1 USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently undergoing a transition from rural to suburban development. As a result of the development the structure has been reclassified as a high hazard dam and is in need of upgrades to comply with current dam safety and performance criteria. Plum Creek Conservation District (District), in collaboration with the National Resource Conservation Service (NRCS), evaluated several alternatives to rehabilitate the structure. Their efforts considered the presence of residences near the dam s downstream toe and others located within the upstream flood pool. The District and NRCS ultimately selected to rehabilitate the structure by replacing the existing vegetated auxiliary spillway with a concrete labyrinth weir spillway and installing a larger principal spillway conduit. This alternative limits the required construction footprint and maintains the maximum upstream water surface elevation. The proposed 210 feet wide labyrinth weir spillway consists of 7 labyrinth cycles and a Saint Anthony Falls stilling basin at the downstream end. The structure will be built into the existing earthen embankment and will require the realignment of an existing Hays County road as part of the project. County coordination has been required to realign the road and satisfy floodplain requirements due to the increased discharge through the larger principal spillway. The project is being performed under the NRCS s Small Watershed Rehabilitation Program, with construction funding being provided by the NRCS, Plum Creek, and the Texas State Soil and Water Conservation Board (TSSWCB). This paper presents the overall design and coordination with Hays County and Texas Parks and Wildlife Department. Introduction Throughout the 1960s and 1970s, the Natural Resource Conservation Service (formerly Soil Conservation Service) constructed over 2000 small watershed dams in Texas and over 10,000 nationally under the authority of the Watershed Protection and Flood Prevention Act of 1954 (Public Law ), Flood Control Act (Public Law ), Pilot Watershed Program 1953/1954 and the Resource Conservation and Development RC&D) Program. These structures were designed to protect downstream agricultural areas and to prevent the adverse economic and physical effects of flooding through the entire watershed community. The dams were designed by NRCS and are operated and maintained by local sponsors. Plum Creek Conservation District is the local sponsor for twenty eight dams, including Plum Creek Floodwater Retarding Structure No. 6 (Dam 6). At the time of construction, the economy of the Plum Creek Watershed was almost entirely agricultural. However, in the last 10 to 15 years the area surrounding Dam 6 has developed into a suburban area. Existing Conditions When Dam 6 was designed and constructed in 1967 it was considered a low hazard dam due to the minimal impact it would have on lives lost and property lost if it were to fail. However, due to the development around Dam 6, it is now considered a high hazard structure. Several features at Dam 6 led to the high hazard classification. There are six residential properties, including a four plex, located at the downstream toe that would be inundated in the event of a dam 1 Freese and Nichols, Inc., Morado Circle, Suite 300, Austin, Texas,78759, (512) , dgm@freese.com, jwe@freese.com

2 failure. Additionally, Goforth Road, a county owned and operated thoroughfare, runs parallel to the dam embankment 25 feet downstream. The as built drawings from the original dam construction indicate this road was to be abandoned when the structure was built. Instead, the usage of Goforth Road by the local community has increased and it now handles approximately 8,000 vehicle trips per day and serves as a primary route for local school buses. Goforth Road crosses the auxiliary spillway and creates breaches in the spillway dikes. There are also many residences located around the reservoir below the top of dam elevation. Figure 1 shows the dam and the location of Goforth Road and structures. Structures located in lake area below top of dam Principal Spillway Auxiliary Spillway Homes and businesses along downstream toe Figure 1: Aerial view of Dam 6 and surrounding area. For high hazard dams, TR 60 criteria require that the principal spillway pass the runoff associated with the 100 year rainfall without engaging the auxiliary spillway. The existing Dam 6 principal spillway is a 30 inch diameter concrete conduit which passes beneath Goforth Road and discharges into a plunge pool on the downstream side. The existing principal spillway does not meet the current TR 60 criteria for high hazard dams as the auxiliary spillway engages during storms larger than the 75 year, 24 hour storm event. The resulting flows through the auxiliary spillway inundate Goforth Road during flood events smaller than the 100 yr event, thus making it a public hazard. TR 60 also requires that the auxiliary spillway pass the runoff associated with the probable maximum precipitation (PMP) without overtopping the dam. Hydrological analyses indicate that Dam 6 would be

