in a vessel using a wet reference leg. DISCUSSION OUTLINE The Discussion of this exercise covers the following points: Measuring
More informationPROCESS MONITORING AND CONTROL
Chemical Engineering Process Design PROCESS MONITORING AND CONTROL Keith Marchildon David Mody Monitoring means Measurement 1. There is no Control without Monitoring 2. Monitoring should not be done without
More informationMulti-Process Station
Process Control Multi-Process Station Courseware Sample 85629-F0 Order no.: 85629-00 First Edition Revision level: 06/2015 By the staff of Festo Didactic Festo Didactic Ltée/Ltd, Quebec, Canada 2009 Internet:
More informationService Test Unit for ROSS Proportional Valves RESK
Service Unit for Proportional Valves Page 1 Technical Description ROSS 04.08.2015 Service Test Unit for ROSS Proportional Valves Technical Description V 1.0 / 2015 RESK 4591.40 For all Prop Valve Models
More informationField Instrumentation Training Strategy
Field Instrumentation Training Strategy 21 st Nico Marneweck 082 883 2652 Kallie Bodenstein 083 226 2787 Marco Coccioni 072 409 5779-1 - Introduction Training customised for the South Africa Industrial
More informationDesign Change Notification
Design Change Notification Date: November 15, 2017 Document #: DCN-112-Trifecta Gas Supply System Subject: Revised design of Trifecta 600 PSIG systems Background: Chart s continuous attention to product
More informationThe Discussion of this exercise covers the following points: Range with an elevated or suppressed zero Suppressed-zero range Elevated-zero range
Exercise 4-3 Zero Suppression and Zero Elevation EXERCISE OBJECTIVE In this exercise, you will learn the effect that mounting a pressure transmitter above or below the reference level has on the hydrostatic
More informationCPE562 Chemical Process Control HOMEWORK #1 PROCESS & INSTRUMENTATION DIAGRAM
Faculty of Chemical Engineering CPE562 Chemical Process Control HOMEWORK #1 PROCESS & INSTRUMENTATION DIAGRAM SUBMISSION DATE: 1 OCT. 2012 Question 1 Name the following equipments based on standard P&ID
More informationBUBBLER CONTROL SYSTEM
BUBBLER CONTROL SYSTEM Description: The HDBCS is a fully automatic bubbler system, which does liquid level measurements in water and wastewater applications. It is a dual air compressor system with, air
More informationCharacterizers for control loops
Characterizers for control loops By: F. G. Shinskey (May 1999) Introduction Commercial controllers such as the PID series (proportional, integral, derivative, and their combinations) are linear devices
More informationcontrol of salinity Thanks to David Hall, from LWTL
control of salinity Thanks to David Hall, from LWTL DI water (0.0% NaCl) salt water (1.0% NaCl) General Idea The objective is to keep the salinity close to a setpoint which will be provided by your instructor
More informationOperating Instructions
Operating Instructions Note: 1. Never let the centrifugal pump run dry. 2. Make sure that there is at least one open path for water flow in the pipe network before turning the pump on. Never run the pump
More informationModel 130M Pneumatic Controller
Instruction MI 017-450 May 1978 Model 130M Pneumatic Controller Installation and Operation Manual Control Unit Controller Model 130M Controller is a pneumatic, shelf-mounted instrument with a separate
More informationProcess & Instrumentation Diagram (P&ID) Purpose. Howitisdone? Methodology?
Process & Instrumentation Diagram (P&ID) Purpose 1. To indicate the instruments or control devices attached to the process. 2. To indicate the control system architecture associated with the process. Howitisdone?
More informationVacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System. Dwg. No
Rev. ECO Description Checked Approval Date 01 32- Release M. Smith Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System Dwg. No. 32-06003.05 Revision 01 June 18, 2007 1 1. Introduction 1.1.
More informationEN00 Pre-Instructional Survey
EN00 Pre-Instructional Survey Name: Date: 1. At 433 degrees F, a type J thermocouple with a 3 degree F reference junction will produce an output in millivolts that is most nearly to: a. 9.04 b. 10.51 c.
