Stabling Point Risk Assessments Wakefield Kirkgate sidings
|
|
- Shanon Blaze Bryan
- 6 years ago
- Views:
Transcription
1 Stabling Point Risk Assessments Wakefield Kirkgate sidings This document is the property of Harsco Track Technologies Ltd. It shall only be used for the purpose for which it is supplied and shall not be copied, reproduced, stored on a retrieval system, disseminated, adapted or disclosed to a third party without the express written permission of Harsco Track Technologies Ltd. Harsco Track Technologies Ltd Document Reference: Revision : Date: STAB/WAKE 01 20/04/06 Prepared by: A.Simpson
2 Introduction and purpose There are approximately 90 stabling points used by the Harsco Track Technologies Ltd. throughout the UK and each of these is unique in terms of its location, layout, hazards and operating requirements and instructions. Information regarding stabling points is difficult to come by across the railway. With this in mind Harsco Track Technologies Ltd. have decided to research and build a directory of stabling points. The purpose of this document is to provide you (the researcher) with the tools and guidance to find and document the information. This information will then be sifted and collated to produce a directory. How to conduct the research It is vital to gain as much information from the site visit as possible. To do this you will need to speak to people at the site and to those who use it regularly. You will also need to answer all the questions provided and make comments as appropriate. Hazard hunt and risk assessment Commencing at the stabling point entrance look for and list all hazards. Look for the things that could cause harm or damage - such as underfoot conditions, overhead obstructions and distances to running lines. Use the 10 points of the COSSs briefing as this will be relevant. Use the Risk assessment table (attached as appendix A) to identify the hazards and calculate the risk. There is an example included Other information (maps and rail layouts) On the spare page provide a rough sketch of the stabling point layout including track layouts, walking routes etc. You will need to include all accessible telephones and structure numbers such as: Bridges Signals Hand operated points Use of derailers
3 Location Overview Location: Wakefield Kirkgate sidings. Questions Question Answer and comments 1. How is the siding accessed Via Wakefield Kirkgate car park 2. Whose is responsible for the siding (Railtrack, Depot, or other) 3. Who is the point of contact inc telephone numbers 4. How are the emergency services contacted inc names and numbers Network Rail Paul Calton Mobile phone Location of emergency access if different from 1 above 6. Where is the location of the nearest first aid point and name any first aiders 7. Name, location & phone number of nearest Accident and Emergency dept Pinderfields hospital Location of nearest personal amenities 9. Is there a display of local information No 10. What is the most effective means of communication Mobile phone 11. Are there any walking routes No 12. What is the length of the siding Aprox. 300metres 13. How are the sidings protected Fixed signals 14. What needs to happen to protect the machine Red flags/light, not to be moved board 15. What type of lighting is available None 16. Full postal address of location. Wakefield Kirkgate station Monk street Wakefield WF1 4EL 17. Is parking available at machine side. Yes 18. Is stable point a secure stable point? Yes
4 19. What security measures are in place? Locked gates and security fencing Note. Under no circumstance should gates or fences be climbed to gain access to yard. 20. Are there any overhead height restrictions? No Map: Directions to Accident & Emergency Dept Start out at WAKEFIELD KIRKGATE STATION,Wakefield Unclassified Turn right onto Tavern Street Tavern Street Turn right onto Brunswick Street Brunswick Street Turn left onto Berners Street Berners Street Turn right onto Peterson Road Peterson Road Continue forward onto Stanley Road Stanley Road Turn right onto Stanley Road - A642 A Turn left Unclassified Arrive at Pinderfields General Hospital (A and E),Wakefield
5 Site Summary Location: Wakefield Kirkgate sidings. The sidings are situated at the East end of Wakefield Kirkgate station. Access is via the down loop. Entry into the siding is then through a locked gate. All other lines in the siding are clamped out of use leaving one line available. Departure is via position light into the up loop. Motor access is via Wakefield Kirkgate station car park through a locked gate at the end of the car park. The yard is also used for storing rail, sleepers, & ballast etc.
