1 Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202 nd Street is currently an undivided two lane rural roadway that has substantially deteriorated. This project, also referred to as County Project (CP) 50-23, will reconstruct County 50 as a divided two lane roadway with turn lanes at all public street intersections, trails along both sides of the roadway, and a trail underpass just west of Highview Avenue. The project also includes changes to intersection traffic controls at the following intersections: 1. County 50 & Holyoke Avenue (new roundabout) 2. County 50 & Cedar Avenue (new traffic signal) The City of Lakeville has planned for two roadway projects adjacent to CP Those projects include: 1. Hamburg Avenue from County 50 to Lakeville Boulevard City Led 2. Hamburg Avenue from County 50 to 200 th Street West and 200 th Street West from Hamburg Avenue to Cedar Avenue Development Led CP and the City reconstruction project are independent projects, but all are planned for construction in Separate contracts are expected for each of the projects. It may be possible for one contractor to have all three contracts. The reconstruction of Hamburg Avenue (north of County 50) and 200 th Street West will be constructed by development. The reconstruction of 202 nd Street West, 200 th Street West and Hamburg Avenue will provide increased mobility and safety for both current and future residents. Consistent with the City s adopted 2030 Comprehensive Plan and draft 2040 Comprehensive Plan, the City has received several requests for redevelopment of the area surrounding County 50, Highview Avenue, Hamburg Avenue and Cedar Avenue. Below are several developments near CP 50-23: Berres Ridge 4 th Addition approved Hamburg Heights - Preliminary review Linden Ridge Approved Cedar Crossing Preliminary approvals Cedar Landing Final addition approved

2 CP nd Street Reconstruction FREQUENTLY ASKED QUESTIONS 1. What improvements are the County and City proposing for County 50 (202 nd Street West)? As part of the traffic evaluation for 202 nd Street West, the County and City reviewed current and future (2030) traffic volumes for County 50 between Holyoke Avenue and County 23 (Cedar Avenue). For County highway reconstruction, the County uses long range forecasts that are based on the adopted city comprehensive plans to account for planned growth. The traffic volumes for County 50 are shown in Table 1.1: Table 1.1 County 50 Holyoke Ave. to Hamburg Ave. County 50 Hamburg Ave. to Cedar Ave. Existing Traffic Volume* 8,900 6, Future Volume* 13,600 11,900 * Vehicles per day Table 1.2 shows typical volume capacities for 2 and 4 lane roadways with turn lanes. Note that left turn lanes may be beneficial for safety at volumes less than 10,000 vehicles per day: Table 1.2 Roadway Design Volume Range* 2 lane ,000 2 lane (with left turn lanes) Up to 18,000 4 lane (with left turn lanes) 18,000-35,000 * Vehicles per day In early budgeting meetings, the County and City discussed the potential of constructing County 50 as a four lane roadway. As shown above, the projected volumes ultimately did not support the need to construct 4 lanes. The City is in the process of updating its Comprehensive Plan, which guides the future development the traffic projections are based on. While changes are proposed to area land use in the updated plan (2040), the 2040 forecasts for County 50 are expected to be very similar to the 2030 forecasts. Based on this evaluation, the County and City are moving forward with a divided 2 lane roadway with turn lanes. With turn lanes at public roadway intersections, center median, and intersection improvements at Holyoke Ave. and Cedar Ave., the roadway is expected to operate acceptably at least 20 years into the future. For reference, the traffic volumes on the segment of County 50 that 2

