1 Loss of Normal Feedwater Analysis by RELAP5/MOD3.3 in Support to Human Reliability Analysis ABSTRACT Andrej Prošek, Borut Mavko Jožef Stefan Institute Jamova cesta 39, SI-1 Ljubljana, Slovenia The current probabilistic safety assessment (PSA) standard recommends the use of bestestimate codes. The purpose of the study was to determine the operator action success criteria time window for manual start of auxiliary feedwater (AFW) during loss of normal feedwater transient using the best-estimate code. The time window was needed for updated human reliability analysis in the Krško nuclear power plant. In addition, deep insights to the PSA analyst were given, how different time windows influence the transient consequences. The RELAP5/MOD3.3 Patch3 best estimate code and base RELAP5 input model were used for the analysis. The time delay when the operator succeeds to start AFW pump was varied in the analysis to get the maximum time window. The results showed sufficient additional available time for the action, therefore recovery action could be considered in the human reliability analysis. It was also shown that uncertainty evaluation of best estimate calculation is not needed as available time is much larger than the time needed to perform the operator action. Finally, it was also shown that fast operator response prevents any risk. 1 INTRODUCTION To estimate the success criteria time windows of operator actions the results of a severe accident code such the MAAP has been used in the conventional probabilistic safety assessment (PSA). However, the PSA standard [1] recommends the use of best-estimate codes to improve the quality of a PSA. Therefore the RELAP5/MOD3.3 best-estimate computer code [2] was used to estimate the operator action success criteria time window needed for updated human reliability analysis. The specified time windows are important for human reliability analysis (HRA) to determine the likelihood of operator actions. The human error probability of certain action is lower if operators have more time available. In the control room of a nuclear power plant there is a team of operators, which is supervised by a shift supervisor. If operators have 1 or more minutes of additional time for action, it can be expected that colleagues or shift supervisor can observe and correct a possible error of their colleague. Consideration of recovery causes lower human error probability and may cause a different impact of human error to the overall probabilistic safety assessment results. The actual times needed for performing the action were assessed based on real simulator scenarios, while the time windows were determined by deterministic safety analysis. In the present study parametric calculations were performed for establishing auxiliary feedwater in case of transients. The most limiting transient was loss of normal feedwater. 35.1
2 ANALYSIS METHODOLOGY For calculations the RELAP5/MOD3.3 P3 computer code [2] and the qualified RELAP5 input model representing a two-loop pressurized water reactor, Westinghouse type, was used [3]. The base RELAP5 input model for nominal power, so called Master input deck, has been provided by Krško nuclear power plant (NPP). It has been used for several analyses, including reference calculations for Krško full scope simulator verification [3], [4] and is described in [5]. In the following the success criteria time windows and the analysis assumptions are described. The idea of the HRA method [6] was to use those deterministic safety analyses to perform sensitivity studies of human actions, which are supplement to safety systems actuations. Sensitivity studies include variations of timing of human action to determine the latest time, when operators have to perform the needed action in order that the main plant parameters are not exceeded their limits. The core cooling success criteria as defined in [4] were used. It is assumed if the hottest core fuel/clad node temperature in the reactor core exceeds 923 K for more than 3 minutes or if temperature of the core exceeds 1348 K, the core damage may occur, which may lead to accident state. For overpressurization the criterion is that primary pressure should not exceed the MPa. Based on these criteria the time window was determined. The operator actions considered in the analysis were delayed AFW pump manual start, reactor coolant pump (RCP) trip per emergency operating procedure (one HPSI pump running and subcooling below 14 K) and HPSI pump termination according to emergency operating procedure criteria (pressurizer pressure above MPa, pressurizer level above 1 % and subcooling greater than 19 K). The most limiting transient requiring operation of AFW is loss of normal feedwater. The success criterion is that capacity of one train of AFW is adequate to remove stored energy and decay heat, to prevent overpressurization of the primary system, and to prevent uncovering of the core resulting in the core heatup. The time needed to start the AFW pump was varied from 1 minute up to 7 minutes, i.e. from the fastest estimated time the operator can respond to the time too late for intervention. The transient starts with the main feedwater loss which was simulated by manual closure of main feedwater valves. These caused the steam generator (SG) level drop and reactor trip on low-low steam generator water level. On the reactor trip the turbine was tripped. In the cases with assumed AFW start delay the safety injection (SI) signal was generated on low steam line pressure. On SI signal the steam line was isolated disabling the steam dump operation. When the AFW pump started to inject, it enabled the secondary side cooling thorough SG power operated relief valves (PORVs), which depressurize the reactor coolant system (RCS) below the pressurizer (PRZ) PORV closure setpoint and then below the maximum pressure capacity of high-pressure safety injection (HPSI) pump. The HPSI injection efficiently prevents further core uncovery. 3 RESULTS The main results are shown in Table 1 and Figs. 1 through 8. Table 1 shows the main sequence of events. The main interest was to define the maximum time window to manually start AFW pump. The cases with and delay were added for comparison purposes to see, how delay influences the transient. The transient started with the loss of main feedwater at time. Due to the loss of heat sink the RCS average temperature started to increase at 2 s, what actuated the steam dump at 3 s. At 53 s the reactor tripped on low-low steam generator level, causing turbine trip. The RCS temperature dropped to no-load value. It can be seen that when the AFW started with 1 minute delay on loss of main feedwater, the reactor tripped but the SI signal generation was prevented (no HPSI injection). Also there was
