RE: 100 VARLEY LANE TRANSPORTATION OVERVIEW

Similar documents
HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

Traffic Analysis Update: 195 Meandering Brook Drive Development

December 15, City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1

IMPLEMENTATION. PEDESTRIAN USERS (Continued /) Building Frontages: A: Stair Applications. Geometry (Accessed from the Sidewalk) Refer to A:

1223 Michael Street, Suite 100, Ottawa, Ontario, K1J 7T2 P: l F: l

May 5, 2009 File:

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS

CITY OF SASKATOON COUNCIL POLICY

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

IMPLEMENTATION. PEDESTRIAN USERS (Continued /) A: Class 2 Pedestrian / Cycle Ways. Pedestrian and Cycle Ways:

Alberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future

TRAFFIC SIGNAL WARRANT STUDY

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL

NEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

10.0 CURB EXTENSIONS GUIDELINE

Transportation Impact Study for Abington Terrace

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

Giles Run Connector Road

Traffic Impact Memorandum. May 22, 2018

Ref. No February 19, Ms. Ashley Blissett, P. Eng., Senior Development Engineer City of Halifax PO Box 1749 HALIFAX NS B3J 3A5

RZC Appendix 8A Marymoor Subarea Street Requirements

Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

WELCOME PETTIT AVENUE SPEED CONTROL REVIEW NIEGHBOURHOOD OPEN HOUSE. City of Niagara Falls Transportation Services

Vehicular turning and path of travel with a proposed curb bulb on the southwest corner of Mount Diablo Boulevard and Dewing Avenue.

ROUNDABOUTS/TRAFFIC CIRCLES

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS

Traffic Calming Policy

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited.

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

February 10, 2015 Project: P

Transportation Knowledge

ATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION

CPC Parking Lot Riverside Drive. Transportation Rationale

Geometric Design Tables

Roadway Classification Review

June 15, Ms. Norma Cozart Zoning Administrator ARLINGTON COUNTY 2100 Clarendon Boulevard Arlington, VA RE: Special GLUP Study Request

KDOT Access Management Policy (AMP)

Building a Liveable Ottawa 2031 Backgrounder 4: Kanata/Stittsville

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

Practical Application of Turn Lane Design Criteria in Developing Suburban & Urban Corridors

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION

19 July 2016 OUR REF:

Document 2 - City of Ottawa Pedestrian Crossover (PXO) Program

2.0 LANE WIDTHS GUIDELINE

CPC Parking Lot Riverside Drive. Transportation Brief

Tonight we will be discussing accidents

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

City of Ottawa s Complete Streets Approach to Transportation Projects

THE LANDMARK AT TALBOT PARK

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng

TRAFFIC SIGNAL WARRANT SUMMARY

Off-road Trails. Guidance

TABLE OF CONTENTS LIST OF FIGURES. Figure Title

84-88 Columbia Street West Waterloo, Ontario Transportation Impact Study. Paradigm Transportation Solutions Limited

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT

Modern Roundabouts. BY : Mark T. Johnson, P.E. An Informational Presentation Prepared For:

Marina Loft (DRC 51-R-12)

Determining Minimum Sightlines at Grade Crossings: A Guide for Road Authorities and Railway Companies

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

122 Avenue: 107 Street to Fort Road

Cycling Network Plan Implementation in Thorncliffe Park and Flemingdon Park

complete streets design and construction standards public primer City of Edmonton

MUNICIPALITY OF ANCHORAGE Traffic Department MEMORANDUM

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

TRAFFIC STUDY GUIDELINES Clarksville Street Department

IMPROVING PEDESTRIAN SAFETY AT UNCONTROLLED CROSSINGS. Guidelines for Marked Crosswalks

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

H8 Signs, Supports and Poles

City of White Rock. Strategic Transportation Plan. May 16, 2005

City of Edinburg Department of Public Works 415 W. University Dr. Edinburg, TX (956) SPEED HUMPS INSTALLATION POLICY

TENW Transportation Engineering NorthWest

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

Alta Planning + Design

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

TRAFFIC IMPACT STUDY CRITERIA

LeBreton Flats. National Capital Commission. Pedestrian and Cyclist Plan. Prepared for: By:

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

Transcription:

IBI Group 400 333 Preston Stret Ottawa ON K1S 5N4 Canada tel 613 225 1311 fax 613 225 9868 April 28, 2014 Mr. Ed Blaszynski Project Manager Infrastructure Approvals Development Review Urban Services Branch Planning and Growth Management Department City of Ottawa 110 Laurier Avenue West Ottawa, ON K1P 1J1 Dear Mr. Blaszynski: RE: 100 VARLEY LANE TRANSPORTATION OVERVIEW IBI Group has been retained by Taggart Realty to complete a Transportation Overview in support of a proposed retirement residence located at 100 Varley Lane in the City of Ottawa. There currently is an existing apartment building located onsite. In discussions with Taggart Realty, it is our understanding that the proposed retirement residence will be constructed on the adjacent parking area. The new building is expected to contain 117 units. City of Ottawa staff was contacted to determine the appropriate scope of work for this overview. A reduced scope of work for the traffic study was agreed to, based on the low traffic generation expected from the proposed use. City staff did confirm the following items be included: Review trip generation of proposed; Assess existing site geometry and access locations; and, Review non-auto modes. All correspondences with City staff and relevant reference material used in this assignment are attached to this letter. EXISTING INFRASTRUCTURE The subject site is located at 100 Varley Lane, within the Kanata North Ward. It is bounded by Varley Lane to the north, Varley Drive to the west, existing existing properties to the south, and Teron Road to the east, as shown in Exhibit 1. IBI Group is a group of firms providing professional services and is affiliated with IBI Group Architects

