Sixth Street Viaduct December 5, 2013 HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN

Similar documents
CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

TOWN OF WINDSOR AGENDA REPORT

AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

Diamond Springs Parkway Project

BUDGET FOR RESEDA BOULEVARD, STREET RECONSTRUCTION / VISION ZERO PROGRAM, REPORT BACK, COUNCIL FILE

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

7th Street Bridge Project. Public Presentation February 24, :30pm-8pm

JOINT PARTNERSHIPS: Working Together To Support Light Rail in Santa Monica

Wilshire Boulevard Bus Rapid Transit Project

ACTION: SELECT PREFERRED LIGHT RAIL ALIGNMENT FOR PHASE 2 OF THE EXPOSITION CORRIDOR TRANSIT PROJECT

Project Budget and Schedule Status

City of Lafayette Public Meeting Agenda Downtown Street Improvement Master Plan Implementation Committee Thursday, April 21, :00 PM

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

Citizens Advisory Committee March 26, 2014

SANTA MONICA BOULEVARD CORRIDOR

TRANSBAY JOINT POWERS AUTHORITY

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Expansion of Bike Share within San Jose supports the City's ambitious mode shift goals to have 15% of commute trips completed by bicycles by 2040.

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Draft MOBILITY ELEMENET. Community Meeting May 22, 2013

CITY OF ANN ARBOR TRAFFIC CALMING PROGRAM PROCESS OVERVIEW. Petitioner defines the project area limits and gathers petition signatures.

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS


COMMUNITY MEETING August 23, 2018

A Downtown Transformed Through Partnerships: the Portland Mall Story

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

City of Wilsonville 5 th Street to Kinsman Road Extension Project

I-105 ExpressLanes Project

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

Richardson Center Corporation By Gary Phillips University at Buffalo Law Student

Participation is open to all Stakeholders of the Coastal San Pedro Neighborhood Council.

Clay Street Bridge Replacement Project

101 Corridor Managed Lanes

Staff Report City of Manhattan Beach

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

Transit Choices December 8, 2016

Bicycle Master Plan Goals, Strategies, and Policies

SUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing

Part of Growing Rail Network

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

Bicycle Friendly Niagara Falls

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

Transportation Technology and Infrastructure Committee February 13, 2017

Service Business Plan

POLICY ADVISORY COMMITTEE

Summer has come to an end and cooler weather is in sight. This is the perfect time of year to start walking and enjoying our downtown area.

City of Los Angeles. Presentation on Sidewalk Vending

I-20 East Transit Initiative. Stakeholder Advisory Committee Meeting September 9, :00-6:00 PM

TRANSPORTATION COMMISSION Agenda Staff Report

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Financial Project ID No(s).: and ETDM No(s).: and 14181

Citizen Advocacy. VISION ZERO IN HILLSBOROUGH COUNTY TODAY

Living Streets Policy

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

MARTIN LUTHER KING JR. WAY

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

I-95/Temple Avenue Improvements Project Colonial Heights, VA

City of Ann Arbor Pedestrian Safety & Access Task Force

Blue Ribbon Commission Report Recommendations on Pedestrian and Bicycle Infrastructure Improvements

Vision Zero San Jose. Moving toward zero traffic deaths and providing safe streets for all

Highway 17 Transportation Improvement Study

TAMPA BAY EXPRESS (TBX)

Charlottesville Regional Chamber of Commerce. October 28, 2014

Update of the Master Transportation Plan s (MTP) Bicycle Element

Andi Lovano, Project Development Administrato~

PROJECT FACT SHEET March 21, 2018

CHAPTER 1 INTRODUCTION

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING

AGENDA ITEM G-2 Public Works

Technical Working Group November 15, 2017

5:30 1 Introductions, appointment of note taker (5 minutes) Ad

PEDESTRIAN ACTION PLAN

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

PROJECT FACT SHEET May 25, 2018

Freeway ramp intersection study

STONY PLAIN ROAD STREETSCAPE

Fishers Community Art Project Request for Proposals May 1, 2014

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

City of Santa Monica City Manager s Update at Council February 23, 2016

History Recent Problems Alternative Routes

Walterdale Bridge Replacement

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Southeast-1 Stations: ALIGNMENT OVERVIEW

Detailed Description of Work

County of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1.