3 is currently being expanded to 4 lanes (Kenwood Trail between 185 th Street and Dodd Boulevard) are 18,100 vehicles per day (vpd) between 185 th Street and 192 nd Street and 15,300 vpd between 192 nd Street and Dodd Boulevard. 2. What happens if traffic volumes along County 50 exceed projections? While the County and City do not foresee a 4-lane need by 2040, the improvements are being designed to allow for expansion to a divided 4 lane roadway in the future as easily as possible. To accomplish this, the following design elements have been included: The roundabout at 202 nd Street and Holyoke will be multi-lane in the east/west direction (like Dodd at the Dodd/Highview roundabout) so that future expansion to the east will begin east of the intersection. The storm sewer system is being designed to accommodate the future 4-lanes, including sizing pipes so there will be minimal removal/replacement of the storm sewer system with a future expansion, and sizing ponds to accommodate the 4 lane design. Where possible, trails will be placed to accommodate 4 lane expansion The trail underpass will be sized to accommodate 4 lane expansion Because expected traffic volumes do not require a four lane roadway, the proposed divided two lane roadway is the most cost effective and addresses the needs of the County and City s roadway systems. The two lane design provides less initial upfront costs, and less maintenance costs (pavement overlays, snow and ice control, drainage systems and roadway markings), while safely accommodating expected traffic growth. 3. What is being done at the intersection of County 50 and Hamburg Avenue to improve sight lines? Based on existing sight lines, the County began looking at the option of lowering the entire intersection. The County initially explored lowering the intersection 5-6 feet. After a number of design iterations to ensure safe sight distances, the intersection is now designed to be lowered 11 feet. 4. What type of traffic control is being proposed along the project corridor? a. County 50 & Holyoke Avenue A roundabout is proposed that will have 2 lanes in each direction on County 50 and 1 lane in each direction on Holyoke Avenue. This roundabout will be similar to the existing roundabout at the intersection of County 9 (Dodd Blvd.) and Highview Ave. in Lakeville. b. County 50 & Highview Avenue A side-street stop is proposed at this intersection. Highview Avenue and the entrance to Quigley-Sime Park will stop. County 50 will not. c. County 50 & Heath Avenue A side-street stop is proposed at this intersection. Heath Avenue and the realigned entrance to Aronson Park will stop. County 50 will not. 3

4 d. County 50 & Hampton Avenue Access at this intersection will be limited to a right in, right out with construction of the median on County 50. e. County 50 & Hamburg Avenue As part of the project, this intersection will be lowered to provide improved sight lines for vehicles at the intersection. Current and future traffic volumes (based on expected development in the area) were reviewed. Volumes are not at the level where a roundabout or a traffic signal would be appropriate (see Table 1.3) to maximize mobility and safety at the intersection. A side-street stop is proposed at this intersection as part of this project, with Hamburg Avenue stopping. If future volumes are greater than expected, a traffic signal could be added when traffic conditions dictate. Table 1.3 Intersection County 50 & Hamburg Ave County 50 & Holyoke Ave County 9 (Dodd Blvd) & Highview Ave County 9 (Dodd Blvd) & County 60 (185 th St) County 9 (Dodd Blvd) & Flagstaff Ave Traffic Control Side-street stop Future Roundabout (2v1) Roundabout (2v1) Recent Signal Future Single-lane Roundabout Entering Volume Volume Distribution 8,735 90/10 16,750 59/41 18,325 75/25 16,150 72/28 16,250 61/39 f. County 50 & County 23 (Cedar Avenue) A traffic signal is proposed at this intersection. 5. What does a divided 2 lane roadway mean and how will it impact owners adjacent to the corridor? The proposed project will construct a center median for safety and mobility along the corridor. Turn lanes will be constructed at each public road intersection. For property owners with driveways on County 50, the driveways will have right-in, right-out access. Residents with limited access will be able to use the full access intersections as needed for U-turns. As traffic volumes along county roads increase, mobility and safety of the traveling public tend to decrease. Managing access is one of the most effective ways to reduce the risk of crashes on the County system, so the County has adopted access spacing guidelines to provide for safe access throughout the County roadway system. Per the guidelines, full access intersections (all 4