3 overtopped by the PMP storm event. This could lead to dam failure and would put approximately 42 homes, 8 businesses and several roads in harm s way. Rehabilitation Once it was determined that Dam 6 does not currently meet the appropriate dam safety guidelines, NRCS and the District began evaluating alternatives to rehabilitate the dam. In order to increase the reservoir s ability to accommodate a 100 year rainfall event before engaging the auxiliary spillway, the principal spillway capacity will be increased by replacing the existing 30 inch diameter conduit with a 42 inch diameter conduit. This will increase the maximum principal spillway discharge from approximately 100 cfs to over 220 cfs, allowing the principal spillway to pass more water earlier in the storm event. The increased discharge through the principal spillway will prevent discharge through the auxiliary spillway prior to the 100 year storm event. This larger principal spillway also provided enough capacity to allow the auxiliary spillway crest to be lowered by approximately 8 inches, which reduced the required width of the auxiliary spillway, while still maintaining the current top of dam elevation. The next step in designing the modifications to the dam was to determine how to allow the structure to handle the full PMP storm event to prevent overtopping of the dam. The proposed alternatives were the following: 1. raise the top of dam, increasing the storage capacity of the reservoir, or 2. increase the discharge capacity of the auxiliary spillway enough that the PMP water level would not exceed the top of the current dam. In most situations in Texas, the height of the dam would be increased in order to store the excess water. Several factors at Dam 6, however, made raising the top of the dam unrealistic. Houses located in the upstream floodplain would be further inundated if the maximum water surface elevation were raised. Additionally, raising the dam with earthen fill would require increasing the dam s footprint in the downstream direction. Houses currently located along the downstream toe prevent this footprint increase. Since raising Dam 6 was not considered feasible, increasing the spillway discharge capacity was the next dam modification considered. The increased spillway capacity could be added through an additional auxiliary spillway, widening the existing open channel auxiliary spillway, or through lowering the spillway crest. In order to pass the design discharge of 26,000 cfs, a vegetative spillway of approximately 650 ft width would be required at Dam 6. However, there was not sufficient land available adjacent to the existing 350 ft wide spillway. Furthermore, an additional spillway on the right end of the dam is not feasible due to the presence of homes and businesses. With no room on either end of the dam, encroaching into the embankment was the last remaining option available to add the additional spillway capacity. In order to minimize the impact to the embankment, NRCS evaluated and ultimately selected a concrete labyrinth weir placed into the existing embankment to replace the existing auxiliary spillway. A labyrinth weir is a type of spillway which increases the discharge weir length without increasing the channel width by folding the weir in a zig zag pattern (accordion like) in plan view within the set confines of training walls. A series of trapezoids are formed which typically increase discharge capacity for a given channel width by approximately three times the discharge capacity of a straight weir. Plum Creek 6 will be the first labyrinth weir used by NRCS in Texas. While the labyrinth weir is innovative and a significant change from a typical vegetative lined,

4 earthen spillway, the concept has been utilized since the 1970s and there are now over 80 labyrinth weirs in the United States. Due to the increased efficiency of the labyrinth weir vs an earthen/vegetated spillway, the labyrinth weir will be 210 ft wide, rather than the 650 ft feet needed for a linear weir. The labyrinth weir provides the entire spillway capacity and allows the existing earthen spillway to be eliminated. This new auxiliary spillway also provides an increased level of protection to Goforth Road. Figure 2: Proposed Labyrinth Weir at Plum Creek Dam 6 The flow velocity through the auxiliary spillway will be over 40 feet/second as it drops 23 feet from the labyrinth crest to Goforth Road. In order to protect the road and downstream channel from the flow, a Saint Anthony Falls (SAF) stilling basin will dissipate the water s energy. The SAF basin incorporates chute blocks, baffle blocks and an end sill to dissipate the energy. The SAF basin floor elevation will be 8 feet below Goforth Road to provide adequate tailwater and to allow two 5 ft x 5 ft culverts to pass flow beneath the road and increase the level of protection of Goforth Road. The labyrinth spillway will engage at the 100 year storm event and Goforth Road will be not be overtopped until the principal and auxiliary spillway discharge exceeds the culvert capacity of approximately 500 cfs, which is more than twice the peak discharge of the 100 year storm. Hays County and Texas Parks and Wildlife Department Coordination In the planning phase and throughout design, NRCS and Plum Creek Conservation District coordinated with various government entities to ensure the proposed design and dam rehabilitation would comply with County and State regulations. These entities included Hays County Transportation Department, Hays County Floodplain Administrator and the Texas Parks and Wildlife Department (TPWD). Hays County Transportation Department performed a geotechnical investigation along the proposed roadway alignment, provided the pavement design, and requested that the project include gates to restrict access to the portion of Goforth Road that will be inundated when the spillway discharge exceeds the culvert capacity. As the design of the modifications progressed, the Transportation Department