Working Group Meeting

Call for Artists/Request for Qualifications Public Art at the Vail Skatepark, Vail, Colorado

Project Team Project Background Project Improvements Proposed Construction Approach Traffic Impact and Mitigation Next Steps Questions/Comments

Transcription:

Sixth Street Viaduct December 5, 2013 HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN

Meeting Agenda 2 1. Project Background and Update 2. Summer Internship Program 3. Viaduct Design Update 4. Intersection Improvement Update 5. Construction 6. Public Art Program 7. Question & Answer SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013

Project Background 3 In 1932, the Sixth Street Viaduct was constructed of concrete containing an alkali silica mix. It was later discovered the mix was breaking down the viaduct structure. The viaduct was retrofitted in 1995. A seismic vulnerability study, completed in 2004, concluded that the viaduct deterioration had reduced its capacity to withstand earthquakes and needed to be replaced. From 2006 to 2011 the City held community meetings to discuss the proposed viaduct replacement project. Approximately 56 public meetings were held between 2006 to 2011 regarding the proposed project: business one-on-one meetings, community advisory committee meetings, public hearings and community information sessions. SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013

Project Background 4 During this period, the City of Los Angeles, Caltrans, and federal agencies held planning meetings and discussions with the community hearing recommendations for the proposed project. This project will demolish and replace the existing 3,500 feet long Sixth Street Viaduct, which spans over the Los Angeles River, railroad corridors, adjacent industrial properties and the 101 Freeway. The community will continue to provide input via community briefings, through the Design Aesthetics Advisory Committee (DAAC), and the Public Arts Advisory Committee (PAAC). SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013

5

Project Background 6 An International Design Competition and release of the project RFP was announced by former Mayor Antonio R. Villaraigosa, Councilmember Jose Huizar, and the Bureau of Engineering on April 12, 2012. There were four public presentations by each design team HNTB was selected as the designer on October 19, 2012 HNTB began to work on the project on March 26, 2013 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013

Project Update 7 The award of CMGC (Construction Manager/General Contractor) Contract to Skanska/Stacy Witbeck, JV (SSW) was adopted by the Board of Public Works on November 15, 2013. Funding is primarily from the Federal Highway Bridge Program with matching funds from the State Proposition 1B Seismic Safety Retrofit Program. SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013

Summer Internship Program 8 Two graduates from Bishop Mora Salesian High School were selected. Interns participated in a 6-week Summer Internship Program. They interacted with elected city officials, city engineer, Bureau of Engineering staff, community outreach team, Cultural Affairs Commission, public utility executives, client partners and other stakeholders. SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013

Summer Internship Program 9 A luncheon was held in honor of the interns where they both shared highlights, including meeting Los Angeles Mayor Eric Garcetti. SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013

Viaduct Design Update 10 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013

SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013 11

SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013 12

SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013 13

SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013 14

SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013 15

SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013 16

SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013 17

SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013 18

Intersection Improvement Update 19 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013

Intersection Improvement Update 20 50% Design completed August 2013 90% Design Scheduled January 2014 Construction Begin Summer 2014 Construction Complete Spring 2015 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013

Construction Skanska & Stacy/Witbeck Joint Venture Skanska USA Civil West (California District) Began working in Southern California in 1919 Recent projects include: Expo 2 Light Rail, Los Angeles & Santa Monica Gold Line Bridge, Arcadia Northridge earthquake I-5 Gavin Canyon bridge reconstruction Stacy & Witbeck Founded in 1981 and based in Alameda, CA Successful CMGC contractor on over 20 projects throughout western US SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013

Construction 22 Skanska USA- Gold Line Bridge, Arcadia, CA SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013

Future Construction Activities Building Demolition Approximately 15 buildings which conflict with new viaduct alignment Projected to begin summer, 2014 Utility Relocation Numerous electrical lines to be relocated underground Projected to begin summer, 2014 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013

Future Construction Activities Off Site Intersections 11 intersections in Boyle Heights 9 intersections west of LA River Night & weekend work to limit disruptions Projected to begin Summer, 2014 Viaduct Demolition Closure of 6 th Street/Whittier Blvd Some night work 6 to 9 months of work beginning no earlier than December, 2014 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013