IBI Group 2 Mr. Ed Blaszynski April 28, 2014 Varley Lane is a 2-lane local roadway that provides access for a small number of residences in the local community. The speed limit along Varley Lane is 40 km/h. Varley Drive a 2-lane collector roadway that connects to Beaverbrook Road. The road has a circuitous alignment, and provides access to the local community. The posted speed limit on Varley Drive is either 40 km/h. Parking is available on both sides of the street. Transit service (morning peak, #65) is provided on Varley Drive with the nearest transit stop to the subject site is within 100m of the subject site. An asphalt path is provided on the east side of Varley Drive for pedestrian access. EXISTING DEVELOPMENT The proposed site plan has been attached at the end of this letter. The existing apartment building contains 85 units. The proposed retirement building is expected to contain 117 units. The plan provides 140 parking spaces onsite; 94 at grade and 44 below grade. Access to the underground parking is provided on a ramp within the site. Onstreet parking is also available on Varley Lane. The proposed development may be accessed via three distinct routes. All routes enter Varley Drive from Varley Lane; each intersection is spaced at least 70 m apart, which meet the requirements in the City s Private Approach By- Law. All relevant pages from the Private Approach By-law have been attached to this letter. TRAFFIC GENERATION The ITE Trip Generation Manual, 9 th Edition was used to estimate the number of peak hour trips. Table 1: 100 Varley Lane Development Trip Generation LAND USE SIZE SOURCE RATE PEAK HOUR SPLIT GENERATED TRAFFIC (VPH) IN OUT IN OUT TOTAL Senior Adult Housing - Attached 117 ITE 252 Formula 1 AM 34% 66% 8 15 23 PM 54% 46% 16 14 30 Notes: sq.ft. = square feet, vph = vehicles per hour. 1 - Formula Rate for Senior Adult Housing - Attached Land Use: AM T=0.20(X)-0.13 PM T=0.24(X)+1.64 Based on the trip generation results in Table 1, the proposed retirement residence is expected to generate approximately 25 and 30 trips in the morning and afternoon peak hour periods respectively. GEOMETRIC REVIEW Horizontal or vertical curves in a road may obstruct the line of sight of a vehicles turning from a side street, which increases the risk of a collision. As a result, the existing site access was assessed for appropriate sight distances.

IBI Group 3 Mr. Ed Blaszynski April 28, 2014 There are no horizontal or vertical curves on either Varley Lane or Varley Drive that obstructs line of sight. The only potential obstacles are parked vehicles on Varley Lane, which require drivers to position themselves further into the street to view oncoming vehicles. As this is an existing issue on a relatively low speed street, this is not considered a safety concern. CONCLUSIONS The overall conclusion of this Transportation Overview is that the proposed 100 Varley Lane retirement residence can be accommodated by the adjacent road network. If you have any questions regarding this Transportation Letter, please do not hesitate to contact me at 613-225-1311. Sincerely, Austin Shih, M.A.Sc, P.Eng. Project Engineer Z:\35771-100VarleyLane\5.2 Reports\5.2.4 Transportation\5.2.4.5 Traffic Impact\2014-04-22\TTL_100VarleyLane_2014-04-28.docx\2014-04-28\WUn

ATTACHMENTS

PROPOSED LOCATION 100 Varley Lane Transportation Overview Exhibit 1 Site Location 35771 MARCH 2014-50m 0m 200m

Austin Shih From: Sent: To: Subject: Blaszynski, Ed [Ed.Blaszynski@ottawa.ca] Monday, February 24, 2014 10:44 AM Austin Shih RE: 100 Varley Lane Transportation STudy Austin, A letter is acceptable Ed Blaszynski Project Manager, Transportation Development Review (Suburban Services Branch) Planning and Growth Management Department City of Ottawa tel: 613 580 2424, ext. 27598 fax: 613 560 6006 e mail: Ed.Blaszynski@ottawa.ca From: Austin Shih [mailto:austin.shih@ibigroup.com] Sent: February 18, 2014 3:31 PM To: Blaszynski, Ed Subject: 100 Varley Lane Transportation STudy Hi Ed, I hope this email finds you well. I m working on a study for a proposed retirement building by Taggart, to be located at 100 Varley Lane in Kanata. The site plan is attached. The site is located in an existing residential community. The nearest major intersections are March Road and Richardson side road (north of site, approximately 500m away), and Beaverbrook and Teron Rd (south of site, nearly 1km away). Both of these intersections are signalized. The developer is proposing 126 units, as mentioned, the land use is retirement home. There is an existing apartment building onsite. The developer requires a rezoning to allow for an additional building on site, which triggers the need for a TIS based on the guidelines. However, peak hour traffic is expected to be low, given the use. ITE Land use would be Senior Adult Housing Attached. Average rates in AM:PM are 0.19 and 0.23 respectively, which equates to 24 and 29 trips respectively. As per the TIS guidelines, this level of traffic would not trigger the need for a study. May I suggest a Transportation Letter that addresses existing trip generation, the propose site layout, access geometry and existing facilities. Thanks and let me know if you wish to discuss. Thanks and Regards, Austin Shih M.A.Sc., P.Eng. IBI Group 1

Route / Circuit 65 Transitway & Station AM: Off only - PM: Full Service AM: Descente seulement - PM: Service complet Light Rail Connection Correspondance au train léger Park & Ride (AM only) Parc-o-Bus (AM seulement)