6 HARSCO TRACK TECHNOLOGIES LTD. STABLING POINT HAZARD HUNT AND RISK ASSESSMENT Location: Wakefield Kirkgate sidings. Task, activity or item Hazard Consequences Initial Risk Rating Score Control Measures Residual Risk Rating Score Further Action & Comments L S R L S R Ballast / chippings piled at side of track Slip or trip on ballast Move machine to safer area in sidings Ballast needs moving Rubbish & broken troughing laying around site Slip or trip Care to be taken when walking round site Site needs clean up. No lighting Slip or trip Care to be taken when walking round site Lighting required
7 HARSCO TRACK TECHNOLOGIES LTD. STABLING POINT HAZARD HUNT AND RISK ASSESSMENT Photographs Location: Wakefield Kirkgate sidings. View to exit signal View from yard towards exit View into yard
8 HARSCO TRACK TECHNOLOGIES LTD. STABLING POINT HAZARD HUNT AND RISK ASSESSMENT Sketch of Stabling Point And Hazards:
9 HARSCO TRACK TECHNOLOGIES LTD. STABLING POINT HAZARD HUNT AND RISK ASSESSMENT SIMPLE RISK RANKING METHOD OVERVIEW First match your views to the nearest statements in chart one under both likelihood and severity. This generates two numbers. You then multiply those numbers to identify a risk rating. This is then applied to chart two to establish the level of risk. When reporting you will need to make a short statement to justify your decision, this demonstrates you have considered all factors and not relied on gut reaction. LIKELIHOOD It s important to consider that any event is less likely to occur the more factors are involved. Ask what if questions to provide a wider view, but in doing so, you must consider the likelihood of that event occurring and if unlikely, not consider it. SEVERITY It s easy to go for worse case scenario when, in reality, this rarely occurs. Ask what if questions against the actions and reactions of the person but remember these are real and will not change dramatically. We must also consider all the mitigating measures that are in place to prevent an incident or accident occurring. Previous incidents and trends can be used as supporting evidence rather than gut reaction. CHART ONE LIKELIHOOD & SEVERITY RATING CHART TWO FINAL RISK RATING Likelihood Rating Severity Rating No likely to occur within the next year Likely to occur once within the next year Likely to occur at least three times in the next year Likely to occur at a monthly frequency Likely to occur at a weekly frequency or less 1 No exposure to safety risk. Minimal loss to business process, some extra work created 2 Minimum exposure to a safety risk (minor injury) Minor loss to business process, partial loss of shift, extensive delay / work curtailed (loss of performance pay) 3 High risk of injury (Major injury), Loss to business process, cancellation of a single shift, (Significant loss of performance pay) 4 Single fatality, significant loss to business process, possession overrun - delay to train service, cancellation of multiple shifts, likely to last for a period of days. 5 Multiple fatalities, catastrophic loss to business process, disruption likely to last for more than seven days resulting in significant penalty payments Risk Level: 1 to 3 = Tolerable Risk Level: 4 to 6 = Broadly acceptable Risk Level: 7 to 25 = Intolerable
Module T7. Safe systems of work when walking or working on or near the line. Withdrawn Document Uncontrolled When Printed. GE/RT T7 Rule Book
T7 (issue 1).qxd 16/4/03 4:27 pm Page 1 GE/RT8000 - T7 Rule Book Module T7 Safe systems of work when walking or working on or near the line Issue 1 June 2003 Comes into force 6 December 2003 T7 (issue
More informationA GUIDE TO WRITING A RISK ASSESSMENT FOR A BMAA EVENT
A GUIDE TO WRITING A RISK ASSESSMENT FOR A BMAA EVENT BMAA 2017 Writing an event Risk Assessment BMAA Guidance What is an event Risk Assessment? An event Risk Assessment (RA) is a document that shows that
More informationArchery Risk Management Plan Lutanda Yarramundi
Archery Risk Management Plan Lutanda Yarramundi School: Year: Dates: Program: Supervising Staff: Activity Context The archery range at Lutanda Yarramundi is located next to River Lodge on the left end
More informationAquatic Guidelines Safe Water Entry Information and Risk Assessments