5 reviewed the proposed horizontal and vertical alignments for compliance with local regulations. The County will also have a construction inspector observing construction of the roadway. The project modified the discharge characteristics of the dam and had the potential to impact the FEMA regulated 100 year floodplain. An analysis of the project s impact on the 100 year floodplain was evaluated and submitted to the Hays County Floodplain Administrator. While the new principal spillway doubles the peak discharge during the 100 year storm event, the water levels remain within the existing FEMA Zone A floodplain. Coordination with TPWD was required due to the necessity of draining the lake in order to perform the rehabilitation construction. The drained lake will necessarily displace the fish and aquatic wildlife. TPWD requested that an aquatic resource relocation plan (ARRP) be prepared and implemented to reduce the impact that the project will have on the state s fish and other aquatic life. The ARRP will be developed in coordination with TPWD and will identify the purpose of the activities, method of collecting and moving the aquatic life, documentation methods to be used, and the disposal methods required to remove dead and non native fishes. As part of the plan preparation, TPWD requested that a mussel survey be performed to determine if any threatened or endangered mussels live in the lake. It is anticipated that the ARRP will be prepared for Dam 6 in the summer of The fish in the lake at Dam 6 will be collected and transported to a nearby lake. Conclusion The rehabilitation of Plum Creek Dam 6 uses an innovative design to rehabilitate Plum Creek Dam 6 so that it will meet current dam safety criteria. The project will increase public safety and provide economic benefits due to flood control. The labyrinth weir auxiliary spillway is a first for NRCS in Texas. The project also successfully addressed the concerns of multiple public agencies through relocation of the Goforth Road, evaluation of impacts on the floodplain and protection of aquatic resources.

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE

More information

Plan B Dam Breach Assessment

Plan B Dam Breach Assessment Plan B Dam Breach Assessment Introduction In support of the Local Sponsor permit applications to the states of Minnesota and North Dakota, a dam breach analysis for the Plan B alignment of the Fargo-Moorhead

More information

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Gregory Richards, P.E., CFM, Gannett Fleming, Inc. Blake Tullis, Ph.D., Utah Water Research

More information

What Happens Downstream Stays Downstream, or Does It? Potential Failure Modes from Spillway Exit Flows

What Happens Downstream Stays Downstream, or Does It? Potential Failure Modes from Spillway Exit Flows What Happens Downstream Stays Downstream, or Does It? Potential Failure Modes from Spillway Exit Flows Gregory Richards, P.E., CFM, Gannett Fleming, Inc. Paul Schweiger, P.E., CFM, Gannett Fleming, Inc.

More information

Technical Report Culvert A Hydraulic Analysis

Technical Report Culvert A Hydraulic Analysis DATE: November 3, 2011 Technical Report Culvert A Hydraulic Analysis TO: FROM: RE: Jim Reiser, P.E. Project Manager Parsons Brinckerhoff, Inc. Kurt Killian, P.E., CFM Parsons Brinckerhoff, Inc. Design

More information

VIRGINIA SOIL AND WATER CONSERVATION BOARD GUIDANCE DOCUMENT ON DAM BREAK INUNDATION ZONE AND INCREMENTAL DAMAGE ANALYSIS AND MAPPING PROCEDURES

VIRGINIA SOIL AND WATER CONSERVATION BOARD GUIDANCE DOCUMENT ON DAM BREAK INUNDATION ZONE AND INCREMENTAL DAMAGE ANALYSIS AND MAPPING PROCEDURES (Approved XXXXX, 2010) Working Draft Version January 14, 2010 VIRGINIA SOIL AND WATER CONSERVATION BOARD GUIDANCE DOCUMENT ON DAM BREAK INUNDATION ZONE AND INCREMENTAL DAMAGE ANALYSIS AND MAPPING PROCEDURES

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION Abstract Lonie I * Tailings and Dams, GHD Brisbane, QLD, Australia Queensland Alumina Limited operates

More information

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

What I ve Learned About Dam Safety Good, Bad and Ugly

What I ve Learned About Dam Safety Good, Bad and Ugly What I ve Learned About Dam Safety Good, Bad and Ugly Ron Gruzesky Dam Safety and Floodplain Compliance Kentucky Division of Water Department for Environmental Protection August 26, 2015 What is a Dam?