More informationPRESSURE CONTROL TRAINER
PRESSURE CONTROL TRAINER Product Code 314A (PCT version) (With Ethernet communication) Instruction manual Contents 1 Description 2 Specifications 3 Packing slip 4 Installation requirements 5 Installation
More informationOperating Instructions
Operating Instructions Before operating the thin film evaporator, please be aware of all safety concerns associated with this experiment: Burn hazard from the column and steam lines, Chemical hazards associated
More informationInert Air (N2) Systems Manual
INSTRUCTION MANUAL Inert Air (N2) Systems Manual N2-MANUAL 2.10 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT. GENERAL INFORMATION Positive pressure nitrogen gas pressurizing
More informationFisher DSA Steam-Atomized Desuperheater
Instruction Manual DSA Desuperheater Fisher DSA Steam-Atomized Desuperheater Contents Introduction... 1 Scope of Manual... 1 Description... 1 Principle of Operation... 2 Installation... 2 Operating Instructions...
More informationYokogawa Systems and PCI Training
Yokogawa Systems and PCI Training 09 th December 2014 Nico Marneweck 082 883 2652 Kallie Bodenstein 083 226 2787 Marco Coccioni 072 409 5779-1 - Introduction Training customised for the South Africa Industrial
More informationSERVICE MANUAL No. I-0043
Bettis Canada Ltd. 4112 91A Street Edmonton, Alberta, Canada T6E 5V2 Tel: (403) 450-3600 Fax: (403) 450-1400 SERVICE MANUAL No. I-0043 Edmonton GAS/HYDRAULIC ADDITIONAL COMPONENTS CUSTOMER: P.O.#: W.O.#:
More informationmy SYSTEM A guide to common applications in water distribution systems
my SYSTEM A guide to common applications in water distribution systems WWW.SINGERVALVE.COM INDEX This short guide is intended to offer guidance on some of the common problems, applications and questions
More informationP-5215 Differential Pressure Transmitter
P-5215 Differential Pressure Transmitter Pneumatic Control Manual 717.1 Pressure Section Product Bulletin P-5215 Issue Date 0891 Features and Benefits Ultra Sensitive Feedback Circuit - Enhances System
More informationOIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply
OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply 4.1.1 General The primary function of a system for handling fuel oil is to transfer oil from the storage tank to the oil burner at specified conditions
More informationThe Discussion of this exercise covers the following points:
Exercise 3-2 Orifice Plates EXERCISE OBJECTIVE In this exercise, you will study how differential pressure flowmeters operate. You will describe the relationship between the flow rate and the pressure drop
More informationFisher DVI Desuperheater Venturi Inline
Instruction Manual DVI Desuperheater Fisher DVI Desuperheater Venturi Inline Contents Introduction... 1 Scope of Manual... 1 Description... 1 Principle of Operation... 2 Installation... 3 Operating Instructions...
More informationCONTROL and INSTRUMENTATION
CONTROL and INSTRUMENTATION COURSE 500: 5 DAYS: Max 8 Candidates This course covers the key aspects of current instrumentation and process control technology and is designed to enable maintenance personnel
More informationHeat Pump Connections and Interior Piping
Job Sheet 3 Heat Pump Connections and Interior Piping OBJECTIVES In this job sheet, you will observe how the presence of air in the ground loop affects the geothermal heat pump performance. You will also
More informationSINGLE VALVE WITH LOW-FLOW BYPASS
CONTROL VALVES Pressure Reducing Valve Sizing Guide Sizing pilot operated reducing valves is not a complicated process. It starts with determining requirements and following these guidelines in valve size
More informationHill PHOENIX Second Nature Medium Temperature Secondary Refrigeration Start-Up Guide
Hill PHOENIX Second Nature Medium Temperature Secondary Refrigeration Start-Up Guide Secondary Coolant System Start-Up Procedures June 2006 Produced by the Hill PHOENIX Learning Center DISCLAIMER This
More informationNOTICE. Issued: February 12, 2010 AO# Dundas Street West, Oakville, ON CANADA Phone: (905) Fax: (905)
NOTICE The enclosed materials are considered proprietary property of GE Water & Process Technologies. No assignments, either implied or expressed, of intellectual property rights, data, know how, trade
More informationTECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve.
Foam 302 a 1. DESCRIPTION (Refer to Figure 1 on page 302 e.) The Viking Low-Flow Foam/Water Proportioning System is a UL Listed and FM Approved system, for use with 3M and Viking brand foam concentrate.
More informationDesign DSA Steam-Atomized Desuperheater
Instruction Manual DSA Desuperheater Design DSA Steam-Atomized Desuperheater Contents Introduction............................... 1 Scope of Manual......................... 1 Description..............................