3 35.3 no need to trip the RCPs and there was no steam discharge through the SG PORVs. When AFW manual start was delayed 1 to 2 minutes, the SI signal was generated on the low steam line pressure. The basic reason were almost empty steam generators after 1 minutes what deteriorated stored and decay heat removal. Therefore at 594 s the RCS average temperature started to increase, by this modulating open the steam dump valves. Due to the increased steam dump flow the secondary side pressure started to decrease, what resulted in SI signal generation on low steam line pressure. The SI signal caused normal charging and letdown isolation and main steam line isolation. By main steam line isolation the steam dump was lost. The HPSI pump started to run on SI signal. However, due to the high primary pressure the HPSI pumps did not inject before the AFW pump start, which very quickly enables cooling by SG PORVs. The HPSI pumps were very efficient in recovering the RCS mass and pressure; therefore they were terminated when SI termination criteria were fulfilled. The RCPs were not tripped for cases with small AFW start delay, because adequate subcooling existed. When AFW delay was 2 minutes or larger, the subcooling was lost and with HPSI pumps running the criterion for tripping RCPs was fulfilled. Table 1: Sequence of main events Event Analyzed cases (AFW delay) Main feedwater closure Rx trip signal generation Turbine trip Steam dump discharge 3--> SI signal generation N.A Letdown isolation N.A Steam line 1 and 2 isolation N.A RCP 1 and 2 trip N.A. N.A. N.A AFW 1 start (by assumption) SG PORV first discharge N.A HPSI pump injection start N.A. N.A. N.A HPSI termination N.A Figures 1 through 8 show the important plant and safety variables, from which the time window was determined. Parametric analyses were performed to give information how influences the time of manual start of the AFW no. 1 pump. Case with 1 minute delayed start of AFW pump shows that the cooling is sufficient (no PRZ PORV and SG PORV discharge). In the case with 1 minutes delay there is no discharge on the primary side, while for sufficient cooling the SG PORVs operation is needed. For delays 2 minutes and more, there is discharge also through the PRZ PORVs. Figure 1 shows that the RCS was not overpressurized. At the time when one AFW pump was started to inject into the secondary side, cooling of the secondary side caused the pressurizer pressure to drop below the PRZ PORV closure setpoint and then below the maximum pressure capacity of HPSI pump. Figure 2 shows the RCS mass inventory. Depletion occurred due to the PRZ PORV discharge, but the RCS mass is efficiently recovered by HPSI pumps injection. When the RCS mass is depleted to approximately one third, the core starts to heat up as shown in Fig. 3. The parametric analysis showed that the core significantly heats up with AFW pump start delayed more than 5 minutes.
4 delayed AFW pump start 16 Pressure (MPa) Figure 1: Pressurizer pressure Mass (t) 8 4 HPSI pumps injection start Figure 2: RCS mass inventory Figure 4 shows the HPSI injected mass into the RCS, which is approximately balanced with the mass discharged through the PRZ PORV shown in Fig. 5. It should be noted that safety injection is terminated by operator when criteria are fulfilled. Secondary side parameters are shown in Figs. 6 through 8 for steam generator no. 1 (SG1) in which AFW was injecting.
5 K Temperature (K) Time [s] Figure 3: Cladding temperature at 11/12 height of the core 12 Mass (t) Figure 4: Integrated HPSI flow Figure 6 shows the SG1 pressure. At turbine trip the pressure initially increased and then started to slowly drop during steam dump operation. On SI signal generation at 617 s the pressure again increased to SG1 PORV setpoint and then oscillates due to SG1 PORV cycling. The SG1 PORV cycling can be seen from Figure 7, showing mass released. Figure 8 shows the SG1 wide range level. The level started to increase at the time when the AFW flow was established.
6 35.6 Mass (t) Figure 5: Integrated PRZ PORVs flow 1 8 Pressure (MPa) SI signal generation Figure 6: Steam generator no. 1 pressure The maximum available time to start AFW pump according to success criteria is 6 minutes. When action is faster, the benefits could be seen. Based on the simulator experience [8], for starting the AFW the operator needs from 1 to 1 minutes. For the human reliability analysis only the information of sufficient time for recovery action was needed. However, the PSA analyst can use more information from deterministic analysis. The results showed that any releases from primary system could be prevented if action is performed in 1 minutes.
7 35.7 Mass (t) Figure 7: Integrated SG1 PORV flow 1 8 Level (%) Figure 8: Steam generator no. 1 wide range level This information gives additional insight into the risks and importance of fast operator response. Fast operator action to manually start AFW pump means no risk while very late response (more than 1 hour) would lead to core uncovery. Due to sufficient time window it is considered that recovery action could be performed.
8 CONCLUSIONS In the present study deterministic safety analyses with RELAP5/MOD3.3 Patch 3 computer code were performed as a support to the human reliability analysis. Safety analyses are needed for determination of time parameters, which are inputs for human reliability analysis within the probabilistic safety assessment. The operator action success criteria time window in the case of loss of normal feedwater, the most limiting transient, was estimated. The results showed sufficient additional available time for the action, therefore recovery action could be considered in the human reliability analysis. It was also shown that uncertainty evaluation of best estimate calculation is not needed in spite of the fact that the event is significant contributor to the risk, because available time is much larger than the time needed to perform the operator action. Finally, it was also shown that fast operator response could prevent any risk in the case of loss of normal feedwater transient. ACKNOWLEDGMENTS The author acknowledges the financial support from the state budget by the Slovenian Research Agency program no. P2-26. The RELAP5/MOD3.3 Krško NPP base input model is courtesy of Krško NPP. REFERENCES [1] ASME, Standard for Probabilistic Risk Assessment for Nuclear Power Plant Applications RA-S-22, The American Society of Mechanical Engineers, 22. [2] USNRC, RELAP5/MOD3.3 code manual, Vols. 1 to 8, Information Systems Laboratories, Inc., Rockville, Maryland, Idaho Falls, Idaho, prepared for USNRC, 26. [3] A. Prošek, I. Parzer, B. Krajnc, Simulation of hypothetical small-break loss-of-coolant accident in modernized nuclear power plant, Electrotechnical Review, 71(4), 24, pp [4] R. P. Prior, J. P. Chaboteaux, F. P. Wolvaardt, M. T. Longton, R. Schene, Best estimate success criteria in the Krsko IPE, Proc. of the PSA/PRA and Severe Accident, Nuclear Society of Slovenia, Ljubljana, Slovenia (1994). [5] A. Prošek, B. Mavko, RELAP5/MOD3.3 Code Validation with Plant Abnormal Event, Science and Technology of Nuclear Installations, Vol. 28, doi:1.1155/28/ [6] M. Čepin, X. He, Development of a Method for Consideration of Dependence between Human Failure Events, Proc. ESREL 26, Estoril, Portugal, September 18-22, 26, pp [7] I. Parzer, B. Mavko, B. Krajnc, Simulation of a hypothetical loss-of-feedwater accident in a modernized nuclear power plant, Journal of Mechanical Engineering, 49(9), 23, pp [8] A. Prošek, M. Čepin, Impact of deterministic safety analysis on human reliability analysis, Proc. of the Risk, Quality and Reliability Conference 27, (RQR 27), Ostrava, Czech Republic (27).