5 movements allowed) are allowed at ¼ mile spacing and restricted access intersections could be considered at 1/8 mile spacing for roadways like County 50. For residents with direct access to County 50, right-in, right-out movements together with U-turns at intersections provide for safer vehicle movements. To assist with this approach, the County and City are currently reviewing the segment between Hamburg Avenue and Cedar Avenue for a possible intersection location about halfway between Hamburg and Cedar. 6. Will the project require additional right of way from adjacent property owners? If additional right of way is necessary, when will the acquisition process begin? The project will require additional right of way (ROW) from adjacent property owners, including four full acquisitions. The County and City have begun the ROW acquisition process, and the County Board has approved offers for the properties that need to be acquired for both full and partial right of way acquisitions. To provide more time for owners who may be acquired in full and need to be relocated, the County often begins full acquisitions several months sooner than partial acquisitions. The County follows the acquisition process defined by the federal Uniform Relocation Assistance and Real Property Acquisition Act for all property acquisitions. 7. Do the County and City request outside funding for the construction of the project? Are the County and City required to construct certain roadway elements including trails? As part of minimizing costs for the County, City, residents and property owners, the County and City pursue outside funding as it becomes available. Outside funding helps both County and City extend their limited transportation funding to additional projects. The County and City applied for federal funding for CP 50-23, and the project was awarded $3.2 million dollars in federal funding through a competitive Regional Solicitation process that recognized the safety and mobility needs of County 50. The current estimate for construction of CP is $6.5 million. The application request included roadway reconstruction, a trail underpass crossing and trails along both sides of the 202 nd Street. The trails are not a requirement to apply for funding but improve the project competitiveness due to the safety and mobility benefits they provide for non-motorized users. 8. Why are trails included along County 50? It is the County s policy to address all transportation modes with highway projects and to include trails with highway projects in non-rural areas. These policies apply regardless of project funding sources to safely address non-motorized transportation needs. Specific to this segment of County 50, trails and the underpass will help walkers and bikers safely access Aronson and Quigley-Sime Parks along the south side of County 50, and will connect existing trails along County 50 and along Holyoke Avenue with the trail along Cedar Avenue. 9. What will happen with the current cul-de-sac of Hampton Avenue? 5

6 The Aronson Bluff development was approved under the assumption that Hampton Avenue would connect with County 50 with right turn movements only. Hampton Avenue was therefore designed in a way that it could be connected to County 50 once it was reconstructed, knowing that a median would be added to County 50 and that County 50 would need to be lowered to improve sight lines at the Hamburg Avenue intersection. It should also be noted that Hampton Avenue is too long to meet City ordinance for a cul-de-sac, and the connection will allow for more efficient local trips. 10. Is County 50 former State Highway 50? This segment of County 50 was never State Highway 50. Old State Highway 50 followed Holyoke through downtown Lakeville, then 210 th Street/Lakeville Boulevard to downtown Farmington. The segment of roadway addressed by this project was built in 1959 as County Road 64. In 2005, this roadway was designated as County State Aid Highway (CSAH) 50 to reflect how it was being used by the public as part of a more regional east-west route together with County Road 50 west of Holyoke Avenue. 11. How can I stay informed about CP 50-23? The County considers public and agency involvement an important part of the transportation project development and construction, and an engagement plan is developed specifically for each project. For CP 50-23, the engagement plan includes open houses, one on one meetings, and the project website. Throughout the design process, the County and its project partners hold several public open houses to discuss the project. Residents and owners within a half mile radius of the project are typically invited via mailed and/or ed invitations. Often, the County hosts neighborhood meetings for residents and owners adjacent to the project corridor to learn about the project and provide input. The County hosts a project webpage to provide information about the project, any upcoming public meetings and to share current design progress. People interested in project updates can submit a request to the County to be included on the project update list. The project update list continues into construction and is used to provide construction updates. To find the webpage for CP 50-23, please go to: (Search 202 nd Street) The project team anticipates an open house late summer to discuss the project staging and proposed detour routes. Upon the County Board authorizing a construction contract, another open house will be held prior to the start of construction, anticipated for spring