Aquatic Guidelines Safe Water Entry Information and Risk Assessments This risk assessment and guidelines package was developed in accordance with the Royal Lifesaving Societies Implementation Guide for
More informationPre-control risk estimate. Likelihood Risk
Activity Consequence s mitigation measures Site Access & Egress Slips, trips & falls al injury by falling. Sprains & broken bones. Site operatives 3 4 12 Ensure access to site is kept clear of plant &
More informationABBEYFIELD STAIR AND CHAIR LIFT RISK ASSESSMENT
ABBEYFIELD STAIR AND CHAIR LIFT RISK ASSESSMENT Name /Location of House Chair Lift Make and Model: Date of Installation: Name of Service/Inspection Contractors: House Manager Date of Risk Assessment: Name
More informationNew Airfield Risk Assessment / Categorisation
New Airfield Risk Assessment / Categorisation Airfield Risk Assessment Prior to commencing operations to a new airfield, airfield risk assessment and categorisation will take place. For continued operations
More informationInfrastructure Requirements for Personal Safety in Respect of Clearances and Access
Infrastructure Requirements for Personal Safety in Respect of Clearances and Access Synopsis This document sets out the design, construction and maintenance requirements for means of access onto, along
More informationIdentification and Screening of Scenarios for LOPA. Ken First Dow Chemical Company Midland, MI
Identification and Screening of Scenarios for LOPA Ken First Dow Chemical Company Midland, MI 1 Layers of Protection Analysis (LOPA) LOPA is a semi-quantitative tool for analyzing and assessing risk. The
More informationRock Climbing Risk Management Plan Lutanda Yarramundi
Rock Climbing Risk Management Plan Lutanda Yarramundi School: Year: Dates: Program: Supervising Staff: Activity Context The rock climbing wall at Lutanda Yarramundi is located next on the side of the Activity
More informationRecommendations for the Risk Assessment of Buffer Stops and End Impact Walls
Recommendations for the Risk Assessment of Buffer Stops and End Synopsis This document gives details of a recommended method which, if followed, would meet the requirements of section 11, Buffer Stops
More informationMountain Bike Risk Management Plan
Mountain Bike Risk Management Plan Lutanda Mt Victoria School: Year: Dates: Program: Supervising Staff: Activity Context Riding Mountain bikes is a fun way to challenge participants in their confidence,
More informationDETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508
DETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508 Simon J Brown Technology Division, Health & Safety Executive, Bootle, Merseyside L20 3QZ, UK Crown Copyright
More informationAbseiling Risk Management Plan Lutanda Yarramundi
Abseiling Risk Management Plan Lutanda Yarramundi School: Year: Dates: Program: Supervising Staff: Activity Context Abseiling at Lutanda Yarramundi is located on the activity tower on the wall facing the
More information1.0 PURPOSE 2.0 REFERENCES
Page 1 1.0 PURPOSE 1.1 This Advisory Circular provides Aerodrome Operators with guidance for the development of corrective action plans to be implemented in order to address findings generated during safety
More informationSafety assessments for Aerodromes (Chapter 3 of the PANS-Aerodromes, 1 st ed)
Safety assessments for Aerodromes (Chapter 3 of the PANS-Aerodromes, 1 st ed) ICAO MID Seminar on Aerodrome Operational Procedures (PANS-Aerodromes) Cairo, November 2017 Avner Shilo, Technical officer
More informationFaculty/School: Faculty of Pharmacy Initial Issue Date: Oct 2016
Use this form to assist you to complete risk assessments for hazardous activities and processes. Any serious or ongoing hazards should be reported via RiskWare to ensure that appropriate corrective actions
More informationPrevention of Falls and Working at Heights
Workplace Safety Schools Cleaning Prevention of Falls and Working at Heights It is the policy of the Company to avoid working at heights above 2 metres wherever practical. When avoidance is not an option,
More informationRisk Analysis & Management Plan
Purpose For excursions to our venues, certain groups are required to conduct a risk analysis & management plan. This is to be forwarded as required to the organiser of the group Process Breakdown The excursion/day
