1 ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT
2 APS and ADA APS is not currently an ADA Standard and is provided at the discretion of the Title II entity APS is recognized in the MnMUTCD, but engineering judgement factors into making a determination on whether or not to provide the accommodation. APS is recognized by the courts as a reasonable accommodation Considered a best practice by the FHWA
3 Why MnDOT Provides APS The Access Board s position demonstrates: APS is viewed as a reasonable accommodation for blind and low vision individuals APS will be included in the final rule for Public ROW The MnMUTCD included APS in advance of the final rule for Public ROW The cost is lowest when provided at the time of signal replacement or when the curb ramp replacement threshold is met Included in Transition plan to limit liability and risk
4 APS Design Considerations Design quadrant first MNMUTCD Criteria MnDOT Criteria Right-of-Way Needs Signal Pole and Cabinet Placement Crosswalk Orientation Plan Format Other design elements: Pork Chops/Islands, Rural APS Design Bumpouts with APS 2
5 MNMUTCD Push Button Criteria 10 ft. minimum button separation 42 in. button height Adjacent to landing 1.5 ft. to 10 ft. from back of curb 5 ft. max offset from crosswalk edge 3
6 Typical Push Button Location Max 4
7 Typical Push Button Location Grass Blvd 5
8 Typical Push Button Location Sidewalk at back of curb (Concrete Blvd) When sidewalk is at the back of curb the push button should be placed toward the back of walk. This improves the MAR and allows the push button to not be in the middle of the walk. 6
9 Typical Push Button Location 7
10 Maintenance Access Route (MAR) A MAR is the minimum clear distance between raised obstacles (i.e. push button stations, signal, lighting or utility poles, buildings, retaining walls, V curbs, hydrants, sign posts, etc.) needed for the mechanical removal of snow and ice. The MAR width is dependent on the anticipated snow and ice equipment utilized 6 for sidewalks and 8 10 for shared use paths. The MAR is only required on the same route as a PAR, does not need to meet 2% cross slope requirements, and should be a paved surface at signalized quadrants. 8
11 MAR & PB Centered on Landing 2 6 Min 9
12 MAR Takes Priority Push Button Offset from Grade Break Min Preferred min Maintain a 6.0 Maintenance Access Route
13 Push Button in Middle of Walk
14 Signal Control Points Push Button Table 0.75 Signal min. Control is the Points distance a PB8-2 push button and PB6-1 can be from a grade break 2 min preferred 12
15 Signal Control Points Push Button Table Landing 4 long ramp designed 6 long ramp constructed 13
16 ROW needs at Signalized Intersections (grass blvds) 14
17 ROW needs at Signalized Intersections (no blvd) 15
18 Signal Pole in Middle of Trail 16
19 Signal Pole in Middle of Ramp 17
20 Signal Pole in Middle of Landing 18
21 Signal Pole in Middle of Landing 19
22 Cabinet in Middle of Walk 20
23 Control Points 21
24 Example APS Intersection 22
25 Example APS Intersection Show all proposed and existing signal components: hand holes, cabinets, push buttons, pedestals, signal poles Must be shown on the ADA detail sheet (20 30 scale) Proposed hand holes should be located outside the PAR 23
26 Floating Crosswalk 24
27 Floating Crosswalk PB2 1 Located on a ramp grade break, too close to the road, adequate MAR? PB2 2 Located in middle of walk Shift Signal Pole 25
28 Floating Crosswalk Offset to crosswalk greater than 5 ft. Crosswalks intersects each other in roadway The distance between buttons will be less than 10 ft. 26
29 Crosswalk Striping Crosswalks shall be striped in a straight alignment between the outside edge of detectable warning, with no kinks unless shown kinked in the plan. 27
30 Detectable Edge Best Practice Mill pavement and/or edge of sidewalk Wayfinding for visually impaired users 28
31 Urban Median Islands 12 min. (measured from back of curb to back of curb) is needed on the short leg to allow enough room to build pedestrian ramps and landings. 29
32 Urban Median Islands Porkchop Islands should have a shared landing with the alignment shown on the left. 30
33 Urban Median Islands 31
34 Rural Pad A rural pad is a depressed corner with no curb and gutter that flows away from the road to the ditch 32
35 Rural Median Islands Typically should be kept rural (flat) so the existing drainage patterns are maintained 33
36 Typical Push Button Placement Combined Directional Ramps with APS typically work well at large bump-outs with compound radii due to the required 10 min. push button (PB) separation needed, and the 2 min. PB setback from grade breaks. 34
37 APS Example Intersection 35
38 APS Example Intersection 36
