Wood County Economic Development

Similar documents
Business Plan Presentation

Asheville s Fairview Water System Improvements: from Modeling to Contract Documents. April 19, 2016 Meg Roberts, PE

Rochester Area Bike Sharing Program Study

South King County High-Capacity Transit Corridor Study

current supply and what is needed for future conditions; this is not the total water demand for these utilities.

Winter Ice Manufacture by Snowmaking: A Novel Approach for Massive Ice Production for a Variety of Industrial and recreational Applications

Greenway Golf Lease Amendment. City Council February 20, 2018

OBG PRESENTS: Proactive Approach to Infrastructure Renewal

Technical Report Culvert A Hydraulic Analysis

MSW Objective 1.1: Level of Service Standards To maintain the IMSWMS MSW collection system to meet or exceed established LOS standards.

Alley OUR BUSINESS SUMMARY

Gas Transportation Planning System in the Department of Economy of Gazprom

Abstract. Background. protected/permissive operation. Source: Google Streetview, Fairview/Orchard intersection

APPENDIX D. SFPUC Supply Reliability Information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

DISCUSSION AND RECOMMENDATION ON OPTIONS FOR THE CREATION OF A COMMUNITY DEVELOPMENT AREA IN THE SUGAR HOUSE NEIGHBORHOOD

Shared Resource Conservation Manager Program Report Washington State University Energy Program, March 2013

The City of Lynnwood. Centrifuge or Screw Press? To Incinerate or not to Incinerate a Best Practice Review

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

The NCI Charrette System

Proposed Sewer & Water Rates. City of Placerville, California February 13, 2018

Government of the District of Columbia Department of Transportation

Rates as of January Current rates may be different. Morganton. Note: "Commercial" rates may also be applicable to other non-residential users.

MAKING THE CONNECTION: TOD A BLUEPRINT FOR SUCCESS

Justin J. Kringstad North Dakota Pipeline Authority

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

Water & Sewer Rate Study

The City of Liberty City Council Special Called Meeting

DEPARTMENT OF TRANSPORT

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

Interlake Tunnel WRA Board Workshop. August 25, 2014

Caltrain Bicycle Parking Management Plan

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Justin J. Kringstad North Dakota Pipeline Authority

Highway 17 Transportation Improvement Study

NILES FERRY INDUSTRIAL PARK Vonore, Monroe County, Tennessee

Napa County Fairgrounds Opportunity Analysis. RCH Group A. Plescia & Co. Fair & Exposition Planning Consultants. September 8, 2016.

The primary purpose of the TFF is to help promote a healthy farm tenanted sector in Scotland. It aims to fulfil this purpose by:

City of Waverly Water System

SARASOTA COUNTY GOVERNMENT Parks and Recreation

Private-Public Partnership. Presentation to Metropolitan Council October 2, 2017

Caltrain Bicycle Parking Management Plan DRAFT PROJECT SCOPE SUBMITTED TO CALTRANS FALL 2014

City Council Budget Work Session. Utility Funds & Library Overview. July 9, 2018

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Road Diets FDOT Process

Medical Oxygen Concentrator Systems. Generate gases on site generate savings

Operational Comparison of Transit Signal Priority Strategies

ST. JOHNS GOLF CLUB PHASE II FINDINGS, PHASE III RECOMMENDATION, AND POTENTIAL PARTNERSHIP OPPORTUNITY

Maryland Chapter Trout Unlimited Brook Trout Conservation Effort

MIKE NET AND RELNET: WHICH APPROACH TO RELIABILITY ANALYSIS IS BETTER?

SIPLACE and BILTON 900,000 meters of flexible LED modules produced in-house with the SIPLACE SX Working with technologies of the future

Living Streets Policy

Constitution of Ukraine

J.A. and Kathryn Albertson Family Foundation Boise Whitewater Park Ph II User Group Meeting 01/23/2018 Presented by: John Tensen P.E.