More informationSafe Work Method Statement
TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Working at eight SWMS No. 16 Authorized and email Signed by the (Managing
More informationUniversity risk assessment form and guidance notes. Oct 06
General Risk ssessment Form: SOSS Generic C: Normal office work on campus Date (1): 12 October 2017 ssessed by (2): Carla Liburd Validated by (3): Chris Orme Location: (4) Normal office work on Campus
More informationHAZARD MANAGEMENT PROCEDURE
TABLE OF CONTENTS 1. OBJECTIVE... 2 2. SCOPE... 2 3. DEFINITIONS... 2 4. RESPONSIBILITIES... 2 5. HAZARD IDENTIFICATION... 3 5.1 HAZARD AND RISK IDENTIFICATION TOOLS AND METHODS... 3 5.1.1 Take 5 Risk
More informationHigh Ropes Management Plan
High Ropes Management Plan Lutanda Mt Victoria School: Year: Dates: Program: Supervising Staff: Activity Context High Ropes is fun way to challenge participants in their confidence, teamwork, decision
More informationSharing practice: OEM prescribed maintenance. Peter Kohler / Andy Webb
Sharing practice: OEM prescribed maintenance Peter Kohler / Andy Webb Overview 1. OEM introduction 2. OEM maintenance: pros and cons 3. OEM maintenance: key message 4. Tools to help 5. Example 6. Takeaway
More informationHazard Assessment & Control. Faculty of Veterinary Medicine
Hazard Assessment & Control Faculty of Veterinary Medicine Emergency Evacuation In the event of an emergency Primary exit is to the. Secondary exit is to the. Assembly point is at. Campus Security Emergency
More informationGeneral Risk Assessment Form
General Risk ssessment Form Date: (1) 30.9.16 ssessed by: (2) John Moore Validated by: (3) Maggie Martin Location: (4) SEED, rthur Lewis Building ssessment ref no (5) Review date: (6) 30.9.17 Task / premises:
More informationInstructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading
Instructions for the Use of the Excel Spreadsheet There are Three tabs at the bottom of this worksheet Instructions tab is the one you are reading H&S Plan Tab The Plan Tab is the front cover pages of
More informationMethod Statement Author
Plan Bee Limited 3.3 Etna Industrial estate Clamp Road Motherwell Scotland ML2 7XQ Tel: 01698580572 Method Statement Method Statement Details Method Statement Number 7 Method Statement Date Monday 3rd
More informationPLANT RISK ASSESSMENT REPORT
PLANT RISK ASSESSMENT REPORT SECTION 1: PLANT IDENTIFICATION Report Number: 407/752 Assessment Date: 5 th May 2015 Company: Wacker Neuson Plant Type: Telescopic Light Balloon Make: Wacker Neuson Model:
More informationCity University of Hong Kong. Health and Safety Risk Assessment for Workstations, Experiments and Research Projects
City University of Hong Kong Health and Safety Risk Assessment for Workstations, Experiments and Research Projects Objective The objective of risk assessment is to perform a careful examination of what
More informationSafe Work Method Statements (SWMS)
Safe Work Method Statements (SWMS) The purpose of a SWMS is to list the steps of a particular task in your workplace, identify the hazards and associated risks in each step and recommend key safety controls
More informationMEMORANDUM. Background
MEMORANDUM DATE: September 2, 2013 TO: FROM: SUBJECT: PROJECT: City of Fife Attn: Russ Blount 5411 23 rd Street East Fife, WA 98424 Al Tebaldi, PE 54 th Avenue East Crossing Safety Memorandum FIFE0000-0177-
More informationSPAD and TPWS activity report Quarter /14
SPAD and TPWS activity report Quarter 1 2013/14 Alexander Moor 020 3142 5487 Mail to: spad@rssb.co.uk The report may be downloaded from the RSSB website: www.rssb.co.uk. Rail Safety and Standards Board
More informationExecutive Group Sponsor name: Jane Doe Delegated Nominee name: Position: Director of Development Position:
EVENT RISK ASSESSMENT FORM MAJOR/STANDARD EVENTS Event name: Urban Arts Events Event type: Major Standard Location/site/premises: Reid Lecture Theatre Date (period) and time of event: 28 th June 2018 Executive
More informationSafe High Pressure Water Washing (HPWW) Requirement
Safe High Pressure Water Washing (HPWW) Requirement Index Page Introduction 3 Flow chart of process steps 4-5 Responsibilities 6 Risk assessment process 7-9 Job safety analyses considerations 10-11 Compliance