7 Hamburg Avenue Reconstruction 1. The property owners along Hamburg Avenue south of 202 nd Street have requested the City patch or make small repairs to the roadway. Why is the City not making minor repairs but instead reconstructing and urbanizing the roadway? The City s annual pavement management program is designed to maintain/extend the life of public roadways. Best management practices, including roadway patching, have consistently been applied to Hamburg Avenue. Hamburg Avenue, south of 202 nd Street, is at the end of its life, where routine maintenance costs exceed the cost-benefit of the public investment. Hamburg Avenue is programmed to be reconstructed in Hamburg Avenue, north of 202 nd Street, and 200 th Street, east of Hamburg Avenue, will be improved with the next phase of the adjacent Berres Ridge development. The exact timing of these improvements is unknown, but it s possible they could be constructed in Will the City be installing watermain with the Hamburg Avenue projects? Will residents be required to connect? Public watermain will installed in coordination with the Hamburg Avenue Reconstruction project in 2019 to minimize costs. The watermain will serve existing residents and future areas of growth, and assist in reliably meeting daily water demands, consistent with the guidelines of the City s Comprehensive Water Plan. City Ordinance (7-5-2) requires property owners to connect to public water within 24 months after it is extended to serve properties. 3. Will property owners along this segment be subject to special assessments for the roadway and watermain? A portion of the public improvements costs (including streets, sidewalks/trails, curb and gutter, storm sewer and water facilities) will be collected through assessments to benefitting properties along Hamburg Avenue, between 202 nd Street and Lakeville Boulevard. An estimate of the amount to be assessed, including individual assessment costs, will be identified in a future feasibility report. MN Statutes Chapter 429 and the City s adopted Special Assessment policy provide details relating to the public involvement process. City staff will conduct a neighborhood informational meeting with property owners in June Can the residents provide input on the roadway design related to trail/sidewalk location and urban vs. rural? The roadway design will be consistent with State Aid and City standards. Public comments will be collected at the June 2018 neighborhood informational meeting and design details, including trail/sidewalk and urban/rural, will be evaluated in a feasibility report. 7

8 5. What will be done regarding speeding on Hamburg now and once the road is reconstructed? The City s Police Department is responding to speeding concerns along Hamburg Avenue by increasing enforcement and promoting driver attention/speed awareness through temporary installation of the mobile radar trailer. Potential traffic calming strategies will be evaluated in a feasibility report. New Development 1. The City of Lakeville has several new housing developments. What has caused the rise in development? The City is experiencing significant growth along 202 nd Street and Hamburg Avenue. Development is typically driven by multiple factors the economy and location are two examples. 2. When new developments are submitted to the City, does the City complete a traffic study? If so, does it look at traffic volumes and access points along the roadway? Traffic studies are used in transportation planning but are not a requirement of each new development. Traffic impact studies are typically completed when development proposals require Environmental Assessment studies, generate significant traffic volumes or when a requested land use differs from the City s adopted Land Use Plan. Traffic impact studies typically contain several elements, including estimated traffic volumes and proposed access locations. 3. Are new developments subject to special assessments or does the City require an escrow for future roadway improvements? New developments are subject to fees as required by City Ordinance (10-5). To date, developments along Hamburg Avenue have provided approximately $300,000 in escrowed funds (instead of an assessment) that will be applied to the project. 8

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

Fields of St. Croix HOA Meeting. October 27, 2016

Fields of St. Croix HOA Meeting. October 27, 2016 Fields of St. Croix HOA Meeting October 27, 2016 Welcome! Why are we here? Update on Manning Avenue Phase 2 Project: Project Design Schedule Project Background Importance of Manning Avenue: Primary north-south

More information

PROJECT PURPOSE & NEED

PROJECT PURPOSE & NEED PROJECT PURPOSE & NEED Expansion to a four-lane divided highway will address congestion on a critical roadway that provides connections to established industrial parks, significant commercial businesses