39 APS Example Intersection 37
40 APS Example Intersection 38
41 APS Hardware & Details Push Button Station Pole Mounting Adaptors Push Button Spacers (Saddle Adaptors) Signal Plan Detail Pedestal Foundation Standard Plate 39
42 Discontinued Push Button Station - Detail 40
43 Discontinued Push Button Station - Detail 41
44 Current APS Push Button Station - Detail MUTCD MnDOT 42
45 APS Push Button Station 43
46 APS Push Button Station 44
47 APS Push Button Station 45
48 APS Push Button Station 46
49 Push Button on Signal Pole The APS push button shall meet the vertical horizontal and crosswalk skew requirements. Height and Reach - 10 max horizontal reach - 42 push button height 47
50 Pole Mounting Adaptor
51 Push Button on Pedestal When a push button is placed on a new or previously existing pedestal pole, the push button shall be installed using 3 APS Push Button Spacers (Saddle Adaptors). 49
52 Saddle Adaptors on Pedestals 2 ½ 50
53 MnDOT Signal Plan Details APS PB Pole Mounting Adaptor & Spacers 51
54 Standard Plate No. 8112I New Pedestal Foundations shall be constructed flush to within ¼ of Landing. 52
55 Push Button on Pedestal Prosecution of Work (ADA) Concrete for new foundation shall be placed either with or after the landing concrete is placed. 53
56 Signal Design Construction Staging 10 Max 54
57 Signal Design Construction Staging Proposed signal poles should be placed behind existing signal poles to allow the existing poles to be active during construction. They should be placed 5 min. away from the existing pole location. Signal pedestal being relocated usually need temporary signal pedestals as to not disrupt vehicular traffic. 55
58 Rectangular Rapid Flashing Beacon (RRFB) Push Button needs to meet all APS requirements including locator tone and audible message Audible message should say: Yellow lights are flashing. Message should be spoken twice For RRFB s, push buttons shall not use vibrotactile indications or percussive indications All push buttons on MnDOT ROW need to be made accessible (not exclusive to RRFB s) FHWA issued interim approval of RRFB effective 3/20/
59 Questions? 57
ADA Operations Contact Info
Intro ADA Operations Contact Info Todd Grugel ph: 651-366-3531 email: todd.grugel@state.mn.us Joe Zilka ph: 651-366-3311 email: joseph.zilka@state.mn.us Harvey Unruh ph: 651-216-2912 email: harvey.unruh@state.mn.us
More informationDesign Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope
Design Overview Section 4 Standard Plans for Design Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group Overview Design Basics Recommendations: The Zone System Driveway Crossings Pedestrian
More informationPreparing a Curb Ramp Project. December 15, 2010
Preparing a Curb Ramp Project December 15, 2010 3 Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans and identifying ramp types at each quadrant Signalized
More informationCHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems
CHAPTER 8 STAKING STAKING Correct staking of traffic control signal or lighting systems is critical to the appropriate placement of system components. 8.1 Traffic Control Signal Systems Locating the components
More informationADA PRESENTATION (CURB RAMPS)
ADA PRESENTATION (CURB RAMPS) ACECNJ/NJDOT/FHWA DESIGN SUMMIT Warren Howard New Jersey Department of Transportation May 21, 2013 ADA Curb Ramps NJDOT wants curb ramps to be designed & constructed properly
More informationSTAKING TRAFFIC CONTROL SIGNAL SYSTEMS
Locating the components of a traffic control signal is not an exact science; many factors influence the location of the components. These factors include: lane widths, radii, pedestrian curb ramp requirements,
More informationADA & Public Rights of Way
ADA & Public Rights of Way Overview of Current and Up-coming Requirements FDOT Design Training Expo 2012 Orlando, FL Dean Perkins, RA - ADA Coordinator Florida Department of Transportation Office of Design,
More informationADA Training Standard Plans
ADA Training Standard Plans SCREEN READABLE VERSION IS IN THE MAKING AND WILL BE MADE AVAILABLE SOON 2018 MnDOT 2 Standard Plans 2017 Overview Overview PROWAG and Curb Ramp Basics Curb Ramp Types ADA Curb
More informationCurb Ramp Guidelines. October Version 1.0
Curb Ramp Guidelines October 2010 Version 1.0 Table of Contents INTRODUCTION... 3 DEFINITIONS... 3 BASIC CURB RAMP COMPONENTS... 4 PEDESTRIAN RAMP TYPES... 6 Selecting ramp types... 7 PERPENDICULAR CURB
More informationADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview
ADA Design Overview Section 2 ADA Design Overview Overview Accessible Pedestrian Signals Alternate Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group 2 Pedestrian Access Route (PAR)
