Network Safeworking Rules and Procedures

Similar documents
Network Safeworking Rules and Procedures

Document Control Identification. Document History. Authorisation

Indicators and Signs ANSG 604. Applicability NSW SMS. Publication Requirement. External Only. Document Status September 2018.

DART VALLEY RAILWAY PLC RULE BOOK SECTION S. For SIGNALLING and HANDSIGNALS

Issue 3. Module TS11. Failure of, or work on, signalling equipment signallers regulations. GERT8000-TS11 Rule Book

Issue 8. Module S5. Passing a signal at danger or an end of authority (EoA) without a movement authority (MA) GERT8000-S5 Rule Book

Withdrawn Document Uncontrolled When Printed. Railway Group Standard : GO/RT3000 Title of Rule Book : Master SECTION D

Module T7. Safe systems of work when walking or working on or near the line. Withdrawn Document Uncontrolled When Printed. GE/RT T7 Rule Book

Status Date Prepared Reviewed Endorsed Approved

Defective Fixed Signals - Rules 1 to 6

Handbook RS521. Signals, Handsignals, Indicators and Signs. Issue 5 RS521. December 2018

TRACK CIRCUIT BLOCK REGULATIONS ISSUE 11/07

2017 NORAC RAILROAD OPERATING RULES STUDY GUIDE SYSTEM OPERATING PRACTICES

Signals, Handsignals, Indicators and Signs Handbook

Issue Module TS1. General signalling regulations. GERT8000-TS1 Rule Book

Infrastructure Works - Rules 1 to 26

GERM8000. Rule Book. Possession Workers Manual. Published by Rail Safety and Standards Board Limited

Handbook 12. Issue 6. Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession. GERT8000-HB12 Rule Book

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Issue 4. Module TS10. ERTMS level 2 train signalling regulations. GERT8000-TS10 Rule Book

Underground Mine Signs Guideline Underground Fires Major Hazard Standard

Revision Date issued Description of Changes 1 24/11/2011 Review 2 09/04/2018 Change in format, (current 2017) hand signals

CIRCULAR NO. O-13. Recommended Practices for Manual Protection of Highway/Railway Grade Crossings

Glossary of Terms. ABANDONMENT The permanent cessation of rail activity on a given line of railroad.

Status Date Prepared Reviewed Endorsed Approved

Module TS8. One-train working regulations. GE/RT8000/TS8 Rule Book. Issue 4. March 2014

Trackside Warning Signs and Markings

Run-a-Way Speed and Ballast Drag Length Calculator Tools User Guide

SECTION 12 ROAD MARKINGS AND DELINEATION

Japanese Traffic Rules

CONSTRUCTION SPECIFICATION

MANUAL OF TRAFFIC SIGNS AND MARKINGS SECTION 2

TRAFFIC ACCOMMODATION IN WORK AREAS

The Railway from Pill Junction to Portishead in March 2015

Withdrawn Document. Title of Rule Book. SECTION P (Part ii) WORKING OF SINGLE AND BI- DIRECTIONAL LINES BY PILOTMAN.

Uncontrolled When Printed Document comes into force 05/12/2015 Supersedes GERT8000-HB6 Iss 4 on 05/12/2015

CHAPTER 1 STANDARD PRACTICES

UNABRIDGED SUMMARY OF NORAC 8 TH EDITION CHANGES

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

MANUAL OF TRAFFIC SIGNS AND MARKINGS

Infrastructure Requirements for Personal Safety in Respect of Clearances and Access

THE CORPORATION OF THE CITY OF BELLEVILLE BY-LAW NUMBER

Signs. signs, signals and road markings. in this chapter

IC Chapter 3. Traffic Control Signals

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Rule Book for Train & Engine Employees

Review of Guidelines for Cycleway Safety Fencing

SECTION 12 ROAD MARKINGS AND DELINEATION

Chapter 8 (2009) - Summary of key changes

Operation of Foxton Level Crossing

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with?

Pre Course Workbook. If you have any questions regarding the content of this workbook, these can be raised during your course with the trainer.

Minimum Safety Requirements for Contractors Working on Railway Property

IC Chapter 3. Traffic Control Signals

Land Transport Rule: Traffic Control Devices 2004

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard.