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project City of RE 4APNOIPF Vh, X` W\ YII PTC ING, CITY COUNCIL AGENDA REPORT Council Meeting Date: September 26, 2016 To: From: Agenda Item: Honorable Mayor and City Council Members Ron Rosenthal, Engineering

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State

More information

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,

More information

CSAH 101 Preliminary Design

CSAH 101 Preliminary Design CSAH 101 Preliminary Design Public Open House No. 2 January 29, 2013 CSAH 62 to Hutchins Drive Welcome / Introductions Hennepin County Craig Twinem, Transportation Maury Hooper, Transportation Nick Peterson,

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

Building Great Neighbourhoods BONNIE DOON

Building Great Neighbourhoods BONNIE DOON Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

Hennepin County Transportation Department

Hennepin County Transportation Department Hennepin County Transportation Department Complete Streets Design and Implementation Prepared for the Complete Streets Task Force Craig Twinem, P.E. Design Division Manager Tom Johnson, P.E. Transportation

More information

County of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program

County of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program County of Greenville South Carolina Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program (rev) August 2008 I. PURPOSE The potential negative impacts from vehicular traffic

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

Traffic Calming Program Update

Traffic Calming Program Update Traffic Calming Program Update Background Proposed Traffic Calming Program update Objectives Engagement process Project qualification criteria Device toolbox Other updates and considerations BACKGROUND

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Reams Road RCA Study. Board of County Commissioners Public Hearing

Reams Road RCA Study. Board of County Commissioners Public Hearing Reams Road RCA Study Board of County Commissioners Public Hearing April 24, 2018 Presentation Overview Study Overview Existing Conditions Development of Alternatives Preferred Alternative Public Involvement

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL No. 2014-63 DATE: September 5, 2014 TO: Funding & Programming Committee PREPARED BY: Joe Barbeau, Senior

More information

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique

More information

Executive Summary June 2015

Executive Summary June 2015 Executive Summary June 2015 Highway 112 Corridor Study Benton and Washington Counties Executive Summary June 2015 Prepared by Transportation Planning and Policy Division Arkansas State Highway and Transportation

More information

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS INTRODUCTION The thoroughfare plan will assist public officials in the development of a specialized system for efficient and safe movement of vehicular traffic while minimizing potential conflicts with

More information

5.0 Roadway System Plan

5.0 Roadway System Plan Southwest Boise Transportation Study Page 16 5.0 Roadway System Plan The Roadway System Plan outlines roadway improvements in the Initial Study Area. It forecasts future deficiencies on the arterial system,

More information

Chapter 6: Transportation

Chapter 6: Transportation Chapter 6: Transportation I. INTRODUCTION The purpose of the Transportation Plan element of the Comprehensive Plan is to provide guidance to the City of North Mankato, as well as existing and future landowners

More information

Preliminary Engineering Study

Preliminary Engineering Study Preliminary Engineering Study Open House # 2 June 6, 2018 PREPARED FOR: PREPARED BY: Agenda Background and status of preliminary engineering study County Road 26 design summary County Road 63 design summary

More information

Borough of Danville, PA Traffic Calming Program Guidelines

Borough of Danville, PA Traffic Calming Program Guidelines Borough of Danville, PA Traffic Calming Program Guidelines Adopted by Borough Council on 1 INTRODUCTION Speeding Traffic is a major concern in the Borough of Danville because of its detrimental impacts

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY INTRODUCTION City Personnel Sign-in Sheet Comment Forms Please Write Down Any Feedback INTRODUCTION List of Topics for Presentation Study

More information

Living Streets Policy

Living Streets Policy Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create

More information

Mark Malone, P.E. SD DOT

Mark Malone, P.E. SD DOT Mark Malone, P.E. SD DOT SD10 Grading & Surfacing From 8 th Ave W to 8 th Ave E 1 mile plus transition lengths Complete Urban Reconstruction Grading, C&G, Storm Sewer, Sidewalk, Concrete Surfacing Railroad