More information

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION STRUCTURE S-65 This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated, vertical lift gates, and a reinforced concrete lock structure with two pairs of

More information

The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam

The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam Utah State University DigitalCommons@USU International Symposium on Hydraulic Structures Jun 28th, 1:30 PM The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam E. A. Thompson Sacramento District

More information

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional

More information

Huntington District. For More Information Contact (304)

Huntington District. For More Information Contact (304) Zoar Levee & Diversion Dam are located in the Muskingum River Basin highlighted in green to left. The Muskingum River Basin is the site of Ohio s first multiple purpose water management and land conservation

More information

Access Management Standards

Access Management Standards Access Management Standards Section 1: Application of Access Standards This chapter describes the Department's access management standards for access connections on the county roadway system. The standards

More information

A LOOK AT EARTH SPILLWAY DESIGN AND EVALUATION AFTER MORE THAN 50 YEARS OF EXPERIENCE

A LOOK AT EARTH SPILLWAY DESIGN AND EVALUATION AFTER MORE THAN 50 YEARS OF EXPERIENCE A LOOK AT EARTH SPILLWAY DESIGN AND EVALUATION AFTER MORE THAN 50 YEARS OF EXPERIENCE Paul G. Schweiger, P.E. 1, Darrell M. Temple, P.E. 2 Danny McCook 3, P.E., & Amanda J. Hess, P.E. 4 ABSTRACT More than

More information

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019 09/25/2018 DRAFT FEMA Region I PA H&H Study ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019 Region I Federal Emergency Management Agency (FEMA) Public Assistance Hydrologic and Hydraulic (H&H)

More information

Spillway Design for Small Dams

Spillway Design for Small Dams Spillway Design for Small Dams by David E. Fantina, PE Introduction: This course presents an overview of the features that go into the design of spillways for small dams. Small dams in this course refer

More information

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES 3 4 5 6 7 8 9 0 3 APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES Kissimmee River Vol December 005 Version Draft 4 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 30 3 3 33 34 35 36 37 38 39 40 4 4 43

More information

Performance of RCC Used for Overtopping Protection and Spillways

Performance of RCC Used for Overtopping Protection and Spillways Protections 2016 2 nd International Seminar on Dam Protection Against Overtopping ISBN: 978-1-1889143-27-9 DOI: Ft. Collins, Colorado, USA, 7-9 September 2016 ABSTRACT Performance of RCC Used for Overtopping

More information

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection TOPIC: COMMON PROBLEMS FOR SMALL DAMS WITH CONCRETE CHANNEL SPILLWAYS The State Dam Safety Program has inspection requirements for state regulated dams. A dam, like any man-made structure, will change

More information

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS. 7E-12 Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures Sediment Basin BENEFITS Flow Control Erosion Control Sediment Control Runoff Reduction Flow Diversion

More information

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION STRUCTURE 65-B This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated vertical lift gates and a reinforced concrete lock structure with two pairs of sector

More information

Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek

Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek City of Fairway, Kansas Fairway Stormwater Level of Service Study - Phase 2 Project No. 108200 Revision 1 12/6/2018 Stormwater

More information

Design of Spillway Upgrades

Design of Spillway Upgrades USACE Dam Safety Program Design of Spillway Upgrades Sal Todaro, P.E. Senior Hydraulic Structures Engineer U.S. Army Corps of Engineers Risk Management Center 1 Presentation Overview 1. USACE (RMC) approach

More information

Information for File # SEW

Information for File # SEW Information for File #2014-02744-SEW Applicant: Minnesota Department of Transportation (MnDOT), District 3; c/o Mr. Robert Nibbe Corps Contact: Sarah Wingert, U.S. Army Corps of Engineers, 180 5 th Street

More information

Ellis Y. Byeon, PE Bryan VanderGheynst, PE 1

Ellis Y. Byeon, PE Bryan VanderGheynst, PE 1 Ellis Y. Byeon, PE Bryan VanderGheynst, PE 1 Background Information: City of Trenton, Mercer County Assunpink Creek, Pond Run and Delaware River Lower 2.5 miles of the Assunpink Creek Lower 0.6 miles of

