SEVERN AVENUE CORRIDOR STUDY Bicycle, Pedestrian, & Landscape Improvements

Similar documents
PUBLIC REALM MASTER PLAN

Derby Street. Project Updates. Salem, Massachusetts

Route 47 (North Main Street) Reconstruction

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Welcome to the Quebec Alternatives Analysis Public Meeting

San Jose Transportation Policy

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

5 CIRCULATION AND STREET DESIGN

F L E T C H E R A V E N U E

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Appendix B - Street Sections

Complete Streets. Designing Streets for Everyone. Sarnia

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

City of Wausau Wausau Center Urban Design and Transportation Master Plan. Design Workshop // October 18, 2018

Item No. 14 Town of Atherton

Lawrence Avenue Streetscape Concepts August 30, 2011

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

Henderson Ave. Complete Streets Project

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Streetscape: Core Shopping District

PRESS RELEASE San Joaquin Council of Governments

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report

Transportation Planning Division

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

NORTH DOWNTOWN N EAST WEST

Multimodal Through Corridors and Placemaking Corridors

Proposed Mural. Ninth St. Proposed Sitting Area. Proposed Bump-out. Bike Lane and Buffer Zone. Proposed Trees and Sitting Area.

City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting

Existing Pedestrian Conditions. PSAC February 8, 2011

Thank you for attending

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Plant City Walk-Bike Plan

FONTAINE AVENUE STUDY Final Report

Preliminary Engineering Study

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

TRANSPORTATION STANDARDS

Board of Supervisors February 27, 2017

complete streets design and construction standards public primer City of Edmonton

Hale iwa Improvement District Project

6.4 RECOMMENDED IMPROVEMENTS

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

McLean Main Street Public Forum Follow-up

CENTENNIAL NEIGHBOURHOODS SECONDARY PLAN STUDY CITY OF HAMILTON SPECIFIC MAP COMMENTS FROM DECEMBER 1st PUBLIC INFORMATION CENTRE #2

CITY OF PORTSMOUTH PLANNING DEPARTMENT

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

Rehabilitation Institute of Chicago s New Research Hospital

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

Chapter 4: Funding and Implementation

Southside Pilot Proposal

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

BROOKLAND Multi-Modal Transportation & Streetscape Study* NE Washington, DC

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Fulton Market Streetscape

NJDOT Complete Streets Checklist

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

Omaha s Complete Streets Policy

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Road Diets FDOT Process

Ajax: The Road to Complete Streets

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Moving Together Conference Complete Streets from the MassDOT District 5 Perspective

Building Great Neighbourhoods QUEEN ALEXANDRA

Las Tunas Downtown Revitalization City Council Study Session. December 1, :00 p.m. Live Oak Park Community Center

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Presentation Starts at 5:30 PM

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

A Guide to Great Streets: The Basics. September 25, 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Appendix 3 SACRAMENTO COUNTY DEPARTMENT OF TRANSPORTATION

Complete Streets Successes, Opportunities, and Challenges

RE: Natomas Landing (P99-091)

MEMORANDUM Ashford Dunwoody Road: Request to waive right of way dedication requirements of Sec

STREETSCAPE CONCEPTS

4404 St. Peter Street New Orleans, LA (504) April 13 th, To Whom It May Concern:

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Reams Road RCA Study. Board of County Commissioners Public Hearing

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

N. Frederick Street to N. Manchester Street

TRANSPORTATION COMMISSION Agenda Staff Report

Right-of-Way Standards

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

MAKE YOUR PLACE IN CHANNELSIDE

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

2.0 Existing Conditions

Application of a Complete Street

S T A T I O N A R E A P L A N

APPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET. B. Subdivision/Site Development Plan/Grading Permit Name and Number:

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

Transcription:

SEVERN AVENUE CORRIDOR STUDY Bicycle, Pedestrian, & Landscape Improvements August 2nd, 2013 ENGINEERS: MEYER ENGINEERS, LTD. CONSULTANT ARCHITECTS: PEREZ, APC TRAFFIC MODELING: ITS REGIONAL, LLC.

VETERANS MEMORIAL BLVD. PONTCHARTRAIN PLACE LAKESIDE MALL SEVERN E AVENUE E PEPPERMILL DRAGO S W. ESPLANADE AVE. EXISTING SEVERN AVENUE CORRIDOR & CONTEXT PLAN BREAUX MART N EDENBORN AVE. DIVISION ST. 18TH ST. 17TH ST.

