Metering and Measuring of Multi-Family Pool Pumps, Final Report - Phase 1 & 2

Similar documents
Pacific Gas and Electric Company Monthly Report On Interruptible Load and Demand Response Programs for April 2010

Energy Efficiency in California Some Possible Lessons for Ontario 20 March 2006

2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A

promoting this energy saving message to all their pool/spa owner customers.

2008 California Building Energy Efficiency Standards

Pacific Gas and Electric Company Monthly Report On Interruptible Load and Demand Response Programs for June 2012

Codes and Standards Enhancement Initiative For PY2004: Title 20 Standards Development

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

APSP APPLIANCE EFFICIENCY POOL PUMP DATABASE INSTRUCTIONS, DECLARATION, AND TERMS OF USE (Instructions last updated 2/1/2018)

Dan Johnson, CBP Swim, Incorporated Lead Dog Aquatic Consulting

List of Forms. Form Description Page No. Form Commercial Swimming Pool Discharge Application Form 31-4

Jennifer Hatfield FSPA Government Relations Consultant J. Hatfield & Associates, PL

IntelliTouch Pool and Spa Control Systems Smart and simple pool and spa automation

SWIMMING POOL / SPA PLAN REVIEW CHECKLIST

Fundamentals of Compressed Air Systems. Pre-Workshop Assignment

Paddlesports. Kayaking Canoeing Rafting Stand up paddling. A Partnership Project of:

Introduction. Check with your swimming pool contractor for more specific ways to upgrade your pool, save money and help the environment.

1 Exam Prep NSF/ANSI Tabs and Highlights

Compact4Pool. pool filters. For spas and swimming pools by up to 20,000 litres Pump, filter, pre-filter and UV-C in one. Advantages of Compact4pool:

Aliso Canyon Gas-Electric Coordination Phase 3 Draft Final Proposal

Cabrillo College Transportation Study

March 21, Click on the Regulatory Information link at the bottom right of the page;

Wildlife Ad Awareness & Attitudes Survey 2015

February 21, Click on the Regulatory Information link at the bottom right of the page;

Project Status Report

EMERGENCY PHONE: or (651) (24 hours)

Oxygen Concentrator. Installation and Operation Manual. ClearWater Tech, LLC. Integrated Ozone Systems

I. Site Information. Pump Information

LAKE BLUFF PARK DISTRICT BLAIR PARK SWIMMING POOL Questions and Answers OVERVIEW

Two types of physical and biological standards are used to judge the performance of the Wheeler North Reef 1) Absolute standards are measured against

Appendix D: Public Meeting Notice

Material Safety Data Sheet SECTION 1: PRODUCT AND COMPANY IDENTIFICATION SECTION 2: INGREDIENTS SECTION 3: HAZARDS IDENTIFICATION

Swimming Pool Requirements

EMERGENCY PHONE: or (651) (24 hours)

Lowering Compressed Air Pressure: What Works in the Plas9cs Industry? Introduc)on by Rod Smith, Publisher, Compressed Air Best Prac)ces Magazine

Updates on CA Pipeline Safety Program

Predators and Prey 1995 through 2010 in the WSCC. Robert McCullough Managing Partner McCullough Research

Annex P Water Well Modification Plan

Nottingham Township 909 Sugar Run Road Eighty Four PA (724) Fax (724)

SWIMMING POOL REQUIREMENTS

June 3, Attention: David Hogan City of San Mateo 330 W. 2oth Avenue San Mateo, CA 94403

ORANGE COUNTY TRANSPORTATION AUTHORITY. Metrolink Ridership and Revenue Quarterly Report. Staff Report

WEST ESSEX REGIONAL SCHOOL DISTRICT HIGH SCHOOL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO

EMERGENCY PHONE: or (651) (24 hours)

PROPOSAL IATTC-93 J-1

EMERGENCY PHONE: or (651) (24 hours)

Safe hydraulics for hydroforming presses. more finished product to be created from less raw material.

Life Smart Spas Frequently Asked Questions

California Efficiency Standards: Progression to Zero Net Energy Buildings. Martha Brook California Energy Commission

3M MATERIAL SAFETY DATA SHEET 3M 4251, 4255, 06941, Organic Vapour/ Particulate Respirator 12/01/2004

Lead Ammunition Survey Summary

Net$ync II. Net$ync II. System Controllers

Cost Reduction and Optimization. for. Manufacturing and Industrial Companies

3M MATERIAL SAFETY DATA SHEET 3M(TM) ESPE(TM) RELYX(TM) VENEER CEMENT TRY-IN PASTE REFILLS 02/24/2005

IonGen. Installation Instructions & Maintenance Owner s Manual. Electronic Clarifier for Ponds and Pondless Waterfall Systems

MATERIAL SAFETY DATA SHEET 5000 Series Easi-Care Organic Vapor & Paint Spray/Pesticide Respirator 09/23/09

Existing Rule Language Compared to Proposed Rule Language

Life Smart Spas Frequently Asked Questions LS600DX

Material Safety Data Sheet Monopole, Inc.

