BANK URBAN DESIGN REVIEW PANEL MEETING. Contents. 14 February Prepared By: Context photos. Conceptual Renderings.

Similar documents
UDB. Urban Design Brief (Continued - Section 6) 137 and 141 George Street, 321 Dalhousie Street May 2013

PUBLIC REALM MASTER PLAN

Site Analysis and Parti Development

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

III.A.4. Photo Simulations

Non-Motorized Overpass at SR 5/US1

Community Meeting: Proposed Development 4520 Penn Ave. Notes January 30, :30-8:30pm

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

APPENDIX 11 WIND EFFECTS ASSESSMENT

Baseball and Books. Master of Architecture. Jacob Tuzzo

MEETING Agenda. Introductions. Project Overview. Key Study Components. Alternative Station Concepts. Preferred Station Concept. Next Steps.

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

NEIGHBORHOOD PLAN RENDERING A1.0: NEIGHBORHOOD PLAN

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

SITE AND BUILDING INFORMATION. March 28, 2018

Major Bike Routes 102 Avenue Workshop April 21, 2015

TRUE+WAY ASL Workbook Unit 4.3

RFP-NR LICENSE AGREEMENT - INDOOR TENNIS FACILITY PINEBROOK TENNIS CENTER

Thoreau Path Master Plan Final Draft. prepared for: The Boston Redevelopment Authority West End Community November 2007

OPEN HOUSE WELCOME Bronte Village Growth Area Review

Architectural Response

Pedestrian Level Wind Study Bank Street. Ottawa, Ontario

Dear Ms. Maw: Qualitative Pedestrian Level Wind Assessment St-Charles Market, 135 Barrette Street, Ottawa GWE File No.

Fordham Plaza. Conceptual Design Study

Traffic Impact Memorandum. May 22, 2018

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

McGrath Boulevard Project Development Public Meeting #2 May 28 th, 2015 East Somerville Community School

@ North Fair Oaks COMMUNITY MEETING

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Getting the facts 8th Street Pedestrian Bridge Preferred Option

Presentation by: Peggy Gaynor, ASLA, Principal GAYNOR, Inc. Images: Peggy Gaynor

West Seattle Junction CITY COUNCIL PRESENTATION Seattle, Washington. March 8, 2011

42nd Ave N Reconstruction

Proposed Mural. Ninth St. Proposed Sitting Area. Proposed Bump-out. Bike Lane and Buffer Zone. Proposed Trees and Sitting Area.

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

Results of the Lansdowne Redevelopment Survey. December 2008

LOT OFFERINGS in COPPERHEAD GOLF COMMUNITY

Arapahoe Square Zoning + Design Standards & Guidelines Task Force Meeting 9 January 27, 2016

Compliance with Section 18-52(4) City of Thornton Development Code

Bentleigh GLEN EIRA COUNCIL TRANSFORMATIONAL CONCEPTS 15

Three Springs Design Guidelines Fencing and Wall Standards

West Seattle Junction City Council Transportation Committee Presentation Seattle, Washington April 26, 2011

5. Automobile Circulation, Wayfinding and Signage

INSPIRED OFFICE SPACE WITH FIVE STAR AMENITIES FIVES AT ERIEVIEW PLAZA

FOR LEASE OR BUILD TO SUIT

Rock Spring Kick-Off Meeting 09/01/15 Walter Johnson High School Break Out Table Summaries. Rock Spring Break Out Table Comments. Table 1: Strengths:

Glebe Neighbourhood Cycling Plan

studio 646 ARCHITECTURE, LLC

Upcoming City of Bellevue Projects in Your Neighborhood

Strolling down the Avenue

Standing Committee on Policy and Strategic Priorities. Potential Granville Bridge Connector Public Engagement

SIDEWALK GUIDELINES April 14, 2008

PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN

11TH & VERMONT SPRC MEETING 4 1/25/ th & North Vermont. Ballston, VA R2L:ARCHITECTS 1 PROJECT TEAM

Monterey Road Complete Streets

Southeast Whitefish Transportation Plan

XI TERMINAL A TER T A W

November 13, Planning and Land Development Regulation Commission (PLDRC)

THE BALTIMORE GONDOLA. Revolutionizing Urban Transportation

V IL L A G E L A K E S I D E

Overview: Phase 3 Draft Development and Circulation Plans, White Bear Station

Four Mile Run Restoration t Project

Presentation Outline. Project/Study Purpose. Existing Conditions. Future Conditions. Understanding the Streetside. Similar Walkable Environments

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

Your views are important. Please fill in a form before you leave. Or alternatively

Physics: Principles and Applications, 6e Giancoli Chapter 3 Kinematics in Two Dimensions; Vectors. Conceptual Questions

Arch 463 ECS Fall Midterm I. 30 Multiple Choice Questions

MISSISSIPPI EAST BANK TRAIL

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

Located at 400 Sunny Isles Blvd. (163rd Street just off of Collins Avenue), a 5-minute walk to the beach and a 5-minute walk to Oleta River State

Land Use and Urban Design

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives.