More information

IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013

IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013 IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013 INTRODUCTION This web page provides information on the Iowa Highway 58 (IA 58) Corridor Improvement Study in Cedar Falls,

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR

More information

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations. The Last Mile Planning for Pedestrians Planning around stations will put pedestrians first. Making walking to stations safe and easy is important; walking will be a part of every rapid transit Accessible

More information

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M. WELCOME - PTH 1 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, 11 4:00 P.M. - 8:00 P.M. PROJECT STUDY AREA 1 Wenzel Street PR 2 Pritchard Farm Farm Road Road McGregor Farm

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

TRANSPORTATION COMMISSION East 19 th St, Harper to O Connell Thursday, March 29, :00 PM City Commission Room, City Hall, 6 E.

TRANSPORTATION COMMISSION East 19 th St, Harper to O Connell Thursday, March 29, :00 PM City Commission Room, City Hall, 6 E. TRANSPORTATION COMMISSION East 19 th St, Harper to O Connell Thursday, March 29, 2018 6:00 PM City Commission Room, City Hall, 6 E. 6th Street AGENDA Public comment related to the meeting topic will be

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue & Public Information Meeting No. 2 Water Street Promenade Maplewood Avenue & Engineering and Design Services Adjacent Areas July 16,2014Portsmouth, NH May 10, 2016 Education / Infrastructure / Innovation

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

City of Moorhead Committee of the Whole Meeting

City of Moorhead Committee of the Whole Meeting City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview

More information

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY 4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas

More information

Water Street Promenade Engineering and Design Services

Water Street Promenade Engineering and Design Services Preliminary Design Presentation Parking & Traffic Safety Committee Water Street Promenade Engineering and Design Services July 16,2014 November 3, 2016 Education / Infrastructure / Innovation 1 Project

More information

Building Great Neighbourhoods QUEEN ALEXANDRA

Building Great Neighbourhoods QUEEN ALEXANDRA Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan Application of a Complete Street initiative and how it might function operationally 8 8 Southbend to Prima Vista October 30, 2017 Presentation Agenda 2 Perspective and History Traffic projections, Levels

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features

More information

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m. FM 1092/Murphy Road Access Management Study Pulic Meeting #1 Wednesday, August 31, 2011 6:00 p.m. 8:00 p.m. Introductions Agency Partners H-GAC Missouri City TxDOT Introductions Consulting Team In Association

More information

CHAPTER 7 ACCESS MANAGEMENT. Background. Principles of Access Management. Hennepin County Transportation Systems Plan (HC-TSP)

CHAPTER 7 ACCESS MANAGEMENT. Background. Principles of Access Management. Hennepin County Transportation Systems Plan (HC-TSP) CHAPTER 7 ACCESS MANAGEMENT Background Principles of Access Management Hennepin County Transportation Systems Plan (HC-TSP) Chapter 7 Access Management 7.1 Background Access management has become an important

More information

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,

More information

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES (Adopted by the Town Council on June 30, 2004) (Revised December 6, 2010) (Revised February 8, 2016) POLICY AND PROCEDURES FOR TRAFFIC

More information

Building Great Neighbourhoods LANSDOWNE

Building Great Neighbourhoods LANSDOWNE Building Great Neighbourhoods LANSDOWNE We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

Safe Routes to School Action Plan Aberdeen, Idaho

Safe Routes to School Action Plan Aberdeen, Idaho Background Aberdeen, Idaho is a largely agricultural community of nearly 2,000 people and is located in the southeast portion of the state on the western edge of American Falls Reservoir. The community

More information

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system Purpose + Need I-29 NW Barry Road 64/68/72 MAIN STREET Connect: < Strengthen the spine of our regional transportation system Leavenworth Road Parallel Parkway State Avenue 18th Street Expressway Shawnee

More information

Application of a Complete Street

Application of a Complete Street Application of a Complete Street Southbend to Prima Vista Update May 14, 2018 Meeting Agenda Perspective and History Public input received Typical sections being considered Presentation of the 2-lane master

More information

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Solana Beach Comprehensive Active Transportation Strategy (CATS) Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element

More information

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years) 12 RECOMMENDATIONS Recommendations are based on the technical analysis of existing and future road and active transportation conditions, the results of the review of existing City policies and public feedback.