Future Construction Activities New River Gateway Crossing under 9 active rail lines Pile driving during daytime Projected to begin spring, 2015 New Viaduct Foundation work to begin spring 2015 Some work to be performed at night to accommodate railroads, businesses, traffic Other site improvements under consideration to be presented in February/March 2014. SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013

SIXTH STREET VIADUCT REPLACEMENT PUBLIC ART PROGRAM Department of Cultural Affairs PUBLIC ART DIVISION

CD14 Motion [Oct 2012]; DCA Report [Mar 2013]; Council Approval [Apr 2013]; PAAC Established [Jul 2013] PAAC Members: Melissa Richardson Banks Principal of CauseConnect Anne Bray artist, teacher, Founding Director of Freewaves Abe Flores Advocacy Field Manager for Arts for LA Timothy Keating Board President & Treasurer of LADADSpace, Vice President of Los Angeles River and Business Association (LARABA), Arts District representative for the LA Historic Cultural Neighborhood Council Edward Padilla artist, teacher, Board President of CASA 0101 Theater PAAC Activities: Orientation [Aug 2013] Working Meeting [Sep 2013] Drafting of a Vision Statement [Nov 2013] BACKGROUND Department of Cultural Affairs PUBLIC ART DIVISION [27]

ART PROGRAM FRAMEWORK PRIMARY CONSIDERATIONS: Architectural Vision Iconic Artwork Muralism Local Opportunities Curatorial Approach Department of Cultural Affairs PUBLIC ART DIVISION [28]

VIADUCT ART PROGRAM FUNDED by the VIADUCT REPLACEMENT PROJECT: Integrated Public Art ICONIC ARTWORK INSTALLED DURING CONSTRUCTION OTHER POTENTIAL ART PROGRAM CONSIDERATIONS: MURALS PROGRAM CONSERVATION + NEW MURALS TEMPORARY ARTS PROGRAMMING FUTURE PROGRAMMING AT VIADUCT Department of Cultural Affairs PUBLIC ART DIVISION [29]

INTEGRATED PUBLIC ART PROJECT Public Works Improvements Arts Program [LAAC 19.85] 1% of Viaduct Construction Budget Iconic Public Artwork Department of Cultural Affairs PUBLIC ART DIVISION [30]

THE VIADUCT DESIGN ARCHITECTURAL DESIGN CONCEPTS: Expanding CONNECTIVITY A CINEMATIC Experience A MULTIMODAL Future ART, CULTURE + HISTORY Department of Cultural Affairs PUBLIC ART DIVISION [31]

ARCHITECT S PUBLIC ART EXAMPLES Crown Fountain, permanent installation ARTIST Jaume Piensa [Spain] LOCATION Millennium Park, Chicago BUDGET $13.5M Bay Lights, temporary installation ARTIST Leo Villareal [NY] LOCATION Bay Bridge, San Francisco BUDGET $8M Department of Cultural Affairs PUBLIC ART DIVISION [32]

ARCHITECT S PUBLIC ART EXAMPLES Song 1, temporary installation ARTIST Doug Aitken [LA] LOCATION Hirshhorn Museum, Washington, D.C. BUDGET $500K Her Patience Is Secret, permanent sculpture ARTIST Janet Echelman [MA] LOCATION Downtown Civic Park, Phoenix BUDGET $2.5M Department of Cultural Affairs PUBLIC ART DIVISION [33]

To create an engaging artwork that is interactive, open-ended, and reflective of LA, with an emphasis on bridging communities and activities flowing around and through the site. THE PUBLIC ARTWORK SHOULD: Address equitable onsite opportunities for participatory cultural expression; SIXTH STREET VIADUCT PUBLIC ART VISION STATEMENT Amplify the Viaduct as a central place for creative activity; Enhance the Viaduct as a destination and focal point to unify the city; and Consider the naming of the Viaduct as a way to emphasize the potential use of public art as a process for cultural exchange. Department of Cultural Affairs PUBLIC ART DIVISION [34]

For more information, visit http://sixthstreetviaductreplacement.org/ 35 @6thstviaduct 6 th Street Viaduct Replacement Project SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN 12.05.2013