1 INHERENTLY SAFER DESIGN CASE STUDY OF RAPID BLOW DOWN ON OFFSHORE PLATFORM Volton Edwards bptt Angus Lyon DNV Energy Alastair Bird DNV Energy INTRODUCTION A term now in common usage within the oil & gas industry is inherently safer design. The objective of this phrase is to promote designs for hydrocarbon extraction and processing facilities that, where practicable, eliminate hazards completely or reduce the magnitude of the consequences of hazard scenarios sufficiently to eliminate the need for elaborate safety systems and procedures. This paper presents a case study where the principles of inherently safer design were used to challenge the normally accepted interpretation of the requirements for depressuring (blow down) systems as set out in the standard API STD 521, Pressure-relieving and depressuring systems, (API 2007). Offshore oil and gas extraction platforms have hydrocarbon containing equipment onboard. The hydrocarbon containing equipment has maximum design operating parameters, such as a maximum design pressure. Hydrocarbon extraction is a dynamic process. The hydrocarbon containing equipment is generally equipped with sensors which monitor the value of parameters, such as pressure. The sensors often have associated alarms which notify the plant operator that pressure is increasing. The operator can then take actions to return the parameter to its normal value. If the operator intervention fails there is often an executive action also attached to the sensor which initiates a shutdown of the plant before the design limits are reached. In case the shutdown system fails there is often a secondary protection system. In the case of overpressure this is generally a relief valve that dumps excess pressure to a vent or flare. As well as the protection systems described above, a blow down system is also generally installed. It has two main purposes: 1. to reduce the pressure in the hydrocarbon containing equipment to atmospheric pressure to allow for the breaking of containment for maintenance and other reasons, and 2. To get rid of hydrocarbon inventory and reduce the pressure in the equipment in the event of an emergency on the facility. It is this latter design intent that is the subject of this paper. BACKGROUND When designing pressure-relieving and depressuring (blow down) systems reference is generally made to API STD 521. API STD 521 is intended primarily for oil refineries; it is also applied to oil and gas production facilities. It gives guidelines examining the principal causes of overpressure; determining individual relieving rates; and selecting and designing disposal systems, including such components as piping, vessels, flares, and vent stacks. Section 5.20 of API STD 521 which covers vapour depressuring states: Depressuring systems can be used to mitigate the consequences of a vessel leak by reducing the leakage rate and/or inventory within the vessel prior to a potential vessel failure. More often, depressuring systems are used to reduce the failure potential for scenarios involving overheating (e.g. fire). If vapour-depressuring is required for both fire and process reasons, the larger requirement should govern the size of the depressuring facilities. For pool-fire exposure...this generally involves reducing equipment pressure from initial conditions to a level equivalent to 50% of the vessels design pressure within approximately 15min. Depressuring to a gauge pressure of 100PSI is commonly considered when depressuing to reduce the consequences from a vessel leak. In addition, BP has a series of engineering technical practices with which new platform designs are required to demonstrate compliance. Two which have requirements relevant to the subject of this paper are: 1. Guidance on Practice for Inherently Safer Design, (BP 2008), and 2. Fire and Explosion Hazard Management (FEHM) of Offshore Facilities, (BP 2009) The inherently safer design technical practice requires a process to be followed which assesses all hazards and produces a design which, as far as possible, eliminates hazards or reduces the magnitude of hazard scenario consequences sufficiently to eliminate the need for elaborate safety systems and procedures. The fire and explosion hazard management practices has a similar intent by requiring a fire and explosion hazard management (HEHM) document to be developed which delivers a strategy for each hazard such that major 349

2 accidents 1 are prevented or adequately managed to assist demonstrating that sufficient thought has gone into the FEHM the practice defines three hazard categories: 1. Controllable hazards 2 2. Evacuation hazards 3 3. Catastrophic Hazards, 4 and requires that every fire and explosion hazard scenario on the facility is categorized as above. Clearly the desired outcome is that where practicable all Fire and Explosion hazard scenarios are categorized as Controllable hazards. This is in line with the intent of Inherently Safe Design. BPTT has recently commissioned a series of small normally unmanned installations (NUIs) (4 6 wells). The initial platforms had their blow down systems deigned to reduce the operating pressure to 50% within 15 min. in compliance with the perceived requirements of API STD 521. CHALLENGE TO THE BLOW DOWN SYSTEM DESIGN The perception that designing the blow down system to achieve 50% reduction in operating pressure in 15 min. is optimum was challenged for the most recent platform design in the series. The challenge was based on: 1. It ignores the fact that the platforms are producing gas and not oil and pool fires are not therefore a credible fire scenario, 2. It ignores the possible benefits of depressuring on reducing the consequences of unplanned process releases from whatever cause. 3. Does it meet the principle of inherently safe design? and 4. Have the maximum number of fire and explosion hazard scenarios been categorized as controllable? To assess whether the challenge was justified the following questions were addressed: Does a more rapid blow down system produce an inherently safer design? Does a more rapid blow down system significantly impact the number of controllable hazard scenarios? Is a more rapid blow down system practicable? 1 An event that can lead to multiple fatalities. 2 Hazard scenarios that allow personnel to remain safely on the facility. Precautionary evacuation may take place if it is safe to do so. 3 Hazard scenarios which have the potential to escalate and cause eventual impairment of the protected muster area and evacuation facilities after a period of time (e.g. endurance period of the protected muster area). 4 Hazard scenarios which preservation of life of personnel on facility cannot be demonstrated and the effects of the hazard scenario cannot be controlled or mitigated such that controlled evacuation can be performed. ASSESSMENT METHOD The assessment was based on evaluating the impact on the consequences of leaks from the process equipment rather than protecting the equipment from overpressure in a fire scenario. In particular, the impact on the escalation potential of fire and explosion hazard scenarios was evaluated as this is the primary criterion for distinguishing controllable from evacuation hazard scenarios. If a process release on the platforms under study ignites early, it is characterized by a jet fire and if the ignition is delayed, a vapour cloud explosion will occur, possibly followed by a jet fire. Escalation can be through failure of other process equipment or structures with the explosion. There are many references which give details of impacts of fires on components, characteristics of jet fires and rules of thumb regarding the time taken for items to fail under fire loading and explosion overpressure. The following is typical and reproduced from Spouge Figure 1 demonstrates that steel loses it strength at elevated temperatures. A point in time is reached when the heat absorbed by the steel component reduces its strength to the point at which the stress in the component 5 is greater than the remaining strength of the steel and the component fails. The greater the heat flux from the fire the quicker it will fail. The heat flux at the boundary of a gas jet flame depends on the composition of the gas and other factors but is of the order of kw/m 2. This value drops of dramatically with distance from the flame as shown in Figure 2. 6 Figure 1. Steel strength v. temperature (Spouge 1999) 5 Either from a structural load or internal pressure. 6 The heat flux at the flame boundary of a liquid pool fire is significantly less, approximately 150 Kw/m