Land Transport Rule Traffic Control Devices 2004

FCX Department of Occupational Health and Safety. Flagging and Barricading Guideline

Including Revision 1 dated May 2012 and Revision 2 dated May 2012

Our Approach to Managing Level Crossing Safety Our Policy

California Manual on Uniform Traffic Control Devices

PEDESTRIAN FENCE TABLE OF CONTENTS CHAPTER 30

Pedestrian Level Crossings Design and Installation

Module Traffic Control and Laws Signs & Signals LESSON PLAN & TEACHER COMMENTARY

Quality. Standards. Methods to determine whether the various traffic control devices are Acceptable, Marginal, or Unacceptable.

Quality Standards. Methods to determine whether the various. Marginal, or or Unacceptable. mndot.gov/fieldmanual. Standards.

Train Operating Data NA_NSP_02.14 R

WESTERN PACIFIC RAILROAD MUSEUM CREW TRAINING

TRANSMITTAL LETTER. Revision to Publication 149, Chapter 20 (Criteria for the Design of Traffic Signal Supports) - March 2009 Edition

CHAPTER 6H. TYPICAL APPLICATIONS

ATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION

ROAD TRAFFIC CODE PENALTIES NOTE; Not all penalty provisions are recorded here. If not listed please refer to RTC.

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

2004 NC Supplement to the Manual on Uniform Traffic Control Devices (MUTCD)

ATOC Guidance Note- Investigation of Station Stopping Incidents

A CHANCE TO RIDE. Lesson 2 Signs & Traffic Symbols

This Manual Part recommends functional/operating guidelines for control of automatic grade crossing warning systems. Draft

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

Guide to the Safety, Health and Welfare at Work (General Application) Regulations Chapter 1 of Part 7: Safety Signs at Places of Work

Handbook 16. Issue 4. AC electrified lines. GERT8000-HB16 Rule Book. September 2018 Comes into force 01 December 2018

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

EWC EARLY WARNING CONTROL OPERATIONAL PRESENTATION. Charles Dickens (757)

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions

Closing statement. I have chosen not to object in principle to the proposal to close S08.

RAILWAY SAFETY. Please click on any of the links below to go directly to your specified topic within this document.

Traffic Signs and Signals

Active Transportation Facility Glossary

You must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures.

ONTARIO REGULATION 239/02 MUNICIPAL ACT MINIMUM MAINTENANCE STANDARDS FOR MUNICIPAL HIGHWAYS

VISUAL AIDS FOR DENOTING OBSTACLES

Madras College Site Traffic Management Plan (South Street) August 2015 Reviewed / Updated August 2016, August 2017 (Next review due August 2018)

Chapter #4 Traffic Control Devices and Laws

MUNICIPALITY OF ANCHORAGE TRAFFIC CODE UPDATE MASTER RECOMMENDATION REPORT: 9.14, 9.16, 9.18

CHAPTER 6H. TYPICAL APPLICATIONS

S 0659 S T A T E O F R H O D E I S L A N D

CHAPTER 3 SIGNS, SIGNALS AND PAVEMENT MARKINGS. Responsible Driving (Red book) NOTES & STUDY GUIDE

Workington Golf Club GOLF BUGGY POLICY 2017

SCOPE Application, Design, Operations,

Global EHS Powered Industrial Truck and Pedestrian Safety

APPENDIX B1. CROSS-REFERENCE GUIDE TO THE OHIO REVISED CODE

Transcription:

Network Safeworking Rules and Procedures Indicators Rule Number: 6009 Version 1.0, 31 March 2016

Indicators Rule Number: 6009 Document Control Identification Document title Number Version Date 6009 Indicators 1.0 31 March 2016 Document History Publication version Effective date Page(s) affected 6009 Indicators 4 May 2016 Reasons for and extent of change(s) Authorisation Adam Sidebottom Rail Safety Manager Brookfield Rail 31 March 2016 DISTRIBUTION AND CHANGE: Brookfield Rail maintains the master for this document and publishes the current version of the Brookfield Rail website. Any changes to the content of this publication require the version number to be updated. Changes to this publication must be approved according to the procedure for developing Brookfield Rail products. To view the latest version of this document visit www.brookfieldrail.com 6009 Indicators, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED

Table of Contents Glossary for this Rule... 4 1. Purpose... 6 2. General... 6 2.1 Driver s Proceed Indicators... 6 3. Junction Indicators... 7 4. Electrically Illuminated Points Indicator... 8 4.1 White Light Type... 8 4.2 Coloured Light Type... 9 5. Mechanical Points Indicator... 9 5.1 Round Type Points Indicator... 9 5.2 Square Type Points Indicator... 10 5.3 Catch Points Indicator... 10 5.4 Cheese Knob Points... 10 6. Driver s Proceed Indicators (DPI)... 11 7. Passing Indicators at Unattended Train Order Crossing Stations... 12 8. Passing Defective Indicators... 12 9. References... 12 10. Effective Date... 12 6009 Indicators, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 3 of 12

