West Orange Township. Complete Streets Concept Plan, 2015

Similar documents
Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

About the Studio. Edward J. Bloustein School of Planning and Public Policy - Rutgers University

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION 6.2 BICYCLE DEMAND AND SUITABILITY Bicycle Demand

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

NJDOT Complete Streets Checklist

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Omaha s Complete Streets Policy

EXECUTIVE SUMMARY. Vision

Bicycle Facilities Planning

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

What Is a Complete Street?

Agency Advisory Group Meeting #3 and Walk Audit Anchorage Non-Motorized Plan

Safe Routes to School Action Plan Aberdeen, Idaho

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Active Transportation Facility Glossary

PEDESTRIAN ACTION PLAN

Physical Implications of Complete Streets Policies

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

City of Charlottesville Bicycle and Pedestrian Master Plan Update

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

and older adults and people with disabilities still face barriers when using the pedestrian network and public transportation.

CONNECTING PEOPLE TO PLACES

Most Dangerous Roads for Walking And How States Can Make them Safer. Route 110, Long Island, New York Image by Dougtone

Table of Contents Introduction. 2 Purpose of the Plan...2 The Benefits of Walking and Bicycling...3 Vision and Goals of the Plan...

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Chapter 6: Along the Street

Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Roosevelt Estates Neighborhood Improvements

Planning Suburban Bike Networks

Monument Elementary School Trenton, NJ School Travel Plan

Long Island Rail Road Expansion Project Floral Park to Hicksville

ASSESSING THE WALKING & BIKING ENVIRONMENT

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Bellevue Downtown Association Downtown Bike Series

Steps to Conducting a Complete Streets Assessment

See Figure 38, Existing Nonmotorized Connections.

A Matter of Fairness: ROCOG s Environmental Justice Protocol. What is Mobility Limitation?

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

The DC Pedestrian Master Plan

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Improvements Infrastructure Gap Assessment and Improvements Street Striping

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

Morristown, NJ Complete Streets Policy

OLDER PEDESTRIANS AT RISK

Tri-State Transportation Campaign Greater Newark Conservancy Newark Complete Streets Walking Audit July 2013

Active Transportation Access to Transit

Multimodal Design Guidance. October 23, 2018 ITE Fall Meeting

SAFE ROUTES TO SCHOOL

Non-Motorized Transportation 7-1

Chapter 2: Standards for Access, Non-Motorized, and Transit

Introduction. Who is WILMAPCO. Why are walkable communities important

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Tonight is for you. Learn everything you can. Share all your ideas.

MOVING PASSAIC COUNTY

Chapter 5. Complete Streets and Walkable Communities.

Hennepin County Pedestrian Plan Public Comment Report

DOWNTOWN MIAMI PEDESTRIAN PRIORITY ZONE

2.0 Existing Conditions

Chapter 13 ORANGE COVE

Design Guidelines. Overview. Design Vision for Yellow Brick Road

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

INDOT Complete Streets Guideline & Policy

CONTRA COSTA. Countywide Bicycle and Pedestrian Plan. Executive Summary. July Contra Costa Countywide Bicycle & Pedestrian Plan

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Multimodal Through Corridors and Placemaking Corridors

Traffic Impact Memorandum. May 22, 2018

City of Birmingham Draft Multi-modal Transportation Plan

Complete Streets. Designing Streets for Everyone. Sarnia

About the Active Transportation Alliance

IMPLEMENTATION WORKBOOK

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Classification Criteria

The Wiggle Route in Context

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

CHAPTER 3: Vision Statement and Goals

Transforming the. Michigan Avenue Corridor. a complete streets and transit-oriented development study Michigan State University Student Research Team

Chapter 5: Crossing the Street

Designing Complete Streets: What you need to know

TRAFFIC IMPACT ANALYSIS

Montclair s Complete Streets Experience

5. RUNNINGWAY GUIDELINES

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Older Pedestrians at Risk And How States Can Make it Safer and Easier for Older Residents to Walk