Effects of Delayed RCP Trip during SBLOCA in PWR
Effects of Delayed RCP Trip during SBLOCA in PWR Javier Montero Technical University of Madrid, Alenza 4, 28003, Madrid, Spain fj.montero@alumnos.upm.es Cesar Queral, Juan Gonzalez-Cadelo cesar.queral@upm.es,
More informationVerification and validation of computer codes Exercise
IAEA Safety Assessment Education and Training (SAET) Programme Joint ICTP- IAEA Essential Knowledge Workshop on Deterministic Safety Assessment and Engineering Aspects Important to Safety Verification
More informationEXPERIMENTAL SUPPORT OF THE BLEED AND FEED ACCIDENT MANAGEMENT MEASURES FOR VVER-440/213 TYPE REACTORS
International Conference Nuclear Energy for New Europe 22 Kranjska Gora, Slovenia, September 9-12, 22 www.drustvo-js.si/gora22 EXPERIMENTAL SUPPORT OF THE BLEED AND FEED ACCIDENT MANAGEMENT MEASURES FOR
More informationInternational Agreement Report
NUREG/IA-0408 International Agreement Report IJS Procedure for Converting Input Deck from RELAP5 to TRACE Prepared by: A. Prošek, O.A. Berar, B. Mavko Jožef Stefan Institute Jamova cesta 39 SI-1000 Ljubljana,
More informationSENSITIVITY ANALYSIS OF THE FIRST CIRCUIT OF COLD CHANNEL PIPELINE RUPTURE SIZE FOR WWER 440/270 REACTOR
PROCEEDINGS OF THE YEREVAN STATE UNIVERSITY Physical and Mathematical Sciences 216, 2, p. 57 62 P h y s i c s SENSITIVITY ANALYSIS OF THE FIRST CIRCUIT OF COLD CHANNEL PIPELINE RUPTURE SIZE FOR WWER 44/27
More informationASVAD THE SIMPLE ANSWER TO A SERIOUS PROBLEM. Automatic Safety Valve for Accumulator Depressurization. (p.p.)
ASVAD Automatic Safety Valve for Accumulator Depressurization (p.p.) THE SIMPLE ANSWER TO A SERIOUS PROBLEM International Experts Meeting on Strengthening Research and Development Effectiveness in the
More informationNE 405/505 Exam 2 Spring 2015
NE 405/505 Exam 2 Spring 2015 (80%) 1) A PWR with UTSGs is operating at 100% power, BOC, with control rods all out in automatic control when a failure in the speed pump controller results in all feed pumps
More informationEngineering & Projects Organization
Engineering & Projects Organization Note from : Date: 11/09/2012 To : Copy : N : PEPR-F.10.1665 Rev. 3 Subject: EPR UK - GDA GDA issue FS04 Single Tube Steam Generator Tube Rupture Analysis for the UK
More informationSafety Analysis: Event Classification
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Safety Analysis: Event Classification Lecturer Lesson IV 1_2 Workshop Information IAEA Workshop City, Country XX - XX Month,
More informationFUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER P: REFERENCE OPERATING CONDITION STUDIES (PCC)
PAGE : 1 / 11 1. PASSIVE SINGLE FAILURE ANALYSIS The aim of the accident analysis in Chapter P is to demonstrate that the safety objectives have been fully achieved, despite the most adverse single failure.
More informationResearch Article Remarks on Consistent Development of Plant Nodalizations: An Example of Application to the ROSA Integral Test Facility
Science and Technology of Nuclear Installations Volume 22, Article ID 5867, 7 pages doi:.55/22/5867 Research Article Remarks on Consistent Development of Plant Nodalizations: An Example of Application
More informationRELAP5 Code Study of ROSA/LSTF Experiments on PWR Safety System Using Steam Generator Secondary-Side Depressurization
Journal of Energy and Power Engineering 9 (15) 6- doi: 1.1765/193-975/15.5. D DAVID PUBLISHING RELAP5 Code Study of ROSA/LSTF Experiments on PWR Safety System Using Steam Generator Secondary-Side Depressurization
More informationNUBIKI Nuclear Safety Research Institute, Budapest, Hungary
System Reliability Analysis and Probabilistic Safety Assessment to Support the Design of a New Containment Cooling System for Severe Accident Management at NPP Paks Tamas Siklossy* a, Attila Bareith a,
More information-. 30ýv. Entergy ARKANSAS NUCLEAR ONE - UNIT I IMPROVED TECHNICAL SPECIFICATIONS SUBMITTAL. 05/01101 Supplement Volume 2 of 2. (Sections 3.7 and 3.