More informationAnnual Inspection and Calibration Checklist VAF Oilcon MK-6(M) MEPC.108(49) Page 1 of 5
Page 1 of 5 Vessel Name: Serial number MCU: Serial Number EPU: Serial Number Skid: Mains Supply: V AC @ Hz Software version MCU: Software version EPU: K-factor Cell: K-factor Skid Flowmeter: P/L Maximum
More informationINSTRUMENTS A THERMAL MASS FLOW SENSOR USING A CONSTANT DIFFERENTIAL TEMPERATURE ABOVE THE AMBIENT GAS TEMPERATURE
TELEDYNE HASTINGS TECHNICAL PAPERS INSTRUMENTS A THERMAL MASS FLOW SENSOR USING A CONSTANT DIFFERENTIAL TEMPERATURE ABOVE THE AMBIENT GAS TEMPERATURE Proceedings of FEDSM 98 1998 ASME Fluids Engineering
More informationH.T.S.T. EQUIPMENT TEST PROCEDURES. Field Reference. Sequence of Testing. Pasteurizer Not Operating 3, 1, 4, 2, 7, 10, 8, 5B, 5E, 5C (dual stem), 9
H.T.S.T. EQUIPMENT TEST PROCEDURES Field Reference Sequence of Testing Equipment testing should be conducted in the following sequence to minimize equipment run times. Pasteurizer Not Operating 3, 1, 4,
More informationBUBBLER CONTROL SYSTEM
BUBBLER CONTROL SYSTEM Description: The LDBCS is a fully automatic bubbler system, which does liquid level measurements in water and wastewater applications. It is a dual air compressor system with, air
More informationPRO-50 Instrument Supply Regulator
Features CRN Approved The PRO-50 Regulator has been granted a Canadian Registration Number. Sour Service Capability Available in NACE configurations that comply with NACE MR0175/MR0103. Environmental limits
More informationTime-Delay Electropneumatic Applications
Exercise 3-4 EXERCISE OBJECTIVE & & & To introduce time delays; To describe the operation of a time-delay valve; To describe the operation of a time-delay relay. DISCUSSION Time-Delays Time delays are
More informationTECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH PNEUMATIC RELEASE
1 of 10 1. DESCRIPTION (Refer to Figures 1-3.) Viking supervised Single Interlocked Preaction Systems utilize a Viking Deluge Valve and a pneumatically pressurized automatic sprinkler system. The system
More informationModels 106-RF / 206-RF Rate of Flow Control Valve
Rate of Valve KEY FEATURES Accurately limits low to a pre-set maximum Easily adjustable low limit Paddle-style oriice plate included Optional oriice plate housing 106-RF Globe Product Overview The 106-RF
More informationNGP-250/500 Nitrogen Generator Quick Start Guide
NGP-250/500 Nitrogen Generator Quick Start Guide Version: A July 2013 Potter Electric Signal Company, LLC 5757 Phantom Dr., Suite 125 P. O. Box 42037 Hazelwood, MO 63042 Phone: (314) 595-6900 Document
More informationDESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection
February 9, 1998 Foam 201a 1. DESCRIPTION A Deluge Bladder Tank Foam/Water System is a standard deluge system capable of discharging a foam/water solution automatically through open sprinklers, spray nozzles,
More informationMWEA MAINTENANCE SEMINAR SPECIALTY VALVES POWER GLOBES
MWEA MAINTENANCE SEMINAR SPECIALTY VALVES POWER GLOBES J O H N G. H U N T E R Types of Valves P A U L M A R C H I Accessories Principals of Operation Maintenance Control Valve Types Common Problems Key
More informationliving with the lab control of salinity 2012 David Hall
control of salinity 2012 David Hall General Idea The objective is to keep the salinity close to a setpoint which will be provided by your instructor The salinity sensor measures the analog voltage output
More informationDigester Processes. 1. Raw Sludge Pumping System
Digester Processes 1. Raw Sludge Pumping System Removes accumulated sludge from the primary clarifiers, pumped through 1 of 2 pipes either 150 or 200mm in diameter (Fig. 1.1). Fig 1.1 Pipes feeding Digesters
More informationPractical Guide. By Steven T. Taylor, P.E., Member ASHRAE