More informationCity of East Grand Forks. ADA Transition Plan. Inventory Manual. June, 2018 DRAFT
ADA Transition Plan City of East Grand Forks Inventory Manual June, 2018 DRAFT ADA Transition Plan City of East Grand Forks Inventory Manual Client City of East Grand Forks Consultant Team SRF Consulting
More informationADA Operations Contact Info
Intro ADA Operations Contact Info Todd Grugel ph: 651-366-3531 email: todd.grugel@state.mn.us Joe Zilka ph: 651-366-3311 email: joseph.zilka@state.mn.us Harvey Unruh ph: 651-216-2912 email: harvey.unruh@state.mn.us
More informationDesigning Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions
Module 3 & Other Purpose: Allow pedestrians to transition between the street and sidewalks, islands, etc. Typically installed at: Intersections (1 ramp at each end of each crosswalk) Mid-block crossings
More informationAccommodating Pedestrians in the Work Zone
Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,
More informationCHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS
CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...
More informationDesigning Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones
Designing Pedestrian Facilities for Accessibility Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in s Maintenance of Accessible Features Title II (28 CFR 35.133(a))
More informationADA on Construction. Guidance for Section C Plan Preparers
ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize
More informationCitywide Sidewalk and Crosswalk Programs
Citywide Sidewalk and Crosswalk Programs Council Meeting October 20, 2015 Presented by Rita Hu and Jamal Mahmoud Program Goals Implement the City s comprehensive plan. Provide pedestrian with safe walking
More informationDISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual
DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.
More informationPROWAG/ADAAG Standards Guidance For Temporary Pedestrian Access Route (TPAR) Facilities and Devices
INTRODUCTION: PROWAG/ADAAG Standards Guidance For Temporary Pedestrian Access Route (TPAR) Facilities and Devices Minnesota Department of Transportation DRAFT Document DRAFT This document was developed
More informationDesigning for Individuals who are visually impaired or blind
Designing for Individuals who are visually impaired or blind Janet M. Barlow Accessible Design for the Blind NACTO Designing Cities Conference October 25, 2012 What do we mean by visually impaired or blind?
More informationCOMPLETE STREETS DURING CONSTRUCTION
COMPLETE STREETS DURING CONSTRUCTION MAINTAINING ACCESSIBILITY FOR ALL Presented by Robbie Burgess, P.E., PTOE Associate Principal Construction Services Manager Howard Stein Hudson rburgess@hshassoc.com
More informationDesigning Accessible Traffic Signals
Designing Accessible Traffic Signals Adam Allen, P.E., TSOS ADA Compliance Crackdown Draft Public Rights of Way Accessibility Guidelines (PROWAG) 2009 Manual on Uniform Traffic Control Devices (MUTCD)
More informationRoute 47 (North Main Street) Reconstruction
TOWN OF SUNDERLAND Route 47 (North Main Street) Reconstruction Presented by Lou Rabito, P.E. Presented to Town of Sunderland June 11, 2018 Project Overview MassDOT Project No. 607245 Resurfacing and Related
More informationDesigning for the Visually Impaired
Designing for the Visually Impaired Melanie White Janet M. Barlow Environmental Access Committee Orientation and Mobility Division Association for Education and Rehabilitation of the Blind and Visually
More informationPEDESTRIAN CROSSING TREATMENTS
PEDESTRIAN CROSSING TREATMENTS BEST PRACTICES Presented by: Doug Enderson, P.E., PTOE Cody Salo, P.E. 1 PRESENTER INTRODUCTIONS Doug Enderson, P.E., PTOE Ped Crossing Experience: ADA Design-Build ADA Inventory
More informationStandards vs. Guidelines. Public Right-of Way Accessibility Guidelines (PROWAG)
www.access-board.gov Public Right-of Way Accessibility Guidelines (PROWAG) Juliet Shoultz, P.E Transportation Systems Engineer US Access Board Standards vs. Guidelines Guidelines are developed by the Access
More informationCity of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY
4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after
More informationField guide for Accessible Public Rights-of-Way Edition
Field guide for Accessible Public Rights-of-Way 2017 Edition CONTENTS PEDESTRIAN FACILITIES IN THE PUBLIC RIGHT-OF-WAY Pedestrian access routes 3 Components 3 Continuous width 3 Median and pedestrian refuge
More informationAPPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES
APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES 092775000 Carson City ADA Transition Plan 2015-03-25 Carson City ADA Transition Plan.docx March 2015 APPENDIX This page intentionally left blank.