ARKANSAS NUCLEAR ONE - UNIT I IMPROVED TECHNICAL SPECIFICATIONS SUBMITTAL -. 30ýv May 1, 2001 05/01101 Supplement Volume 2 of 2 (Sections 3.7 and 3.8) Entergy MSSVs 3.7.1 3.7 PLANT SYSTEMS 3.7.1 Main Steam
More informationIntegrated Coping Strategies for Beyond-Design-Basis External Events
IAEA IEM on SAM in the Light of the Fukushima Daiichi NPP, 17-20 March 2014, Vienna, Austria Integrated Coping Strategies for Beyond-Design-Basis External Events Jaewhan Kim and Kwang-Il Ahn KAERI Contents
More informationAn Improved Modeling Method for ISLOCA for RI-ISI and Other Risk Informed Applications
An Improved odeling ethod for ISLOCA for RI-ISI and Other Risk Informed Applications Young G. Jo 1) 1) Southern Nuclear Operating Company, Birmingham, AL, USA ABSTRACT In this study, an improved modeling
More informationTools and Methods for Assessing the Risk Associated with Consequential Steam Generator Tube Rupture
Tools and Methods for Assessing the Risk Associated with Consequential Steam Generator Tube Rupture Mohamad Ali Azarm a and S. Sancaktar b a Innovative Engineering and Safety Solutions, Germantown, MD,
More informationCONTENTS OF THE PCSR CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION
PAGE : 1 / 8 CONTENTS OF THE PCSR CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION SUB-CHAPTER 1.1 INTRODUCTION SUB-CHAPTER 1.2 GENERAL DESCRIPTION OF THE UNIT SUB-CHAPTER 1.3 COMPARISON WITH REACTORS
More informationClassical Event Tree Analysis and Dynamic Event Tree Analysis for High Pressure Core Melt Accidents in a German PWR
OECD International Workshop on Level 2 PSA and Severe Accident Management Koeln, Germany, March 29-31, 2004 Classical Event Tree Analysis and Dynamic Event Tree Analysis for High Pressure Core Melt Accidents
More informationSimulation of Experiment on Aerosol Behaviour at Severe Accident Conditions in the LACE Experimental Facility with the ASTEC CPA Code
Simulation of on Aerosol Behaviour at Severe Accident Conditions in the LACE al Facility with the CPA Code Ivo Kljenak, Borut Mavko Jožef Stefan Institute Jamova 39, SI-1000 Ljubljana, Slovenia Ivo.Kljenak@ijs.si,
More informationFUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER I: AUXILIARY SYSTEMS 2. VOLUME AND CHEMICAL CONTROL (RCV [CVCS])
PAGE : 1 / 16 2. VOLUME AND CHEMICAL CONTROL (RCV [CVCS]) 2.0. SAFETY REQUIREMENTS 2.0.1. Safety functions 2.0.1.1. Control of reactivity In normal operation, the RCV [CVCS] regulates and adjusts (jointly
More informationNuclear safety Lecture 4. The accident of the TMI-2 (1979)
Nuclear safety Lecture 4. The accident of the TMI-2 (1979) Ildikó Boros BME NTI 27 February 2017 The China Syndrome Opening: 16 March 1979 Story: the operator of the Ventana NPP tries to hide the safety
More informationContainment Isolation system analysis and its contribution to level 2 PSA results in Doel 3 unit
Containment Isolation system analysis and its contribution to level 2 PSA results in Doel 3 unit Marius LONTOS a*, Stanislas MITAILLÉ a, and Shizhen YU a, Jérémy BULLE a TRACTEBEL ENGIE, Brussels, Belgium
More informationA comparative study of FLEX strategies to cope with Extended Station Blackout (SBO)
A comparative study of FLEX strategies to cope with Extended Station Blackout (SBO) Presented by M. G Shahinoor Islam Master s Student of KINGS October 26 th 2017 KNS Meeting FLEX Objectives 2 page of
More informationSAFETY DEMONSTRATION TESTS ON HTR-10
2nd International Topical Meeting on HIGH TEMPERATURE REACTOR TECHNOLOGY Beijing, CHINA,, September 22-24, 24 #Paper H6 SAFETY DEMONSTRATION TESTS ON HTR-1 Shouyin HU, Ruipian WANG, Zuying GAO Institute
More informationAP1000 European 19. Probabilistic Risk Assessment Design Control Document
APPENDIX 19E SHUTDOWN EVALUATION 19E.1 Introduction Westinghouse has considered shutdown operations in the design of the A1000 nuclear power plant. The AP1000 defense-in-depth design philosophy to provide
More informationThe Nitrogen Threat. The simple answer to a serious problem. 1. Why nitrogen is a risky threat to our reactors? 2. Current strategies to deal with it.
International Conference on Topical Issues in Nuclear Installation Safety: Safety Demonstration of Advanced Water Cooled Nuclear Power Plants. The simple answer to a serious problem Vienna. 6 9 June 2017
More informationConsiderations for the Practical Application of the Safety Requirements for Nuclear Power Plant Design
Considerations for the Practical Application of the Safety Requirements for Nuclear Power Plant Design Joint ICTP-IAEA Essential Knowledge Workshop on Deterministic Safety Analysis and Engineering Aspects
More informationVisual Observation of Nucleate Boiling and Sliding Phenomena of Boiling Bubbles on a Horizontal Tube Heater
Proceedings of the 2 nd World Congress on Mechanical, Chemical, and Material Engineering (MCM'16) Budapest, Hungary August 22 23, 216 Paper No. HTFF 146 DOI:.11159/htff16.146 Visual Observation of Nucleate
More informationV.H. Sanchez Espinoza and I. Gómez-García-Toraño
V.H. Sanchez Espinoza and I. Gómez-García-Toraño ANALYSIS OF PWR SEVERE ACCIDENT SEQUENCES INCLUDING MITIGATIVE MEASURES TO PREVENT OR DELAY THE FAILURE OF SAFETY BARRIERS WITH THE SEVERE ACCIDENT CODE
More informationPRA Methodology Overview
PRA Methodology Overview 22.39 Elements of Reactor Design, Operations, and Safety Lecture 9 Fall 2006 George E. Apostolakis Massachusetts Institute of Technology Department of Nuclear Science and Engineering
More informationIAEA Headquarters in Vienna, Austria 6 to 9 June 2017 Ref No.: CN-251. Ivica Bašić, Ivan Vrbanić APoSS d.o.o.