HOUSE AND GROUND RULES AND REGULATIONS. Kona Kai Club 1551 Shelter Island Drive, San Diego, CA (619)

EMERGENCY PHONE: or (651) (24 hours)

Gas Injection Systems

2016 APS Go! Surveys Summary Results for Trades Center

Session A2: 10:20am WELCOME TO EDMONTON: THE IMPACT OF POPULATION GROWTH ON THE HOUSING MARKET

COMMERCIAL LOW PROFILE 8 Electric Heated Air Curtain Data Sheet

DRAFT. Table of Contents. Background

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY

Any use of this material except in accordance with a written agreement with Western Power is prohibited.

Minnesota Crash Mapping Analysis Tool (MnCMAT) & Crash Data

Tom Swift President & COO

Arizona Swimming Pool Design and Planning Guide Copyright AZWPC, All Rights Reserved

Fahmida Ahmed Director, Office of Sustainability Department of Sustainability & Energy Management Stanford University

EMERGENCY PHONE: or (651) (24 hours)

STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK September 2015

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

ARCHITECT INSTALLATION GUIDELINES FOR RESIDENTIAL TRITON INSTALLATIONS

EMERGENCY PHONE: or (651) (24 hours) Ingredient C.A.S. No. % by Wt POLYESTER < 14 POLYPROPYLENE > 86

EMERGENCY PHONE: or (651) (24 hours)

Material Safety Data Sheet SECTION 1: PRODUCT AND COMPANY IDENTIFICATION SECTION 2: INGREDIENTS SECTION 3: HAZARDS IDENTIFICATION

CENTRAL HUDSON GAS & ELECTRIC CORPORATION CASE 17-E- & 17-G- EAM PANEL SCHEDULE OF EXHIBITS

NACTO Designing Cities Conference Project Evaluation: Tools for Measuring Success and Building Support. October 29, 2015

I have to say that I had no idea about compressors. That means it s easy for everybody.

Master Control Systems, Inc. Variable Speed Fire Pump Controllers

Report to the Benjamin Hair-Just Swim For Life Foundation on JACS4 The Jefferson Area Community Survey

SWIMMING POOL PERMIT APPLICATION

ENGINEERING DATA. Engineering Data

92831 TEL: (714) FAX:

EMERGENCY PHONE: or (651) (24 hours)

3M MATERIAL SAFETY DATA SHEET 3M Dust/Mist respirator 9320 FFP2 Respirator, 1862, Unvalved 09/13/2004

Pool Inspection. Your Street San Diego, California Prepared for: Your Name Prepared by: Priority Inspection Service

SECTION 5: PEER CITY REVIEW

AS AS Australian Standard. Spa pools. Part 2: Private spas. This is a free 6 page sample. Access the full version online.

COMPRESSED AIR TEXTILES ENERGY EFFICIENCY

PRELIMINARY DRAFT FIRST AMENDMENT TO VISION 2050: A REGIONAL LAND USE AND TRANSPORTATION PLAN FOR SOUTHEASTERN WISCONSIN

Cocahoe Economics Fact Sheet

MATERIAL SAFETY DATA SHEET 3M Tempa-DOT Thermometers (without latex in overwrap) 03/27/09

ANALYZING THE SHIP DISPOSAL OPTIONS

NEW YORK STATE 2018 Observational Survey of Seat Belt Use

Optimizing Compressed Air Storage for Energy Efficiency

Material Safety Data Sheet SECTION 1: PRODUCT AND COMPANY IDENTIFICATION SECTION 2: INGREDIENTS SECTION 3: HAZARDS IDENTIFICATION

Transcription:

Metering and Measuring of Multi-Family Pool Pumps, Final Report - Phase 1 & 2 Prepared for: Southern California Edison Company San Diego Gas and Electric Company Southern California Gas Company Pacific Gas and Electric Company CALMAC Study ID SCE0393.01 April 25, 2016 Prepared by: ADM Associates, Inc. 3239 Ramos Circle Sacramento, CA 95827 916-363-8383