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

5. Automobile Circulation, Wayfinding and Signage

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Proposed White Flint Separated Bike Lane Network September 2015

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

Planning Guidance in the 2012 AASHTO Bike Guide

Transcription:

West Orange Township Complete Streets Concept Plan, 2015

INTRODUCTION 1. Background 1. History 2. West Orange characteristics 3. Demographics 4. Transportation 5. Methodology 6. Overall findings 2. Creating complete streets 1. Northfield Avenue 2. Pleasant Valley Way 3. Main Street 4. Overall suggestions 5. Bicycle network 6. Policy suggestions 3. Beyond the scope 1. Shared streets 2. Visualizing the community 3. Summary Main Street in downtown West Orange

INTRODUCTION What are Complete Streets? o Complete Streets are streets for everyone o Enable safe access for pedestrians, bicyclists, motorists, and transit riders of all ages and abilities Are Complete Streets right for West Orange? o Improvements must be appropriate for the local context o Plan gives realistic and meaningful policy guidance for the township https://www.digitalcommonwealth.org/search/commonwealth:mg74qw24f www.ca-city.com A complete streets design from Redmond, Washington

Background Creating Complete Streets Beyond the Scope BACKGROUND

Background History West Orange Characteristics Demographics Transportation Methodology Overall Findings HISTORY

HISTORY o 1700s: Oldest homes were built o 1856: Llewellyn Park established o 1863: Contemporary boundaries established o 1886: Thomas Edison arrives o Moves into Glenmont o Establishes a laboratory, factory, and movie studio. o 1940s - 1960s: Development of western suburban zone https://www.digitalcommonwealth.org/search/commonwealth:mg74qw24f Image source: http://blog.hemmings.com/index.php/2011/06/20/edison-west-orange-1902/ Thomas and Mina Edison in West Orange, 1902 o 1973: I-280 cuts through community

FUTURE DEVELOPMENT o Main Street redevelopment area o 21-acre site o Renovation of 1901 battery factory building o 610 Residential units o 18,000 sq. ft. commercial space https://www.digitalcommonwealth.org/search/commonwealth:mg74qw24f Image source: http://blog.hemmings.com/index.php/2011/06/20/edison-west-orange-1902/ Source: Prisim Capital Partners LLC Renderings of Main Street redevelopment area

Background History West Orange Characteristics Demographics Transportation Methodology Overall Findings WEST ORANGE CHARACTERISTICS

PHYSICAL o 44.6% of land use in West Orange is residential LAND USE LAND COVER o Nearly 30% of forest cover o Commercial services around Main Street & Northfield Avenue o More than half of residential land use is medium density Land Use Land Cover Land Use Land Cover Residential, Low Density Residential, Medium Density Residential, High Density Commercial Industrial Transportation and Infrastructure Recreation and Athletic Fields Forest Wetlands Water Sources: NJDEP, 2012, NJGIN, 2014, NJDOT, 2015

PHYSICAL www.eaglerockreservation.org/ COMMUNITY RESOURCES Community Resources Nj.com Wikipedia Sources: NJGIS, ACS, Google

PHYSICAL o Northfield Avenue & Main Street o Pleasant Valley Way & Eagle Rock Avenue o Southwestern corner of Northfield Avenue BUSINESS CONCENTRATION o Essex Green Shopping Center Concentration of Businesses High Low Source: Reference USA, NJGIN

Background History West Orange Characteristics Demographics Transportation Methodology Overall Findings DEMOGRAPHICS

DEMOGRAPHICS POPULATION DENSITY o Total Population: 46,425 people o Population Density: 3,836/sq. mile o 5 th most populated township in Essex County o Concentration of high population density around Main Street and southeast of Northfield Avenue Population Density / sq. mile Population Density/sq. 955-2552 2553-4233 4234-8192 8193-11850 11860-37510 Sources: NJDEP, 2012; NJGIN, 2014; ACS, 2013

DEMOGRAPHICS RACE/ ETHNICITY Race/Ethnicity 1 Dot = 15 people Sources: NJDEP, 2012; NJGIN, 2014; ACS, 2013