More information

General Information for Culvert Design

General Information for Culvert Design Design Manual Chapter 2 - Stormwater 2E - Culvert Design 2E-1 General Information for Culvert Design A. Introduction A culvert is a conduit under an embankment that transports stormwater from one side

More information

PRELIMINARY RISK ASSESSMENT RIDM PROJECT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT

PRELIMINARY RISK ASSESSMENT RIDM PROJECT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT PRELIMINARY RISK ASSESSMENT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT RIDM PROJECT MAY 3, 2018 DAVID S. BOWLES AND LOREN R. ANDERSON RAC ENGINEERS AND ECONOMISTS, LLC AND UTAH STATE UNIVERSITY

More information

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Seventeenth Statewide Conference on Local Bridges Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Tuesday, October 25, 2011 Training Session: Culvert Design, Analysis - talk 2 Presented

More information

HISTORY OF CONSTRUCTION

HISTORY OF CONSTRUCTION HISTORY OF CONSTRUCTION CFR 257.73(c)(1) West Boiler Slag Pond Clifty Creek Plant Madison, Indiana October, 2016 Prepared for: Indiana Kentucky Electric Corporation Prepared by: American Electric Power

More information

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN SPALDING COUNTY, GEORGIA CHAPTER 4 4.0 CULVERT DESIGN... 4-1 4.1 INTRODUCTION... 4-1 4.2 SYMBOLS AND DEFINITIONS... 4-1 4.3 ENGINEERING DESIGN CRITERIA... 4-2 4.3.1 FREQUENCY FLOOD... 4-2 4.3.2 VELOCITY

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.015.003 Report issued: July 03, 2017 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN Elsa Alves *, Felix Hernando and Rafael Chacón * Laboratório Nacional de Engenharia Civil (LNEC) Av. do Brasil, 101, 1700-066 Lisboa, Portugal

More information

Session C9: Priest Rapids Fish Bypass: A Case Study from Start to Finish

Session C9: Priest Rapids Fish Bypass: A Case Study from Start to Finish University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

Outlet Structures T-12

Outlet Structures T-12 Description This section provides guidance and details for outlet structures for use primarily with BMPs utilizing sedimentation, (i.e., extended detention basins (EDBs), retention ponds, and constructed

More information

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

Colusa Basin Drain Watershed Fish Stranding Tour Concept Paper Mike Hendrick and Brycen Swart NMFS

Colusa Basin Drain Watershed Fish Stranding Tour Concept Paper Mike Hendrick and Brycen Swart NMFS Colusa Basin Drain Watershed Fish Stranding Tour Concept Paper Mike Hendrick and Brycen Swart NMFS On May 31, 2013 representatives from CDFW, USFWS, and NMFS went on a field tour to look at locations in

More information

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM Facility Number: Date: Time: Subdivision Name: Watershed: Weather: Inspector(s): Date of Last Rainfall: Amount: Inches Streets: Mapbook Location: GPS Coordinates: Property Classification: Residential 9

More information

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration. HY-8 Version 7.2 Build Date January 17, 2012 Federal Highway Administration http://www.fhwa.dot.gov/engineering/hydraulics/software/hy8/index.cfm SIMPLE Simple to use Use for simple culverts and bridges

More information

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS v. 8.4 WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS Objectives Define a conceptual schematic of the roadway, invert, and downstream

More information

Scott Dam Spillway Comparing Physical Model Study Results

Scott Dam Spillway Comparing Physical Model Study Results Scott Dam Spillway Comparing Physical Model Study Results Darren Hinton, P.E., Ph.D., Seattle Laboratory Manager, Northwest Hydraulic Consultants, USA Brian Hughes, M.A.Sc., P.E., Principal, Northwest

More information

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2018

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2018 EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2018 Normal and Critical Depths Q1. If the discharge in a channel of width 5 m is 20 m 3 s 1 and Manning s n is 0.02 m 1/3 s, find: (a) the normal depth and Froude number

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Check Dams DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Though not generally considered

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.003 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

Applying Engineering Solutions to the Science of Invasive Aquatic Species Control Asian Carp and Sea Lamprey. Bill Holman, P.E. Stanley Consultants

Applying Engineering Solutions to the Science of Invasive Aquatic Species Control Asian Carp and Sea Lamprey. Bill Holman, P.E. Stanley Consultants Applying Engineering Solutions to the Science of Invasive Aquatic Species Control Asian Carp and Sea Lamprey Bill Holman, P.E. Stanley Consultants Sea Lamprey: Great Lakes Invader Lake Superior Sea Lamprey