3 Figure 2. Scale diagram of heat flux from a gas jet fire Typical failure time for components is presented in Table 1. From Table 1 it can be seen that the failure times of components are significantly shorter if engulfed in the flame. For example, pipes and vessels can be expected to fail after 5 minutes if engulfed in a jet fire, but would last for 60 minutes if the flame is very close but not engulfing. This information was used to establish a simple escalation rule set as follows 7 : Escalation to process equipment and structures occurs if the component is engulfed in a jet flame for more than 5 minutes When a system containing pressurized gas leaks is isolated, the leak release rate and associated jet flame length decay exponentially. If the system is equipped with a blow down system its activation removes gas from the system, reducing the system pressure, and thus reducing the leak release rate 8 and associated jet flame length. This is shown diagrammatically in Figure 3. A simple spreadsheet was prepared to model leak release rate versus time for given blow down rates and leak holes sizes using the Chamberlain flame length correlation. 9 Leaks can vary in equivalent hole size and are often characterized under the titles of small, medium and 7 Assuming no passive fire protection or active water cooling. 8 The leak release rate is a function of the pressure in the system at any point in time. 9 Flame length (m) ¼ 11.14Q Q ¼ release rate (kg/sec). large 10 for the purpose of risk assessments. Statistically the chance of small leaks predominates. The modeling was based on the most likely hole size (small). Screens shots of the spreadsheet model are presented in Appendix A. Figure A1 displays the spreadsheet with the system operating pressure and inventory volume of the platforms discussed in this paper. The blow down is modeled based on reducing operating pressure to 50% in 15 minutes. Figure A2 is the same spreadsheet with the same blow down characteristics and a 10 mm dia. leak. From Figure A2 it can be seen that with blow down 11 the flame length starts at approximately 10.8 m in length, after 5 mins. It is 9.3 m and after 20 mins. It is still 6m in length. This is a significant flame size. In an ideal world, provided that isolation and blow down are successful, all escalations due to fires would be avoided. In reality this requires reducing the jet fire length to less than, says, 1m after 5 minutes. 12 To achieve this requires an initial blow down rate of 41 Kg/sec (see Figure A3). The larger the initial blow down rate, in general, the further the tip of the blow down vent needs to be to the boundary of the platform to ensure that:. flammable gas clouds cannot be blown back onto the platform during a blow down and,. If the vent discharge ignites the level of thermal radiation at the boundary of the platform is within acceptable levels. In practice, achieving an acceptable vent design for 41 Kg/sec proved impracticable, primarily because the platform design was one of a series of clone designs and the required location of the vent tip would have required a complete structural redesign of the topsides. A compromise was reached which reduced system pressure as quickly as possible, commensurate with an initial blow down rate that allowed a vent to be designed without a total topside structural redesign. The initial blow down rate selected was approximately 16 Kg/sec which reduces flame length to approximately 5 m after 5 mins and 1 m after 15 mins (see Figure A4). EVALUATION OF INCREASED SAFETY ASSOCIATED WITH THE INSTALLED BLOW DOWN Although not ideal, the compromise initial blow down rate reduces the severity of process fires associated with small releases measurably. What impact does this have on safety? One of the main driving forces behind this initiative was to influence the decisions that the offshore installation 10 Small leaks 10 mm dia.; medium : leaks 25 mm dia.; large leaks 100 mm dia. 11 It is assumed that isolation has occurred. 12 The actual desired flame length is dependent on the distance of critical equipment to leak sources. 351

4 Table 1. Typical component failure time from fire loading (Spouge 1999) Times to failure (minutes) Component Type of failure Jet flame Pool flame 37.5 kw/m 2 Steel plate Yield Steel plate Fire penetration Steel beam Yield Steel beam Collapse Jacket leg Buckling Pipe/riser/process vessel Rupture A rated fire wall Fire penetration H rated fire wall Fire penetration Table 2. Hazard scenario totals Hazard scenario category Slow blow down Rapid blow down Controllable Evacuation Total Figure 3. Leak Release rate with Blow down manager (OIM) must make subsequent to a confirmed process release on his/her facility. Soon after the release event the OIM must decide whether to keep personnel on the facility or carry out a precautionary evacuation. Evacuation via lifeboat, or other means such as barrel rafts, have their own set of hazards and are not risk free. It is not a decision to that should be made lightly. One of the main considerations that the OIM will base his/her decision on is whether the event is controllable, i.e. are the characteristics of the event such that, provided personnel are protected from the immediate effects, the overall integrity of the facility will not be compromised, in other words the event will not escalate. 13 This fits neatly with the BP requirement to categorise all fire and explosion hazard scenarios as described in Section 2. The difference in the number of controllable and evacuation hazard scenarios was therefore evaluated as a measure of improved safety. Quantified risk assessments (QRAs) have been completed for the clone design NUI platforms. The QRAs evaluate all 14 fire and explosion hazard scenarios. The 13 Escalation is the failure of critical equipment e.g. other pipes, vessels, key structural members or evacuation equipment. 14 Various leak hole sizes and leak locations within the process area. chance of each of each hazard scenario escalating is assessed as part of the QRA. A sensitivity was run on the QRA model simulating the more rapid blow down. The change in risk values and the change in number of fire and explosion hazard scenarios categorized as controllable and evacuation 15 were calculated. The number of fire and explosion hazard scenarios that change their category due to the rapid blow down is shown in Table 2. The Rapid blow down reduces the number of evacuation hazard scenarios by 24 representing a reduction of 25%. The increase in the number of controllable fire & explosion hazard scenarios demonstrates a meaningful contribution to an inherently safer design. DISCUSSION The initial blow down rate is not the only variable that influences the number of controllable hazard scenarios. The volume of the inventory isolated when shut-in also has a significant impact. If, for example, the isolated inventory was reduced by one third, the flame length after 5 minutes would be reduced to 1m rather than the 5 m with the revised blow down rate. 16 The reason for discussing this volume is because the present design of the NUI platforms has emergency shut-down valves at the wells and export riser. The topside is effectively a single inventory. There 15 Evacuation hazard scenarios include fire & explosion hazard scenarios with the potential to escalate. 16 Based on a 10 mm dia. leak. 352