Access Management Regulations and Standards

Impacts of Freshwater Releases from Lake Okeechobee on Sanibel Island and the Coastal Waters of Lee County

VDOT BICYCLE & PEDESTRIAN IMPLEMENTATION GUIDE FOR LOCALITY INVOLVEMENT April 2017

JACKRABBIT DEVELOPMENT

Eastern PA Trail Summit October 1, 2018

Functional Classification of Roads and Streets

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

WATER MANAGEMENT STRATEGIES FOR CYPRUS. Dr. Ioannis P. Glekas AEOLIKI Ltd

Hydraulic transients, also known as pressure

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Environment and Public Works Committee Presentation

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

Fairfax County Parkway Widening Fairfax County

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

Expansion of Bike Share within San Jose supports the City's ambitious mode shift goals to have 15% of commute trips completed by bicycles by 2040.

District Cooling System at Kai Tak Development Content

al qadisiya, kuwait city sustainable urban retrofit and design + ali irani, andré pina, katie gertz, nathaniel jones, nelson soares

Welcome to the Final Cross Camden County Trail Public Input Session!

to the Public Information Centre for the Downtown Traffic Study

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Hydraulic Modeling to Aid TDG Abatement at Boundary and Cabinet Gorge Dams

RESIDENTIAL WATER DISTRIBUTION

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps

RECOMMENDATION. POLICY The Park Board approves all use of lands under its jurisdiction.

Charlotte Region Fast Lanes Study Phase III

HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation

San Antonio Creek Spreading Grounds Rehabilitation Project Ojai Valley, CA

Basalt Creek Transportation Refinement Plan Recommendations

The five potential solutions and some of their benefits and costs are listed in the following table: Ferry Patron Bike Parking Alternatives

Cascade Bicycle Club Strategic Plan

PROVING THAT BLADDER SURGE TANKS CURED EXCESSIVE SURGE CONDITIONS IN A 30 FORCE MAIN

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010.

Members of the Board of Directors. Wendy Knowles, Clerk of the Board. Metrolink Ridership and Revenue Annual Report

Bicycle and Pedestrian Plans and Improvements

Developing a programme to make Taranaki predator-free

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY

Recent Developments in Pressure Management

Public Hearing Tarrant County. October 11 th, 2012

2017 Distance Report. A Review of Driving Distance Introduction

City of Fairfax, Virginia City Council Work Session

Reality Flow Monitoring:

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

November 14, Dulles To DC Loop Public-Private Partnership Proposal. Executive Summary

Transcription:

Wood County Economic Development Water Source Evaluation Study Phase I and Phase II Study Review NWWSD Public Meeting February 15, 2018 Jack Jones, P.E. Poggemeyer Design Group

Purpose Summary Phase I Study To protect the economic development interest of Wood County and its citizens that are currently served public water produced by the City of Toledo. To determine if feasible alternatives are available to serve Wood County customers currently supplied with a Toledo water. If so, are the alternatives cost effective. Could the alternatives be physically and politically achieved. Conclusion Cost range would be $40.57 to $42.92 per 1000 c.f. with no grant funding This is a competitive rate to the proposed Toledo Rate

Summary Phase I Study Evaluated: City of Bowling Green WTP Bayshore Power Plant WTP Maumee River WTP (Various Intake Locations) Costs for improvements were to be paid by NWWSD and Perrysburg. The most feasible concept was a City of Bowling Green water supply. The primary potential users were: City of Perrysburg NWWSD

Previous Phase I Report Summary Alternative Users: City of Maumee Village of Whitehouse Henry County Water District Minimum Costs: Maximum Costs: $134 Million to $151 Million $233 Million to $252 Million

Benefit Analysis City of Bowling Green WTP Expansion: Existing Operation Staff Least Capital Cost Expandable Technology Membrane Shared Process Benefits City of Bowling Green Cooperation/Benefit Existing Customer Service Agreement

Benefit Analysis New Bayshore Power Plant WTP: Purchase After Closure Issues Existing Unlimited Source Supply Lake Erie All New Operating Staff Longest Transmission Mains Routes Source Water Quality Concerns Storm Activity Small Backup Reservoir - Recommended

Benefit Analysis New Maumee River Supply WTP: Potentially Closest to Area to be Served Most Problematic Area for Reservoir Siting All New Operating Staff New River Intake Controversy (Potential) Most Urbanized Development Shortest Transmission Main Routes