More informationROADWAY AND PARKING DETAILS TYPICAL STREET SECTIONS PRINCIPAL ARTERIAL NOT TO SCALE
NOTES: O:\Division Information\Engineering\Documents\Engineering and Construction\COMMERCE CITY\CAD files\2016 Updated Files\307-01 thru 307-09 (Roadway & Parking Typical Sections).dwg 6' SIDEWALK MAY
More informationPaul Vraney Bureau of Project Development 02/11/2016
Paul Vraney Bureau of Project Development 02/11/2016 ADA background & alterations definition Design considerations Provide sufficient layout data Curb ramp selection Maximum curb ramp and gutter slopes
More informationC. Brian Shamburger, P.E., PTOE Kimley-Horn and Associates, Inc. State of Texas Registered Firm #928
TECHNICAL MEMORANDUM To: From: Mr. Douglas G. Williams Director Transportation Services Texas A&M University C. Brian Shamburger, P.E., PTOE Kimley-Horn and Associates, Inc. State of Texas Registered Firm
More informationOff-road Trails. Guidance
Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along
More informationADA* for Roadway Design
ADA* for Roadway Design Incorporating PROWAG** * Americans with Disabilities Act ** Public Rights of Way Accessibility Guidelines Title II of the ADA requirements for pedestrian facilities within public
More informationDesign Considerations
Design Manual Chapter 13 - Traffic Signals 13D - Design Considerations 13D-1 Design Considerations In addition to basic MUTCD requirements, the safe and efficient operation of a signalized intersection
More informationRC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found
RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found on Sheet 1. RC-67M note Construct curb ramps with a minimum
More informationActive Transportation Facility Glossary
Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike
More informationDesigning Pedestrian Facilities for Accessibility
Designing Pedestrian Facilities for Accessibility Laws, Regulations and Pedestrian Characteristics John H. Miller, PE - FHWA ACECNJ/NJDOT/FHWA 2013 DESIGN SUMMIT Legal Background Architectural Barriers
More informationSCOPE Application, Design, Operations,
SCOPE Application, Design, Operations, Maintenance, etc.: Typical Traffic Control Signals Pedestrian Hybrid Beacons Emergency Vehicle One-Lane/Two-Way Facilities, Freeway Entrance Ramps, and Movable Bridges
More informationAccessible Sidewalk Requirements
Accessible Sidewalk Requirements A. Introduction 12A-2 Design Manual Chapter 12 - Sidewalks and Bicycle Facilities 12A - Sidewalks SUDAS and Iowa DOT jointly developed this section based on the July 26,
More informationAppendix 3 Roadway and Bike/Ped Design Standards
Appendix 3 Roadway and Bike/Ped Design Standards OTO Transportation Plan 2040 4/20/2017 Page A3-1 Adopted Standards The adopted OTO Design Standards and Major Thoroughfare Plan are contained herein.
More informationAmericans with Disabilities Act and Curb Ramps
Americans with Disabilities Act and Curb Ramps Katherine Smutzer Standards Engineer, INDOT Purdue Road School Wednesday March 9, 2016 Two Items to Remember All curb ramps, sidewalks and sidewalk driveway
More informationScenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access.
Scenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access. For the following slides assume an overlay project and provide pedestrian
More informationGEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION
TABLE 1A CG-6 CURB AND GUTTER SECTION HORIZONTAL AND VERTICAL CONTROLS CURB AND GUTTER ROADWAYS MAXIMUM 3:1 CUT OR FILL SLOPE CURVE DATA MIN. SIGHT DISTANCE PROJECTED TRAFFIC VOLUME (ADT) MIN. DESIGN SPEED
More informationPedestrians and Bicyclists. Bruce Friedman and Scott Wainwright FHWA MUTCD Team
Impact of the New MUTCD on Pedestrians and Bicyclists Bruce Friedman and Scott Wainwright FHWA MUTCD Team Development of the 2009 MUTCD NPA published in the Federal Register on January 2, 2008 Received
More informationFigure 3B-1. Examples of Two-Lane, Two-Way Marking Applications
Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones
More informationRevisions to Larimer County Urban Area Street Standards (2016 Update)
1.9.2 B 1-18 Street Construction Policy 1.14 (new) 1-29 Complete Streets in Fort Collins 4.1.1 04-01 General 4.1.3 04-01 Capacity and Safety Issues 4.1.3 B 04-02 Pedestrian Traffic Considerations 4.1.4
More informationCITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY
CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY Preliminary Recommendations October 2018 2014 HDR, Inc., all rights reserved. PROJECT BACKGROUND WALKING AUDIT FINDINGS PROPOSED IMPROVEMENT CONCEPTS
More informationREVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE
Development Engineering 300 Richards Blvd., 3rd Floor Sacramento, CA 95811 Engineering Services Division REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE Phone: 916-808-8300 Fax: 916-808-1984 Preparation
More informationDriveway Design Criteria
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved
More informationINDEX. Geometric Design Guide for Canadian Roads INDEX
Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines
More informationR A M P U P! - City of Tacoma's Curb Ramp Installation Matrix
R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix DESCRIPTION OF WORK NEW CONSTR. ALTERATION MAINT. COMMENTS STREET PAVING New street paving or overlay through an intersection (Figures 1 &
More information12A Accessible Sidewalk Requirements. 12A Protruding Objects
TOC Design Manual Chapter 12 - Sidewalks and Bicycle Facilities Table of Contents Table of Contents Chapter 12 - Sidewalks and Bicycle Facilities 12A Sidewalks 12A-1---------------------------------General
More informationPBIC Webinar. Accessible Pedestrian Signals [IMAGE] March 11, 2014, 2 pm
PBIC Webinar Accessible Pedestrian Signals [IMAGE] Daniel Carter, Snr. Research Associate, UNC Highway Safety Research Center Janet Barlow, President, Accessible Design for the Blind March 11, 2014, 2
More informationTraffic Engineering Update on Bike/Ped Topics. Marc Lipschultz, P.E. PTOE Central Office Traffic Engineering Division
Traffic Engineering Update on Bike/Ped Topics Marc Lipschultz, P.E. PTOE Central Office Traffic Engineering Division Bicycle/Pedestrian Advisory Committee August 3, 2016 Agenda Share the Road / Bikes May
More informationTransportation Planning Division
Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving
More informationField guide for Accessible Public Rights-of-Way Edition
Field guide for Accessible Public Rights-of-Way 2015 Edition BRIEFING MEMO SUBJECT: Department of Justice/Department of Transportation Joint Technical Assistance on Title II of the Americans with Disabilities
More informationCrosswalk Policy Revisions & Pedestrian & Bicycle Connection Plans. Presentation to Sanibel City Council July 16, 2013
Crosswalk Policy Revisions & Pedestrian & Bicycle Connection Plans Presentation to Sanibel City Council July 16, 2013 Outline Crosswalk Policy Revisions Minimum Standards Goals and Objectives Pedestrian
More informationWhat Is a Complete Street?
Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for
More informationPROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE
PROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE A.1 STANDARD Measures shall be taken to accommodate pedestrian traffic through and/or around Work Zones for Construction
More informationComplete Streets Design Considerations. Second Street Corridor Complete Streets Workshop and Assessment Manchester, NH April 26, 2013
Complete Streets Design Considerations Second Street Corridor Complete Streets Workshop and Assessment Manchester, NH April 26, 2013 2 nd Street Existing Information Average Annual Daily Traffic Volumes
More informationMUTCD Part 6D: Pedestrian and Worker Safety
MUTCD Part 6D: Pedestrian and Worker Safety Section 6D.01 Pedestrian and Worker Safety The needs and control of all road users (motorists, bicyclists, and pedestrians) within the highway, including persons
More informationThis Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.
