Rhino VE CE Bulk Unloader Operator s Card

Similar documents
Owner's Manual Sealweld SuperSeal II Pump

WARNING: READ THE GENERAL INFORMATION MANUAL INCLUDED FOR OPERATING AND SAFETY PRECAUTIONS AND OTHER IMPORTANT INFORMATION.

Color Change Procedures ColorMax Powder Booth with Spectrum II Feed Center and Prodigy HDLV Powder Transfer System A04

TWO POST RAM PACKAGE 5 GALLON READ THIS MANUAL CAREFULLY BEFORE INSTALLING, OPERATING OR SERVICING THIS EQUIPMENT.

TWO POST RAM PACKAGE 55 GALLON

Safety Powder Spray Systems

Pressure Dump Valve Service Kit for Series 3000 Units

Pressure Dump Valve Service Kit for Series 2300 Units

Tribomatic II Powder Pump

High-Pressure Mechanical Two-Component Mixing System


For parts and technical support, call your nearest Finishing Customer Support Centre. Find your nearest centre at

Stand-Alone Bubble Detection System

CP II Inline Regulator

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS

Instructions Parts List

RhinoPro Cartridge Gun Manual

Basic Pneumatics. Module 8: Pressure control valves. Academic Services PREPARED BY. April 2012

EQUIPMENT Operation Manual. Loctite Stainless Steel Poppet Valve Part Number

HYDRAULIC CYLINDER TEST

Anti-Drool Automatic Dispensing Valve

Moving Fluids Concept and Theory

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012

AUTOMATED INDUSTRIAL MACHINE, INC TOGGLE-AIRE

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

Lockout Tagout Policy

FOR TM TURRET COMBAT ENGINEER VEHICLE, M728 ( ) TECHNICAL MANUAL

Dry Filter Continuous Pipe Coater System

Hydraulic Punch Drivers

NHR Powder Feed Hopper

NGP-250/500 Nitrogen Generator Quick Start Guide

Winter Shut Down Procedure

AUTOMATED INDUSTRIAL MACHINE, INC TOGGLE-AIRE DIVISION

TANK MATE INCLUDES: TOOLS REQUIRED: CONRADER VALVES 3/4 WRENCH **TUBING CUTTERS TEE PETCOCK TEE ASSEMBLY 8 FOOT NYLON TUBING

Model 7989T Steel Pipe Squeezer Sch. 40 & Sch. 80. Operations Manual

Portable Oil Lube Air Compressors

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL OTHER FLUID POWER VALVES. This work covers part of outcome 2 of the Edexcel standard module:

AUTOMATED INDUSTRIAL MACHINE, INC

OPERATING PROCEDURES

LOCKOUT/TAGOUT PROGRAM

Operation Manual - PN A MENSOR MODEL 73 SHOP AIR BOOSTER

EQUIPMENT OPERATION MANUAL. Loctite Dispense Valve Manual

accidents which arise due to non-observance of these instructions and the safety information herein.

G7S Hand Pump Owner s Manual

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

Flo-Brush PDMP Applicator Tool

H. Control of Hazardous Energy: Lockout/Tag Out

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments)

BD Cytopeia Fluidic Kit User s Guide

Encore PE 50-lb Feed Hopper

Lockout Tagout Program

University of Arkansas Office of Environmental Health and Safety

RCV-125 REMOTE CONTROL SYSTEM IMPORTANT WARNING FOR SAFER BLAST CLEANING

BRAKE SYSTEM BLEEDING

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

Syringe, Distribution Valve and Infusion Pump Removal/Replacement ATTENTION SYRINGE REPLACEMENT

2K 600mL Dispense Guns with Built-In Retainers

Lockout/Tagout - Control of Hazardous Energy Program

RM052S-XXX-XX TWO POST LIFT / RAM

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N

450P- RV AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES

450P AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES

UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER

SERVICE KITS SPECIFICATIONS GENERAL DESCRIPTION. y Use only genuine ARO replacement parts to assure compatible. RM051S-XXX-XX Single Post Lift / Ram

Hazards associated with the gas system and how to mitigate them

Control of Hazardous Energy Program (Lockout/Tagout)

MANUAL BE SERIES Test Benches

AIR DISTRIBUTOR. PART NUMBER (Including, but not inclusive) AD28483-_ALB, AD28563-_ALB, AD36097-_ALB, AD36098-_ALB, AD28485-_ALB

Facilities Management

RM051S-XXX-XX SINGLE POST LIFT / RAM

Interface Devices, Inc. Hydraulic Mini Mule

Control of Hazardous Energy Lockout / Tagout Program

XpressFill XF2500 Counter Pressure Filler. Operating Instructions

LOCKOUT/TAGOUT PLAN August 2015

Operators & Maintenance Manual OPERATOR S MANUAL USAGE AND MAINTENANCE F100M F100M. Powered Fixed Hoist Ideal for raised swimming pools and hot tubs