Evaluation of Alternatives All three primary alternatives proved feasible for implementation; however, the alternative that has the least probable implementation risk factors is the City of Bowling Green WTP Expansion. These risk factors include: Land Availability/Costs Utility Conflicts/Existing Systems Neighborhood Opposition Political Cooperation Environmental Permitting/Approvals Agency Review/Support Cost Variations/Funding Easier Implementation

Previous Phase I Report Summary Project Improvements City of BG Alternative WTP Expansion (13.29 21 MGD) (Recommended) Reservoir (60 90 Days) Raw Water Transmission Line Transmission Supply Mains Booster Pump Station/Storage Next Step Intergovernmental Agreement Negotiations Completed August 2016

Phase II Study WCEDC decided to complete a Phase II Study to refine concepts and probable capital and operating costs based on the City of Bowling Green source supply and include the City of Maumee service area along with the City of Perrysburg and NWWSD service areas. Currently, the City of Toledo and its current contract communities continue to negotiate for the creation of a more equitable Regional System.

Purpose Phase II Study A. More in-depth study of the Bowling Green WTP expansion. B. Reviewed the wholesale rate and what debt is included in the rate. C. Reviewed the alternatives for reservoir construction and opted for two 150 to 200 acre reservoirs, one within one mile and a second within two miles of the WTP. D. Proposed, hydraulically modeled and evaluated advantages and disadvantages of three transmission main route concepts to provide service. E. Refined the transmission mains, reservoirs and WTP expansion costs. F. Adjusted the probable bulk water rate at the point of service based on the Bowling Green wholesale rate and refined project costs.

Results of the Phase II Study A. Transmission main route costs were refined and vary from $42.4 Million to $50.4 Million. B. The WTP and reservoir costs were refined to $104.9 Million for 23.49 MGD. C. The City of Bowling Green funds the $104.9 Million in the wholesale rate calculation. D. This current wholesale rate would be adequate to fund the new debt and operating costs at $27.13/1000 c.f. plus a monthly meter charge estimated at $8,345/month. E. The additional transmission debt and operational costs adds an estimated $8.55/1000 c.f. F. The final costs for the bulk water to the point of connection is estimated at $35.94/1000 c.f. (Lower than Phase I Study Estimate due to Maumee Inclusion)

Benefits of Bowling Green Service Higher pressures at WTP 95 psi. Additional topographic influence for 12 to 21.5 psi. Peak capacity of WTP = 21 MGD to 24.3 MGD (23.59 MGD Used). Could provide service without existing entity pumping facilities. Provides additional benefits to the City of Bowling Green: More treatment flexibility More reservoir capacity More transmission redundancy Lower per unit of treatment operating costs Maintain redundant Toledo connections for emergency conditions.

Phase I Phase II Comparison Phase I Study Phase II Study Did Not Include Maumee Cost to Serve without Grants $40.85/100 0 c.f. Smaller transmission mains without Maumee Evaluated only one Primary Route Costs Min: $134 - $151 M with Maumee Max: $233 - $252 M with Expanded Area Capacity 21 MGD Summer Includes Maumee Costs $35.94/1000 c.f. Requires larger transmission mains to include Maumee Multiple alternative routes made more sense with Maumee Service Costs $147.3 - $154.3 M with Maumee Capacity 23.59 MGD Summer

Summary NWWSD, Perrysburg and Maumee have a potential cost effective option to Toledo Water if developed jointly with a City of Bowling Green WTP expansion. The City of Bowling Green would still own, operate and maintain the facility. Bowling Green has proved to be pro-regional in its wholesale agreements in approach and methodology realizing the benefit of its regional partners in its own operations. With the Bowling Green Alternative, there could be some limitations on large volume future prospective water users when compared to the Toledo connections and WTP capacity.

Summary The economic benefits of the Bowling Green Connection would need to be recalculated if the District Perrysburg Maumee cooperative purchase is modified by one or more of the entities determining reduced interest. The TAWA Agreement continues to develop positively, if all entities agree and are supported by their respective legislative entities.

QUESTIONS?