Wellington Street : Wind Impact Qualitative Assessment. To Whom It May Concern, RE: Proposed Wellington Street Wind Impact Qualitative Assessment

NACTO Designing Cities 2014 Dongho Chang, City Traffic Engineer October 23, 2014

New High School #6. Schematic Design Presentation. Killeen Independent School District \\ Killeen, Texas. October 09, 2018

Fulton Market Streetscape

Shared Court Housing Concept Summary

Elmhurst Metra Station. Public Hearing Wednesday - November 30, 2016

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

EL SEGUNDO 2335 ALASKA AVE FOR LEASE CREATIVE OFFICE SPACE FOR LEASE IN EL SEGUNDO ±47,265 SF FOR LEASE

Hennepin/First Transportation Study

STAFF REPORT TO THE PLANNING COMMISSION December 12,2016. Schuler Shoes PUD Concept and Development Stage Plan And Rezoning

The following is submitted together with the plans and application for the staff and plan commission consideration of approval.

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

SITE AND BUILDING INFORMATION

SAFE ROUTES TO SCHOOL (SR2S)

Portland, Oregon. Salt Lake City, Utah. April 20, 2016

DRAFT. Lecompton. Table of Contents. Background

NEWMARKET UPHAM S CORNER

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

BOARD OF REGENTS BRIEFING PAPER. 1. Agenda Item Title: Tropicana Ave. Improvements Right of Way

Chapter 6 Transportation Plan

You are invited to an... OPEN HOUSE. Recommended Approach for the Franklin Avenue / East River Parkway Intersection

Sixth Line Development - Transit Facilities Plan

Roosevelt Estates Neighborhood Improvements

WHERE YOU ARE MATTERS. IT S THE CORE OF WHO YOU ARE. FIND YOUR SPACE AT AXIS.

Cloud Development and Forms

Decisions of the Area Planning Panel (Keighley and Shipley) on Wednesday, 21 March 2018

Update of the Master Transportation Plan s (MTP) Bicycle Element

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Transcription:

890-900 BANK URBAN DESIGN REVIEW PANEL MEETING Contents Context photos Conceptual Renderings Shadow Analysis Proposed Floor Plans, Parking Layout & Front Elevation A B C D 14 February 2018 Prepared By:

1 2 3 4 1 - Bank St. and Fourth Ave. 5 2-5th Avenue Court 3-33 Regent St 5-885-891 Bank St 4 - The Glebe Meat Market Existing Context - Bank Street East p.1 14 February 2018 Page A1

1 - The Running Room - 901 Bank St. 1 2 - Pizza Pizza - 933 Bank St. 2 3 - Sporting Life at Lansdowne 5 - Whole Foods at Lansdowne 3 4 - The Vibe at Lansdowne 5 4 Existing Context - Bank Street East p.2 14 February 2018 Page A2

1 2 2-854-866 Bank St. 1-846-850 Bank St. 3 3 - Kettleman s Bagels 4 5 4 - Lord Lansdowne Retirement Residence 5 - The Glebe Centre Existing Context - Bank Street West 14 February 2018 Page A3

1 - Bank Street. at Fifth Avenue 2 - Lansdowne Park Aerial Neighborhood View 14 February 2018 Page A4

1 Street Grid + Connection 890-900 BANK Holmwood Ave. Melgund Ave. Bank St. Thornton Ave. Clarey Ave. Monk St. Conceptual Renderings Street Grid + Connection 14 February 2018 Page B1

BANK ST. CLAREY AVE. Street Grid + Connection with Building Gap MELGUND AVE. MONK ST. Aerial Site Map @ Clarey Avenue Conceptual Renderings Street Grid + Connection 14 February 2018 Page B2

BANK ST. CLAREY AVE. Street Grid + Connection with Building Gap MELGUND AVE. MONK ST. Aerial Site Map @ Melgund Avenue Conceptual Renderings Street Grid + Connection 14 February 2018 Page B3