Glossary for this Rule Active Control Level Crossing A road or pedestrian level crossing where warning equipment warns road users and pedestrians about approaching rail traffic by devices such as flashing lights or barriers. Adjacent Authorised Speed Authority Brookfield Rail Catch Points Controlled Absolute Signal Cross Facing Points Fixed Signal Handsignal Issue Level Crossing Location Main Line Points Points Indicator Protection Near to, close to, parallel to. The maximum permissible speed as laid down by Brookfield Rail, subject to any lesser speed shown in a Special Notice (SN), authorised electronic management system or imposed by warning and caution boards or a permanent speed board. Formal name for a written Authority (e.g. Local Possession Authority, Alternative Proceed Authority). Brookfield Rail Pty. Ltd. Single or double bladed points used to derail rail traffic that might enter or foul an adjacent running line. A signal that is controlled or operated by a Network Controller. The signal must not be passed at STOP without authority. To cross or pass other rail traffic. Points with the switch blades facing approaching rail traffic where the track diverges. A signal that is located permanently near the line. A signal given by hand or lights movements, hand signals may be with or without flags. To provide or send copies of authorities, warnings, notices and Network publications to affected Competent Workers by voice, hand delivery or electronic means. A location where the railway line and a road or pedestrian walkway cross paths on the same level (at grade). A place in the Network with a designated name, identification number, or signalling reference. The running line (not including Loops) normally used for running rail traffic through and between locations A track component consisting of paired pieces of tapered rail (blades) that can be moved and set to allow tracks to diverge or converge. An indicator showing the position of points. The means used to prevent rail traffic from entering a worksite or other portion of track, or to prevent road or pedestrian traffic entering a level crossing. 6009 Indicators, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 4 of 12

Rail Traffic Rail Traffic Crew Route Secure Self-Restoring Points (SRP) Shunt Station Trailing Points Train Train Order Trains and track vehicle or vehicles travelling on the network. Competent Workers responsible for the operation of the Motive Power Unit. The rail traffic path from one limit of authority to the next in the direction of travel. To safeguard against accidental or unauthorised access or movement. Points which can be operated remotely or by push button that automatically restores to their normal position following the movement of rail traffic. (refer to Points) To move rail traffic, rakes of vehicles, or vehicles on lines for purposes other than through movement. A system of tracks within station limits at the beginning or end of a section at which rail traffic may cross, pass or run around. Points with the switch blades facing away from approaching rail traffic where the track converges. A locomotive or self-propelled vehicle, alone or coupled to one or more vehicles. Rail Traffic. An authority issued by the Network Controller for the movement of rail traffic or issue of LPA track work authorities. 6009 Indicators, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 5 of 12

1. Purpose The function of this Rule is to describe the protocols for using indicators. They are provided to give Rail Traffic Crew information on the Route setting of Points and may be used in conjunction with Fixed Signals. 2. General WARNING: Indicators do not indicate the line ahead is clear. When used in conjunction with signals, the Indicator when illuminated does not authorise the Rail Traffic Crew to pass a signal at Stop. The signal must show PROCEED for authority to pass. Where a Fixed Signal is not provided to govern the movement, Rail Traffic Crews must not proceed through the Points until verbally or Handsignalled to do so. Indicators work in conjunction with the Points to which they apply, solely to indicate the way the Points are set. Points Indicators take several forms: Junction indicators; Electrically Illuminated Points Indicators; and mechanical Points Indicators. The different forms of indicators may be used in combination with each other. 2.1 Driver s Proceed Indicators Driver s Proceed indicators are provided on the approach to some Active Controlled Level Crossings to indicate to Rail Traffic Crews that the Level Crossing Protection is active. 6009 Indicators, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 6 of 12

3. Junction Indicators A Junction Indicator is mounted above the Controlled Absolute Signal with which it is associated and exhibits an indicator for each diverging Route in conjunction with a PROCEED indication on the signal. A Junction Indicator may be provided with up to six arms fixed at 45 degree intervals. Diverging roads only are indicated. No indication is provided for the non-diverging line. Each arm of the Junction Indicator contains five white lights. A minimum of three white lights must be illuminated before a PROCEED Indication can be displayed on the signal. A Junction Indicator, when illuminated, does not authorise Rail Traffic Crew to pass a signal at STOP. The signal must show a PROCEED indication for authority to pass it. Signals with Junction Indicators attached can only be passed at STOP in accordance with Rule 6013 Passing Fixed Signals at STOP. 6009 Indicators, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 7 of 12