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

VILLAGE OF NILES TRAFFIC CALMING POLICY

VILLAGE OF NILES TRAFFIC CALMING POLICY INTRODUCTION There is increasing interest across the country in developing new strategies to reduce the speed and amount of traffic in residential neighborhoods. Measurement of speeds, traffic volumes,

More information

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

5/7/2013 VIA  . RE: University Village Safeway Expansion (P13-019) 5/7/2013 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: University Village

More information

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY I. VISION, GOALS & PRINCIPLES VISION To improve the streets of Portland making them safer and more accessible for all users including pedestrians,

More information

CTH M Reconstruction

CTH M Reconstruction CTH M Reconstruction ID 5992 09 81 City of Madison, South Pleasant View Road (Cross Country Road Prairie Hill Road) CTH M Dane County Public Information Meeting Thursday, May 24, 2012 6 p.m. to 8 p.m.

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

STANLEY STREET December 19, 2017

STANLEY STREET December 19, 2017 STANLEY STREET December 19, 2017 Welcome Mike Wiza, Mayor Scott Beduhn, Director of Public Works Agenda 1. Introduction 2. Existing Roadway Conditions 3. Current Alternative Improvements 4. Summary of

More information

Traffic Calming Policy

Traffic Calming Policy Article I. Purpose and Goal. The purpose of this policy is to establish criteria and procedures the City will use to evaluate requests for, and if appropriate, implement traffic calming measures. Neighborhood

More information

East Burke Transportation, Safety and Capacity Improvements

East Burke Transportation, Safety and Capacity Improvements East Burke Transportation, Safety and Capacity Improvements The purpose of this project is to increase mobility and improve safety for pedestrians, cyclists, and motor vehicles along VT Route 114 in the

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004 Roadway Classification Design Standards and Policies Pueblo, Colorado November, 2004 Table of Contents Page Chapter 1. General Provisions 1.1 Jurisdiction 3 1.2 Purpose and Intent 3 1.3 Modification 3

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

AMATS Complete Streets Policy

AMATS Complete Streets Policy AMATS Complete Streets Policy Table of Contents: Section 1. Definition of Complete Streets Section 2. Principles of Complete Streets Section 3. Complete Streets Policy Section 4. Consistency Section 5.

More information

Residential Traffic Calming Program Guide. Town of Ashland, Virginia

Residential Traffic Calming Program Guide. Town of Ashland, Virginia Residential Traffic Calming Program Guide Town of Ashland, Virginia August 1, 2006 TABLE OF CONTENTS A. INTRODUCTION... 1 B. GOALS... 1 C. CRITERIA... 1 D. IDENTIFYING NEIGHBORHOOD TRAFFIC CONCERNS...

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd. DRAFT PROJECT PAGE July 12, 2007 Main St / Broadway Rd (SR 1579) Project Statement Project Recommendation: From Avent Ferry Rd (NC 42) to the Harnett County line, Broadway Rd/Main St is recommended to

More information

TRANSPORTATION & MOBILITY

TRANSPORTATION & MOBILITY TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines

More information

Classification Criteria

Classification Criteria SCHEDULE D TO RECOMMENDED OFFICIAL PLAN AMENDMENT NO. 40 SCHEDULE C-4 Road Criteria Criteria Traffic Service Objective Land Service/Access Typical Daily Traffic Volume Flow characteristics Travel Speed

More information

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM. City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018 5:00 8:00 PM Region of Waterloo City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018

More information

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections Roadway Cross-Sections Medford s roadway cross-section standards apply to new and reconstructed roads. The crosssections take into consideration roadway function and operational characteristics, including

More information

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2 Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2: Policies and Actions The Bicycle Master Plan provides a road map for making bicycling in Bellingham a viable transportation

More information

PUBLIC HEARING. for State Road (S.R.) 5/U.S. 1 Roundabout at Old Dixie Highway Flagler County, Florida. Financial Project ID No.