2 Scale + Building Stepbacks 890-900 BANK Bank St. looking South Bank St. looking North Conceptual Renderings Scale + Building Stepbacks 14 February 2018 Page B4

November 2016 Concept February 2018 Concept Additional Stepbacks on Monk Street 890-900 BANK Conceptual Renderings Scale + Building Stepbacks 14 February 2018 Page B1

November 2016 Concept February 2018 Concept Conceptual Renderings & Eighth Floor Plan Scale + Building Stepbacks 14 February 2018 Page B2

November 2016 Concept February 2018 Concept Conceptual Renderings & East-West Building Section Scale + Building Stepbacks 14 February 2018 Page B3

November 2016 Concept February 2018 Concept Decrease height abutting 17-23 Monk Street 890-900 BANK Conceptual Renderings Scale + Building Stepbacks 14 February 2018 Page B4

November 2016 Concept February 2018 Concept Conceptual Renderings & Fifth Floor Plan Scale + Building Stepbacks 14 February 2018 Page B5

November 2016 Concept February 2018 Concept Conceptual Renderings & East-West Building Section Scale + Building Stepbacks 14 February 2018 Page B6

3 Open Space + Public Realm 890-900 BANK Conceptual Renderings Open Space + Public Realm 14 February 2018 Page B7

Open Space + Public Realm Conceptual Renderings Open Space + Public Realm 14 February 2018 Page B8

Reference Images Open Space + Public Realm Conceptual Renderings Open Space + Public Realm 14 February 2018 Page B9

4 Massing + Materiality 890-900 BANK Conceptual Renderings Massing + Materiality 14 February 2018 Page B10

8 Storeys 4 Storeys 3 Storeys Mechanical Penthouse +22.995m 8th Floor +17.215m 6th Floor +29.100m Roof +25.885m 9th Floor +20.005m 7th Floor +14.325m 5th Floor +11.435m 4th Floor +8.545m 3rd Floor +5.100m 2nd Floor +0.000m Ground Floor EIFS-2 EIFS-1 ST-1 EIFS-2 ST-1 EIFS-1 EIFS-2 ST-1 ST-1 AL-1 BV-1 ST-1 EIFS-2 ST-1 EIFS-1 Lido Embossed EIFS BV-1 Clay Brick ST-1 Manufactured Stone Block EIFS-2 Metallic EIFS AL-1 Longboard Aluminum Siding Bank Street Elevation Massing + Materiality 14 February 2018 Page B11

THORNTON AVENUE THORNTON AVENUE THORNTON AVENUE THORNTON AVENUE Proposed - 8am Proposed - 10am Proposed - 12pm Proposed - 2pm THORNTON AVENUE THORNTON AVENUE Proposed - 4pm Proposed - 6pm Shadow Analysis Equinox (September 21, Solar Time) Proposed Massing 14 February 2018 Page C1

THORNTON AVENUE THORNTON AVENUE THORNTON AVENUE THORNTON AVENUE Proposed - 8am Proposed - 10am Proposed - 12pm Proposed - 2pm THORNTON AVENUE THORNTON AVENUE THORNTON AVENUE Proposed - 4pm Proposed - 6pm Proposed - 8pm Shadow Analysis Summer Solstice (June 21, Solar Time) Proposed Massing 14 February 2018 Page C2

THORNTON AVENUE THORNTON AVENUE THORNTON AVENUE THORNTON AVENUE Proposed - 9am Proposed - 11am Proposed - 1pm Proposed - 3pm Shadow Analysis Winter Solstice (December 21, Solar Time) Proposed Massing 14 February 2018 Page C3

Proposed Site Plan 14 February 2018 Page D1

Proposed Ground Floor Plan 14 February 2018 Page D2

Proposed Second Floor Plan Amenities + Independent Living (IL) 14 February 2018 Page D3

Proposed Third Floor Plan Care 14 February 2018 Page D4

Proposed Fourth Floor Plan Care 14 February 2018 Page D5

Proposed Fifth Floor Plan Memory Care (MC) 14 February 2018 Page D6

Proposed Sixth Floor Plan Flex 14 February 2018 Page D7

Proposed Seventh Floor Plan Independent Living (IL) 14 February 2018 Page D8

Proposed Eighth Floor Plan Independent Living (IL) 14 February 2018 Page D9

Proposed Parking Level 1 14 February 2018 Page D10