4.1 GENERAL This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. These Roadway Standards are for new construction and modification
More informationAlberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999
Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,
More informationPEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS
PEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS Traffic Safety Engineering Division Updated: April 2018 EXECUTIVE SUMMARY NDOT Traffic Safety Engineering Division developed
More informationChapter 5: Crossing the Street
Chapter 5: Crossing the Street Whether walking or bicycling, a student s journey to school will more than likely require crossing one or more streets. Per the Safe Routes to School Guide, maintained by
More informationNOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG
NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG NOT TO SCALE PUBLIC WORKS STANDARD DETAILS SIDEWALK RAMPS DATE: MARCH 2013 FILE NAME: SIDEWALK RAMPS.DWG NOT
More informationAmericans with Disabilities Act Transition Plan for Public Right-of-Way Improvements
Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3
More informationScoping and Design Considerations for APS and ADA Curb Ramps. Adam Tyra, PE INDOT Greenfield District Traffic
Scoping and Design Considerations for APS and ADA Curb Ramps Adam Tyra, PE INDOT Greenfield District Traffic Background and Perspective Scoping and Asset Management for traffic signals for INDOT s Greenfield
More informationHennepin County Pedestrian Plan Public Comment Report
Hennepin County Pedestrian Plan Public Comment Report On May 31, 2013, the draft Hennepin County Pedestrian Plan was released for a 45-day public comment period ending July 15, 2013. The county received
More informationCalifornia Manual on Uniform Traffic Control Devices
California Manual on Uniform Traffic Control Devices FHWA s MUTCD 2009 Edition as amended for use in California 2012 Edition State of California Business, Transportation and Housing Agency Department of
More informationCONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS
'HYHORSPHQW (QJLQHHULQJ 5LFKDUGV %OYG UG )ORRU 6DFUDPHQWR &$ Phone: 916-808-8300 Fax: 916-808-1984 (QJLQHHULQJ 6HUYLFHV 'LYLVLRQ CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS
More informationGuidance for Installation of Pedestrian Crosswalks on Michigan State Trunkline Highways
Guidance for Installation of Pedestrian Crosswalks on Michigan State Trunkline Highways Michigan Department of Transportation July 7, 2014 Engineering Manual Preamble This manual provides guidance to administrative,
More informationATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION
ATTACHMENT NO. 11 RRLRT No. 2 TECHNICAL COMMITTEE: TOPIC: Railroad / Light Rail Transit Technical Committee Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014
More informationDowntown Signals Traffic Analysis
Downtown Signals Traffic Analysis City of St. Mary s April 16, 2018 Presented by: Allan Heitbrink, P.E. & Craig Eley, P.E. Who We Are Craig Eley, P.E o o o Previously the ODOT D7 Traffic and Safety Engineer.
More informationSIGN PLACEMENT-ELEVATION VIEW: FREEWAY (FORESLOPE) ROADSIDE SIGN LOCATIONS & SUPPORT SPACING MICHIGAN DEPARTMENT OF TRANSPORTATION (MIN.
