1 R1500 : Traffic Safety at 25 Avenue and 128 Street Intersection Corporate NO: R1500 Report COUNCIL DATE: May 25, 1998 REGULAR COUNCIL TO: Mayor & Council DATE: April 27, 1998 FROM: General Manager, Engineering FILE: SUBJECT: Traffic Safety at 25 Avenue and 128 Street Intersection RECOMMENDATIONS 1. That Council receive the report on the intersection of 25 Avenue and 128 Street as information. 2. That Council authorize staff to forward a copy of this report to all persons who attended the Engineering Department meetings which were held in relation to this intersection and to all persons who have written to the City with their comments about the subject intersection. 3. That Council direct staff to review the traffic volumes and accident statistics at the intersection of 25 Avenue and 128 Street in two years' time and to apprise Council should any changes be necessary at that time. PURPOSE The purpose of this report is to apprise Council of safety concerns that have been brought to the attention of Engineering Department staff related to the operation of the intersection of 25 Avenue and 128 Street, and to advise Council of actions which are considered reasonable to address these concerns. BACKGROUND Over the past several years, the Engineering Department has received a number of letters and telephone calls concerning safety of pedestrians and motorists at the intersection of 25 Avenue and 128 Street. The attached Figure 1 illustrates the intersection as it currently exists. The following list documents the major concerns which have been raised: Vehicles parked on the west side of 128 Street north of 25 Avenue cause sight line problems for eastbound motorists on 25 Avenue who are attempting to turn left at 128 Street.

2 Motorists on 25 Avenue have difficulty in entering 128 Street due to the volume and speed of traffic on 128 Street. Right-angle (90 degree) parking on the north side of 25 Avenue, immediately west of 128 Street, results in motorists backing out into 25 Avenue traffic and into the subject intersection. The bulb on the north-west corner of the intersection is perceived to create a narrow opening for motorists making the left turn movement from northbound on 128 Street to westbound on 25 Avenue. Northbound motorists on 128 Street pass left turning vehicles at 25 Avenue on the right. This is not permitted where there is crosswalk at the intersection and is especially unsafe when pedestrians are present in the crosswalk across 128 Street on the north side of 25 Avenue. The construction of the new 25 Avenue cul-de-sac on the east side of 128 Street is offset from the west leg of 25 Avenue at the intersection and complicates the intersection. Motorists on 128 Street exceed the speed limit through the school zone for Crescent Elementary School which is located to the south of the 25 Avenue intersection. The relocation of the bus stop on the east side of 128 Street from south of 25 Avenue to immediately north of 25 Avenue is considered to be undesirable since the new location is less convenient for some of the patrons of the transit system who live in the area. School children from the residential development in the vicinity of 24A Avenue on the west side of 128 Street are required to walk north to 25 Avenue then east along 25 Avenue to 128 Street then south along 128 Street to the signalized intersection at 24 Avenue to use the crosswalk at that location to access the Crescent Elementary School. There is currently no sidewalk along the south side of 25 Avenue to the west of 128 Street. There is a crossing guard at the 24 Avenue intersection to assist school children to cross the street. The Engineering Department undertook a review of the intersection about one year ago, in conjunction with the local residents and the conclusion at that time was that of all the options presented and discussed, no option received the support of a majority of residents. While some residents were of the opinion that a rearrangement of parking in the vicinity of the intersection would improve the safety of the intersection, other residents stated that it would not enhance safety but negatively affect the business operation of the grocery store at the corner. Based on the feedback of all concerned, it was decided at that time that no changes would be made to the intersection. The existing configuration of the intersection is shown on Figure 1. Despite the above review and conclusion, the Engineering Department continued to receive letters and phone calls regarding the intersection. In an attempt to work toward a constructive resolution to the concerns, the Engineering Department held an Open House on October 2, 1997, at Crescent Park Elementary School to seek input from the residents. Invitations to the public Open House were delivered to all residents within a two block radius of this intersection. Residents who chose to attend were able to view plans of the intersection and dialogue with Engineering Department representatives who were in attendance. Those attending the Open House were also requested to fill out comment sheets regarding their suggestions with respect to possible improvements to the intersection. A summary of the comments received at the Open House are attached as Appendix A. In response to the input received at the Open House, Engineering Department staff undertook a detailed traffic