5 are two manifolds which have manual isolation valves separating them from the remainder of the topside pipe-work. 17 Both manifolds and the topside pipe-work have blow down valves installed. If these isolation valves were actuated and tied into the shut-down system there would have been three isolatable sections each with approximately one third of the inventory. As can be seen form the above when developing the hazard management strategy for process fires there is value in considering variations in both blow down characteristics and isolation philosophy. One item not discussed so far which should not be overlooked when developing the design of a blow down system is the effect that rapid blow down has on the temperature of the hydrocarbon, both upstream and downstream of the blow down valves. Very low temperatures can be generated at high blow down rates and appropriate pipe and vessel materials must be selected. The previous vent design used material good for 2208F. During a rapid blow down the gas temperature was calculated to drop to 2608F. However detailed heat transfer calculations determined that the steel wall temperature never dropped below 2408F. Material suitable for 2408F was procured for the vent. REFERENCES API 2007, Pressure-relieving and Depressuring Systems, Standard 521 BP 2008, Inherently Safer Design bp Group GP BP 2009, Fire and Explosion Hazard Management (FEHM) of Offshore Facilities GP24-20 Spouge, John 1999, A guide to Quantified Risk Assessment for Offshore Installations CMPT publication 99/100a 17 Used to isolate a manifold for maintenance purposes. 353

6 APPENDIX A: BLOW DOWN SPREADSHEET SCREEN SHOTS Figure A1. Blow down to 50% of Operating Pressure in 15 mins. 354

7 Figure A2. Blow down to 50% of Operating Pressure in 15 mins. 10 mm dia. leak 355

8 Figure A3. Rapid blow down 356

9 Figure A4. As installed blow down 357

Risks Associated with Caissons on Ageing Offshore Facilities

Risks Associated with Caissons on Ageing Offshore Facilities Risks Associated with Caissons on Ageing Offshore Facilities D. Michael Johnson, DNV GL, Peter Joyce, BG Group, Sumeet Pabby, BG Group, Innes Lawtie, BG Group. Neil Arthur, BG Group, Paul Murray, DNV GL.

More information

Identification and Screening of Scenarios for LOPA. Ken First Dow Chemical Company Midland, MI

Identification and Screening of Scenarios for LOPA. Ken First Dow Chemical Company Midland, MI Identification and Screening of Scenarios for LOPA Ken First Dow Chemical Company Midland, MI 1 Layers of Protection Analysis (LOPA) LOPA is a semi-quantitative tool for analyzing and assessing risk. The

More information

Pressure Relief Valves is there a need when there are EDVs?

Pressure Relief Valves is there a need when there are EDVs? Pressure Relief Valves is there a need when there are DVs? Glenn Pettitt, nvironmental Resources Management, xchequer Court, 33 St Mary Axe, London, C3A 8AA Philip Pennicott, agip kco, Frontier Plaza,

More information

NORMAL OPERATING PROCEDURES Operating Parameter Information

NORMAL OPERATING PROCEDURES Operating Parameter Information Operating Parameter Information Each operator performing the normal operating procedures (routine checks) of the facility should be familiar with the current normal operating parameters of all systems

More information

DIGITAL SOLUTIONS TRAINING CATALOGUE. QRA and CFD simulation. Phast, Safeti and KFX SAFER, SMARTER, GREENER

DIGITAL SOLUTIONS TRAINING CATALOGUE. QRA and CFD simulation. Phast, Safeti and KFX SAFER, SMARTER, GREENER DIGITAL SOLUTIONS TRAINING CATALOGUE QRA and CFD simulation Phast, Safeti and KFX SAFER, SMARTER, GREENER 02 PHAST, SAFETI AND KFX Training catalogue Global training Our increased focus on global training,

More information

SAFETI OFFSHORE. Modelling of the progression of an offshore hydrocarbon release accident WHITEPAPER. Authors:

SAFETI OFFSHORE. Modelling of the progression of an offshore hydrocarbon release accident WHITEPAPER. Authors: WHITEPAPER SAFETI OFFSHORE Modelling of the progression of an offshore hydrocarbon release accident Authors: Brian Bain, DNV GL, Aberdeen. E-mail : brian.bain@dnvgl.com David Worthington, DNV GL, London.

More information

Improving Accuracy of Frequency Estimation of Major Vapor Cloud Explosions for Evaluating Control Room Location through Quantitative Risk Assessment

Improving Accuracy of Frequency Estimation of Major Vapor Cloud Explosions for Evaluating Control Room Location through Quantitative Risk Assessment Improving Accuracy of Frequency Estimation of Major Vapor Cloud Explosions for Evaluating Control Room Location through Quantitative Risk Assessment Naser Badri 1, Farshad Nourai 2 and Davod Rashtchian

More information

Well Integrity - Christmas Tree Acceptable Leakage Rate and Sustained Casing Pressure

Well Integrity - Christmas Tree Acceptable Leakage Rate and Sustained Casing Pressure Well Integrity - Christmas Tree Acceptable Leakage Rate and Sustained Casing Pressure Mrudhul Raj, Atkins Ltd, Aberdeen, UK The loss of well integrity can result in major accidents and presents a severe

More information

USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT

USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT Kieran J Glynn, Advisor Major Accident Risk, BP, UK The exceedance curve approach was developed following the issue of the 2003

More information

Using Consequence Modeling to Help Make Emergency Decisions

Using Consequence Modeling to Help Make Emergency Decisions Using Consequence Modeling to Help Make Emergency Decisions Della Wong / Nova Chemicals & Robert B. Gerow / SAFER-ERMC CSChE 2002 Conference October 20-23, 23, 2002 Vancouver B.C. If auto safety was like

More information

Title of Paper Interpretation of IP15 in Process Plant Design: a Commonsense Approach ---------------------------------------------------------------------------------------------------------------------------

