Newcastle Racecourse Masterplan. 1 Introduction. Completing the vision of a redeveloped Newcastle Racecourse Welcome to our exhibition.

Similar documents
Living Streets response to the Draft London Plan

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

CUERDEN TRANSPORT PROPOSALS

Your views are important. Please fill in a form before you leave. Or alternatively

Press centre and Broadcast centre

The boards contain our dra Vision & Objec ves for Danbury.

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION

Part B Design Guidance / Principles _

This report provides an overview of all the feedback received, key themes which emerged and the actions Grenadier will take in response.

Delivering the. Strategy 7.0

connectivity through walking and cycling

ABERDEEN: CITY OF THE FUTURE

AN INVITATION TO BECOME A SPONSOR OF

Nottingham Cycle City Frequently Asked Questions

CAMBRIDGE SOUTH WEST PARK & RIDE

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

Yorkhill & Kelvingrove Community Council Cycling Village Proposal. Yorkhill Kelvingrove Cycling Village (1.3)

HISTON ROAD Have your say on better public transport, cycling and walking journeys

Bulwell Cycling Consultation

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

East Molesey Cricket Club. Formal application/proposal to develop a Second Pitch for the EMCC on Hurst Meadow

Tonight is for you. Learn everything you can. Share all your ideas.

Comments The Plan for Port Whitby

Hopkins Architects. University of Nottingham. University Park Campus Masterplan Strategy. 13 th February 2009

London Prepares. series

HORNDEAN BREWERY, LONDON ROAD. The site has stood vacant since operations were. Homes, has now contracted to purchase the

DOWNTOWN TENINO. Goal: Get more People in Downtown. A Pamphlet of Concepts for

Congupna Community Plan Steering Committee (CCPSC) Greater Shepparton City Council (GSCC) CCPSC GSCC VicRoads CCPSC GSCC. CCPSC GSCC VicRoads

Blyth Estuary Green Travel Project

Application for seed funding for the North Roscommon Greenway

ENFIELD TOWN THE REVISED DESIGN

Phone: Ref No: 06/2018/0884

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

Warfield Neighbourhood Plan: 4.4 Infrastructure

University of Leeds Travel Plan

Frome Street Bicycle Route

Much Wenlock Neighbourhood Plan Land and Premises Availability Assessment

31. Rosses Point Mini-Plan

CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES

LIVERPOOL ARENA COMPLEX PARTNERSHIP OPPORTUNITIES

Ann Arbor Downtown Street Plan

Evaluating a Cycling Strategy

transport consultancy Stadia & Venues

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

Draft Greater Sydney Region Plan

Active Travel Strategy Dumfries and Galloway

Pullman National Monument. TAC/CAC August 22, 2016

North Coast Corridor:

Background paper (Local Government Act 1972 Section 100D)

TRANSPORTATION NEEDS ASSESSMENT

The following tables summarise the actions identified through the Assessment of Needs and Opportunities work and the consultation with key partners.

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

UNDERSTANDING WALKING NETWORKS TO ENABLE SMARTER CHOICES IN TRANSPORT PLANNING IN DUNDEE. Gillian Iversen Atkins

OPEN HOUSE WELCOME Bronte Village Growth Area Review

9. Parking Supporting Statement

Introduction. Prince Street Cycling Ambition Fund Public Realm Project

North West Non-Technical Summary of the Transport Assessment September 2011

Bristol City Council has produced a draft Bristol Transport Strategy document.

Draft MOBILITY ELEMENET. Community Meeting May 22, 2013

M6 Junction 10 Public Consultation

Sandwell General Hospital Travel Plan 2014

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

Appendix C 3. Bicycle / Pedestrian Planning

BYRES ROAD: PUBLIC REALM Public Consultation

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

PONTELAND RUGBY FOOTBALL CLUB

John Muir Discovery Level 1 Award

20mph Speed Limit Trial Warrington Borough Council. Mark Tune Traffic Management & Road Safety Manager

Sustainable Mobility in Greater Sudbury NeORA Conference September 25, 2012

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Transportation Master Plan Advisory Task Force

Standing Committee on Policy and Strategic Priorities. Mount Pleasant Industrial Area Parking Strategy and Access Improvements

DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS Peer Chacko, AICP, Assistant Director, City of Dallas

Bringing projects to life

CHAPTER 7.0 IMPLEMENTATION

SIGNS - RULES Signs - Rules Structure of the Rules Section Activities Discretionary Activities

CHRISTCHURCH AND EAST DORSET Local Plan Review Options Consultation Response Form