Overview And Comparison Of International Practices Concerning The Requirements On Single Failure Criterion With Emphasize On New Water-Cooled Reactor Designs Presentation on International Conference on
More informationAssessing Combinations of Hazards in a Probabilistic Safety Analysis
Assessing Combinations of Hazards in a Probabilistic Safety Analysis Halbert Taekema a, and Hans Brinkman a a NRG, Arnhem, The Netherlands Abstract: Guidance on how to systematically address combination
More informationWorkshop Information IAEA Workshop
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Risk Monitoring tools: Requirements of Risk Monitors, relation with the Living PSA, applications of Risk Monitors Lecturer Lesson
More informationA c o n c e p t u a l c o m p a r a t i v e s t u d y o f F L E X s t r a t e g i e s t o c o p e w i t h e x t e n d e d S B O.
A c o n c e p t u a l c o m p a r a t i v e s t u d y o f F L E X s t r a t e g i e s t o c o p e w i t h e x t e n d e d S B O Hak Kyu Lim KEPCO International Nuclear Graduate School (KINGS) Probabilistic
More informationTHE NITROGEN INJECTION THREAT IN PWR REACTORS
THE NITROGEN INJECTION THREAT IN PWR REACTORS Weakness of current strategies & ASVAD, the new passive solution. Arnaldo Laborda Rami ASVAD INTL. SL (SPAIN) Tarragona (SPAIN) Email: alaborda@asvad-nuclear.com
More informationFUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER F: CONTAINMENT AND SAFEGUARD SYSTEMS 7. CONTAINMENT HEAT REMOVAL SYSTEM (EVU [CHRS])
PAGE : 1 / 16 7. CONTAINMENT HEAT REMOVAL SYSTEM (EVU [CHRS]) 7.0. SAFETY REQUIREMENTS 7.0.1. Safety functions The main functions of the EVU system [CHRS] are to limit the pressure inside the containment
More informationDynamic Context Quantification for Design Basis Accidents List Extension and Timely Severe Accident Management
Dynamic Context Quantification for Design Basis Accidents List Extension and Timely Severe Accident Management Emil Kostov a,b and Gueorgui Petkov a a Technical University, Sofia, Bulgaria b WorleyParsons,
More informationMIKE NET AND RELNET: WHICH APPROACH TO RELIABILITY ANALYSIS IS BETTER?
MIKE NET AND RELNET: WIC APPROAC TO RELIABILITY ANALYSIS IS BETTER? Alexandr Andrianov Water and Environmental Engineering, Department of Chemical Engineering, Lund University P.O. Box 124, SE-221 00 Lund,
More informationON TRANSIENTS IN PUMA
5 BNL-NUREG- 63 007 P, : EVALUATION OF THE EFFECTS OF INITIAL CONDITIONS ON TRANSIENTS IN PUMA Yiiksel Parlatan, Jae Jo, and Upendra S. Rohatgi Brookhaven National Laboratory Department of Advanced Technology
More informationNOT PROTECTIVELY MARKED. REDACTED PUBLIC VERSION HPC PCSR3 Sub-chapter 16.2 PSA Results and Discussion NNB GENERATION COMPANY (HPC) LTD
HPC PCSR3 Sub-chapter 16.2 PSA Results and Discussion Page No.: i / iii NNB GENERATION COMPANY (HPC) LTD HPC PCSR3: CHAPTER 16 PROBABILISTIC SAFETY ASSESSMENT SUB-CHAPTER 16.2 PSA RESULTS AND DISCUSSION
More informationReview and Assessment of Engineering Factors
Review and Assessment of Engineering Factors 2013 Learning Objectives After going through this presentation the participants are expected to be familiar with: Engineering factors as follows; Defense in
More information10. SYSTEM ANALYSIS. The assessment consist of two elements: Safety Analysis Report and an independent Review of Safety Report.