More information

API th Edition Ballot Item 7.8 Work Item 4 Gas Breakthrough

API th Edition Ballot Item 7.8 Work Item 4 Gas Breakthrough API 521 7 th Edition Ballot Item 7.8 Work Item 4 Gas Breakthrough NOTE: This is a reballot of previously approved API 521 7 th Edition Ballot Item 6.3 which was modified based on comments. Comments should

More information

I. CHEM. E. SYMPOSIUM SERIES NO. 85

I. CHEM. E. SYMPOSIUM SERIES NO. 85 FIRE SURVIVAL OF PROCESS VESSELS CONTAINING GAS J. Nylund * The present work is a theoretical evaluation of the ability of process vessels to survive hydrocarbon fires when the vessels are designed and

More information

PRAGMATIC ASSESSMENT OF EXPLOSION RISKS TO THE CONTROL ROOM BUILDING OF A VINYL CHLORIDE PLANT

PRAGMATIC ASSESSMENT OF EXPLOSION RISKS TO THE CONTROL ROOM BUILDING OF A VINYL CHLORIDE PLANT PRAGMATIC ASSESSMENT OF EXPLOSION RISKS TO THE CONTROL ROOM BUILDING OF A VINYL CHLORIDE PLANT L.P. Sluijs 1, B.J. Haitsma 1 and P. Beaufort 2 1 Vectra Group Ltd. 2 Shin-Etsu (contact details: Vectra Group

More information

Every things under control High-Integrity Pressure Protection System (HIPPS)

Every things under control High-Integrity Pressure Protection System (HIPPS) Every things under control www.adico.co info@adico.co Table Of Contents 1. Introduction... 2 2. Standards... 3 3. HIPPS vs Emergency Shut Down... 4 4. Safety Requirement Specification... 4 5. Device Integrity

More information

Analysis of the application and sizing of pressure safety valves for fire protection on offshore oil and gas installations Annex I

Analysis of the application and sizing of pressure safety valves for fire protection on offshore oil and gas installations Annex I Analysis of the application and sizing of pressure safety valves for fire protection on offshore oil and gas installations Annex I Article draft The annex contains an article draft, based on an investigation

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

Challenges in Relief Design for Pilot Plants

Challenges in Relief Design for Pilot Plants Challenges in Relief Design for Pilot Plants Published on July 5, 2017 Michael Trainor Relief system design at the pilot scale presents unique challenges that don t always apply at the commercial scale.

More information

Practical Modelling & Hazard Assessment of LPG & LNG Spills

Practical Modelling & Hazard Assessment of LPG & LNG Spills Practical Modelling & Hazard Assessment of LPG & LNG Spills UKELG 3 rd April 2012 Tony Ennis Introduction Refrigerated or pressurised Release scenarios & release rate Vaporisation Gas dispersion Consequences

More information

A Generic Model To Assess Major Incident Frequencies For Offshore Assets

A Generic Model To Assess Major Incident Frequencies For Offshore Assets A Generic Model To Assess Major Incident Frequencies For Offshore Assets Richard Emery, MMI Engineering Ltd, The Brew House, Wilderspool Park, Greenall s Avenue, Warrington, WA4 6HL. Quantitative risk

More information

Annexure 2: Rapid Risk Assesment RISK ANALYSIS

Annexure 2: Rapid Risk Assesment RISK ANALYSIS RISK ANALYSIS (I) Catastrophic Rupture of LPG Bullet Truck (18 MT) At the LPG bottling plant, LPG will be transported by Bullet Truck tank. In the event of fire in LPG bullet truck in parking area, BLEVE

More information

Relief Systems. 11/6/ Fall

Relief Systems. 11/6/ Fall Relief Systems 1 Relief Scenarios o A single relief event requires a particulate vent area and valve size o Relief scenarios are determined based on a PHA o For each scenario, a vent area is calculated

More information

Process Equipment Exposed to Fire. A Case Study on the Behaviour of a Fire Exposed LNG Segment.

Process Equipment Exposed to Fire. A Case Study on the Behaviour of a Fire Exposed LNG Segment. Process Equipment Exposed to Fire. A Case Study on the Behaviour of a Fire Exposed LNG Segment. Arve Klavenes and Geir Berge Petrell AS Kjøpmannsgata 19, NO-713 Trondheim, Norway When pressurized equipment

More information

SEMS II: BSEE should focus on eliminating human error

SEMS II: BSEE should focus on eliminating human error SEMS II: BSEE should focus on eliminating human error How US companies can prevent accidents on start-ups and shut-downs by using valve interlocks The proposed changes to BSEE s SEMS (Safety and Environmental

More information

DOMINO EFFECT MODELLING CONSIDERATIONS FOR QUANTITATIVE RISK ASSESSMENT OF OFFSHORE INSTALLATIONS

DOMINO EFFECT MODELLING CONSIDERATIONS FOR QUANTITATIVE RISK ASSESSMENT OF OFFSHORE INSTALLATIONS WHITEPAPER DOMINO EFFECT MODELLING CONSIDERATIONS FOR QUANTITATIVE RISK ASSESSMENT OF OFFSHORE INSTALLATIONS Authors: Brian Bain, DNV GL, Aberdeen. E-mail: brian.bain@dnvgl.com David Worthington, DNV GL,

More information

Piper Alpha Case Study: June Credited to ConocoPhillips Project Development

Piper Alpha Case Study: June Credited to ConocoPhillips Project Development Piper Alpha Case Study: June 2008 Credited to ConocoPhillips Project Development What was the Piper Alpha platform? Built in 1976 A major Northern North Sea oil & gas drilling & production platform 226

More information

THE BAKER REPORT HOW FINDINGS HAVE BEEN USED BY JOHNSON MATTHEY TO REVIEW THEIR MANUFACTURING OPERATIONS

THE BAKER REPORT HOW FINDINGS HAVE BEEN USED BY JOHNSON MATTHEY TO REVIEW THEIR MANUFACTURING OPERATIONS THE BAKER REPORT HOW FINDINGS HAVE BEEN USED BY JOHNSON MATTHEY TO REVIEW THEIR MANUFACTURING OPERATIONS Colin P. Lynas, Elizabeth Campbell and Hendrik J. Koornhof Johnson Matthey Catalysts This paper

More information

MAHB. INSPECTION Process Hazard Analysis

MAHB. INSPECTION Process Hazard Analysis Number 5 2016 seveso common MAHB INSPECTION s e r i e s criteria Process Hazard Analysis Major Accident Hazards Bureau Security Technology Assessment Unit This publication of the European community on

More information

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart Technical Standards and Legislation: Risk Based Inspection Presenter: Pierre Swart Agenda Change in Legislation. Where RBI fits in. Application to implement RBI. RBI concepts. Elements of an RBI analysis.