3 and pedestrian count at the intersection, traced pedestrian patterns through the intersection, reviewed the accident history for the intersection and prepared a list of possible intersection modifications which were considered to be reasonable. The Engineering Department then arranged a second public meeting which was held at Camp Alexandra at Crescent Beach to which residents within a two block radius of the intersection were invited. The meeting was held at 7:00 p.m. on January 21, 1998, and was attended by approximately 25 to 30 residents. Engineering Department staff made a presentation on: the results of the Open House; the actions taken by the Engineering Department since the Open House; and the modifications which were considered reasonable to make to the intersection to address the concerns of the area residents. The presentation was followed by a question and answer period during which the residents expressed their opinions and concerns with respect to the proposed modifications to the intersection. The general consensus amongst the residents was that the proposed measures were helpful but did not go far enough to alleviate their perceived safety concerns. They felt that the intersection should have either a 4-way stop, a traffic signal, or a pedestrian signal. DISCUSSION The following is a review of various concerns which have been raised in letters to the Engineering Department, in conversations between residents of the area and Engineering Department staff or at meetings arranged by the Engineering Department. Accident Rate The accident history at this intersection indicates that motor vehicle accidents are much lower at this intersection than City-wide averages. Over the past four years, there was approximately one accident per year at this intersection, or an accident rate of 0.4 accidents per million vehicles entering the intersection. This accident rate is considered low. The intersection is not in the top 200 high accident locations in Surrey. It is possible that the intersection operates safely because the level of safety perceived by motorists using the intersection is giving rise to greater caution when driving through the intersection. Sight Lines The sight line distance for eastbound left turning motorists on 25 Avenue at 128 Street is just sufficient to meet the minimum requirement given the speed limit for traffic on 128 Street (65 m based on a 50 km/h speed limit). However, should southbound vehicles on 128 Street exceed the posted speed limit of 50 km/h (outside of the School Zone hours), eastbound left turning vehicles would not have sufficient sight distance to properly judge a safe gap in the 128 Street traffic. An improvement to the sight lines at this intersection would be desirable. The removal of the parallel parking space on 128 Street north of and closest to the intersection of 25 Avenue would be sufficient to improve sight lines for eastbound traffic Parking

4 Approximately 50% of the residents attending the first Open House expressed concern about the on-street public parking around the grocery store. Suggested improvements included: (a) making 25 Avenue parallel parking only' on the north side in place of the current right-angle (90 degree) parking; (b) removing parking on 25 Avenue altogether; and (c) moving the parallel parking on the west side of 128 Street to the north away from the intersection to provide better sight lines. The grocery store in the northwest corner of the intersection has an existing 10 stall parking lot immediately to the west of the store with a driveway off 25 Avenue. This parking lot is not typically used by the patrons of the store. This appears to be due to the layout and location of the parking lot relative to the entrance to the store. The store entrance is at the east end of the store building. Customers to the grocery store generally park in front of the store on 128 Street, on 25 Avenue, and occasionally, on the east side of 128 Street across from the store. Delivery vehicles typically park on 25 Avenue parallel to the curb contrary to other vehicles which are parked at 90 degrees. The owner of the grocery store is not in favour of any change to the on-street parking in the vicinity of the store. Right-angle parking on urban streets is no longer considered to be good design practice relative to motorist safety considerations. It would be possible to reconfigure the on-street parking on the north side of 25 Avenue from right-angle parking to parallel parking only. This parking bay can be extended further west such that the five existing right-angle parking spaces would be converted to 5 parallel parking spaces. This parking layout is shown in Figure 3. Following the public meeting held on January 21, 1998, the Engineering Department received 37 form letters from customers of the grocery store and a follow-up petition including 44 signatures asking that no changes be made to the on-street parking arrangement in the vicinity of the store. Despite the fact that the current parking on-street parking arrangement on 25 Avenue adjacent to the store is not considered desirable, the accident history at this location does not indicate that it is causing a safety problem. Given the fact that there appears to be relatively strong public sentiment to leave the 25 Avenue parking in its current configuration, the Engineering Department is not intending to make any changes to the 25 Avenue parking layout at this time. As mentioned in previous section, a parallel parking space on the east side of 128 Street immediately north of the 25 Avenue intersection should be removed to improve the sight lines at the intersection. Offset Intersection A new cul-de-sac was constructed during the summer of 1997 as the east leg of the intersection. This cul-desac is constructed to half-road standards similar to many others in the City. As a result of the offset, the westbound and eastbound lanes on 25 Avenue on either side of 128 Street are slightly offset from each other. This slight offset is not considered to be a significant problem at the intersection since the volume of traffic using the cul-de-sac will be very small. It is expected that once the cul-de-sac is fully developed it will generate approximately 100 vehicle trips a day or about 10 trips in the p.m. peak hour (i.e., one vehicle every 6