PUBLIC HEARING. for State Road (S.R.) 5/U.S. 1 Roundabout at Old Dixie Highway Flagler County, Florida. Financial Project ID No. for State Road (S.R.) 5/U.S. 1 Roundabout at Old Dixie Highway Flagler County, Florida Financial Project ID No.: 441210-1-32-0 1 Welcome to the Public Hearing for State Road (S.R.) 5/U.S. 1 Roundabout

More information

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018 Public Information Meeting Orange Camp Road Dr. Martin Luther King Jr. Beltway to I-4 Presented by: Volusia County August 2, 2018 1 Project Goals To improve the operations and safety for Orange Camp Road

More information

Shore Drive Safety Task Force. Report to the SDAC

Shore Drive Safety Task Force. Report to the SDAC Shore Drive Safety Task Force Report to the SDAC April 20, 2006 Table of Contents Introduction... 3 Section I Safety Recommendations... 5 Section II Communication/Public Involvement Plan... 14 Section

More information

Washington St. Corridor Study

Washington St. Corridor Study FIGURE 7.17 Bridge Alternatives - Cross Sections 86 Discarded Alternative: Short-Term Bridge Repair Short-term repairs and west bridge span replacement were considered during analysis. Short-term repairs

More information

General Design Factors

General Design Factors Chapter 3: 3-1.0 Introduction General Design Factors Mn/DOT s goals include encouraging and accommodating safe bicycling. From a design perspective, these goals are achieved by first having an understanding

More information

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Mineral Avenue Corridor Assessment ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Biography - Aaron Heumann, PE, PTOE Currently City of Littleton Transportation Engineering Manager 24

More information

Double the amount of bicycle ridership while at the same time reducing the number of bicycle crashes by one-third.

Double the amount of bicycle ridership while at the same time reducing the number of bicycle crashes by one-third. CHAPTER 6 Recommended Policies and Action Items To achieve the goals stated in Chapter 1 and guide implementation of the Bicycle Plan, policies and action items have been identified. They are presented

More information

122 Avenue: 107 Street to Fort Road

122 Avenue: 107 Street to Fort Road : 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed

More information

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION CITY OF TORONTO TRANSPORTATION SERVICES DIVISION 2016 TRAFFIC CALMING GUIDE FOR TORONTO TABLE OF CONTENTS Introduction

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington

More information

North Shore Transportation Improvement Strategy

North Shore Transportation Improvement Strategy North Shore Transportation Improvement Strategy Preliminary, Near-term Recommendation 2016 April Transportation Improvement Strategy (TIS) Comprehensive and Analytical A multi-modal transportation strategy

More information

6.4 RECOMMENDED IMPROVEMENTS

6.4 RECOMMENDED IMPROVEMENTS 6.4 RECOMMENDED IMPROVEMENTS 6.4.1 Williston Road Recommendations While all alternatives would be an improvement over existing conditions, Alternative 3B is recommended over the others because it provides

More information

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway

More information

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return Summary: Local return is an important revenue source for cities to maintain their local transportation infrastructure. Most cities use their local return to operate small bus systems and repave streets,

More information

City of Birmingham Draft Multi-modal Transportation Plan

City of Birmingham Draft Multi-modal Transportation Plan City of Birmingham Draft Multi-modal Transportation Plan City Commission Public Hearing Monday, November 25, 2013 7:30 pm Norman Cox, PLA, ASLA The Greenway Collaborative, Inc. Ann Arbor, Michigan The

More information