More information

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line Grade Crossing Enhancements CPUC 1 2 3 4 5 Citrus Avenue, Riverside County Palmyrita Ave., Columbia Avenue, Marlborough Ave., Spruce St., MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3

More information

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9 October 9, 2012 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 RE: Trout Unlimited Comments on the Scope of Environmental Impact Statement

More information

Greenup Lock Filling and Emptying System Study

Greenup Lock Filling and Emptying System Study Fourth LACCEI International Latin American and Caribbean Conference for Engineering and Technology (LACCET 2006) Breaking Frontiers and Barriers in Engineering: Education, Research and Practice 21-23 June

More information

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Culvert Design for Low and High Gradient Streams in the Midwest Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Overview Culvert Design Considerations Hydraulic Terms Culvert Impacts Low

More information

TECHNICAL MEMORANDUM 002 EMORANNO. 001

TECHNICAL MEMORANDUM 002 EMORANNO. 001 TECHNICAL MEMORANDUM 002 EMORANNO. 001 To: Jack Synder, P.E. EES Consulting From: Mort McMillen, P.E. Paul Larson, SE Date: October 13, 2010 Project: Cc: Taylor Bowen Subject: Technical Memorandum (TM)

More information

Innovative spillways. PK-weirs. Franska exempel 10/04/2018. Speaker : A. Chapuis,

Innovative spillways. PK-weirs. Franska exempel 10/04/2018. Speaker : A. Chapuis, Innovative spillways PK-weirs. Franska exempel 10/04/2018 Speaker : A. Chapuis, Member of CFBR - French Committee on Dams and Reservoirs Member of CFBR technical mirror group of ICOLD Committee C Hydraulic

More information

NUMERICAL AND PHYSICAL MODELING

NUMERICAL AND PHYSICAL MODELING POINTE DU BOIS GENERATING STATION SPILLWAY REPLACEMENT PROJECT NUMERICAL AND PHYSICAL MODELING Kara Hurtig, Northwest Hydraulic Consultants, North Vancouver, BC, Canada David S. Brown, KGS Group, Winnipeg,

More information

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SALUDA HYDROELECTRIC PROJECT FERC PROJECT NO. 516 DESCRIPTION OF SALUDA HYRDOELECTRIC PROJECT EXHIBIT A AUGUST 2008 Prepared by: SOUTH CAROLINA

More information

Living Streets Policy

Living Streets Policy Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EH Engineer Regulation 1110-2-1451 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design ACQUISITION OF LANDS DOWNSTREAM FROM SPILLWAYS FOR HYDROLOGIC

More information

Applying Engineering Solutions to the Science of Protection and Enhancement of Aquatic Environments. Bill Holman, P.E. Stanley Consultants

Applying Engineering Solutions to the Science of Protection and Enhancement of Aquatic Environments. Bill Holman, P.E. Stanley Consultants Applying Engineering Solutions to the Science of Protection and Enhancement of Aquatic Environments Bill Holman, P.E. Stanley Consultants Project Development PHASE STAGE TASKS PURPOSE I II III Investigation

More information

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Indiana LTAP Road Scholar Core Course #10 Culvert Drainage Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Objectives Review culvert shapes, end sections, and materials

More information

HYDRAULIC JUMP AND WEIR FLOW

HYDRAULIC JUMP AND WEIR FLOW HYDRAULIC JUMP AND WEIR FLOW 1 Condition for formation of hydraulic jump When depth of flow is forced to change from a supercritical depth to a subcritical depth Or Froude number decreases from greater

More information

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b) ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2019 LIBERTY UTILITIES Empire District Prepared by: Rachel

More information

Coal Combustion Residuals Closure Plan

Coal Combustion Residuals Closure Plan Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number: C150035.00 October 2016 Prepared by: GAI Consultants, Inc. Richmond Office

More information

CLAIBORNE LOCK AND DAM PERTINENT DATA

CLAIBORNE LOCK AND DAM PERTINENT DATA CLAIBORNE LOCK AND DAM PERTINENT DATA GENERAL Location Clarke, Monroe, & Wilcox Counties, Alabama; Alabama River, river mile 72.5 Drainage area Millers Ferry to Claiborne sq. mi. 836 Total drainage area

More information

PROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA,

PROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA, PROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA, FLOOD OF FEBRUARY 1986 By J.C. Blodgett and J.B. Lucas U.S. GEOLOGICAL SURVEY Open-File Report 88-82 CO CM I m r-h CM Sacramento, California

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

MEMO. Schedule 'B' Class Environmental Assessment and Preliminary Design Lakeview Boulevard Improvements Culvert Assessment.