4. Electrically Illuminated Points Indicator An electrically illuminated Points Indicator is located Adjacent to and works in conjunction with, the electric point motor attached to Self-Restoring Points. The operations of Self-Restoring Points are detailed in Procedure 9022 Operation of Self Restoring Points. The indicator:- consists of two triangular shaped indicators mounted one above the other on a single mast: the upper indicator applies to Rail Traffic approaching in the Facing direction; and the lower indicator applies to Rail Traffic approaching in the Trailing direction. has a matt black finish on both sides with a strip of white reflectorised tape surrounding the outline of the indicator and contains three lights as an indication to approaching Rail Traffic. 4.1 White Light Type Only two white lights will be visible at any one time on each indicator and, for an approaching Rail Traffic Crew, will indicate that: when there are two lights in a vertical position, that the Points are set and locked for the normal setting. when there are two lights at a 45, the Points are set and locked for the reverse setting. if only one light or no lights are visible Rail Traffic must not pass over the Points until they have been examined by the Rail Traffic Crew. The Rail Traffic Crew in this instance must ensure the Points are correctly set for the safe passage of the Rail Traffic. The indicator lights may be approach lit when a Train is within approximately 400 metres of the Station. 6009 Indicators, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 8 of 12

4.2 Coloured Light Type Only one light will be visible at any one time on each indicator and, for an approaching Rail Traffic Crew, will indicate: when there is a white light, that the Points are set and locked for the normal setting. when there is a yellow light, that the Points are set and locked for the reverse setting. when there is a red light, that the Points are out of correspondence and not set, Rail Traffic must not pass over the Points until they have been examined by the Rail Traffic Crew. The Rail Traffic Crew in this instance must ensure the Points are correctly set for the safe passage of the Rail Traffic. 5. Mechanical Points Indicator 5.1 Round Type Points Indicator Round type Point Indicators, attached to Main Line Points in Train Order Territory, have a round reflectorised green target when set in the normal Main Line position and a round reflectorised red target when set in the reverse position. 6009 Indicators, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 9 of 12

5.2 Square Type Points Indicator Square type Point Indicators have a square half red and half green reflectorised target. The green is exhibited in the direction for which the Points are set. These indicators are usually found in Station yards and at Junctions. 5.3 Catch Points Indicator Catch Point Indicators have a square red reflectorised target when in the normal derail position and a square green reflectorised target when reversed to the running position. These indicators are found in Station yards attached to Catch Points. 5.4 Cheese Knob Points Cheese knob Points are painted: white on one side to indicate Points are set to the right; and black on the other side to indicate the Points are set to the left. 6009 Indicators, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 10 of 12

6. Driver s Proceed Indicators (DPI) Operations of DPIs are included in the Local Instructions for the Location concerned, Local instructions are detailed in Brookfield Rail s: Rail Access Management System; Intranet site The Depot ; and Internet site www.brookfieldrail.com. Driver s Proceed indicators use white, yellow and red lights to indicate the status of Active Control Level Crossing Protection equipment 6009 Indicators, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 11 of 12

7. Passing Indicators at Unattended Train Order Crossing Stations Rail Traffic Crews must not proceed through the Points until verbally or hand signalled to do so. If no Crossing, passing or Shunting is to take place, the Rail Traffic shall enter the Station on the Main Line, or as directed on the Train Order, and a verbal or hand signal is not required. Where the Rail Traffic is not required to stop for the Issue of a further Train Order or for any other reason, the Rail Traffic Crew shall proceed at Authorised Speed. 8. Passing Defective Indicators Rail Traffic Crews must not pass mechanical or Electrically Illuminated Points Indicators that display no indication or display an illegal indication until: the Points have been checked and set for the Route; and if necessary, the Points have been Secured. If the DPIs are not working correctly, Rail Traffic Crews must act in accordance with Rule 2015 Active Control Level Crossing Management. 9. References 2015 Active Control Level Crossing Management. 6013 Passing Fixed Signals at STOP. 9022 Operation of Self Restoring Points. 10. Effective Date 4 May 2016 6009 Indicators, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 12 of 12