More information

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER P: REFERENCE OPERATING CONDITION STUDIES (PCC)

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER P: REFERENCE OPERATING CONDITION STUDIES (PCC) PAGE : 1 / 11 1. PASSIVE SINGLE FAILURE ANALYSIS The aim of the accident analysis in Chapter P is to demonstrate that the safety objectives have been fully achieved, despite the most adverse single failure.

More information

Abstract. 1 Introduction

Abstract. 1 Introduction Risk assessment study of the mutual interactive influence of working procedures on terminals handling dangerous goods in port of Koper (Slovenia) L. Battelino Water Management Institute, Maritime Engineering

More information

6.6 Relief Devices. Introduction

6.6 Relief Devices. Introduction 6.6 Relief Devices Introduction Relief devices are used to help prevent a catastrophic failure of equipment and/or minimize the effects of any unanticipated or uncontrolled events. As such, relief devices

More information

Blast Damage Consideratons for Horizontal Pressure Vessel and Potential for Domino Effects

Blast Damage Consideratons for Horizontal Pressure Vessel and Potential for Domino Effects A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 26, 2012 Guest Editors: Valerio Cozzani, Eddy De Rademaeker Copyright 2012, AIDIC Servizi S.r.l., ISBN 978-88-95608-17-4; ISSN 1974-9791 The Italian

More information

Frequently Asked Questions Directive 056 Facilities Technical

Frequently Asked Questions Directive 056 Facilities Technical Frequently Asked Questions Directive 056 Facilities Technical October 2017 This document clarifies and supports some of the technical requirements related to Directive 056: Energy Development Applications

More information

Process Safety Value and Learnings Central Valley Chemical Safety Day March 20, 2014

Process Safety Value and Learnings Central Valley Chemical Safety Day March 20, 2014 Process Safety Value and Learnings Central Valley Chemical Safety Day March 20, 2014 Randy Bennett Sr. Staff Health & Safety Engineer Process Safety Management Group Aera Energy LLC Key Points Process

More information

LEAK FREQUENCY MODELLING FOR OFFSHORE QRA BASED ON THE HYDROCARBON RELEASE DATABASE

LEAK FREQUENCY MODELLING FOR OFFSHORE QRA BASED ON THE HYDROCARBON RELEASE DATABASE LEAK FREQUENCY MODELLING FOR OFFSHORE QRA BASED ON THE HYDROCARBON RELEASE DATABASE Andreas Falck 1, Brian Bain 2 and Laila K. Rødsætre 3 1 DNV Energy, Norway 2 DNV Energy, UK 3 StatoilHydro ASA, Norway

More information

Impact on People. A minor injury with no permanent health damage

Impact on People. A minor injury with no permanent health damage Practical Experience of applying Layer of Protection Analysis For Safety Instrumented Systems (SIS) to comply with IEC 61511. Richard Gowland. Director European Process Safety Centre. (Rtgowland@aol.com,

More information

RESOLUTION MSC.397(95) (adopted on 11 June 2015) AMENDMENTS TO PART A OF THE SEAFARERS' TRAINING, CERTIFICATION AND WATCHKEEPING (STCW) CODE

RESOLUTION MSC.397(95) (adopted on 11 June 2015) AMENDMENTS TO PART A OF THE SEAFARERS' TRAINING, CERTIFICATION AND WATCHKEEPING (STCW) CODE RESOLUTION MSC.397(95) (adopted on 11 June 2015) THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization concerning the functions of the Committee,

More information

Changes Between API STD 521 6th Ed and 5th Ed Cataloged

Changes Between API STD 521 6th Ed and 5th Ed Cataloged Changes Between API STD 521 6th Ed and 5th Ed Cataloged Dustin Smith Smith & Burgess LLC 7600 W Tidwell, Houston, TX Dustin.Smith@smithburgess.com John Burgess Jarrett Doe Smith & Burgess LLC 7600 W Tidwell,

More information

Hazard Operability Analysis

Hazard Operability Analysis Hazard Operability Analysis Politecnico di Milano Dipartimento di Energia HAZOP Qualitative Deductive (search for causes) Inductive (consequence analysis) AIM: Identification of possible process anomalies

More information

A large Layer of Protection Analysis for a Gas terminal scenarios/ cause consequence pairs

A large Layer of Protection Analysis for a Gas terminal scenarios/ cause consequence pairs A large Layer of Protection Analysis for a Gas terminal 2000+ scenarios/ cause consequence pairs Richard Gowland European process Safety Centre The scope of the study was a large gas terminal handling

More information

The Relationship Between Automation Complexity and Operator Error

The Relationship Between Automation Complexity and Operator Error The Relationship Between Automation Complexity and Operator Error presented by Russell Ogle, Ph.D., P.E., CSP rogle@exponent.com (630) 274-3215 Chemical Plant Control Control physical and chemical processes

More information

Dow s New Practice for Locating Temporary Portable Buildings. P. Partridge 9/29/05 UNRESTRICTED - May be shared with anyone Slide 1

Dow s New Practice for Locating Temporary Portable Buildings. P. Partridge 9/29/05 UNRESTRICTED - May be shared with anyone Slide 1 Dow s New Practice for Locating Temporary Portable Buildings P. Partridge 9/29/05 UNRESTRICTED - May be shared with anyone Slide 1 Dow guidelines issued following the explosion at BP s Texas City facility

More information

Part 2.5 Dispersion Modeling Using ALOHA

Part 2.5 Dispersion Modeling Using ALOHA Part 2.5 Dispersion Modeling Using ALOHA Dr. Arshad Ahmad Email: arshad@utm.my 1 Software Commonly used for Risk Analysis Software SAFETI SFU CAFTAN ETRA HAZSEC. HAZTRAC. PHAST. WHAZAN EFFECTS. DAMAGE

More information

OPERATING PROCEDURES

OPERATING PROCEDURES OPERATING PROCEDURES 1.0 Purpose This element identifies Petsec s Operating Procedures for its Safety and Environmental Management System (SEMS) Program; it applies to all Petsec operations. Petsec is