DEMOGRAPHICS MEDIAN INCOME o Median income: $26,130 over $200,000 o Average median income: $87, 516 o Census tracts closest to Orange Township have low median household incomes Median Income ($) Median Income ($) 26,310-46,310 46,311-70,625 70,626-109,653 109,654-158,462 158,463-215,398 Source: ACS, 2013

DEMOGRAPHICS PERCENT IN POVERTY o Average percent in poverty o New Jersey: 10% o Essex County: 17% o West Orange: 7% o Concentrated in eastern section of West Orange Poverty Rate (%) Poverty Rate (%) No Data 0-1 1.0-2.8 2.9-13.9 14-19 Source: ACS, 2013

DEMOGRAPHICS PERCENT WITH DISABILITY o Concentration of people with disability in: o Northwestern section o Main Street o West of Pleasant Valley Way Percent with Disability (%) Percent with Disability (% 0-1.4 1.4-4.2 4.2-6.3 6.3-9.5 9.5-21.4 Source: ACS, 2013

DEMOGRAPHICS PERCENT WITH SENIORS o Median age: 40 years old o Population 65 years and older: 15% o 40% of households in West Orange have at least one person 60 years or older Percent of Households With Seniors (%) (Over 60 years old) 12-28 29-36 37-43 44-51 52-75 Sources: ACS, 2013, NJGIN

DEMOGRAPHICS PERCENT WITH CHILDREN o Nearly ¼ of West Orange population is under 18 years old o 1969 48% of children walked to school o 2009 13% of children walked to school o Main reason: traffic-related dangers Percent of Households With Children (%) (Under 18 years old) 10-22 23-32 33-45 46-62 63-85 Source: ACS, 2013, NJGIN

Background History West Orange Characteristics Demographics Transportation Methodology Overall Findings TRANSPORTATION

TRANSPORTATION NJ TRANSIT BUS ROUTES o NJ Transit buses operate along all major streets: o Main Street o Pleasant Valley Way o Northfield Avenue Bus Routes Bus Routes 21 73 29 79 71 97 Sources: NJDEP; NJGIN, NJgeoweb

TRANSPORTATION CRASH DENSITY o Heavily concentrated: o Intersection of Main Street & Northfield Avenue o Intersection of I-280 & other arterial roads Crash Clusters Crash Cluster Medium Risk High Risk Very High Risk Sources: NJGIN; NJDEP; Plan4Safety

TRANSPORTATION ALL CRASHES o Crash locations along principal arterial roads* o NJDOT: 25% of all crashes take place at intersections * According to the most recent NJDOT data, there were 11,876 total crashes in West Orange from 2003 2012. Only 10,630 of them are geo-coded on our map. Sources: NJGIN; NJDEP; Plan4Safety

TRANSPORTATION PEDESTRIAN VEHICLE CRASHES o Along major intersections o 273 total crashes from 2003 2012 o Unmarked crosswalks, vehicle speed, lack of lighting, crosswalk distance, and angle increase risk of crashes Sources: NJGIN; NJDEP; Plan4Safety

TRANSPORTATION PUBLIC TRANSIT DESTINATION OF WEST ORANGE RESIDENTS 4000 3660 3500 3000 Number of residents 2500 2000 1500 1000 500 0 New York City 1828 Newark 997 Union County 846 Bergen County 704 666 Morris County Jersey City 582 525 511 501 501 Other Essex County Destinations Passaic County Hudson County East Orange Middlesex County 293 Other New Jersey Counties 49 Other New York and Connecticut Source: U.S. Census Bureau. 2015. LODES Data. Longitudinal-Employer Household Dynamics Program