ractical Guide The following article was published in ASHRAE Journal, March 2003. Copyright 2003 American Society of Heating, Refrigerating and Air- Conditioning Engineers, Inc. It is presented for educational
More informationCASCADE CONTROL TRAINER
CASCADE CONTROL TRAINER Product Code 315A (PCT version) Instruction manual Contents 1 Description 2 Specifications 3 Installation requirements 4 Installation Commissioning 5 Troubleshooting 6 Components
More informationFlamco Flamco-Fill STA Flamco-Fill STM
STA STM Typ STA 5936 Typ STM 5937 GB Installation and operating instructions 1999, 2 Contents GB UK Limited P.O. Box 9, Washway Lane, St. Helens, Merseyside WA10 6FE United Kingdom Telephone: 01744 744744
More informationProcess Control Loops
In this section, you will learn about how control components and control algorithms are integrated to create a process control system. Because in some processes many variables must be controlled, and each
More informationACV-10 Automatic Control Valve
ACV-10 Automatic Control Valve Installation, Operation & Maintenance General: The Archer Instruments ACV-10 is a precision automatic feed rate control valve for use in vacuum systems feeding Chlorine,
More informationInstallation and operation Manual. Bermad Surge Anticipation Valve. Model No 435
Instruction manual Bermad surge anticipation manual Model No 435 Installation and operation Manual Bermad Surge Anticipation Valve Model No 435 Bermad Water Technologies Rev 0 5/05/2015 7 Inglewood Drive,
More informationHighest Quality. Gas Chlorination Systems
Highest Quality Gas Chlorination Systems Application: Gas chlorination systems are used for water disinfection and other purposes in a variety of applications. Compared to other disinfection methods, chlorine
More informationReclaim Basic Set Up
This purpose of the document is to simplify the set up and understand the Gas Services reclaim system functions. The Gas Services Reclaim Manual is to be used for reference, maintenance, and servicing.
More informationGP1 & GP2. Electropneumatic Regulators FOR PRESSURE CONTROL TO 1,000 PSI
GP1 & GP2 Electropneumatic Regulators FOR PRESSURE CONTROL TO 1, PSI GP1 & GP2 Functional Description The GP series control valve is an electronic pressure regulator designed to precisely control the pressure
More informationDynamic Simulation for T-9 Storage Tank (Holding Case)
Dynamic Simulation for T-9 Storage Tank (Holding Case) CASE 1: 19,642 Kg/Hr (Holding: 52 o C), No Liquid Draw Workshop Description Estimation of vapor flow rate coming out from the T-9 tank for holding
More informationDPC-30 DPC-100. Reference Manual
DPC-30 DPC-100 Reference Manual 1. Introduction 1.1 Description The Martel DPC Digital Pneumatic Calibrator improves upon traditional dial gauge pneumatic calibrators. The Martel DPC improves accuracy,
More informationV10K GAS FEED SYSTEM WALLACE & TIERNAN PRODUCTS
V10K GAS FEED SYSTEM WALLACE & TIERNAN PRODUCTS V10K SYSTEM: PROVEN TECHNOLOGY WORLDWIDE IN USE Since Charles F. Wallace and Martin F. Tiernan discovered the first chlorine gas feed system in 1913 the
More informationMODEL LW74E, LW76E. Unit of Total Plate Front Cover Fitting HEX Soc. Bolt TAG (Ratings Shown) Register Front Cover
Total-counter type Register ULTRA OVAL with BATCH CONTROLLER MODEL LW74E, LW76E GENERAL SPECIFICATION GS.No.GBC201E 5 GENERAL This unit is designed specifically to mount integrally on the ULTRA OVAL, a
More informationModeling a Pressure Safety Valve
Modeling a Pressure Safety Valve Pressure Safety Valves (PSV), Pressure Relief Valves (PRV), and other pressure relieving devices offer protection against overpressure in many types of hydraulic systems.
More informationTECHNICAL DATA. Dry 132a. October 1, 2008
October 1, 2008 Dry 132a 1. Description Viking High Pressure (HP) Dry Systems utilize a Viking Model E or Model F Deluge Valve to control the water supply to system piping equipped with closed sprinklers.