5 minutes during the peak hour). Crosswalk Location A suggestion was made by the residents to relocate the existing crosswalk from the north side of the intersection to the south side or possibly consider installing crosswalks on both sides of the intersection. A traffic count at this intersection indicates 92 pedestrians crossing 128 Street during the afternoon peak period between 3:00 and 6:00 p.m. A trace of these pedestrian movements indicate that 80 out of the 92 pedestrians crossed on the north side of the intersection at the existing crosswalk. Based on the pedestrian surveys at this site, the existing crosswalk on the north side should be retained but it would also be reasonable to install a second crosswalk on the south side of the intersection. Motorists on Northbound 128 Street Passing on the Right Some residents have indicated a concern about northbound motorists on 128 Street passing on the right of left turning vehicles at the intersection. Although this is normally permitted, it is illegal while there are pedestrians present or waiting to cross at the crosswalk at the intersection. To discourage motorists passing on the right at the intersection, the existing concrete curb on the east side of 128 Street which stops at a point approximately 10 metres south of the intersection should be extended to the north so that there is insufficient pavement width at the intersection for northbound motorists to pass on the right. Bus Stops The area in the vicinity of the subject intersection is serviced by three bus routes (#351, 352, and #355) all of which run north and south on 128 Street. There are existing bus stops that are very closely spaced on 128 Street. These are located at 24 Avenue, just north of 24 Avenue, and at 26 Avenue. The typical spacing of bus stops on arterial streets is about 400 m or every two blocks. When the 25 Avenue cul-de-sac was constructed on the east side of 128 Street during the summer of 1997, B.C. Transit requested that a new bus bay be constructed on the northeast corner of this intersection. This was intended to provide for the relocation of the bus stop from a point approximately 75 metres south of 25 Avenue on 128 Street to a more standard location at 25 Avenue. There is a seniors housing complex located on approximately 128A Street and 25 Avenue to the east of the subject intersection. The relocated bus stop is considered by some of the seniors who live in this complex to be more inconvenient than the original location. The typical pedestrian pattern for the seniors to the original bus stop location was to walk south from the complex to the tennis court parking lot and then west through the parking lot to 128 Street. With the relocation of the bus stop to 25 Avenue, there is a more direct access between the seniors complex and the bus stop by means of the new 25 Avenue cul-de-sac. This new route requires the construction of a private walkway on the property on which the seniors complex is located. Engineering Department staff have discussed this with the building manager for the complex. Sidewalks Some residents have indicated a concern for the safety of school children as a result of there not being a

6 sidewalk on the south side of 25 Avenue to the west of 128 Street. Sidewalks in the City of Surrey are installed on a priority system based on estimates of the numbers of pedestrians that may be expected to use any particular sidewalk. Although the point system does not indicate additional sidewalks are required in the vicinity of the subject intersection at this time, the Engineering Department surveys indicate that pedestrian movements are relatively high and users would benefit from an additional sidewalk on the south side of 25 Avenue between 127A Street and 128 Street. The Engineering Department is planning on installing this sidewalk under the City's sidewalk program during the 1998 construction season. The property located in the northwest corner of the intersection of 24 Avenue and 128 Street is proposed for redevelopment. As and when such a redevelopment occurs which will likely occur in the next few years, a pedestrian walkway will be secured such that pedestrians from 24A Avenue west of 128 Street can access the intersection of 24 Avenue and 128 Street directly without having to travel north to 25 Avenue and then back south to 24 Avenue. 4-Way Stop Some residents suggested that a 4-way stop be installed at the intersection of 25 Avenue and 128 Street. Fourway stops are typically installed at intersections where there are (a) similar traffic volumes on all legs, (b) high accident rates, and (c) the intersecting roads are of the same classification. At this intersection, 128 Street is an arterial road while 25 Avenue is a local road. The accident history indicates the intersection has a low accident rate (an average of less than 1 accident per year). The traffic volumes are more than five times higher on 128 Street than 25 Avenue. Given this information, a 4-way stop is not recommended at this location. If a four-way stop were to be installed, long queues (up to 8 vehicles in one direction) would result on 128 Street. The Engineering Department's experience indicates that when long queues form on one street at a 4-way stop intersection without queues on the crossing street, motorists will not perceive a need to stop, and may begin to ignore the stop sign. Such a situation is considered to be hazardous. Traffic Signal Some of the residents in the area have suggested that the installation of a traffic signal at the intersection would improve the safety of the intersection and would act to slow traffic down on 128 Street through the school zone. The installation of traffic signals in the City is based on a recognized warrant calculation. The calculation is based on traffic volumes and the accident history at the intersection. A signal is warranted when a score of 100 points is reached. Based on current traffic volumes and accident rates, the intersection of 25 Avenue and 128 Street achieves a score of 72 points. The signal warrant analysis indicates that a traffic signal or pedestrian signal is not warranted at the subject intersection at this time. Given the existing growth patterns in the area, it is unlikely that this intersection would warrant a signal in the next several years. There are many unsignalized intersections in the City which achieve a higher score and should be considered for signalization ahead of the subject intersection. Traffic Signing It was suggested by some residents that the school zones signs on 128 Street should be moved further away from the school to allow drivers more time to slow to 30 km/h before reaching the school. The Engineering Department agrees with this change. The school zone signs have been moved as requested. In addition to the above, new school zone signs have also been installed on 25 Avenue approaching the subject intersection.