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

MARKHOUSE ROAD IMPROVEMENTS

QLDC Council 29 October Report for Agenda Item: 3

Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016

2.0 Ballpark District

Bentleigh GLEN EIRA COUNCIL TRANSFORMATIONAL CONCEPTS 15

Marlow FC Founded 1870

ADDRESS TO THE FOUNDATION FOR SCIENCE AND TECHNOLOGY JULY 9

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008

TRANSPORT AND MOVEMENT

Milton Road Project Update. Paul van de Bulk 30 January 2018

Report to Cabinet. 18 May 2016

Design Workshops Summary of all Feedback January 2017

2. Context. Existing framework. The context. The challenge. Transport Strategy

Active Transportation Infrastructure Investment A Business Case

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Welcome! Public Open House on UBC s Transportation Plan

Transcription:

1 Introduction Completing the vision of a redeveloped Newcastle Racecourse Welcome to our exhibition. Please take a look at our information boards and feel free to ask members of the project team any questions you have about our plans. The proposals include a new circa 3,500sqm event centre, an outdoor hospitality area and public open space, and the refurbishment of listed buildings on site to maintain them for the long term so as to improve the overall environment within the racecourse area. In order to help us fund particularly the new events centre, we will also be proposing some residential accommodation within close proximity to the existing buildings on the racecourse. Aerial map showing site boundary to be included in the planning application (Map data 2016 Google) Today s Event We are preparing a planning application and asking for comments. We are excited about our plans and we hope you are too. We have made a commitment to keep the local community updated and listen to feedback on the proposals. This event is part of us keeping this promise, by giving local people an opportunity to find out more about our vision for Newcastle Racecourse and comment on the plans. Artist s impression of how the new events centre could look Arena racing Artist s impression of how the new events centre could look

2 ARC s Vision Our journey so far... Bringing world class racing to Newcastle Newcastle Racecourse is owned by the Arena Racing Company (ARC), which operates 16 courses across the UK, as well as 2 greyhound arcadia in the North East, and stages 40% of the national fixture list. ARC has ambitious plans for Newcastle Racecourse. In 2014, planning consent was secured for, and ARC subsequently delivered, significant enhancements to the Gosforth Park Estate in which it is located. The enhancements included a two mile, three furlong all weather surface on the flat track which includes the only floodlit straight mile in world racing. This has meant that we see some of the best jockeys and horses in training come to Newcastle, showcasing our city to a global TV audience of millions, creating jobs and attracting visitors and investment. Building on the benefits from the initial phase ARC s investment in all-weather track and improvements to the stands (Arena Racing) The next phase of the development will build on the benefits which resulted from the initial phase. These benefits will all contribute to securing Newcastle Racecourse s future as a world class venue which has facilities on a par with similar venues around the world. The benefits include: A multi million pound investment into one of Newcastle s premier businesses, maintaining Newcastle Racecourse s reputation as a world class venue and securing the Racecourse s place on the international stage Boosting Newcastle s economy through the attraction of more visitors Creating 275 temporary jobs for local people during the construction phase and 25 permanent, full time jobs at the events centre Providing more community facilities through the creation of an outdoor hospitality area for the public to enjoy Providing the accommodation needed to ensure the continued success of Newcastle Racecourse and wider Gosforth Park Estate Forthcoming refurbishment of stands ARC s investment in all-weather track and lighting (Arena Racing)

3 Proposals Main Racecourse Complex Masterplan Scale 1:2000@A3 Access to potential new cycleway around site perimeter New development Parklands Golf Course Public space and landscaping to improve setting of listed buildings Repairs and conservation to listed buildings Refurbishment Screen barn with landscaping Existing green space New landscaping Retain and improve maintenance barn Improved pedestrian surface Tree replanting Existing building Footpath on both sides Parking (grasscrete for car ) Existing trees Visitor overflow New trees Horse box Vehicular routes Golf club (100) Pedestrian and cycle access Stables Horse walk Flexible events and hospitality area Restricted vehicular route Apartment access Flexible events and hospitality area Access to potential new cycleway Horse ramp Grasscrete (approx 100) Grasscrete (approx 85) Exhibition (250) Park House around site perimeter Traffic management Border Minstrel Caretakers House Brandling House Access to potential new cycleway around site perimeter Car Improved pedestrian surface Refurbished conference space Pedestrian access to Event Centre Traffic management Accessible / taxis / drop off Flexible events space / pedestrian arrival plaza 3,500sqm Event Centre nts partme A Parade Ring Car Taxi / short stay (50) Coach (18) Link at first floor Service access Existing Goals Football Centre ts en a rtm Ap Soft and hard landscaping to apartments in keeping with racecourse character Lighting columns Masterplan Northumberland Golf Course Precedent images