More informationFlow meter. bellow vaporizer. APL valve. Scavenging system
Introductory Lecture Series: The Anesthesia Machine PORNSIRI WANNADILOK Objectives Anesthesia Machine Ventilators Scavenging Systems System Checkout 1 Flow meter ventilator bellow vaporizer Corrugated
More informationModeling Case Study: Surge Tanks, Valves, Level sensors, and modeling
Modeling Case Study: Surge Tanks, Valves, Level sensors, and modeling By Peter Woolf (pwoolf@umich.edu) University of Michigan Michigan Chemical Process Dynamics and Controls Open Textbook version 1.0
More informationTEST BENCH FOR SAFETY VALVES
TEST BENCH FOR SAFETY VALVES 1) Hydro panel : This Panel possesses This Bench Contains One Panel and One Reservoir. 1 No. Monobloc Version : Single Phase AC, 50 Hz Type of Duty :S1 (Continuous) Class of
More informationInstallation and Operation Manual
Manual Static pressure transducer with controller Differential static pressure transducer with analog output and optional PI control mode Large diaphragm element with differential transformer Transducer
More informationToronto Water Ashbridges Bay Treatment Plant Aeration Tank 2 - Process Control Narrative
Toronto Water Ashbridges Bay Treatment Plant Aeration Tank 2 - Process Control Narrative 3 14.02.11 Issued For Construction Rev 3 2 14.09.09 Issued For Construction 1 13.04.26 100% Submission For Programmers
More informationCash Valve TYPE KP PILOT OPERATED BACK PRESSURE VALVE. ISSUED - DECEMBER 2000 CAVMC-0518-US-0208 ISO 9001 Certified
Cash Valve PILOT OPERATED BACK PRESSURE VALVE ISSUED - DECEMBER 2000 CAVMC-0518-US-0208 ISO 01 Certified KP HIGH CAPACITY PILOT OPERATED BACK PRESSURE VALVE DESCRIPTION The Cash Valve Type KP is a pilot
More informationSeries 2G Diaphragm Actuators
Series 2G Diaphragm Actuators Precise Control: Operates valves in on/off, throttling or proportioning systems Series 2G diaphragm actuators are designed for on/off or throttling control of Norris angle-disc
More informationFM Approved - Automatic Water Control Valve as standard deluge valve. No formal approval available for coating. Foam Concentrate
December 6, 2010 Foam 21a 1. Description With Multiple Foam/Water Deluge Systems Supplied by a Bladder Tank, multiple deluge foam risers can be supplied from a single foam concentrate source. Where a bladder
More informationPressure Control. where: p is the pressure F is the normal component of the force A is the area
Pressure Control First of all, what is pressure, the property we want to control? From Wikipedia, the free encyclopedia. Pressure is the application of force to a surface, and the concentration of that
More informationOperation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve
Operation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve Model CYCLE GARD II, CI & CNA YOUR PRODUCT INFORMATION: Model Number: Date: Serial Number:
More informationAPPS-160 Gen 2 User Manual
APPS-160 Gen 2 User Manual Applicable Products: PN 11914406 - APPS-160 10 to 50 PSIG operating pressure PN 11918618 - APPS-160 40 to 85 PSIG operating pressure Rev 9/16/2004 Chart Ind. www-chart-ind.com
More informationWATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL
Capital Controls Series 71V3000 The Series 71V3000 electrically-heated vaporizer automatically vaporizes and superheats liquid chlorine, sulfur dioxide or ammonia at a rate controlled by the gas feed system.
More informationTECHNICAL DATA. than the water inlet pressure to the concentrate
Foam102a 1. DESCRIPTION The Viking Low Flow Foam/Water proportioning system, is a UL Listed and FM Approved system, for use with 3M foam concentrates. This system consists of a standard wet pipe sprinkler
More informationCHECK-VALVES Automatically Position Themselves by the Natural Forces of the Conveying Air. A PNEUMATIC CONVEYING SYSTEM PATENT #: 5,160,222
PATENT #: 5,160,222 PHONE: (913)677-5777 FAX: (913)677-067 E-Mail : techair@techairinc.com www.techairinc.com CHECK-KLEEN DIVERTER A PNEUMATIC CONVEYING SYSTEM FLAP-CHECKS exposed to product air stream
More informationThis portion of the piping tutorial covers control valve sizing, control valves, and the use of nodes.