7 STAKEHOLDER COMMENTS Crescent Park Market Engineering staff have spoken with Mr. Philip Chung, owner of the Crescent Park Market. He is opposed to any changes in the on-street parking layout around his store. He is concerned that vehicles unable to access the on-street parking would not likely use the off-street parking in the back which will result in a loss of business. Crescent Housing Society (Kiwanis Village) Engineering staff have spoken with the manager of the Kiwanis Village, the seniors housing complex. The housing manager has advised that the old bus stop location on the east side of 128 Street between 24 and 25 Avenues is preferred but that the extra walking distance is not a major concern. Public Meeting The results of the public meetings related to the subject intersection are covered under the Background Section of this report. PROPOSED ACTIONS Based on a review of the safety of this intersection and in consideration of the comments received, the following actions will be undertaken by the Engineering Department: 1. One parallel parking space on the west side of 128 Street closest to the corner of 25 Avenue will be removed to improve sight lines for eastbound left turning traffic. 2. An asphalt sidewalk will be constructed on the south side of 25 Avenue between 127A Street and 128 Street. 3. Pedestrian crosswalks will be painted on both the north and south sides of the 25 Avenue and 128 Street intersection. 4. The school zone signs on 128 Street will be relocated farther to the north to give motorists more advance notice regarding the need to reduce their speed on 128 Street at the elementary school. 5. New school zone signs will be installed on 25 Avenue approaching the 128 Street intersection. 6. The curb on the east side of 128 Street south of 25 Avenue be extended northwards to 25 Avenue to prevent northbound vehicles from passing on the right. 7. Pursue a long-term pedestrian linkage that would allow pedestrians from the 24A Avenue area directly to access the signalized intersection at 24 Avenue and 128 Street, and avoid the need to use the 25 Avenue and 128 Street intersection (please see Figure 4).

8 Figure 2 showing these proposed works is attached. The Engineering Department will continue to monitor the accident statistics for the intersection and will review the traffic volumes in two years' time. CONCLUSIONS The Engineering Department's studies do not indicate a particular safety problem at the intersection of 25 Avenue and 128 Street. Despite this result, in view of the concerns which have been expressed by the area residents, it is considered reasonable to implement some changes to the intersection. Although the proposed actions may not satisfy all of the stakeholders, they are viewed to be a reasonable compromise between the interests of the residents, the motorists, the pedestrians, and the owner of the grocery store. MJM:brb Attachment Umendra Mital, P. Eng., General Manager, Engineering g:\1998\utilitys\traffic\ mjm WS284 04/27/98 10:06 AM

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,

More information

Traffic Control Signals Cosburn Avenue and Todmorden Lane/ Private Access

Traffic Control Signals Cosburn Avenue and Todmorden Lane/ Private Access REPORT FOR ACTION Traffic Control Signals Cosburn Avenue and Todmorden Lane/ Private Access Date: May 25, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services,

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Traffic Control Signals - Cosburn Avenue and Cedarvale Avenue

Traffic Control Signals - Cosburn Avenue and Cedarvale Avenue REPORT FOR ACTION Traffic Control Signals - Cosburn Avenue and Cedarvale Avenue Date: April 24, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto

More information

122 Avenue: 107 Street to Fort Road

122 Avenue: 107 Street to Fort Road : 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed

More information

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Memorandum. Sunday, July 13, Saturday, July 19, 2014 Memorandum To: David Lowin, Brooklyn Bridge Park Corporation From: Daniel Schack, AICP, PTP Date: Re: Brooklyn Bridge Park Pier 5/6 Loop Road Traffic Study Project No: 14-01-2407 At the request of Brooklyn

More information

Transportation Impacts: Toronto York Spadina Subway Extension

Transportation Impacts: Toronto York Spadina Subway Extension STAFF REPORT ACTION REQUIRED Transportation Impacts: Toronto York Spadina Subway Extension Date: June 6, 2011 To: From: Wards: Reference Number: North York Community Council Director, Transportation Services

More information

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department 28 REGIONAL MUNICIPALITY OF OTTAWA-CARLETON MUNICIPALITÉ RÉGIONALE D OTTAWA-CARLETON REPORT RAPPORT Our File/N/Réf. Your File/V/Réf. 25 23-97-R016 DATE 15 April 1997 TO/DEST. FROM/EXP. SUBJECT/OBJET Co-ordinator

More information

Windy Ridge Elementary School

Windy Ridge Elementary School Windy Ridge Elementary School SCHOOL ROUTE PLAN For WINDY RIDGE ELEMENTARY SCHOOL LOCATION 54 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