10. SYSTEM ANALYSIS Several projects related to the safety analysis of the Ignalina NPP or its safety systems have been performed. The joint Lithuanian - Sweden Barselina project - the first probabilistic
More informationUKEPR Issue 01
Title: PCSR Appendix 14C Analysis of single failure for main steam line break Total number of pages: 93 Page No.: I / IV Chapter Pilot: F. CERRU Name/Initials Date 26-07-2012 Approved for EDF by: A. PETIT
More informationHEALTH AND SAFETY EXECUTIVE HM NUCLEAR INSTALLATIONS INSPECTORATE
HEALTH AND SAFETY EXECUTIVE HM NUCLEAR INSTALLATIONS INSPECTORATE New Reactor Generic Design Assessment (GDA) - Step 2 Preliminary Review Assessment of: Structural Integrity Aspects of AREVA/EdF EPR HM
More informationThe Davis Besse Nuclear Power Plant Three Mile Island Accident Precursor Event September 24, 1977
The Davis Besse Nuclear Power Plant Three Mile Island Accident Precursor Event September 24, 1977 Copyright Mike Derivan 2014 On September 24, 1977 the Davis Besse Nuclear Power Plant near Toledo Ohio
More informationSAFETY APPROACHES. The practical elimination approach of accident situations for water-cooled nuclear power reactors
SAFETY APPROACHES The practical elimination approach of accident situations for water-cooled nuclear power reactors 2017 SUMMARY The implementation of the defence in depth principle and current regulations
More informationAvailable online at ScienceDirect. Procedia Engineering 100 (2015 ) 24 32
Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 100 (2015 ) 24 32 25th DAAAM International Symposium on Intelligent Manufacturing and Automation, DAAAM 2014 A Soft Control
More informationIAEA Training in Level 2 PSA MODULE 8: Coupling Source Terms to Probabilistic Event Analysis (CET end-state binning)
IAEA Training in Level 2 PSA MODULE 8: Coupling Source Terms to Probabilistic Event Analysis (CET end-state binning) The Problem A probabilistic treatment of severe accident progression leads to numerous
More informationSafety and efficiency go hand in hand at MVM Paks NPP
International Forum Atomexpo 2018 Safety and efficiency go hand in hand at MVM Paks NPP József Elter MVM Paks Nuclear Power Plant Ltd. Hungary Start up Four of the VVER-440/V213 unit Power units up-rate
More informationIAEA SAFETY STANDARDS for protecting people and the environment
IAEA SAFETY STANDARDS for protecting people and the environment DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS DRAFT SAFETY GUIDE DS 482 STATUS: STEP 11 Submission to Review
More informationSafety Classification of Structures, Systems and Components in Nuclear Power Plants
DS367 Draft 5.1 IAEA SAFETY STANDARDS for protecting people and the environment Date: 04/11/2008 Status: for Member States comments Reviewed in NS-SSCS Please submit your comments by 20 March 2009 Safety
More informationACCIDENT MANAGEMENT AND EPR AT DUKOVANY NPP
ACCIDENT MANAGEMENT AND EPR AT DUKOVANY NPP 27-29 September 2017 Vienna IAEA Miroslav Trnka OVERVIEW General EOPs and SAMGs (changes) DAM (FLEX) EDMG Equipment (new + ongoing projects) Staff (drills and
More informationIEM on Severe Accident Management in the light of the accident at the Fukushima Daïchi NPP
IEM on Severe Accident Management in the light of the accident at the Fukushima Daïchi NPP Progress, challenges and perspectives in the field of design features, as regards SAMG IAEA, March 2014 Introduction
More informationHTR Systems and Components
IAEA Course on HTR Technology Beijing, 22-26.October 2012 HTR Systems and Components Dr. Gerd Brinkmann Dieter Vanvor AREVA NP GMBH Henry-Dunant-Strasse 50 91058 Erlangen phone +49 9131 900 96840/95821
More informationIAEA SAFETY STANDARDS for protecting people and the environment
Date: 2016-08-31 IAEA SAFETY STANDARDS for protecting people and the environment STATUS: STEP 8a For Submission to Member States DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS
More informationLevel 2 PSA for the VVER 440/213 Dukovany Nuclear Power Plant
Nuclear Nuclear Research Research Institute Řež plc Institute Řež plc Level 2 PSA for the VVER 440/213 Dukovany Nuclear Power Plant Jiří Dienstbier, Stanislav Husťák OECD International Workshop on Level-2
More informationWorkshop Information IAEA Workshop
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Safety Assessment of General Design Aspects of NPPs (Part 2) Lecturer Lesson Lesson III III 1_2 1_2 Workshop Information IAEA
More informationAdvanced LOPA Topics
11 Advanced LOPA Topics 11.1. Purpose The purpose of this chapter is to discuss more complex methods for using the LOPA technique. It is intended for analysts who are competent with applying the basic
More informationTraceable calibration of automatic weighing instruments in dynamic operation
Traceable calibration of automatic weighing instruments in dynamic operation Matej Grum* Metrology Institute of the Republic of Slovenia, Grudnovo nabrežje 17, 1000 Ljubljana, Slovenia Abstract. The article
More informationUse of Computational Fluid Dynamic Fire Models to Evaluate Operator Habitability for Manual Actions in Fire Compartments
ANS PSA 2011 International Topical Meeting on Probabilistic Safety Assessment and Analysis Wilmington, NC, March 13-17, 2011, on CD-ROM, American Nuclear Society, LaGrange Park, IL (2008) Use of Computational
More informationExtensive Damage Mitigation Guidelines (EDMG)
Extensive Damage Mitigation Guidelines (EDMG) Roy Harter RLH Global Services Regional Workshop on Sharing Best Practices in Development and Implementation of Severe Accident Management Guidelines October
More informationDISTRIBUTION LIST. Preliminary Safety Report Chapter 7 Safety Systems UK HPR1000 GDA. GNS Executive. GNS all staff. GNS and BRB all staff CGN EDF
Rev: 000 Page: 2 / 82 DISTRIBUTION LIST Recipients GNS Executive GNS all staff Cross Box GNS and BRB all staff CGN EDF Regulators Public Rev: 000 Page: 3 / 82 SENSITIVE INFORMATION RECORD Section Number
More informationRESULTS FROM THE APPLICATION OF UNCERTAINTY METHODS IN THE UMS AND IN BEMUSE
RESULTS FROM THE APPLICATION OF UNCERTAINTY METHODS IN THE UMS AND IN BEMUSE A. Petruzzi (UNIPI) Presenteb by M. Adorni (UNIPI) Kick off meeting on Uncertainty Analyses for Criticality Safety Assessment
More informationPOWER Quantifying Correction Curve Uncertainty Through Empirical Methods
Proceedings of the ASME 2014 Power Conference POWER2014 July 28-31, 2014, Baltimore, Maryland, USA POWER2014-32187 Quantifying Correction Curve Uncertainty Through Empirical Methods ABSTRACT Christopher
More informationEvent tree analysis. Prof. Enrico Zio. Politecnico di Milano Dipartimento di Energia. Prof. Enrico Zio
Event tree analysis Politecnico di Milano Dipartimento di Energia Techniques for Risk Analysis Hazard identification: FMEA (Failure Modes and Effects Analysis) & HAZOP (HAZard and OPerability study) Accident
More informationIng. JOZEF BALÁŽ Ph.D. and Ing MILAN CVAN CSc
PROPOSAL, DESIGN, IMPLEMENTATION AND SAFETY DEMONSTRATION OF SEVERE ACCIDENT MANAGEMENT MEASURES AT VVER440 IN SLOVAKIA Ing. Jozef Baláž, Ph.D. VUJE a.s. Trnava, Slovakia Email: Jozef.Balaz@vuje.sk Ing.