TRANSPORTATION WEST ORANGE MAJOR ROADS AADT COUNTS Location Cross Streets AADT Date Eagle Rock Ave Cliff St, Valley View St 13,033 1/24/12 Main St Alden St, Lakeside Ave 14,016 6/4/12 Mount Pleasant Ave Merrywood Dr, Greentree Rd 8,319 5/14/12 Northfield Ave St Cloud Pl, Ridgeway Ave 21,059 7/10/12 Pleasant Valley Way Greenwood Ave, Stanford Ave 21,259 1/11/12 Prospect Ave Eagle Rock Ave, Cannon St 19,645 4/8/14 Source: NJDOT

Background History West Orange Characteristics Demographics Transportation Methodology Overall Findings METHODOLOGY

METHODOLOGY Consulted with local stakeholders and residents Identified dangerous areas with traffic volume and crash data 19 streets were selected for further analysis and walkability audits https://www.digitalcommonwealth.org/search/commonwealth:mg74qw24f Image source: http://blog.hemmings.com/index.php/2011/06/20/edison-west-orange-1902/

METHODOLOGY ASSESSED STREETS o Chestnut Street o Eagle Rock Avenue o Franklin Avenue o Harrison Avenue o Main Street o Mitchell Street o Mount Pleasant Avenue o Northfield Avenue o Park Avenue o Pleasant Valley Way o Prospect Avenue o Rollinson Street o Sandford Avenue o Sheridan Avenue o Valley Road o Washington Street o Wheeler Street o William Street o Woodland Avenue Source: NJGIN

METHODOLOGY No Instances 1-4 Instances Issues within School Zone? 5 or more Instances Issues within School Zone? Sidewalks No sidewalks or paths* If no sidewalks, add 80 points and move on to Street Crossings Sidewalks cracked/broken 0 2 3 4 5 Sidewalks are uneven* 0 5 6 10 11 Sidewalks blocked by lights, poles, signs, plants, vehicles* 0 5 6 10 11 Sidewalks are not continuous* 0 5 6 10 11 Sidewalks are interrupted by driveways 0 2 3 4 5 Sidewalks not wide enough for two people* 0 5 6 10 11 Intersections don t have curb ramps* Sidewalks do not have a parkway/buffer separating it 0 3 4 6 7 from the street Existence of overgrowth 0 2 3 4 5 Other** https://www.digitalcommonwealth.org/search/commonwealth:mg74qw24f 0 5 Image source: http://blog.hemmings.com/index.php/2011/06/20/edison-west-orange-1902/ 6 10 11

METHODOLOGY Street Total Walkability Score Pleasant Valley Way 283 Prospect Avenue 240 Northfield Avenue 208 Wheeler Street 187 Washington Street 140 Chestnut Street 132 Harrison Avenue 129 Main Street 120 Valley Road 118 Mount Pleasant Avenue 118 Woodland Avenue 115 Park Avenue 107 Eagle Rock Avenue 96 Stanford Avenue 89 Mitchell Street 78 William Street 69 Sheridan Avenue 61 Franklin Avenue 57 Rollinson Street 47 0-75 76-140 141-210 211-270 271-352 Scoring Chart Very Walkable: The best score; many of the elements of this street are working well and only modest adjustments will be needed in select categories, if at all Walkable: The street is generally good, but needs improvement in some areas for a better pedestrian environment Somewhat Walkable: There is a general need for improvement to improve walkability, safety and inclusivity on this street. Existing conditions may currently pose a hazard to pedestrians Not Very Walkable: The street needs a lot of work to improve walkability, safety and inclusivity and is likely a hazard to pedestrians without fixes in the near and long term https://www.digitalcommonwealth.org/search/commonwealth:mg74qw24f Image source: http://blog.hemmings.com/index.php/2011/06/20/edison-west-orange-1902/ Not Walkable At All: The worst score; this street is not safe to walk and has other barriers to inclusivity and comfort. Immediate attention should be paid for these streets to ensure a safer community and better quality of life for all.