Hidden Oaks Elementary School

Hidden Oaks Elementary School Hidden Oaks Elementary School SCHOOL ROUTE PLAN For HIDDEN OAKS ELEMENTARY SCHOOL LOCATION 13 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

Meadow Woods Elementary School

Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 1, 219 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:

More information

ORANGE COUNTY TRAFFIC COMMITTEE. Intersection Control. Constituent. Deepthi Arabolu. Relocate Stop Sign

ORANGE COUNTY TRAFFIC COMMITTEE. Intersection Control. Constituent. Deepthi Arabolu. Relocate Stop Sign ORANGE COUNTY TRAFFIC COMMITTEE SUPERVISORIAL DISTRICT: 3 SUBJECT: Intersection Control LOCATION: Browning Avenue at Rainbow Drive; North Tustin; TB 830-E3 INITIATED BY: INVESTIGATOR: REQUEST: Constituent

More information

EXHIBIT R1. Neighborhood Cul-de-Sac Implementation

EXHIBIT R1. Neighborhood Cul-de-Sac Implementation Neighborhood Cul-de-Sac Implementation The traffic study conducted for the Talaria project analyzed the amount of project traffic expected to use local, residential streets immediately north of the project

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION CITY OF TORONTO TRANSPORTATION SERVICES DIVISION 2016 TRAFFIC CALMING GUIDE FOR TORONTO TABLE OF CONTENTS Introduction

More information

COMMITTEE RECOMMENDATIONS. That Council approve:

COMMITTEE RECOMMENDATIONS. That Council approve: 4. MODIFICATIONS TO INNES ROAD (REGIONAL ROAD 30) AND TENTH LINE ROAD (REGIONAL ROAD 47) TO ACCOMMODATE THE DEVELOPMENT OF THE TRINITY COMMONS SHOPPING CENTRE COMMITTEE RECOMMENDATIONS That Council approve:

More information

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014 Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks Thomas Jefferson Working Group Meeting #6 November 10, 2014 2 3 INTRODUCTION 4 Goal of our work: Identify and assess multi-modal

More information

REPORT. Engineering and Construction Department

REPORT. Engineering and Construction Department REPORT COMMUNITY SERVICES COMMITTEE MEETING DATE: JUNE 11, 2013 FROM: Engineering and Construction Department DATE: May 24, 2013 SUBJECT: Great Lakes Boulevard Mini Roundabout LOCATION: Great Lakes Boulevard

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

NEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE

NEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE The City of Vaughan 2141 Major Mackenzie Drive Vaughan, Ontario Canada L6A 1T1 Tel (905) 832-2281 NEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE REVISED JUNE 2010 APPLICABILITY The Neighbourhood

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

Richmond-Adelaide Cycle Tracks

Richmond-Adelaide Cycle Tracks Public Drop-In Event Richmond-Adelaide Cycle Tracks June 25, 2018 12:00 p.m. 3:00 p.m. 4:30 p.m. 7:30 p.m. Metro Hall, Rotunda 55 John Street 1 Purpose of Event In Scope Communicate an update about the

More information

Traffic Control Signals Review 4325 McCowan Road

Traffic Control Signals Review 4325 McCowan Road REPORT FOR ACTION Traffic Control Signals Review 4325 McCowan Road Date: March 15, 2018 To: Scarborough Community Council From: Director, Transportation Services, Scarborough District Wards: Ward 41 Scarborough

More information

WELCOME PETTIT AVENUE SPEED CONTROL REVIEW NIEGHBOURHOOD OPEN HOUSE. City of Niagara Falls Transportation Services

WELCOME PETTIT AVENUE SPEED CONTROL REVIEW NIEGHBOURHOOD OPEN HOUSE. City of Niagara Falls Transportation Services WELCOME PETTIT AVENUE SPEED CONTROL REVIEW NIEGHBOURHOOD OPEN HOUSE City of Niagara Falls Transportation Services NEIGHBOURHOOD TRAFFIC REVIEW OBJECTIVES A Neighbourhood Traffic Review should be undertaken

More information

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES (Adopted by the Town Council on June 30, 2004) (Revised December 6, 2010) (Revised February 8, 2016) POLICY AND PROCEDURES FOR TRAFFIC

More information

WELCOME Public Information Centre

WELCOME Public Information Centre WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background

More information

180 Grand Avenue, Suite x117 Dowling Associates, Inc.

180 Grand Avenue, Suite x117 Dowling Associates, Inc. 180 Grand Avenue, Suite 250 510.839.1742 x117 Oakland, CA 94612 510.839.0871 fax www.dowlinginc.com mbowman@dowlinginc.com Dowling Associates, Inc. Date: Memorandum To: CC: From: Ms. Leah Greenblat City