More informationCOMPUTING SOURCE TERMS WITH DYNAMIC CONTAINMENT EVENT TREES
COMPUTING SOURCE TERMS WITH DYNAMIC CONTAINMENT EVENT TREES Tero Tyrväinen 1, Taneli Silvonen 2, Teemu Mätäsniemi 1 1 VTT Technical Research Centre of Finland Ltd.: P.O. Box 1000, Espoo, Finland, 02044,
More informationPEPSE Modeling of Triple Trains of Turbines Sending Extraction Steam to Triple Trains of Feedwater Heaters
PEPSE Modeling of Triple Trains of Turbines Sending Extraction Steam to Triple Trains of Feedwater Heaters Gene L. Minner, PhD SCIENTECH, Inc 440 West Broadway Idaho Falls, ID 83402 ABSTRACT This paper
More informationEvery things under control High-Integrity Pressure Protection System (HIPPS)
Every things under control www.adico.co info@adico.co Table Of Contents 1. Introduction... 2 2. Standards... 3 3. HIPPS vs Emergency Shut Down... 4 4. Safety Requirement Specification... 4 5. Device Integrity
More informationTHE CANDU 9 DISTRffiUTED CONTROL SYSTEM DESIGN PROCESS
THE CANDU 9 DISTRffiUTED CONTROL SYSTEM DESIGN PROCESS J.E. HARBER, M.K. KATTAN Atomic Energy of Canada Limited 2251 Speakman Drive, Mississauga, Ont., L5K 1B2 CA9900006 and M.J. MACBETH Institute for
More informationRanking of safety issues for
IAEA-TECDOC-640 Ranking of safety issues for WWER-440 model RANKING OF SAFETY ISSUES FOR WWER-440 MODEL PLEASE BE AWARE THAT ALL OF THE MISSING PAGES IN THIS DOCUMENT WERE ORIGINALLY BLANK RANKING OF SAFETY
More informationPreliminary Failure Mode and Effect Analysis for CH HCSB TBM
Preliminary Failure Mode and Effect Analysis for CH HCSB TBM Presented by: Chen Zhi Contributors by HCSB TBM Safety Group, in China June 21, 2007 E-mail: chenz@swip.ac.cn Outline Introduction FMEA Main
More informationSHUTDOWN SYSTEMS: SDS1 AND SDS2
Chapter 12 SHUTDOWN SYSTEMS: SDS1 AND SDS2 12.1 INTRODUCTION Up to this point we have looked with great details at the reactor regulating system. In order to better understand the overall design of a CANDU
More informationCHAPTER 7: THE FEEDBACK LOOP
When I complete this chapter, I want to be able to do the following. Identify the major elements in the feedback loop Select appropriate candidate variables to be controlled and manipulated Evaluate the
More informationTransient Analyses In Relief Systems
Transient Analyses In Relief Systems Dirk Deboer, Brady Haneman and Quoc-Khanh Tran Kaiser Engineers Pty Ltd ABSTRACT Analyses of pressure relief systems are concerned with transient process disturbances
More informationDETAILS OF THE ACCIDENT PROGRESSION IN 1F1
DETAILS OF THE ACCIDENT PROGRESSION IN 1F1 EMUG 2019 BRAUN, Matthias Switzerland, 3 rd -5 th April 2019 Not part of the BSAF OECD Benchmark Project Relying exclusively on publically available input data
More informationSOURCES AND EFFECT OF NON-CONDENSABLE GASES IN REACTOR COOLANT SYSTEM OF LWR
SOURCES AND EFFECT OF NON-CONDENSABLE GASES IN REACTOR COOLANT SYSTEM OF LWR P. Kral UJV Rez, a. s. Hlavni 130, Husinec-Rez, Czech Republic pavel.kral@ujv.cz J. Hyvärinen LUT School of Energy Systems /
More informationSIMULATION OF CONTAINMENT HYDROGEN CONTROL SYSTEM AT IGNALINA NPP
SIMULATION OF CONTAINMENT HYDROGEN CONTROL SYSTEM AT IGNALINA NPP Egidijus Babilas, Egidijus Urbonavicius, Sigitas Rimkevicius Laboratory of Nuclear Installation Safety, Lithuanian Energy Institute 1.
More informationInternational Agreement Report
NUREG/IA-0423 International Agreement Report Analysis with TRACE Code of PKL-III Test F 1.2 Prepared by: J.L. Munoz-Cobo, S. Chiva, A. Escrivá Instituto de Ingenierίa Energética Univesitat Politécnica
More informationPI MODERN RELIABILITY TECHNIQUES OBJECTIVES. 5.1 Describe each of the following reliability assessment techniques by:
PI 21. 05 PI 21. 05 MODERN RELIABILITY TECHNIQUES OBJECTIVES 5.1 Describe each of the following reliability assessment techniques by: ~) Stating its purpose. i1) Giving an e ample of where it is used.