More information

BSR GPTC Z TR GM References and Reporting Page 1 of 8

BSR GPTC Z TR GM References and Reporting Page 1 of 8 Page 1 of 8 PRIMARY: 192.605 SECONDARY: 191.23 PURPOSE: Review guide material added by TR 2009-17 to 5.1(e) and consider restructuring the guide material under 192.605 as discussed further below. ORIGIN/RATIONALE

More information

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE February 9, 1998 Foam 101a A BLADDER TANK WITH 1. DESCRIPTION A Wet Pipe Bladder Tank Foam/Water System is a standard wet pipe automatic sprinkler system capable of discharging a foam/water solution automatically

More information

INSPECTIONS OF THE LPG ESTABLISHMENTS IN PORTUGAL. Graça Bravo. 26th September 2017

INSPECTIONS OF THE LPG ESTABLISHMENTS IN PORTUGAL. Graça Bravo. 26th September 2017 INSPECTIONS OF THE LPG ESTABLISHMENTS IN PORTUGAL Graça Bravo 26th September 2017 SUMMARY 1. IDENTIFICATION OF THE LPG ESTABLISHMENTS 2. GENERAL DESCRIPTION OF THE LPG ESTABLISHMENT 3. INSPECTION SUPPORTING

More information

RELIEF VALVES IN PARALLEL

RELIEF VALVES IN PARALLEL RELIEF VALVES IN PARALLEL Mary Kay O'Connor Process Safety Center International Symposium BEYOND REGULATORY COMPLIANCE MAKING SAFETY SECOND NATURE October 26-28, 2010 James R. Lawrence Sr. Why use a Relief

More information

"Although a good start with a good project, others are as much a hostage of the "human factor".

Although a good start with a good project, others are as much a hostage of the human factor. IBP1151_13 PIG LAUNCHERS AND RECEIVERS OPERATIONAL SECURITY Eduardo de Oliveira 1 IBP1151-13 PIG Launchers and receivers operational security Copyright 2013, Brazilian Petroleum, Gas and Biofuels Institute

More information

BROCHURE. Pressure relief A proven approach

BROCHURE. Pressure relief A proven approach BROCHURE Pressure relief A proven approach 2 PRESSURE RELIEF A PROVEN APPROACH Pressure relief Pressure relief systems are a vital layer of protection for your processes. To provide this protection, systems

More information

Looking Beyond Relief System Design Standards

Looking Beyond Relief System Design Standards Looking Beyond Relief System Design Standards M. Reilly & T. Craddock Introduction A correctly designed relief system is key to safe plant design and operation, ensuring the ability to handle any potential

More information

Engineering Safety into the Design

Engineering Safety into the Design Engineering safety into the design Peter Scantlebury P.Eng Technical Safety Manager Amec Foster Wheeler, Oil & Gas Canada Abstract Safety by design is Amec Foster Wheeler s systematic approach to engineering

More information

Gas Cabinets and Valve Manifold Boxes: Applying CGA G13- Rev 2015 to Gas Delivery Equipment

Gas Cabinets and Valve Manifold Boxes: Applying CGA G13- Rev 2015 to Gas Delivery Equipment Gas Cabinets and Valve Manifold Boxes: Applying CGA G13- Rev 2015 to Gas Delivery Equipment The Standard Governing the Storage & Use of Silane: Compressed Gas Association s Publication CGA G-13 2015: Storage

More information

Tube rupture in a natural gas heater

Tube rupture in a natural gas heater Tube rupture in a natural gas heater Dynamic simulation supports the use of a pressure safety valve over a rupture disk in the event of a tube rupture HARRY Z HA and PATRICK STANG Fluor Canada Ltd A fast

More information

PROCEDURE. April 20, TOP dated 11/1/88

PROCEDURE. April 20, TOP dated 11/1/88 Subject: Effective Date: page 1 of 2 Initiated by: Failure Modes and Effects Analysis April 20, 1999 Supersedes: TOP 22.019 dated 11/1/88 Head, Engineering and Technical Infrastructure Approved: Director

More information

API Standard Venting Atmospheric and Low-Pressure Storage Tanks: Nonrefrigerated and Refrigerated

API Standard Venting Atmospheric and Low-Pressure Storage Tanks: Nonrefrigerated and Refrigerated General API Standard 2000 - Venting Atmospheric and Low-Pressure Storage Tanks: Is there any limit for the maximum allowable linear velocity or any other parameter for the roof of a floating roof tank

More information

Fire and Safety for Offshore drilling and production Ajey Walavalkar ANSYS Inc.

Fire and Safety for Offshore drilling and production Ajey Walavalkar ANSYS Inc. Fire and Safety for Offshore drilling and production Ajey Walavalkar ANSYS Inc. 1 ANSYS, Inc. September 12, Fire and safety related applications Gas Dispersion and Ventilation Formation of combustible

More information

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS INTERNATIONAL MARITIME ORGANIZATION A 14/Res.567 16 January 1986 Original: ENGLISH ASSEMBLY - 14th session Agenda item lo(b) IMO RESOLUTION A.567(14) adopted on 20 November 1985 THE ASSEMBLY, RECALLING

More information

State of the Art in the Technical Assessment of DOMINO EFFECT

State of the Art in the Technical Assessment of DOMINO EFFECT State of the Art in the Technical Assessment of DOMINO EFFECT Valerio Cozzani LISES - DICAM, Alma Mater Studiorum - Università di Bologna, Bologna, Italy DOMINO EFFECT: Requirements for the control of

More information

Dri-Line Mk3 Monnier Compressed Air Drain Trap

Dri-Line Mk3 Monnier Compressed Air Drain Trap 5044050/2 IM-P504-24 CH Issue 2 Dri-Line Mk3 Monnier Compressed Air Drain Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation and Operation

More information

Removal of hydraulic load holding valve incident causing injury

Removal of hydraulic load holding valve incident causing injury Removal of hydraulic load holding valve incident causing injury Preface In regards to the incident involving injury caused by an uncontrolled release of energy, I will offer several recommendations which

More information

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply 4.1.1 General The primary function of a system for handling fuel oil is to transfer oil from the storage tank to the oil burner at specified conditions