More information

2. KING EDWARD AVENUE AND ST. PATRICK STREET - SAFETY IMPROVEMENT

2. KING EDWARD AVENUE AND ST. PATRICK STREET - SAFETY IMPROVEMENT 2. KING EDWARD AVENUE AND ST. PATRICK STREET - SAFETY IMPROVEMENT COMMITTEE RECOMMENDATION That Council approve the construction of the proposed modifications for the intersection of King Edward Avenue

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report Traffic Study of Fuller Street, Cady Street, West Street and West Avenue Final Report July 2005 Prepared for: Town of Ludlow Prepared by: Pioneer Valley Planning Commission 26 Central Street West Springfield,

More information

Orange Center Elementary School

Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Evaluation and Changes to Pedestrian Priority Phase Signal (Scramble Crossing) at Bay Street and Bloor Street

Evaluation and Changes to Pedestrian Priority Phase Signal (Scramble Crossing) at Bay Street and Bloor Street PW2.2 STAFF REPORT ACTION REQUIRED Evaluation and Changes to Pedestrian Priority Phase Signal (Scramble Crossing) at Bay Street and Bloor Street Date: February 12, 2015 To: From: Public Works and Infrastructure

More information

Durrance Elementary School

Durrance Elementary School Durrance Elementary School SCHOOL ROUTE PLAN For DURRANCE ELEMENTARY SCHOOL LOCATION 9 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO.: 10.3 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various traffic and parking modifications on Bay Street

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

Traffic Calming St. Clarens Avenue between Brandon Avenue and Davenport Road

Traffic Calming St. Clarens Avenue between Brandon Avenue and Davenport Road STAFF REPT ACTION REQUIRED Traffic Calming St. Clarens Avenue between Brandon Avenue and Davenport Road Date: February 2, 2012 To: From: Wards: Reference Number: Etobicoke York Community Council Acting

More information

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation

More information

As the Toronto Transit Commission (TTC) operates a transit service on Avenue Road, City Council approval of this report is required.

As the Toronto Transit Commission (TTC) operates a transit service on Avenue Road, City Council approval of this report is required. REPORT FOR ACTION Corridor Safety Review - Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

Edenbrook Hill Drive Traffic Calming Study

Edenbrook Hill Drive Traffic Calming Study WELCOME Public Information Centre Edenbrook Hill Drive Traffic Calming Study Fletchers Meadow Secondary School Wednesday January 20, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming

More information

Traffic Signal Phasing Study Summary & Staff Recommendations

Traffic Signal Phasing Study Summary & Staff Recommendations Traffic Signal Phasing Study Summary & Staff Recommendations Consultant Study by Skipper Consulting, Inc. Staff Committee Recommendations by Randy Pewitt, Executive Director of Emergency Mgt. and Safety

More information

Public Information Centre

Public Information Centre WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City

More information

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project MEMO TO: FROM: Brian McHugh, Buckhead Community Improvement District Jagan Kaja, AICP, WSP Parsons Brinckerhoff SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project DATE: October

More information

Chapter 2: Standards for Access, Non-Motorized, and Transit

Chapter 2: Standards for Access, Non-Motorized, and Transit Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing

More information

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School SCHOOL ROUTE PLAN For MAXEY ELEMENTARY SCHOOL LOCATION 33 ORANGE COUNTY Prepared for:

More information

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013 Sunnybrae Elementary School Walking and Bicycling Audit JUNE 2013 San Mateo-Foster City School District C/CAG City/County Association of Governments of San Mateo County SUNNYBRAE ELEMENTARY SCHOOL WALKING

More information

Clay Street Bridge Replacement Project

Clay Street Bridge Replacement Project Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar Ravine Road. The proposed

More information

Multi-Modal Traffic Analysis. Parisi and Associates

Multi-Modal Traffic Analysis. Parisi and Associates Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table

More information

Seattle Department of Transportation (SDOT) Preliminary Responses to Madison-Miller Community List of Site-Specific Concerns

Seattle Department of Transportation (SDOT) Preliminary Responses to Madison-Miller Community List of Site-Specific Concerns Seattle Department of Transportation (SDOT) Preliminary Responses to Madison-Miller Community List of Site-Specific Concerns Background In July 2002 SDOT staff met with a small group of community residents

More information

Ottawa Beach Road Study

Ottawa Beach Road Study Ottawa Beach Road Study Prepared For: Park Township September 30, 2014 Project No. G140303 OTTAWA BEACH ROAD STUDY PREPARED FOR: PARK TOWNSHIP SEPTEMBER 30, 2014 PROJECT NO. G140303 TABLE OF CONTENTS 1.0

More information

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity

More information

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION 5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION Having held a public hearing, that Council approve the preliminary designs