3' HINGE POINT EACH POST (TYP) (MIN.) (SAW CUT OR FUSE PLATE) EDGE OF FORESLOPE 4" STEEL COLUMN 6" WOOD POST THRU TRAVELED 7'MIN. SHOULDER LATERAL OFFSET (FORESLOPE) (VARIABLE) BREAKA POSTS THE LATERAL
More informationProposed Language as approved by the NCUTCD on June 23, 2011, for new section on Pedestrian Channelizing Devices
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 Proposed Language as approved by the NCUTCD on June 23, 2011, for new section on Pedestrian Channelizing
More informationITE Wayfinding Workshop, Oct , 2004
ITE Wayfinding Workshop, Oct. 23-24, 2004 Japan, 1967-- --the first country to use warning and guidance surfaces to provide location and direction information. Dot tiles at curb-ramps, ramps, blended curbs,
More informationSTEP. Rectangular Rapid Flashing Beacons. Safe Transportation for Every Pedestrian
STEP Safe Transportation for Every Pedestrian Rectangular Rapid Flashing Beacons Duane Thomas, Federal Highway Administration Megan McCarty Graham, Toole Design October 30, 2018 Housekeeping Problems with
More informationF L E T C H E R A V E N U E
Jan. 29, 2014 Introduction F L E T C H E R A V E N U E FDOT Local Agency Program (LAP) Project FPN: 428214-1-58-01 CIP 63090 Hillsborough County, Traffic Engineering, PWD Stake holders and partners are
More informationDerby Street. Project Updates. Salem, Massachusetts
Derby Street Project Updates Salem, Massachusetts September 13, 2017 Project Limits Derby Street Project Objectives 1. Improve complete streets elements on Derby Street 2. Improve sidewalks on finger streets
More informationCity of Vallejo Traffic Calming Toolbox
City of Vallejo Traffic Calming Toolbox June 1, 2013 Final Table of Contents Introduction... 1 Non-Physical Devices... 3 High-Visibility Crosswalk... 3 In Pavement Lighted Crosswalk... 4 Rapid Flashing
More informationSection 4: Inventory Methodology and Findings
Section 4: Inventory Methodology and Findings Section 4.1: Purpose and Summary of the Inventory Effort The purpose of the inventory is to show a baseline of existing pedestrian facilities in the City of
More informationSRTS IMPLEMENTATION COSTS
SRTS IMPLEMENTATION COSTS What Is a Estimate? A cost estimate establishes the anticipated budget required to implement the actions (the improvement projects and programs) identified in your School Travel
More informationS.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project
Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library
More informationComplete Streets and the Americans with Disabilities Act (ADA) Jennifer E. Ruley, PE Active Transportation Engineer Louisiana Public Health Institute
Complete Streets and the Americans with Disabilities Act (ADA) Jennifer E. Ruley, PE Active Transportation Engineer Louisiana Public Health Institute Important Video What words apply here? For either initiative
More informationBroad Street Bicycle Boulevard Design Guidelines
Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified
More informationADA Technical Frequently Asked Questions
ADA Technical Frequently Asked Questions 1. What is the correct way to select and label curb ramp types using the Standard Construction Details?... 2 2. When do you label a curb ramp as modified (e.g.
More informationAPPENDIX D COST SUMMARY TABLES
APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to
More informationTask 4 Wayfinding Elements, Placement and Technical Guidance 4.1 Wayfinding Elements
1836 Blake Street Denver, CO 80202 720.524.7831 ww.altaplanning.com MEMO 3 Task 4 Wayfinding Elements, Placement and Technical Guidance 4.1 Wayfinding Elements Based on field reconnaissance, best practices
More informationSteps to Conducting a Complete Streets Assessment
Steps to Conducting a Complete Streets Assessment Familiarize yourself with Complete Streets Read through the Complete Streets Assessment Guidelines. This will give you an idea of what Complete Streets
More information10.0 CURB EXTENSIONS GUIDELINE
10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services
More informationA. Arlington County Master Transportation Plan Pedestrian Element B. Arlington County Horizontal Standards H-3.1 Driveway Entrances
GENERAL 1. Description This standard identifies minimum requirements that shall be met for all accessible ramps in the design and construction of elements for Arlington County Horizontal Design Standards.
More information12A Accessible Sidewalk Requirements
TOC Design Manual Chapter 12 - Sidewalks and Bicycle Facilities Table of Contents Table of Contents Chapter 12 - Sidewalks and Bicycle Facilities 12A Sidewalks 12A-1---------------------------------General
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More informationComplete Streets Funding Program Project Prioritization Plan
Funding Program Project Prioritization Plan Location and Type Needs South Street Crosswalk Installation Stripe a new formalized crosswalk across South Street at the Anne T. Dunphy School pedestrian path
More informationCHAPTER 1 STANDARD PRACTICES
CHAPTER 1 STANDARD PRACTICES OBJECTIVES 1) Functions and Limitations 2) Standardization of Application 3) Materials 4) Colors 5) Widths and Patterns of Longitudinal Pavement Marking Lines 6) General Principles
More informationPedestrian Safety at Roundabouts
Countermeasure Strategies for Pedestrian Safety Pedestrian Safety at Roundabouts Hillary Isebrands Federal Highway Administration January 6, 2016 Today s Presentation Introduction and housekeeping Audio
More informationMemorandum MAR or in part.
Interim U.& Department of Transportation federal Highway Administration Memorandum Correction issued 3/21/2018 Subject: - INFORMATION: MUTCD Approval for Optional Use of Pedestrian-Actuated Rectangular
More information