Table of Contents List of Figures Number Title Page Figure 2-1 Variable Speed Pool Pump 2-2 Figure 3-1 Data Logger with Current Transducer inside Timeclock Box 3-5 Figure 3-2 Typical Dial Timer used to Control Pool Pumps (left) and a Variable Speed Pump Control Panel (right) 3-8 Figure 3-3 Distribution (black dots) and Fit (blue circles) of Power Factor vs. Amps for Variable Speed Pool Pumps 3-9 Figure 4-1 Multi-Family Pool Size Distribution by IOU 4-1 Figure 4-2 Pool Pump hp Size Distribution for Single Speed and VSD Pumps by IOU 4-2 Figure 4-3 Pool Pump Service Factor hp Distribution for Single Speed and VSD Pumps 4-2 Figure 4-4 Pool Pump Energy Usage vs. Effective Pool Volume 4-4 Figure 4-5 Energy Savings Distribution for 52 Pump Retrofits in SCE Service Territory 4-5 Figure 4-6. Annual Energy Savings vs. Baseline Nameplate Horsepower 4-6 Figure 4-7 Annual Energy Usage against Baseline Nameplate Horsepower 4-8 Figure 4-8. Relative Energy Savings versus Baseline Pump Horsepower 4-8 Figure 4-9 Average Weekday Pool Pump Load Profiles for SCE and SCG 4-10 Figure 4-10 Average Weekday Pool Pump Load Profiles for SDG&E 4-10 Figure 4-11 Energy Savings by Hour for SCE, SDG&E, and SCG. 4-12 Figure 4-12 VSD Pump Power versus Percent Speed for 3 Motor Sizes 4-13 Figure 4-13 Multi-Family Pool Heater Type by IOU 4-14 State-Wide IOU Multi-Family Pools

List of Tables Number Title Page Table 1-1 Absolute and Relative Energy Savings and Demand Reduction per Pump by IOU 1-2 Table 3-1 Pool Visit Sample Sizes by IOU 3-1 Table 3-2 Target Pool Locations by Climate Zone for PG&E 3-3 Table 3-3 Pool Location by Climate Zone and Utility 3-10 Table 3-4 Pool Visit Sample Size by IOU and Pump Type 3-11 Table 3-5 List of County Environment Health Departments Targeted 3-13 Table 4-1 Pool Size by IOU 4-1 Table 4-2 Average Pump Rating by IOU 4-3 Table 4-3 Absolute and Relative Energy Savings and Demand Reduction per Pump by IOU 4-4 Table 4-4 Natural Gas Pool Heater Output Rating 4-14 Table 4-5 In-Pool and Pool Area Lighting Average Wattage and Energy 4-15 Table 4-6 In-Pool Lighting Types and Wattages 4-15 Table 4-7 Pool Area Lighting Types and Wattages 4-16 Table 4-8 County Environment Health Departments Contacted for Survey 4-17 Table 5-1 Absolute and Relative Energy Savings and Demand Reduction per Pump by IOU 5-20 Disclaimer This report was prepared for Southern California Edison (SCE) and funded by California utility customers under the auspices of the California Public Utilities Commission. Reproduction or distribution of the whole or any part of the contents of this document without the express written permission of SCE is prohibited. This work was performed with reasonable care and in accordance with professional standards. However, neither SCE nor any entity performing the work pursuant to SCE s authority make any warranty or representation, expressed or implied, with regard to this report, the merchantability or fitness for a particular purpose of the results of the work, or any analyses, or conclusions contained in this report. The results reflected in the work are generally representative of operating conditions; however, the results in any other situation may vary depending upon particular operating conditions. State-Wide IOU Multi-Family Pools

1. Executive Summary This report contains the results of field measurements for multi-family swimming pool equipment for the investor owned utilities (IOU)s in California. The collection of data from multi-family pool pumps will support the IOUs when updating work papers. Pools located in four IOU areas; Southern California Edison Company (SCE), San Diego Gas and Electric Company (SDG&E), Southern California Gas Company (SCG), and Pacific Gas and Electric (PG&E) have field measurements completed and included in this report. The final report is inclusive of the Phase 1 report which did not include PG&E results and the Phase 2 report which did include PG&E results. The main objectives for this study are: To conduct pre and post measurements of pool pump usage via onsite visits to a sample of 50 multi-family pools receiving variable speed drive (VSD) pool pumps in SCE service area and monitor the power profile of the baseline and new pool pumps; To conduct baseline or post-measurements of pool pump usage via onsite visits to a sample of 27 multi-family swimming pools (22 for SDG&E and 5 for SCG); To conduct same-day pre- and post-measurements of pool pump usage on a sample of 5 multi-family pools receiving variable speed drive pool pumps in PG&E service area; To implement a telephone survey with the local enforcement agencies in the targeted counties of the IOU service territories, and retrieval of other documentation in order to collect information regarding the regulatory requirements of county guidelines for poolturnover and pump operation; To characterize pools and to inventory other pool equipment such as spas, water features, filters, heaters, in-pool lighting, pool area lighting, and associated controls. The results of these activities will be used by the IOUs to update statewide work papers on variable speed drive pool pumps in the multi-family space and LED pool lighting. The most significant portion of this study is the pre and post metering of pool pump energy use for SCE sites. The analysis of the field data showed that the average energy savings for early replacement is 6,408 kwh per pump. This is a 48.5 % energy savings. The savings is even higher when two negative saving pumps are excluded 1. The demand savings is 0.58 kw per pump which is a reduction of 33.1 %. Energy and demand savings developed for the single visit sites for SDG&E and SCG utilized savings characterizations from the SCE sites. Energy and demand savings for the PG&E sites were conducted on VSD installations not recruited as part of a utility incentive program. The savings are lower for these sites in part due to non-operation of the pumps 1 Additional detail is provided in section 4.2 State-Wide IOU Multi-Family Pools 1-1