More information

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation APRIL 2016 A collaborative study between: For Additional Information or to Comment If you would like additional

More information

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Governance and Priorities Committee Report For the July 2, 2015 Meeting CITY OF VICTORIA For the July 2, 2015 Meeting To: Governance and Priorities Committee Date: From: Subject: Brad Dellebuur, A/Assistant Director, Transportation and Parking Services Executive Summary The

More information

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Orleans Gardens Shopping Centre Inc. 2851 John Street, Suite 1 Markham, ON K3R 5R7

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Public Works and Infrastructure Committee. General Manager, Transportation Services

Public Works and Infrastructure Committee. General Manager, Transportation Services STAFF REPORT ACTION REQUIRED Extending the Bay Street Bicycle Lanes Date: May 16, 2013 To: From: Public Works and Infrastructure Committee General Manager, Transportation Services Wards: Toronto Centre

More information

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

CITY OF SAINT JOHN TRAFFIC CALMING POLICY CITY OF SAINT JOHN TRAFFIC CALMING POLICY VERSION: 1.0 April 10, 2012 Pedestrians, Cyclists and Motorists Sharing Street Spaces CONTENTS INTRODUCTION... 3 POLICY GOAL... 3 POLICY OBJECTIVES... 3 GUIDING

More information

Item No. 14 Town of Atherton

Item No. 14 Town of Atherton Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY

More information

County of Spartanburg South Carolina

County of Spartanburg South Carolina County of Spartanburg South Carolina Traffic Calming Program June 2012 (Revised/Program on Hold) PURPOSE The potential negative impacts from vehicular traffic on residential roads have been a longstanding

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

Lake Whitney Elementary School

Lake Whitney Elementary School Lake Whitney Elementary School SCHOOL ROUTE PLAN For LAKE WHITNEY ELEMENTARY SCHOOL LOCATION 18 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

Student Pedestrian Safety Fiddlers Canyon Elementary Community Council 2012

Student Pedestrian Safety Fiddlers Canyon Elementary Community Council 2012 Student Pedestrian Safety Fiddlers Canyon Elementary Community Council 2012 Introduction Fiddlers Canyon Elementary students must cross North Wedgewood Lane and Fiddlers Canyon Drive in order to come to

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various

More information

Recommendations. Central Salem Mobility Study

Recommendations. Central Salem Mobility Study Central Salem Mobility Study The Central Salem Mobility Study evaluated a range of multimodal transportation issues affecting downtown Salem, including circulation, access, and safety for people traveling

More information

POLICY FOR NEIGHBORHOOD TRAFFIC CALMING

POLICY FOR NEIGHBORHOOD TRAFFIC CALMING POLICY FOR NEIGHBORHOOD TRAFFIC CALMING I. STATEMENT OF PURPOSE This policy provides a procedure for the consideration, evaluation and implementation of requests for traffic calming measures. II. DEFINITIONS

More information

5 Transit & Traffic. Overview

5 Transit & Traffic. Overview 5 Transit & Traffic Overview Montgomery Place s roadways and overall traffic circulation are unique in the city due to the narrow streets and avenues with boulevards; however, no sidewalks or curbs in

More information

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Adopted January 6, 2014 Town of Mooresville Development Services Department TOWN OF MOORESVILLE NEIGHBORHOOD TRAFFIC

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

May 5, 2009 File:

May 5, 2009 File: MMM Group Limited Suite 600 1455 West Georgia Street Vancouver, BC V6G 2T3 t: 604-685-9381 f: 604-683-8655 www.mmm.ca May 5, 2009 File: 50-09001-007 1420 1055 West Hastings Street Vancouver, BC V6E 2E9

More information

City of Seattle Edward B. Murray, Mayor

City of Seattle Edward B. Murray, Mayor City of Seattle Edward B. Murray, Mayor Department of Transportation Scott Kubly, Director Eastlake Community Council 117 E Louisa St. #1 Seattle, WA 98102-3278 January 28, 2016 RE: Roosevelt to Downtown

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016 CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016 Item 6, Report No. 38, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan

More information

5 Circulation & Parking

5 Circulation & Parking 5 Circulation & Parking Downtown Parking & Circulation Strategy. Downtown Wayne has a somewhat disconnected system of local public streets to connect downtown with the residential neighborhoods, and primary

More information

TRAFFIC CALMING POLICY NEWTOWN TOWNSHIP DELAWARE COUNTY, PA

TRAFFIC CALMING POLICY NEWTOWN TOWNSHIP DELAWARE COUNTY, PA TRAFFIC CALMING POLICY NEWTOWN TOWNSHIP DELAWARE COUNTY, PA September 2014 1 TABLE OF CONTENTS INTRODUCTION... 3 PURPOSE AND GOALS... 3 DEFINITIONS... 4 APPLICABILITY... 5 ELIGIBLE STREETS... 5 LOCATION