More informationExperimental Verification of Integrated Pressure Suppression Systems in Fusion Reactors at In-Vessel Loss-of -Coolant Events
Experimental Verification of Integrated Pressure Suppression Systems in Fusion Reactors at In-Vessel Loss-of -Coolant Events K. Takase 1), H. Akimoto 1) 1) Japan Atomic Energy Research Institute (JAERI),
More informationHIGH WIND PRA DEVELOPMENT AND LESSONS LEARNED FROM IMPLEMENTATION Artur Mironenko and Nicholas Lovelace
HIGH WIND PRA DEVELOPMENT AND LESSONS LEARNED FROM IMPLEMENTATION Artur Mironenko and Nicholas Lovelace April 27, 2015 Overview Introduction High Wind PRA Development Tasks High Wind PRA Lessons Learned
More informationHazard Operability Analysis
Hazard Operability Analysis Politecnico di Milano Dipartimento di Energia HAZOP Qualitative Deductive (search for causes) Inductive (consequence analysis) AIM: Identification of possible process anomalies
More informationDRAFT REGULATORY GUIDE DG-1074
Draft Guide DG-1074 - December 1998 Page 1 of 55 U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REGULATORY RESEARCH DRAFT REGULATORY GUIDE December 1998 Division 1 Draft DG-1074 Contact: E.L. Murphy
More informationMELCOR code application to VVER440/V213 analyses
1 st Meeting of European MELCOR Users Group, MELCOR code application to VVER440/V213 analyses Villigen, Switzerland 15-16 December 2008 Juraj Jančovič jancovic@vuje.sk 1 CONTENT - overview of MELCOR models
More informationEMERGENCY CORE COOLING SYSTEM SIMPLIFICATION
EMERGENCY CORE COOLING SYSTEM SIMPLIFICATION XA9846601 R.S. HART Sheridan Park Research Community, Atomic Energy of Canada Ltd, Mississauga, Ontario D.B. RHODES Chalk River Laboratories, Atomic Energy
More informationDetermination of the Design Load for Structural Safety Assessment against Gas Explosion in Offshore Topside
Determination of the Design Load for Structural Safety Assessment against Gas Explosion in Offshore Topside Migyeong Kim a, Gyusung Kim a, *, Jongjin Jung a and Wooseung Sim a a Advanced Technology Institute,
More informationINFLUENCE OF MEASURING PROCESS AUTOMATION ON UNCERTAINTY OF MASS STANDARD AND WEIGHTS CALIBRATION.
Andrzej Hantz RADWAG BALANCES AND SCALES INFLUENCE OF MEASURING PROCESS AUTOMATION ON UNCERTAINTY OF MASS STANDARD AND WEIGHTS CALIBRATION. The article presents the influence of comparison process automatization
More informationSTART UP MODELING OF KAIST MICRO MODULAR REACTOR COMPRESSOR USING BETA LINE METHOD WITH GAMMA+ CODE
The 6th International Supercritical CO2 Power Cycles Symposium March 27-29, 2018, Pittsburgh, Pennsylvania START UP MODELING OF KAIST MICRO MODULAR REACTOR COMPRESSOR USING BETA LINE METHOD WITH GAMMA+
More informationModelling of the Separated Geothermal Water Flow between Te Mihi flash plants
Proceedings World Geothermal Congress 2015 Melbourne, Australia, 19-25 April 2015 Modelling of the Separated Geothermal Water Flow between Te Mihi flash plants Kevin Koorey, Kim Harwood and Norman Lawgun
More informationUKEPR Issue 04
Title: PCSR Sub-chapter 6.8 Main steam relief train system - VDA [MSRT] Total number of pages: 16 Page No.: I / III Chapter Pilot: M. LACHAISE Name/Initials Date 25-06-2012 Approved for EDF by: A. PETIT
More informationAccident Management Strategies for Mark I and Mark III BWRs
Accident Management Strategies for Mark I and Mark III BWRs E. L. Fuller Office of Nuclear Regulatory Research United States Nuclear Regulatory Commission IAEA Workshop Vienna, Austria July 17-21, 2017
More informationEnhancing NPP Safety through an Effective Dependability Management
Prepared and presented by Gheorghe VIERU, PhD Senior Scientific Nuclear Security Research Worker AREN/c.o. Institute for Nuclear Research Pitesti, ROMANIA Safety: Defence in Depth, October 2013 1 OUTLINES
More informationAPPENDIX B AN EXAMPLE RISK CALCULATION
APPENDIX B AN EXAMPLE RISK CALCULATION CONTENTS B.1 Introduction... B.2 Accident Frequency Analysis... B.2.1 Overview of Accident Frequency Analysis... B.2.2 Description of Accident Sequence... B.2.3 Quantification
More informationJournal of Applied Fluid Transients, Vol 1-1, April 2014 (3-1)
Modeling and Field Verification Study of Air Slam Conditions on kalanit Pipeline System By Yiftach Brunner & Sathish Kumar ir valves are integral part of long water transmission mains and are essential
More informationSteam generator tube rupture analysis using dynamic simulation
Steam generator tube rupture analysis using dynamic simulation Heat Exchangers are used to transfer heat from a hot fluid to a cold fluid. Most of the times these fluids are available at different pressures
More informationResearch Article Experimental Studies for the VVER-440/213 Bubble Condenser System for Kola NPP at the Integral Test Facility BC V-213
Science and Technology of Nuclear Installations Volume 212, Article ID 275693, 2 pages doi:1.1155/212/275693 Research Article Experimental Studies for the VVER-44/213 Bubble Condenser System for Kola NPP
More informationContents. Foreword. Acknowledgements. General Introduction
Contents Foreword Acknowledgements General Introduction Chapter 1 Hazards, Risks and Control Points... Hazards and Drinking Water... Pathogens are the Main Hazards in Drinking Water... Other Hazards...
More informationDesign and Analysis of Reactor Dish Vessel
IJIRST International Journal for Innovative Research in Science & Technology Volume 3 Issue 11 April 2017 ISSN (online): 2349-6010 Design and Analysis of Reactor Dish Vessel Aniket D. Patil PG Student
More information