More information

DF1 and DF2 Diffusers

DF1 and DF2 Diffusers 1550650/4 IM-P155-07 ST Issue 4 and Diffusers Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Operation 6. Maintenance

More information

The American Society for Nondestructive Testing

The American Society for Nondestructive Testing the NDT Technician FOCUS Vby Terry Tamutus* and Samuel J. Ternowchek Valve leaks are a common problem for refineries, processing plants and power generation plants. Studies conducted by several companies

More information

Quantitative Risk Analysis (QRA)

Quantitative Risk Analysis (QRA) Quantitative Risk Analysis (QRA) A realistic approach to relief header and flare system design Siemens AG 2017, All rights reserved 1 Quantitative Risk Analysis Introduction Most existing pressure relief

More information

Mounting and Operating Instructions EB 2558 EN. Self-operated Pressure Regulators. Type Pressure Build-up Regulator

Mounting and Operating Instructions EB 2558 EN. Self-operated Pressure Regulators. Type Pressure Build-up Regulator Self-operated Pressure Regulators Type 2357-31 Pressure Build-up Regulator with safety function and integrated excess pressure valve Type 2357-31 with non-return unit at port C Ports A and B with soldering

More information

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection February 9, 1998 Foam 201a 1. DESCRIPTION A Deluge Bladder Tank Foam/Water System is a standard deluge system capable of discharging a foam/water solution automatically through open sprinklers, spray nozzles,

More information

Process Safety and the Human Factor

Process Safety and the Human Factor Process Safety and the Human Factor INTRODUCTION The increasing lifetime of industrial processing plants creates a growing challenge for plant owners/operators to continue to run in a safe and efficient

More information

Introduction to consequence modelling

Introduction to consequence modelling QUESTIONS AND ANSWERS Introduction to consequence modelling PRESENTERS: Kehinde Shaba (DNV GL - Software), Mark Hunter (DNV GL Oil & Gas, Risk Advisory) 1. I've found that some chemicals cannot be individually

More information

Development of Accidental Collapse Limit State Criteria for Offshore Structures

Development of Accidental Collapse Limit State Criteria for Offshore Structures Risk Acceptance and Risk Communication Stanford, March 26-27, 2007 Development of Accidental Collapse Limit State Criteria for Offshore Structures by Torgeir Moan Norwegian University of Science and Technology

More information

CFD Based Approach for VCE Risk Assessment

CFD Based Approach for VCE Risk Assessment CFD Based Approach for VCE Risk Assessment 2009 MKOPSC International Symposium Anna Qiao, Steven Zhang, Asmund Huser DNV Energy Objective Determine the maximum design load at a specified frequency Provide

More information

Module No. # 01 Lecture No. # 6.2 HAZOP (continued)

Module No. # 01 Lecture No. # 6.2 HAZOP (continued) Health, Safety and Environmental Management in Petroleum and Offshore Engineering Prof. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute Of Technology, Madras Module No. # 01

More information

Thank You for Attending Today s Webinar. Today s Featured Speaker

Thank You for Attending Today s Webinar. Today s Featured Speaker Thank You for Attending Today s Webinar Your Host Mike DeLacluyse President Lesman Instrument Company miked@lesman.com Today s Featured Speaker A.J. Piskor Combustion & Controls Specialist Lesman Instrument

More information

Review of Source Term Modelling for Hydrocarbon Releases using Process Dynamic Simulation

Review of Source Term Modelling for Hydrocarbon Releases using Process Dynamic Simulation Review of Source Term Modelling for Hydrocarbon Releases using Process Dynamic Simulation Conor Crowley and Mrudhul Raj, Atkins Limited, Kirkgate House, Upperkirkgate, Aberdeen AB10 1HW Andrew Ross, Chemical

More information

COMMON MISUNDERSTANDINGS ABOUT THE PRACTICAL APPLICATION OF IEC 61508

COMMON MISUNDERSTANDINGS ABOUT THE PRACTICAL APPLICATION OF IEC 61508 COMMON MISUNDERSTANDINGS ABOUT THE PRACTICAL APPLICATION OF IEC 61508 Helen Pearce, James Catmur and Geoff Stevens The use of IEC 61508 for determination of the Safety Integrity Level (SIL) of Safety Interlock

More information

Using Reliability Centred Maintenance (RCM) to determine which automated monitoring systems to install to new and existing equipment

Using Reliability Centred Maintenance (RCM) to determine which automated monitoring systems to install to new and existing equipment Using Reliability Centred Maintenance (RCM) to determine which automated monitoring systems to install to new and existing equipment CHRIS JAMES RELIABILITY MANAGEMENT LTD Cairo, November 2018 The rate

More information

PROTEGO Braunschweiger Flammenfilter GmbH

PROTEGO Braunschweiger Flammenfilter GmbH PROTEGO Braunschweiger Flammenfilter GmbH Venting of atmospheric and low-pressure storage tanks ISO 28300/API 2000 Simon Maier Regional Manger Europe 7.12.2017 Agenda 1 Why conservation vents do not function

More information

TESCOM 50-4X Series Safety, Installation & Start-Up Procedures

TESCOM 50-4X Series Safety, Installation & Start-Up Procedures Operations & Service Manual TESCOM 50-4X Series Safety, Installation & Start-Up Procedures Do not attempt to select, install, use or maintain this product until you have read and fully understood this

More information

SAFETY MANUAL PURGING, VENTING & DRAINING PROCEDURE TABLE OF CONTENTS 1. INTRODUCTION SCOPE DEFINITIONS PROCEDURE...