More information

1. Provide a dedicated westbound approach bus lane at the intersection;

1. Provide a dedicated westbound approach bus lane at the intersection; 3. MODIFICATIONS AT HIGHWAY 417 WESTBOUND OFF-RAMP/PINCREST ROAD - PUBLIC HEARING COMMITTEE RECOMMENDATIONS Having held a public hearing, that Council approve the preliminary design for the proposed modifications

More information

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY INTRODUCTION City Personnel Sign-in Sheet Comment Forms Please Write Down Any Feedback INTRODUCTION List of Topics for Presentation Study

More information

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO TRAFFIC ACTION PLAN North Central Neighborhood CITY OF SAN MATEO Draft February 2017 Table of Contents Introduction... 1 The Traffic Forum Process... 4 Neighborhood Traffic Issues... 6 Neighborhood Recommendations

More information

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.

More information

2016 Church Street Access Study. 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY

2016 Church Street Access Study. 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY 2016 Church Street Access Study 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY 13202 www.smtcmpo.org Syracuse Metropolitan Transportation Council Final Report February 23, 2016 This

More information

The Corporation of the City of Sarnia. School Crossing Guard Warrant Policy

The Corporation of the City of Sarnia. School Crossing Guard Warrant Policy The Corporation of the City of Sarnia School Crossing Guard Warrant Policy Table of Contents Overview And Description... 2 Role of the School Crossing Guard... 2 Definition of a Designated School Crossing...

More information

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting 72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME Public Information Meeting Project Goals About the Project The goal of this project is to address congestion along 72 Avenue and adjacent streets

More information

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006 Corporate NO: C012 Report COUNCIL DATE: June 26, 2006 COUNCIL-IN-COMMITTEE TO: Mayor & Council DATE: June 22, 2006 FROM: General Manager, Engineering FILE: 0410-20(MoT/Gate) SUBJECT: Surrey Response on

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

CONTENTS EXECUTIVE SUMMARY 1

CONTENTS EXECUTIVE SUMMARY 1 CONTENTS CHAPTER PAGE EXECUTIVE SUMMARY 1 1 ISSUES AND PURPOSE OF THE ANALYSIS 2 1.1 Background 2 1.2 Analysis Area 2 1.3 Issues and Observations 3 1.4 Project and Public Meetings 3 2 LIST OF PREFERRED

More information

Paris on the Grand Residential Development TIS Response to City of Brant Comments APPROACH LEFT MOE LEFT THROUGH RIGHT

Paris on the Grand Residential Development TIS Response to City of Brant Comments APPROACH LEFT MOE LEFT THROUGH RIGHT Project: 110650 Transportation Planning Transit Planning Glenn Scheels, MCIP, RPP GSP Group 201-72 Victoria Street South Kitchener ON N2G 4Y9 Dear : Traffic Engineering Parking Planning Re: Paris on the

More information

Forest Hills Improvement Initiative

Forest Hills Improvement Initiative Forest Hills Improvement Initiative Transportation Action Plan Short Term Recommendations ONLY Final Draft as of April 30, 2008 For Community Review and Feedback Prepared for: The City of Boston Boston

More information

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation J Street and Folsom Boulevard Lane Conversion Project (T15125400) Before and After Traffic Evaluation Prepared by Transportation Division June 2014 Executive Summary On February 12, 2013, the City of Sacramento

More information

STONY PLAIN ROAD STREETSCAPE

STONY PLAIN ROAD STREETSCAPE Jasper Place Revitalization Strategy: Vision The people involved in the Jasper Place Revitalization Strategy envision: Goal 1: Feeling safe in our community Create a community where feeling safe is common--where

More information

Neighborhood Pedestrian Safety and Traffic Calming Study

Neighborhood Pedestrian Safety and Traffic Calming Study Neighborhood Pedestrian Safety and Traffic Calming Study for the area bounded by Foster Avenue, Bedford Avenue, Farragut Road and Ocean Avenue Flatbush, Brooklyn, New York prepared by Michael King, miking@trafficcalmer.com

More information

WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS

WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS CITY OF LINWOOD ATLANTIC COUNTY, NEW JERSEY March 30, 2006 PREPARED FOR: City of Linwood 400 Poplar Avenue Linwood,

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

DYNAMIC LANES FOR AUCKLAND

DYNAMIC LANES FOR AUCKLAND Dynamic Lanes for Auckland MENEZES M. and INMAN R. Page 1 DYNAMIC LANES FOR AUCKLAND Authors: INMAN, Robert BA (Hons) Previously Auckland Transport Senior Traffic Engineer Now Aurecon Robert.Inman@aurecongroup.com

More information