Piping Tutorial A piping network represents the flow of fluids through several pieces of equipment. If sufficient variables (flow rate and pressure) are specified on the piping network, CHEMCAD calculates
More informationQuickHeat TM Packaged Heat Exchanger Solutions
4831999/1 IM-P483-03 CH Issue 1 QuickHeat TM Packaged Heat Exchanger Solutions Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning
More informationInstallation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units
Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units Models: EPS Single Pump EPT Twin Pump EPS-HP EPT-HP Single Pump High Pressure Twin Pump High Pressure
More informationFUEL GAS FIRING CONTROL RJ (Dick) Perry Safety Systems Consultant 6 June 2016
INTRODUCTION Fired equipment such as Heaters and Boilers, normally have to comply with either NFPA 85/86 or API 556 for North America and some other countries which apply such standards, or EN 746-2 for
More informationFOAM TANK (1/2) DATA SHEET
FIRE FIGHTING EQUIPMENT DATA SHEET FOAM TANK (1/) DATA SHEET JOB NO. : RFQ. NO. : ISSUE : SHEET OF 01 CUSTOMER : ITEM NO. : 0 PROJECT : QUANTITY : 0 LOCATION : SERVICE : FOAM SYSTEM 0 05 CODE & STANDARDS
More informationArmfield Distillation Column Operation Guidelines
Armfield Distillation Column Operation Guidelines 11-2016 R.Cox Safety SAFETY GLASSES ARE REQUIRED WHEN OPERATING THE DISTILLATION COLUMN Wear gloves when mixing alcohol feedstock The column will become
More informationECONORESS ELECTRONIC EPS & EPT - ENHANCED PRESSURISATION SET INSTALLATION OPERATION & MAINTENANCE DOCUMENTATION
ECONORESS ELECTRONIC EPS & EPT - ENHANCED PRESSURISATION SET INSTALLATION OPERATION & MAINTENANCE DOCUMENTATION OCT2010 STOKVIS ENERGY SYSTEMS 96R WALTON ROAD EAST MOLESEY SURREY KT8 0DL TEL: 020 87833050
More informationBecker Precision Equipment
Becker Precision Equipment VRP-B-CH Series Valve Regulation Pilot VRP-B-CH Valve Regulator Pilot Provides Low-Bleed Pressure Control When Combined with Double-Acting Pneumatic Control Valve Actuators Description
More informationHow to Combat Process Disturbances and Interactions
How to Combat Process Disturbances and Interactions Henri A. (Hank) Brittain, Ph.D., Jean-François Dubé, P.Eng. BBA - Top Control Inc. KEYWORDS Decoupling, First-Order Plus DeadTime (FOPDT) Feedforward,
More informationThe Compact, Portable, Efficient and Economical Solution to boost Shop Compressed Air Pressure by 2 or 3 times
Tseries Series AB AB Air Air Boosters Boosters The Compact, Portable, Efficient and Economical Solution to boost Shop Compressed Air Pressure by 2 or 3 times.01/1 MANIFOLD MOUNTED VALVES FOR EASY SERVICING
More informationCOMPAFLOW. Compressed Air. Volumetric flow. Gas. Mass flow. Steam. Net volumetric flow. Liquid
Volumetric flow Compressed Air Mass flow Gas Net volumetric flow Steam Liquid Universal compact orifice flow meter combines a compact orifice flow sensor and sotiphicated converter One-piece flow sensor,
More informationHEATEC TEC-NOTE. Setting Siemens Pressure Transmitter. Used on Heatec Vertical Asphalt Tanks. Publication No , Revised
HEATEC TEC-NOTE, Revised 1-5-15 Setting Siemens Pressure Transmitter Used on Heatec Vertical Asphalt Tanks This document provides information on setting Siemens pressure transmitters used on Heatec vertical
More informationAUTROL 217 Expansion and pressurization Systems
Local regulations may restrict the use of this product to below the conditions quoted. In the interests of development and improvement of the product, we reserve the right to change the specification without
More informationRadar, Ultrasonic and RF Level Transmitters
Radar, Ultrasonic and RF Level Transmitters Both measures the time it takes the wave to travel between the transmitter and that reflected wave off the surface of the material to reach the transmitter again.
More informationC1 Series Pneumatic Controllers and Transmitters
Instruction Manual C1 Controllers and Transmitters C1 Series Pneumatic Controllers and Transmitters Contents Introduction............................... 2 Scope of Manual......................... 2 Description..............................
More informationPriority (Swing) Motors Data and Specifications
s Data and Specifications Specifications HMF 55 HMF 75 HMF 105 cm 3/rev in 3/rev 55 3.36 75 4.57 105 6.40 Pressure Ratings Nominal 5000 PSIG Maximum 6090 PSIG Peak 7250 PSIG Operating Speed Maximum 4100