MEMO. Schedule 'B' Class Environmental Assessment and Preliminary Design Lakeview Boulevard Improvements Culvert Assessment. MEMO Schedule 'B' Class Environmental Assessment and Preliminary Design Lakeview Boulevard Improvements Culvert Assessment February 15, 2017 As per the preferred Lakeview Boulevard alignment provided by

More information

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES. Lake Okeechobee & EAA Vol 3 A-i December 2005 Version 1 Draft 4

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES. Lake Okeechobee & EAA Vol 3 A-i December 2005 Version 1 Draft 4 1 1 1 1 1 1 1 1 0 1 0 1 0 APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES Lake Okeechobee & EAA Vol A-i December 00 1 1 1 1 1 1 1 1 0 1 from the drainage area served, under a design head of. feet pool

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

Modeling of Long Culverts and Stormdrains A Comparison of Different Methods

Modeling of Long Culverts and Stormdrains A Comparison of Different Methods Modeling of Long Culverts and Stormdrains A Comparison of Different Methods Shrinivas Kaulgud, P.E., CFM Cheryl Hannan, P.E., CFM, LEED AP October 12, 2017 Presentation Outline Introduction Case Studies

More information

Urban Planning and Land Use

Urban Planning and Land Use Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning

More information

The Basics of Culvert and Inlet Design

The Basics of Culvert and Inlet Design PDHonline Course C619 (8 PDH) The Basics of Culvert and Inlet Design Jerry D. Morrow, PE 2013 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030 6658 Phone & Fax: 703 988 0088 www.pdhonline.org

More information

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By: FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project

More information

JAP Additional Information Sheet

JAP Additional Information Sheet JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide

More information

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004 Roadway Classification Design Standards and Policies Pueblo, Colorado November, 2004 Table of Contents Page Chapter 1. General Provisions 1.1 Jurisdiction 3 1.2 Purpose and Intent 3 1.3 Modification 3

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

Lecture 10 : Sewer Appurtenances

Lecture 10 : Sewer Appurtenances 1 P age Module 8 : Sewer Appurtenances Lecture 10 : Sewer Appurtenances 2 P age The structures, which are constructed at suitable intervals along the sewerage system to help its efficient operation and

More information

Project 184 Preferred Canal Drainage Structure and Release Point Plan

Project 184 Preferred Canal Drainage Structure and Release Point Plan Project 184 Preferred Canal Drainage Structure and Release Point Plan September 2011 Version 5.0 REVISION HISTORY Page Description Date 7 Added Section 5.1 Plan Modifications 09/08/11 9 Modified Table

More information

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION CITY OF TORONTO TRANSPORTATION SERVICES DIVISION 2016 TRAFFIC CALMING GUIDE FOR TORONTO TABLE OF CONTENTS Introduction

More information

Road Design Guidelines for Low Impact to Hydrology *

Road Design Guidelines for Low Impact to Hydrology * Five Counties Salmonid Conservation Program P.O. Box 2819 Weaverville, CA 96093 (530) 623-1351 Ext. 5 FAX (530) 623-1353 email: mlancaster@trinitycounty.org Road Design Guidelines for Low Impact to Hydrology

More information

Dam Modification Report Stingy Run Fly Ash Reservoir Appendix E Spillway System Design Calculations E1: Spillway/Energy Dissipater Design for 100-year Event CHE8273 8 September 4, 2014 Written by: CJW

More information

Big Spring Creek Habitat Enhancement and Fishery Management Plans

Big Spring Creek Habitat Enhancement and Fishery Management Plans Big Spring Creek Habitat Enhancement and Fishery Management Plans November 5, 2012 Big Spring Events and Activities Center Newville, PA Charlie McGarrell Regional Habitat Biologist Pennsylvania Fish and

More information

United States Department of the Interior

United States Department of the Interior United States Department of the Interior FISH AND WILDLIFE SERVICE Virginia Ecological Services Field Office 6669 SHORT LANE GLOUCESTER, VA 23061 PHONE: (804)693-6694 FAX: (804)693-9032 URL: www.fws.gov/northeast/virginiafield/

More information

SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT

SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT NAPA COUNTY, CALIFORNIA PREPARED BY NAPA COUNTY RESOURCE CONSERVATION DISTRICT 1303 JEFFERSON ST. SUITE 500B NAPA, CALIFORNIA 94559 WWW.NAPARCD.ORG

More information

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable

More information

Regional School District #19 Transportation Policy

Regional School District #19 Transportation Policy Regional School District #19 Transportation Policy I. Scope of Policy Many students attending E.O. Smith High School are transported by local boards of education, through written agreements with those

More information

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.