More informationTLILIC2001 Licence to Operate a Forklift Truck
Learner Name: Learner ID: Learner Contact Number: Learner Email Address: Date Training Commenced: This Book Contains: Course Information. Review Questions. The following review questions are to be completed
More informationAbseiling Risk Management Plan
Abseiling Risk Management Plan Lutanda Mt Victoria School: Year: Dates: Program: Supervising Staff: Activity Context Abseiling at Lutanda Mt Victoria involves descending a natural rock face at Mt York,
More informationRisk Assessment Form
Risk Assessment Form School Activity Risk Assessment conducted by: Consultation occurred with: (names & role) Description of activity being assesses Batchelor Outdoor Education Centre High and Low Ropes
More informationSafety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1
Safety Guidelines for Live Entertainment and Events Part 2. Hazard Identification and Risk Management Contents Disclaimer... 1 1. Principles of Risk Management... 2 2. The Risk Management Process... 2
More informationDevelopment, implementation and use of the All Level Crossing Risk Model (ALCRM) Alan Symons Network Rail Infrastructure Ltd Great Britain
Development, implementation and use of the All Level Crossing Risk Model (ALCRM) Alan Symons Network Rail Infrastructure Ltd Great Britain 1 Level Crossing Facts (Great Britain) Over 7000 in active use
More informationBasketball Risk Assessment for AoC Sport National Championships 2018 Nottingham University
Trivial Minor Moderate Serious Very Serious Basketball Risk Assessment for AoC Sport National Championships 2018 Nottingham University The assessor can assign values for the hazard severity (a) and likelihood
More informationTelco Antennas SWMS Working At Height Above 2m
Telco Antennas SWMS Working At Height Above 2m A SWMS shall be developed for a task where the risk has been assessed as Medium or Higher Division: Date: SWMS No: (e.g. Installation, Engineering Workshop)
More informationMinimum Safety Requirements for Contractors Working on Railway Property
Minimum Safety Requirements for Contractors Working on Railway Property Effective_ April 1, 2007 Introduction Canadian Pacific is committed to provide a Safe and Healthy working environment for all Railway
More informationReview of Guidelines for Cycleway Safety Fencing
Review of Guidelines for Cycleway 1.0 PURPOSE 1.1 This document is meant to provide a review of available reference documents for determining appropriate fencing requirements for cycleway paths and shared
More informationStep 3 Existing Control Measures. Step 4 Risk Score & Rating (Table 1) Risk
RISK ASSESSMENT Department: Serial No: TMED0004 Date: 15/02/2018 Activity/Situation: Below is a general risk assessment for use by school groups visiting the Tank Museum. Museum staff are present in the
More informationHazard Recognition. Leader s Guide and Quiz
Hazard Recognition Leader s Guide and Quiz 4831 INTRODUCTION TO THE PROGRAM Structure and Organization Information in this program is presented in a definite order so that employees will see the relationships
More informationSafety in Precast Erection
Safety in Precast Erection C. Kirubakaran R Star Consultants Pte Ltd, Singapore Abstract: Construction industry is known to be one of the most hazardous among different industries all over the world. The
More informationClosing statement. I have chosen not to object in principle to the proposal to close S08.
Closing statement In drafting the order being considered by this Inquiry Network Rail have set out plans to close many at grade pedestrian crossings in Suffolk and have been quite open that they will seek
More informationSafe Use of Access Equipment
Safe Use of Access Equipment Guidance Note 2 Nov 17 1 Safe Use of Access Equipment Introduction This Guidance Note gives practical information about using access equipment. Sample templates have been included
More informationTHE PONY CLUB RISK ASSESSMENT CHECK LIST SUMMER CAMP
Start Date Finish Date Location Map Reference Having started with the details of the exact location of the site so that the emergency services can be told where they are required we start our assessment
More informationRISK ASSESSMENT. White Paper.