ADM Associates, Inc. Metering and Measuring of Multi-Family Pool Pumps Final Report, April 2016 during the overnight hours. The savings results are summarized in Table 1-1. The last row is the weighted average by number of pumps across all IOUs. Table 1-1 Absolute and Relative Energy Savings and Demand Reduction per Pump by IOU IOU Energy Savings, kwh Demand Reduction, kw Energy Savings, % Demand Reduction, % Approach SCE 6,408 0.58 48.5% 33.1% Pre/Post with 52 Pumps (51 Pools) On-Site audits for 8 VSD and 17 SS SDG&E 6,901 0.58 48.5% 31.7% Pumps, savings projected from SCE results SCG 9,203 0.83 48.5% 37.0% On-Site audits for 6 VSD Pumps, savings projected from SCE results PG&E 3,051 0.59 34.0% 32.6% One-time Pre/Post readings for 4 pools Average 6,448 0.57 46.2% 31.5% Weighted averages The average multi-family pool size for the SCE study sample is 26,250 gallons. In the San Diego area, the average pool size for the sample is slightly higher at 28,210 gallons. The SCG pools averaged 37,200 gallons and the PG&E pools averaged 28,467 gallons. The average baseline single speed pump motor for the SCE sample is 1.46 horsepower (hp), 1.72 hp for the SDG&E sample, and 1.50 hp for the PG&E sample. New VSD pumps are larger and average 1.74 hp for SCE, 3.00 hp for SDG&E, and 2.85 hp for PG&E. Flow data from the pool equipment was not consistently available and is subject to unknown accuracy, particularly at lower flow rates. However, for the data collected from the SCE pools the average turnover 2 rate was 6.6 hours for the single speed pumps and 8.6 hours for the VSD pumps. For the four PG&E pools, the average pool turnover rate was 7.8 hours for the single-speed and 8.2 hours for the VSD pumps. Natural gas pool heaters are in use in less than 30 % of the multi-family pools. An additional 5 % to 10 % of the pools have natural gas pool heaters that are no longer in use. The average pool heater size has an output rating of 350 kbtu/hr for SCG, and 410 kbtu/hr for SDG&E, and 275 kbtu/hr for PG&E. Approximately 65 % of the pools have incandescent lighting in them, whereas only about 18 % of the pools have LED lighting in them. The average incandescent lamp wattage ranges from 250 to 400 watts. The typical in-pool LED lamp has a wattage of 50 to 65 watts. The annual in-pool lighting energy use ranged from a low of 1,054 kwh for SDG&E to a high of 2,264 kwh for the five pools designated as SCG sites. Interviews were conducted with 10 county environmental health departments that oversee the periodic inspections of public pools. The interviews were intended to identify how each county interrupts and applies Title 22 and Title 24 codes as they pertain to the commissioning and inspection of public swimming pools. Every respondent indicated that they were open to allowing energy and demand saving equipment or controls for the operation of public pool recirculation 2 A turnover occurs when the pump has pumped the volume of water the pool contains. State-Wide IOU Multi-Family Pools 1-2

ADM Associates, Inc. Metering and Measuring of Multi-Family Pool Pumps Final Report, April 2016 systems provided that the use of such equipment was not in direct conflict with public swimming pool code enforcement. When asked whether there were sections of the public pool code that could be open to more than one interpretation the answers varied. One-third of the respondents answered No while the remaining respondents indicated that yes, all codes have some interpretation involved in their application. Every county respondent indicated that they strive for consistency in code enforcement among all inspectors in the county. State-Wide IOU Multi-Family Pools 1-3