Background History West Orange Characteristics Demographics Transportation Methodology Overall Findings OVERALL FINDINGS

OVERALL FINDINGS SAFETY Open utility ducts

OVERALL FINDINGS SAFETY Cracked and uneven sidewalks Bus stops without pedestrian infrastructure

OVERALL FINDINGS SAFETY Unmarked crosswalks

OVERALL FINDINGS ACCESSIBILITY Misaligned truncated domes Discontinuous sidewalks

OVERALL FINDINGS Accessibility ACCESSIBILITY Lack of pedestrian scale lighting

OVERALL FINDINGS ACCESSIBILITY Lack of bicycle infrastructure

OVERALL FINDINGS COMFORT & APPEAL Lack of shoulders and parkways

OVERALL FINDINGS COMFORT & APPEAL Out-of-order parking meters Lack of lighting

OVERALL FINDINGS Unmarked crossing Wide curb radius Lack of pedestrian scale lighting Wide curb radius No street trees in parkway No street trees in parkway Dangerous and confusing intersection Woodland Avenue, West Orange

Background Creating Complete Streets Beyond the Scope CREATING COMPLETE STREETS

Creating Complete Streets Northfield Avenue Pleasant Valley Way Main Street Overall Recommendations Bicycle Network Policy Recommendations NORTHFIELD AVENUE

NORTHFIELD AVENUE NORTHFIELD AVENUE o South side of West Orange o East west, 3.43 miles o Residential, suburban, large elevation changes Source: NJGIN

NORTHFIELD AVENUE NORTHFIELD AVENUE Long distances between crosswalks Wide lanes encourage speeding Northfield Avenue, near Turtleback Zoo

NORTHFIELD AVENUE NORTHFIELD AVENUE MAIN STREET

NORTHFIELD AVENUE NORTHFIELD AVENUE MAIN STREET

NORTHFIELD AVENUE Northfield Avenue, near Turtleback Zoo, before

NORTHFIELD AVENUE NORTHFIELD AVENUE Northfield Avenue, near Turtleback Zoo, after

NORTHFIELD AVENUE Presence of overgrowth No sidewalk No shoulder Northfield Avenue, facing west near Walker Rd Northfield Avenue, just west of Pleasant Valley Way

NORTHFIELD AVENUE NORTHFIELD AVENUE MAIN STREET

NORTHFIELD AVENUE NORTHFIELD AVENUE MAIN STREET

NORTHFIELD AVENUE No transit shelter No sidewalks Wide streets with no crosswalks NORTHFIELD AVENUE Northfield Avenue, facing west near Dogwood Rd

NORTHFIELD AVENUE NORTHFIELD AVENUE MAIN STREET

NORTHFIELD AVENUE NORTHFIELD AVENUE MAIN STREET

NORTHFIELD AVENUE Northfield Avenue, near Dogwood Ave, before

NORTHFIELD AVENUE Northfield Avenue, near Dogwood Ave, after

Creating Complete Streets Northfield Avenue Pleasant Valley Way Main Street Overall Recommendations Bicycle Network Policy Recommendations PLEASANT VALLEY WAY

PLEASANT VALLEY WAY PLEASANT VALLEY WAY o West side of West Orange o North south, 4.28 miles o Residential, suburban Source: NJGIN

PLEASANT VALLEY WAY No pedestrian scale lighting No bicycle infrastructure No shoulder striping Lane width determines speed Pleasant Valley Way, in front of high school

PLEASANT VALLEY WAY PLEASANT VALLEY WAY MAIN STREET

PLEASANT VALLEY WAY PLEASANT VALLEY WAY MAIN STREET

PLEASANT VALLEY WAY Pleasant Valley Way, north of high school, before

PLEASANT VALLEY WAY PLEASANT VALLEY after Pleasant Valley Way, north of high school, after

PLEASANT VALLEY WAY Lack of pedestrian scale lighting No sidewalks Lack of crosswalks Wide lanes encourage speeding Pleasant Valley Way, near Cunningham Dr.