RISK ASSESSMENT White Paper www.leuze.com White Paper RISK ASSESSMENT IN HARMONY The European Machinery Directive as well as its implementations on a national level (in Germany ProdSG and 9 ProdSV) require
More informationOur Approach to Managing Level Crossing Safety Our Policy
Our Approach to Managing Level Crossing Safety Our Policy Our policy towards managing level crossing risk is: that we are committed to reducing the risk at level crossings where reasonably practicable
More informationALIGNING MOD POSMS SAFETY AND POEMS ENVIRONMENTAL RISK APPROACHES EXPERIENCE AND GUIDANCE
ALIGNING MOD POSMS SAFETY AND POEMS ENVIRONMENTAL RISK APPROACHES EXPERIENCE AND GUIDANCE R. L. Maguire MIMechE MSaRS RS2A Limited Swindon, UK 07505 743 725 rlm@rs2a.com Keywords: POSMS, POEMS, Alignment,
More informationJillys Early Childhood Development and Educational Centre
Form - Excursion risk management plan Jillys Early Childhood Development and Educational Centre Excursion details Date(s) of excursion Departure and arrival times As per 'Vacation Care Programme' on Jillys
More informationHS329 Risk Management Procedure
HS329 Risk Management Procedure Work Health and Safety Act 2011 Policy hierarchy link Work Health and Safety Regulation 2011 Work Health and Safety Policy Code of Practice How to Manage Work Health and
More informationLearning event following Ironmen runaway
Requirements for the session Learning event following Ironmen runaway Laptop Projector Speakers Screen Post-it notes/pens Flipcharts/pens Safety Vision poster Overview of the session Timings Activity Instructions
More informationCYCLING TIME TRIALS The national governing body for CYCLING time trials
CYCLING TIME TRIALS The national governing body for CYCLING time trials www.ctt.org.uk SOUTH DISTRICT COUNCIL COURSE DETAILS FOR START SHEETS & RISK ASSESSMENT INDEX Guidance Notes for Event Promoters
More informationRISK ASSESSMENT. Catapults
RISK ASSESSMENT Catapults Outer Limits Adventure Fitness Sam Stedman 85 Chandler Street, Garbutt 4814 Mobile: 0421 484 211 1 ACTIVITY DESCRIPTION Details Title: Date: Activity: Details: Program Manager:
More informationSH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN
SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH 07 3265 6537 M 0411 756 719 ABN 45 081 359 613 OHS-FRM-100 Rev 11 (07/18) Page 1 SH&EWMS No.: F-C-QLD-30
More informationFIRE HYDRANT TESTING METHOD STATEMENT.
SUBJECT: TASK: FIRE HYDRANT INSPECTION & TESTING. 1. Location....1 2. The Scope of Works.... 1 3. Description of Task.... 1 4. Access & Egress to & from Work Area.... 2 5. Safety Hazard Identification....
More informationAPPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION)
APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION) West Midlands Interchange Transport Assessment DCO Submission WEST MIDLANDS INTERCHANGE SUBJECT: Technical Note 22 Review of Vicarage Road Junction
More informationT-PROP RISK ASSESSMENT
T-PROP RISK ASSESSMENT 13/02/2012 ELBROC RA T-PROP CONTENTS Introduction 3 1. Product Description 3 2. Design Criteria 3 3. Risk Assessment Team 3 4. Objectives 4 5. Hazard Classification 4 Risk matrix
More informationRoom B15 Architecture Building Bridgeford Street
Date: 9/12/16 ssessed by: General Risk ssessment Form Task / premises: (7) Use of the CNC machine used for cutting wood, metals and plastics. rchitecture Building ssessment ref no 1 12/12/16 ctivity (8)
More informationSpecific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable).
OCCUPATIONAL HEALTH & SAFETY MANUAL Section OHS-005, Job Safety Analysis SCORESBY, VIC 3179 GEELONG, VIC 3218 MALAGA, WA 6090 DUDLEY PARK, SA 5008 MANSFIELD, QLD 4122 NORTH ROCKS, NSW, 2641 ACT 2609 LAVINGTON,
More informationAeronautical studies and Safety Assessment
Aerodrome Safeguarding Workshop Cairo, 4 6 Dec. 2017 Aeronautical studies and Safety Assessment Nawal A. Abdel Hady ICAO MID Regional Office, Aerodrome and Ground Aids (AGA) Expert References ICAO SARPS
More informationFaculty/School: Pharmacy Initial Issue Date: Oct 2016
Use this form to assist you to complete risk assessments for hazardous activities and processes. Any serious or ongoing hazards should be reported via RiskWare to ensure that appropriate corrective actions
More informationRISK ASSESSMENT HAZARD IDENTIFICATION AND RISK ASSESSMENT METHODOLOGY
RISK ASSESSMENT HAZARD IDENTIFICATION AND RISK ASSESSMENT METHODOLOGY A) RISK Risk concerns the deviation of one or more results of one or more future events from their expected value. Risk related to
More informationAccident, Incident and Ill-health Reporting Procedure. This is a sub-policy of UEL s main Health and Safety Policy Statement
Corporate Services Health and Safety Unit Accident, Incident and Ill-health Reporting Procedure This is a sub-policy of UEL s main Health and Safety Policy Statement 1. INTRODUCTION The purpose of this
More informationAPPENDIX 1: HAZARD IDENTIFICATION and RISK ASSESSMENT PRO-FORMAS
FSC Operational Codes of Practice 7 July 2006 No 9: Risk Assessments Page 1 of 5 Appendix 1: Hazard Identification & Risk Assessment Pro-formas APPENDIX 1: HAZARD IDENTIFICATION and RISK ASSESSMENT PRO-FORMAS
More informationPLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS
PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS Project: Insert Client Repair/ Replacement of low level light units/ low level
More informationLow Level Cycle Signals used as repeaters of the main traffic signals Appendices
Low Level Cycle Signals used as repeaters of the main traffic signals Appendices Track trial report This document contains the appendices to accompany the report from the first sub-trial of a larger track
More informationThis guidance explains what hazards and risks are and provides an overview of requirements under the Health and Safety at Work Act 2015 (HSWA).