More information

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Recommended Roadway Plan Section 2 - Land Development and Roadway Access Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines

More information

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016 CLOSURE PLAN CFR 257.102(b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio September, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical Engineering

More information

JACKTOWN ACRES FLOOD MITIGATION IMPROVEMENTS ANALYSIS

JACKTOWN ACRES FLOOD MITIGATION IMPROVEMENTS ANALYSIS JACKTOWN ACRES FLOOD MITIGATION IMPROVEMENTS ANALYSIS SITUATE IN: NORTH HUNTINGDON TOWNSHIP WESTMORELAND COUNTY, PENNSYLVANIA PREPARED FOR: North Huntingdon Township 11279 Center Highway North Huntingdon,

More information

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SALUDA HYDROELECTRIC PROJECT FERC PROJECT NO. 516 PROJECT DESCRIPTION EXHIBIT A DECEMBER 2007 Prepared by: SOUTH CAROLINA ELECTRIC & GAS COMPANY

More information

Reams Road RCA Study. Board of County Commissioners Public Hearing

Reams Road RCA Study. Board of County Commissioners Public Hearing Reams Road RCA Study Board of County Commissioners Public Hearing April 24, 2018 Presentation Overview Study Overview Existing Conditions Development of Alternatives Preferred Alternative Public Involvement

More information

Trout Buffer Variance

Trout Buffer Variance Trout Buffer Variance Ashley L. Rodgers, PE Spring 2015 Why a Trout Buffer Capturing pollutants in runoff to keep the water clean. Capturing sediment to keep mud out of the water. Providing shade to keep

More information

ATTACHMENT 5 8, 2013, CESPK-ED-HD

ATTACHMENT 5 8, 2013, CESPK-ED-HD ATTACHMENT 5 October 8, 2013, CESPK-ED-HD Memorandum for Record, HEC-RAS Modeling of the Cumulative Impact of the Corp s Tentatively Selected Project (TSP) and the Proposed SouthEast Connector, Truckee

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

Proposed Reclassification of Muskrat Creek, North Platte River Basin in Goshen County, Wyoming

Proposed Reclassification of Muskrat Creek, North Platte River Basin in Goshen County, Wyoming Proposed Reclassification of Muskrat Creek, North Platte River Basin in Goshen County, Wyoming October 25, 2010 Waterbody: Muskrat Creek - Mainstem of Muskrat Creek from its headwaters downstream to its

More information

Access requests to County streets and roadways are processed through one of the following methods:

Access requests to County streets and roadways are processed through one of the following methods: 13.1 GENERAL APPLICATION PROCESS Access requests to County streets and roadways are processed through one of the following methods: A. Planned Developments may set general locations for access points.

More information

Environmental Review and Permitting for Wild Trout

Environmental Review and Permitting for Wild Trout Environmental Review and Permitting for Wild Trout Tom Shervinskie Wild Trout Summit Watershed Analysis Section August 26, 2017 Division of Environmental Services The mission of the Pennsylvania Fish and

More information

Packwood Lake Intake Screen Velocity Test Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington

Packwood Lake Intake Screen Velocity Test Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington for Energy Northwest's Packwood Lake Hydroelectric Project FERC No. 2244 Lewis County, Washington Submitted to P.O. Box 968 Richland, Washington 99352-0968 Submitted by EES Consulting 1155 North State

More information

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer Washington State Fish Passage Barrier Removal Projects Casey Kramer, PE WSDOT State Hydraulics Engineer 2014 National Hydraulic Engineering Conference Iowa City, IA August 20 th, 2014 WSDOT Fish Passage

More information

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3

More information

Geometric Design Tables

Geometric Design Tables Design Manual Chapter 5 - Roadway Design 5C - Geometric Design Criteria 5C-1 Geometric Design Tables A. General The following sections present two sets of design criteria tables - Preferred Roadway Elements

More information