SAFETY MANUAL PURGING, VENTING & DRAINING PROCEDURE TABLE OF CONTENTS 1. INTRODUCTION SCOPE DEFINITIONS PROCEDURE... Page 1 of 11 TABLE OF CONTENTS 1. INTRODUCTION... 2 2. SCOPE... 2 3. DEFINITIONS... 2 4.... 3 5. RESPONSIBILTIES... 10 6. REFERENCES... 10 7. ATTACHMENTS... 11 8. APPENDICES... 11 Rev. Issue Date Amendment

More information

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2)

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2) UN-GTR PART A INSERTION Stand 09.02.2011, 17:20 Uhr A.3.3 HYDROGEN STORAGE SYSTEM The hydrogen storage system consists of all components that form the primary pressure boundary of the stored hydrogen in

More information

Pressure Piping Code-Industrial Piping. Part 6: Safeguarding

Pressure Piping Code-Industrial Piping. Part 6: Safeguarding ICS 23.040 J74 National Standard of the People's Republic of China GB/T 20801.6-2006 Pressure Piping Code-Industrial Piping Part 6: Safeguarding ffi1jtfil~ju1t1 I~tfil ~6$?t: ~~~1? Issued on: December

More information

HM and HM34 Inverted Bucket Steam Traps Installation and Maintenance Instructions

HM and HM34 Inverted Bucket Steam Traps Installation and Maintenance Instructions 0670350/4 IM-S03-11 ST Issue 4 HM and HM34 Inverted Bucket Steam Traps Installation and Maintenance Instructions 1. Safety information 2. General product information HM Series 3. Installation 4. Commissioning

More information

TSS21 Sealed Thermostatic Steam Tracer Trap

TSS21 Sealed Thermostatic Steam Tracer Trap 1255050/4 IM-P125-10 ST Issue 4 TSS21 Sealed Thermostatic Steam Tracer Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning

More information

QuickHeat TM Packaged Heat Exchanger Solutions

QuickHeat TM Packaged Heat Exchanger Solutions 4831999/1 IM-P483-03 CH Issue 1 QuickHeat TM Packaged Heat Exchanger Solutions Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning

More information

SIMPLIFIED APPROACHES TO FIRE AND EXPLOSION ENGINEERING

SIMPLIFIED APPROACHES TO FIRE AND EXPLOSION ENGINEERING SIMPLIFIED APPROACHES TO FIRE AND EXPLOSION ENGINEERING Steve Walker (MSL Engineering Ltd.), Brian Corr, Vincent Tam (BP), Justin Bucknell (MSL Services Corp.) and Pat O Connor (BP America) AUTHOR BIOGRAPHICAL

More information

Designing to proposed API WHB tube failure document

Designing to proposed API WHB tube failure document Designing to proposed API WHB tube failure document Dennis H. Martens Consultant and Technical Advisor (martensdh@pm-engr.com) Porter McGuffie Inc. Lon Stern Consultant (lhstern@earthlink.net) Stern Treating

More information

Instruction Manual Contact Pressure Vacuum Gauge

Instruction Manual Contact Pressure Vacuum Gauge MS10 Instruction Manual Contact Pressure Vacuum Gauge Table of Contents 1. Safety Instructions 2. Intended Applications 3. Product Description and Functions 4. Installation 5. Commissioning 6. Maintenance

More information

MSC Guidelines for Review of Vapor Control Systems Procedure Number: C1-46 Revision Date: 01/08/2018

MSC Guidelines for Review of Vapor Control Systems Procedure Number: C1-46 Revision Date: 01/08/2018 T. O. Phillips, CDR, Chief, Tank Vessel & Offshore Division Purpose: The purpose of this document is to provide guidance and information regarding the submission of vapor control system (VCS) piping plans

More information

Inherently Safer Design Analysis Approaches

Inherently Safer Design Analysis Approaches Inherently Safer Design Analysis Approaches There are a number of ways inherent safety can be analyzed. In any case, the intent is to formalize the consideration of inherent safety rather than to include

More information

JOSOP 603 flaring and venting Standard

JOSOP 603 flaring and venting Standard JOSOP 603 flaring and venting Standard Dec, 2010 Approved December 29, 2010 Version 01 Posted February 3, 2011 Table of Contents 1.0 Purpose, Objectives and Scope... 3 1.1 Purpose... 3 1.2 Objective...

More information

There are three fuelling systems which use LNG/CNG and which may be found in vehicles today:

There are three fuelling systems which use LNG/CNG and which may be found in vehicles today: UKRO Humberside Education Workshop 2017 NATURAL GAS POWERED VEHICLES Some LGV manufacturers (currently IVECO and SCANIA) are able to offer and Alternative Fueled vehicles that use Compresses Natural Gas

More information

AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011

AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011 AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF SEMS HAZARD ANALYSIS TRAINING September 29, 2011 Purpose The purpose of this meeting is to provide guidelines for determination of hazard

More information

API th Edition Ballot Item 6.8 Work Item 54 Global Air Failure

API th Edition Ballot Item 6.8 Work Item 54 Global Air Failure API 521 7 th Edition Ballot Item 6.8 Work Item 54 Global Air Failure Background Work Item 54: # Source Section Comment Proposed Change Volunteer 54 Fall 2014 meeting Global instrument air failure scenario

More information

Jupiter Type 4 Tube Owner s Manual

Jupiter Type 4 Tube Owner s Manual Jupiter Type 4 Tube Owner s Manual Forward Thank you for purchasing a Cimarron Composites Type 4 Tube. The content of this manual contains information for the use of Cimarron Gas Tubes. Please read this

More information

FAILURE AND HAZARD ANALYSIS OF THE NPDGAMMA LH2 TARGET SYSTEM

FAILURE AND HAZARD ANALYSIS OF THE NPDGAMMA LH2 TARGET SYSTEM FAILURE AND HAZARD ANALYSIS OF THE NPDGAMMA LH2 TARGET SYSTEM Revision: 0.00 Edited by: Seppo Penttila, November 10, 2010 1. General The RSS 8305.0 Installation, Commissioning, and Operation of the NPDGamma

More information

HIGH RATE BASKET STRAINER

HIGH RATE BASKET STRAINER Installation and Operation Instruction Manual INSMAN-105 High Rate Basket Strainer Phone: 951.656.6716 Toll-Free: 800.854.4788 www.yardneyfilters.com Yardney Water Management Systems, Inc. 6666 Box Springs

More information

Hazard Identification

Hazard Identification Hazard Identification Most important stage of Risk Assessment Process 35+ Techniques Quantitative / Qualitative Failure Modes and Effects Analysis FMEA Energy Analysis Hazard and Operability Studies HAZOP

More information

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap 1250650/6 IM-P125-07 ST Issue 6 MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation

More information

Dynamic Modelling of Control Valves

Dynamic Modelling of Control Valves Dynamic Modelling of Control Valves Observed PRV d/s Pressure Against Flow Pressure (m) 28 27.5 27 26.5 26 25.5 25 24.5 24 0 0.5 1 1.5 2 2.5 Element Flow (l/s) Andy Rowland Technical Lead Water Networks

More information