A189 4 Traffic, Access and Parking A1056 Industrial Park entrances Great Lim e Road Killingworth Way Garden centre entrance A1 Hotel entrance Main access Northumberland Golf Club entrance Secondary access Main Racecourse Strategic Masterplan Scale 1:10000@A3 SSSI area Potential new cycle route Improved pedestrian/ cycle routes and signage Internal vehicular route External vehicular route Horse walk New landscape Trees Repair and conservation works to listed buildings Proposed development Refurbishment B1318 (Great North Road) Designated grasscrete style car A189 Traffic We are working with our highways consultants to explore the most appropriate strategies for mitigating the effects of any potential traffic increase. Our highways consultants will be producing a full transport assessment as part of the planning application. Initial results show that the local road network has capacity for this potential increase. Main entrance Access The proposals include the creation of a car area for the new event centre which will accommodate around 250 cars. A car accumulation exercise was undertaken to ensure this provision is sufficient. In the event of additional high demand, there is an overspill car area on the western side of the site which will be available. Parking Access to the course will be unchanged. Main access will continue to be from the Great North Road with a second, alternative access off Great Lime Road, which leads off the A189. Precedent images

5 A Sustainable Future A Sustainable Future for High Gosforth Park Estate Newcastle Racecourse has been part of High Gosforth Park for over 120 years. Because of our long local history we are conscious of our responsibility to respect the unique heritage of our home. Gosforth Park Nature Reserve The future of Gosforth Park Nature Reserve will continue to be secured. Newcastle Racecourse owns the land on which the Reserve is located, and was previously able to award the Natural History Society of Northumbria a 30 year lease of the land. The approved plans enabled the implementation of a long term woodland management plan to enhance the wildlife and ecological value of the High Gosforth Park Estate. Respecting our heritage For our 2014 planning consent we worked closely with experts from Durham University and Woodhall Planning and Conservation to ensure that the heritage value of the site continues to be enhanced. As part of our current proposals we intend to refurbish the listed buildings on site to maintain them for generations to come. Any new buildings will be carefully designed to respect their sensitive setting. Raceday, 1949 (Tyne & Wear Archives and Museums) View showing improved central area and setting of listed buildings Aerial view (Arena Racing) Nature reserve Woodlands

6 Creating New Homes Creating New Homes Two apartment blocks are proposed to be built, containing approximately 170 apartments. The apartments will be built to the west of racecourse buildings, on previously developed land. The event centre would cost several million pounds to build and could not be funded ordinarily from the returns from the race days throughout the year. Therefore, there needs to be an additional source of funding, with apartments being the best form of raising funds from the racecourse site. ARC is working closely with its planning team to ensure that the design is in-keeping and will respect the site s setting and listed buildings. The apartments will be designed to sit within their secluded woodland setting whilst relating to the existing racetrack frontage. The architectural design and materials will be sympathetic to the surrounding development and landscape. The apartments will be in keeping with the height of the existing racecourse stands and surrounding trees. Views from the racecourse and surrounding residential areas, Northumberland golf club, and the B1318 road to the west have all been taken into consideration. Aerial view showing the apartments in context View from across racecourse

7 Thank You Thank You for Coming Today Thank you for taking the time to come to the exhibition today and give us your feedback. Your comments will be carefully considered and used to help shape the proposals. How to have your say Your views are important to us and there are a number of ways you can have your say: Complete one of the feedback forms provided and post it in the comments box, or alternatively return the form using the freepost address printed on it Call us using our dedicated community information line 0844 556 3002 Email us at newcastleracecourse@lexcomm.co.uk If you have any questions please ask one of our development team, who are present today. ARC s investment in all weather track and improvements to the stands After this consultation we will be looking closely at all the feedback provided and consider how we can use it to add to our initial ideas. A planning application will be submitted to Newcastle City Council soon thereafter and the council Planning Committee will subsequently consider the planning application. If planning permission is granted by the council, we expect to start on site as soon as possible. Birds eye view of Gosforth Park (Map data 2018 Google) 2014 2015-16 2016 2016-17 2018 2018 1 2 3 4 5 6 Newcastle Racecourse has previously secured planning consent for, and subsequently delivered, significant enhancements to the Gosforth Park Estate in which it is located. The enhancements have included a new all-weather track, associated racing improvements and new homes within an historic walled garden. Analysis of the existing site and racecourse facilities and options for improvement Initial engagement with Newcastle City Council Development of initial ideas and pre application enquiry to Newcastle City Council August: Public consultation Autumn: Further development of the masterplan, events centre proposals and improvements to listed buildings. Submission of planning application About ARC Arena Racing Company ( ARC ) is the largest racecourse operator in the UK. ARC racecourses host over 500 fixtures every year which attract 1.2 million people. ARC hosts racing at all levels of the sport including the world s oldest Classic, the St Leger, run each year in September at Doncaster Racecourse as part of the four day St Leger Festival ARC racecourse locations