W. ESPLANADE AVE. 12TH ST. PEPPERMILL 4 PONTCHARTRAIN PLACE MELVIL DEWEY DR. CHASE BANK 14TH ST. 15TH ST. 16TH ST. LE MADELEINE 4 3 17TH ST. 3 2 DICK S SPORTING GOODS 18TH ST. 19TH ST. LAKESIDE GARAGE 20TH ST. 21ST ST. LAKESIDE GARAGE 22ND ST. 1 1 BREAUX MART KENNETH ST. VETERANS MEMORIAL BLVD. PROPOSED SEVERN AVENUE CORRIDOR PLAN N A greening of Severn Avenue through the addition of the following elements will create a more bike and pedestrian friendly environment: Widened sidewalks Street trees for shading Shrubs & hedges Parklets with street furniture Upgraded street & pedestrian lighting Gateways marking the entrances to the corridor Bike lanes (between 17th/18th St. & W. Esplanade Ave.) As such, Severn can become a multi-modal corridor refl ective of its role at the center of Metarie s commercial and business district. Dedicated Bike Lane Shared Use Road

SECTION 1 EXISTING Parking garage at turn lane Parking lot at Breaux Mart

6 2 2 7 3 5 1 5 1 6 4 SECTION 1 PROPOSED Parking garage at turn lane Parking lot at Breaux Mart 1 Increase walk to 8-0 in width (Typical along corridor) 5 Add hedges to screen parking lot / garage 2 Add new road & pedestrian lighting (Typical along corridor) 6 Add shade trees to landscape strip as additional buffer 3 Add shrubs in neutral ground (Typical along corridor) 7 Add Bougainvillea trellis at high-voltage power lines 4 Potentially remove select curb cuts to create a more continuous walking path

8 SIDEWALK EXAMPLE 8 SIDEWALK EXAMPLE Oak Street, New Orleans, LA

SCREENED PARKING EXAMPLE Piazza d Italia, New Orleans, LA

SEVERN AVENUE BREAUX MART BREAUX MART PARKING LOT Consolidation of curb cuts

SECTION 2 EXISTING Parklet at garage

1 1 SECTION 2 PROPOSED Parklet at garage 1 Parklet

PARKLET EXAMPLE San Francisco, CA

SECTION 3 EXISTING Blank facade conditions

2 1 4 3 2 3 4 1 SECTION 3 PROPOSED Blank facade conditions 1 Enhance plantings along blank wall through layering 2 Enhance blank building wall through an increased connection with sidewalk 3 Add 5 ft. bicycle lane with 2 ft. buffer 4 Add turn lane

LAYERED PLANTING EXAMPLE Harrah s Casino, New Orleans, LA

SIDEWALK EXAMPLE Magazine Street, New Orleans, LA SIDEWALK EXAMPLE Fulton Street, New Orleans, LA

GATEWAY ARCH

VETERANS MEMORIAL BLVD. LAKESIDE MALL 17TH ST. < TO LAKE SEVERN E AVENUE E N. ARNOULT RD. EDENBORN AVE. 18TH ST. W. ESPLANADE AVE. HESSMER AVE. DIVISION ST. ST. BIKE LANE PLAN N Dedicated Bike Lane Shared Use Road

SECTION 4 EXISTING Parking lots with landscape strip

1 1 1 1 SECTION 4 PROPOSED Parking lots with landscape strip 1 Add 5 ft. bicycle lane with 2 ft. buffer

OLD-STYLE POWER POLE NEW-STYLE POWER POLE

PRELIMINARY STATEMENT OF PROBABLE COST Description Amount Unit Unit Price Cost Mobilization, Insurance, Etc. 1 LS $350,000 $350,000 Sidewalk and Driveway Replacement 9,500 SY $120 $1,140,000 Striping 1 LS $170,000 $170,000 Replace Street Lights (Includes Wiring) 30 EA $11,000 $330,000 Pedestrian Lighting (Includes Wiring) 100 EA $5,000 $500,000 Landscaping and Irrigation 1 LS $400,000 $400,000 Pedestrian Signal Heads 1 LS $130,000 $130,000 Parklets 10 EA $22,000 $220,000 Right Turn Lane Additions 700 SY $160 $112,000 Venterans Entry Gateway 1 LS $500,000 $500,000 17th Street Gateway 1 LS $310,000 $310,000 W. Esplanade Gateway 1 LS $300,000 $300,000 Total Construction Cost - Base Improvements $4,462,000 Alternate No. 1 Drainage Improvements 1 LS $2,700,000 $2,700,000 Alternate No. 2 Replace Power Poles 50 EA $5,000 $250,000* Total Construction Cost - Base Improvements + Alternates Nos. 1 & 2 $7,412,000 * Parish to coordinate with Utility Companies on cost. NOTE: All prices include 20% construction contingency. Engineering, surveying, etc. is not included.