PLEASANT VALLEY WAY PLEASANT VALLEY WAY MAIN STREET

PLEASANT VALLEY WAY PLEASANT VALLEY WAY MAIN STREET

Creating Complete Streets Northfield Avenue Pleasant Valley Way Main Street Overall Recommendations Bicycle Network Policy Recommendations MAIN STREET

MAIN STREET MAIN STREET o East side of West Orange o North south, 1.36 miles o Dense, urban, commercial and residential Source: NJGIN

MAIN STREET Lack of pedestrian scale lighting Short cross time Sidewalks blocked No shoulder Large turning radii Parking unmarked Main Street at Northfield Avenue and Valley Road

MAIN STREET

MAIN STREET MAIN STREET

MAIN STREET Main Street just south of Park Avenue, before

MAIN STREET Main Street just south of Park Avenue, after

MAIN STREET Lack of pedestrian scale lighting Lack of sidewalk Graffiti Cracked and uneven sidewalk No shoulder Main Street just north of Charles Street

MAIN STREET MAIN STREET

MAIN STREET

MAIN STREET No bus shelter or bench No street trees No street furniture High speeds Main Street in front of the Thomas Edison Park

MAIN STREET MAIN STREET

MAIN STREET MAIN STREET MAIN STREET

MAIN STREET MAIN STREET Main Street in front of the Thomas Edison Park, before

MAIN STREET Main Street in front of the Thomas Edison Park, after

MAIN STREET Main Street in front of the Thomas Edison Park, after

MAIN STREET Main Street in front of the Thomas Edison Park, after

MAIN STREET Main Street in front of the Thomas Edison Park, after

Creating Complete Streets Northfield Avenue Pleasant Valley Way Main Street Overall Recommendations Bicycle Network Policy Recommendations OVERALL RECOMMENDATIONS

RECOMMENDATIONS Beautify the Community Benches Bicycle racks Bus shelter ADA-compliant curbs Decorations

RECOMMENDATIONS Pedestrian scale lighting Shade trees for pedestrian comfort Wide sidewalk Albany Street, New Brunswick

RECOMMENDATIONS Space for local business signs Planters on the street Well-maintained infrastructure Varied materials for the buffer Raritan Avenue, Highland Park

WAYFINDING https://www.digitalcommonwealth.org/search/commonwealth:mg74qw24f Image source: http://blog.hemmings.com/index.php/2011/06/20/edison-west-orange-1902/ Attached to existing poles Standalone kiosk Attached to bus shelter

WAYFINDING o Key component of Complete Streets Plan o Emphasizes how walkable West Orange can be o Provides navigation assistance to pedestrians o Increases foot traffic to local businesses and attractions https://www.digitalcommonwealth.org/search/commonwealth:mg74qw24f Image source: http://blog.hemmings.com/index.php/2011/06/20/edison-west-orange-1902/

WAYFINDING Museum in the Streets https://www.digitalcommonwealth.org/search/commonwealth:mg74qw24f Image source: http://blog.hemmings.com/index.php/2011/06/20/edison-west-orange-1902/ Museum in the Streets Museum in the Streets Minneapolis, MN Waterville, ME

Creating Complete Streets Northfield Avenue Pleasant Valley Way Main Street Overall Recommendations Bicycle Network Policy Recommendations BICYCLE NETWORK

BICYCLE NETWORK BICYCLE NETWORK o Benefits of cycling include: Improved physical and mental health Elevated property values Increased social and cultural interactions Expanded transportation equity Decreased congestion Reduced environmental footprint Cyclist seen on Northfield Ave during field work 9/30/15

BICYCLE NETWORK BICYCLE NETWORK Four Types of Cyclist by Portion of Population source: Portland, OR, DOT

BICYCLE NETWORK BICYCLE NETWORK o A method for comparing the ease and comfort of cycling on different roads o Level of Stress 1: the level most bicyclists can tolerate, including children and senior citizens o Level of Stress 2: the level tolerated by most adult bicyclists o Level of Stress 3: the level tolerated by the enthused & confident rider o Level of Stress 4: the level tolerated by the strong & fearless rider West Orange Level of Stress Criteria Street Width Posted Speed Limit 2-3 Lanes 4-5 Lanes 6+ Lanes 25 MPH 1-2 3 4 30 MPH 2-3 4 4 35+ MPH 4 4 5 Add 1 LOS for poor pavement Add 1 LOS for steep grade