Hazards and risks Health and Safety at Work Act (2015) Guidance Last updated: 31 May 2017 What this guidance contains This guidance explains what hazards and risks are and provides an overview of requirements
More informationIRFU Age Grade Mini Rugby
IRFU Age Grade Mini Rugby Mini Rugby Festival Guidelines 2018 Mini Rugby (LTPD Stage 1) The ethos of mini rugby is to foster and develop young players (boys & girls) of all ability in the game of rugby
More informationEmergency Response Plans
PO Box 2114 Woonona East NSW 2517 (WOLLONGONG) PTY LTD Ph: 0417 420 760 Fax: 02 4283 2216 A/H: 02 4283 7727 EPA Licence: 11788 ABN: 57 079 336 799 Unit 11 Lot 1 York Place Woonona NSW 2517 Emergency Response
More informationHEALTH AND SAFETY POLICY APPENDIX B WORKING AT HEIGHT GUIDE AND RISK ASSESMENT
KENSWORTH PRIMARY SCHOOL HEALTH AND SAFETY POLICY APPENDIX B WORKING AT HEIGHT GUIDE AND RISK ASSESMENT KPS-005 RISK ASSESSMENT FOR: Title of activity / person Working at height low level activities What
More informationReport to Cabinet. 18 May 2016
Agenda Item 8 Report to Cabinet 18 May 2016 Subject: Presenting Cabinet Member: Proposed CCTV Enforcement of Traffic Contraventions in a Bus Lane (Key Decision Ref. No. HE030) Highways and Environment
More informationRisk Assessment Form
Risk Assessment Form School Activity Risk Assessment conducted by: Consultation occurred with: (names & role) Description of activity being assesses Batchelor Outdoor Education Centre Artificial Climbing
More informationRisk Assessment Form
Assessment Form This reviewed assessment supersedes the original assessment dated October 2003 and is reviewed on an annual basis Business Area: Ingleton Waterfalls Walk Area/Task: Pathway around the waterfalls
More informationUse of MEWPs in Arboriculture
Guidance to the technical author: Please do not comment on items that are greyed out in this document as the context of this text will be supplied by the Arboricultural Association. Throughout the guide
More informationGuidance on Provision, Risk. Assessment and Review of Level. Crossings. Withdrawn Document Uncontrolled When Printed
Railway Group Guidance Note Guidance on Provision, Risk Assessment and Review of Level Crossings Synopsis This document provides guidance on meeting the requirements contained in GI/RT7011 Provision, Risk
More informationImproving Cyclist Safety at the Dundas Street West and Sterling Road Intersection
STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee
More informationHealth and Safety Program Inspections
POLICY: It is CPP s policy to maintain a program of safety inspections. The objective of this program is to control and mitigate hazards in the workplace and worksite. All CPP s facilities and worksites
More informationSAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030
SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030 HIGH RISK APT AM Holdings Pty. Ltd. [ABN] 95124754383 Principal Contractor (PC) APA Group Level 19, HSBC Building 580 George
More informationPLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS
PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS Project: (insert Client) Replacement/ Repair of high level light units/ high
More informationWheelPower British Wheelchair Sport
Second Stoke Mandeville In2 Sport Camp Saturday 29 th and Sunday 30th November2014 Stoke Mandeville Stadium, Aylesbury The In2 Sport Camp is for those aged 18+ with a physical impairment. The camp will
More informationPOSITION OF PERSON COMPLETING REPORT: IN CONSULTATION WITH: David Radolovic POSITION: HSR/ Program Coordinator
YMCA CENTRE: Parks Recreation Centre ASSESSMENT DATE: 04/08/2015 PROGRAM / AREA: Climbing Wall TASK / ITEM: Climbing Wall PERSON COMPLETING REPORT: Anthony Bates POSITION OF PERSON COMPLETING REPORT: Camping
More informationinnova-ve entrepreneurial global 1