BICYCLE NETWORK BICYCLE NETWORK

BICYCLE NETWORK BICYCLE NETWORK o A network of bicycle lanes and sharrows as appropriate o Includes a continuous, low-stress route allowing cycling access throughout town; the West Orange Bikeway o Integrated with community resources and major attractions o Possible expansion to include other important avenues and additional local bicycle paths o Include new bicycle-specific signage and bicycle racks

BICYCLE NETWORK BICYCLE NETWORK o The West Orange Bikeway connects every part of town o A mix of sharrows, bicycle lanes and protected bicycle lanes depending on the street o Level of Stress 2 or lower throughout the entire route. Two short sections are Level of Stress 3 due to a steep grade o Unique and distinct street sign toppers at every intersection of the bikeway Proposed street sign topper for West Orange Bikeway

BICYCLE NETWORK BICYCLE NETWORK Proposed West Orange-specific bicycle racks Proposed West Orange-specific bicycle wayfinding signage To be installed on all streets with sharrows

Creating Complete Streets Northfield Avenue Pleasant Valley Way Main Street Overall Recommendations Bicycle Network Policy Recommendations POLICY RECOMMENDATIONS

VISION ZERO VISION ZERO Vision Zero o 4 Es Engineering, Enforcement, Encouragement, Education o Zero deaths and injuries due to traffic violence o Community Design o Infrastructure o Pricing/Convenience o Education o Safety o Performance Measures Image source: la.streetsblog.org

VISION ZERO VISION ZERO

VISION ZERO VISION ZERO Safety o Year 1: 20 mph for residential streets o Years 2-5: No right turns on red at dangerous intersections o Years 6-10: 25 mph for arterial streets Image source: usa.streetsblog.org

VISION ZERO VISION ZERO Education o Year 1: Celebrate Vision Zero o Years 2-5: WO Pedestrian Safety Advisory Board holds annual Kids of West Orange Event o Years 6-10: Safe Routes to School representative visits schools Image source: newjerseybikewalk.org

VISION ZERO VISION ZERO Infrastructure o Year 1: Complete street redesign of 2 streets o Years 2-5: Pedestrian wayfinding signage o Years 6-10: Complete streets guidelines Image source: switchboard.nrdc.org

FUNDING AND GRANTS FUNDING Federal, state and local sources include: o o o o o o o Community Development Block Grants Transportation Alternatives Program (TAP) Highway Safety Improvement Program (HSIP) NJDOT Bikeway Grant Program NJDOT Safe Streets to Transit NJDOT Centers of Place Grant Program NJDOT Bicycle and Pedestrian Local Transportation Planning Assistance Program Hud.gov, Safety.fhwa.dot.gov and NJDOT

Background Creating Complete Streets Beyond the Scope BEYOND THE SCOPE

Beyond the Scope Shared Street Visualizing the Community Summary SHARED STREET

SHARED STREET SHARED STREET Shared streets: traffic calmed spaces where children play, people walk, bike, and share the road with drivers Dylan Passmore, Flickr

SHARED STREET

SHARED STREET Wide curb radius WHEELER STREET o East side of West Orange o North south, less than 1/10 th mile o Dense, urban, commercial, and residential Source: NJGIN

SHARED STREET SHARED STREET Wheeler Street: Before

SHARED STREET

SHARED STREET

SHARED STREET SHARED STREET

SHARED STREET

SHARED STREET SHARED STREET

SHARED STREET

SHARED STREET

Beyond the Scope Shared Street Visualizing the Community Summary VISUALIZING THE COMMUNITY

VISUALIZING THE COMMUNITY

SUMMARY o Good opportunities to make streets safer, more accessible o Funding is available o Will require some priority-setting o Wayfinding and bicycle network support pedestrian improvements o Zoning and policy changes may help in the future o Complete Streets will improve the West Orange community for all residents

THANK YOU! THANK YOU!