www.utm.my innova-ve entrepreneurial global Safety Integrity Level (SIL) is defined as: Relative level of risk-reduction provided by a safety function to specify a target level of risk reduction. SIL is
More informationRISK ASSESSMENT/SAFE WORKING PRACTICE SD008 Speed Sessions and Competitions Including resurfacing
REF: SD008 TASK/ACTIVITY: Speed Sessions and Competitions ASSESSMENT DATE: 22.02.16 DEPT: Sports Development LOCATION: Ice Rinks and Service corridor ASSESSED BY: A Worth Who may be affected by the Venue
More informationWelcome to the Ballarat Swap Meet SITE HOLDER INFORMATION GUIDE. Pack up day Sunday 26 th by 1.00pm
Welcome to the Ballarat Swap Meet SITE HOLDER INFORMATION GUIDE 2017 Set-up on Thursday 23 rd February 2017 from 2.00pm Trading Friday 24 th 7.00am 6.00pm and Saturday 25 th 7.00am 5.00pm Pack up day Sunday
More informationPurpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT
SYDNEY TRAINS SAFETY MANAGEMENT SYSTEM OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT Purpose Scope Process flow This operating procedure supports SMS-07-SP-3067 Manage Safety Change and establishes the
More informationFaculty/School: Pharmacy Initial Issue Date: Oct Dr. Alpesh Patel and Padmaja Dhanvate
Use this form to assist you to complete risk assessments for hazardous activities and processes. Any serious or ongoing hazards should be reported via RiskWare to ensure that appropriate corrective actions
More informationWork Health & Safety Event Safety Checklist Small Event
Note: This checklist relates to the Bedford Park site and contains information specific to that site. Other sites can use the checklist but may need to adapt the information. This documentation must be
More informationRisk Assessment Guidance
Risk Assessment Guidance The assessor can assign values for the hazard severity (a) and likelihood of occurrence (b) (taking into account the frequency and duration of exposure) on a scale of 1 to 5, then
More informationPewsey Carnival Event
Pewsey Carnival Event Risk Assessment for carnival assembly and procession: ASSESSMENT REPORT FORM Assessment Date Annual carnival assembly and procession nd July 008 Assessor(s): Nigel Lihou, Mick Hunter,
More informationAge Concern Hounslow Manual Handling Risk Assessment PART ONE PRELIMINARY RISK ASSESSMENT
Age Concern Hounslow Manual Handling Risk Assessment PART ONE PRELIMINARY RISK ASSESSMENT This checklist is to be used as a preliminary assessment of the work area. If the answer is yes or possibly, then
More informationWorking Alone. Latest revised date: October 26, 2011 Page 1 of 7 Prepared by: Department of Health & Safety S-014
Working Alone Latest revised date: October 26, 2011 Page 1 of 7 1.0 Introduction Memorial will establish specific practices and procedures to minimize the risks of injury or violence to staff, faculty,
More informationRisk Assessment Generic
Risk Assessment Generic Assessor George Knight Date March 2017 Review Date March 2018 Reference 040 Location All areas. Description of task Generic risk assessment carrying the site and activities in general.
More informationHAZARD IDENTIFICATION & RISK ASSESSMENT
Clearheart Construction Co., Inc. Hazard Identification & Risk Assessment HAZARD IDENTIFICATION & RISK ASSESSMENT If all employees and subcontractors followed established OSHA compliant procedures to accomplish
More informationACTIVITY RISK ASSESSMENT
ACTIVITY RISK ASSESSMENT Activity Name and Description: Child Activity Risk Assessment Template normally you would describe the activity here Activity Location: Where is the activity to be held? Activity
More informationSupervisors guide for managing reported hazards and incident (HS714)
Supervisors guide for managing reported hazards and incident (HS714) Version 4.1 27 February Health and Safety Unit Contents What happens when a hazard/ incident is reported?... 1 Steps to managing reported
More information