Tridak Model 1060 User Guide. Syringe Filling System

Suggested Installation & Operating Instructions for Sidewinder Pumps

KEG PUMP. Range of Electric Keg Pumps

Squeegee Unit for MRS Multi-Recovery System

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

Instructions Parts List

NHR-X-X Encore Feed Hoppers

Introduction to Pneumatics

Basic Pneumatics. Module 2: Direct Control of single acting cylinder PREPARED BY. IAT Curriculum Unit. January 2011

INSTRUCTION MANUAL FOR MODEL 7360V VERTICAL CURING CHAMBER Revision E May

Health, Safety, Security and Environment

Lockout/Tagout Program

Equipment Operating Procedure Glove Box

SERVICE KITS SPECIFICATIONS GENERAL DESCRIPTION. RM052S-XXX-XX Two Post Lift / Ram

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR

MODEL NUMBER: P-A AUTOMATIC PORTABLE COMPRESSOR

Hi-Force Limited Prospect Way Daventry Northants NN11 8PL United Kingdom Tel: +44(0) : Fax: +44(0) : Website:

HP20LBS, A7A-LBS-AC, and Airless Spray Automatic Dispensing Valves

Bobtail DOT 407 / 412 Vacuum

Rejuvenation Instructions

KJ4000 Operating Instructions & Parts Manual NSN

Tradition & Technology

- Repeat calibration until desired results are reached otherwise set SW2 and SW1-8 open.

Transcription:

Rhino VE CE Bulk Unloader Operator s Card Component Locator SeeFigure1andrefertoTable1. SHOWNINTHE OPEN POSITION 1 3 8 4 7 6 5 Figure 1 Component Locator (Some parts are not shown for clarity.) Item Description Table 1 Major Components 1 Air Motor lockout Valve: When closed, locks out air pressure to the air motor; prevents the pump from stroking but it does not shut off the ram air supply. NOTE: The ram air supply is required to raise and lower the ram when the air is deactivated. Bleeder Stem: Bleeds air from below the follower when a new material drum is loaded into the system. 3 Bleed Valve: The bleed valve is designed for use as a bleed port at the highest point of the pump hydraulic section. This port is used to bleed air from the pump section during initial startup and container changes. 4 Drum In Position Switch: This switch activates when a drum is positioned onto the frame. 5, 6 Blow-off Assembly: The blow-off assembly consists of the blow-off hose (5)and the blow-off stem (6). The blow-off stem connects to the blow-off port on the follower plate. The blow-off hose connects to the blow-off stem. When the blow-off valve is activated, the blow-off stem forces air beneath the bottom of the follower plate and into the container. This pressure forces the container off of the follower. Continued... E 01 Nordson Corporation Issued 1/1

Rhino VE CE Bulk Unloader Operator s Card Item Description Table 1 Major Components (continued) 7 Control Module: SeeFigure. The RAM REGULATOR controls the air supply to the ram. It sets the amount of air pressure going to the top of the ram cylinders which determines the amount of pressure the follower plate exerts on the material. These switches control the ram movement, purge, and blowoff functions: S : The two push buttons located on each side of the control panel activate the downward movement of the ram. Both push buttons must be pressedatthesametimeandheldintomanuallylower the follower into the drum. S RAM UP: This push button controls the upward movement of the ram. It must be pressed and held in to move the ram. Releasing the push button stops the upward movement and places the ram in the Neutral position. During operation, momentarily pressing the RAM UP push button stops the air motor. NOTE: The Neutral position does not mechanically lock the ram. Air pressure remains in the ram cylinders. Small air leaks in the circuit can cause the ram to move. When necessary, use support blocks to prevent the ram from moving. S BLOWOFF: This push button activates the air that goes through a port in the follower and into the drum. The air pressurizes the pail with enough air to raise the follower from the pail. S PURGE: This push button cycles the inactive pump during drum changes for material purging on Automatic Changeover units. 8 Air Motor Regulator: Sets the amount of air pressure going to the air motor which determines the amount of material pressure exiting the bulk unloader. RAM REGULATOR RAM UP PURGE BLOW-OFF NOT USED ON AUTOMATIC SHUTDOWN UNITS Figure Control Module E 01 Nordson Corporation

Rhino VE CE Bulk Unloader Operator s Card 3 WARNING S Allow only qualified personnel to perform the following tasks. Follow the safety instructions in this document and all other related documentation. S Severe personal injury could result if your hands or fingers are caught between the follower plate and container. Keep your hands clear of this area. S Do not open the bleed valve more than three turns. The bleed valve and material may be forced from the valve body. S Unloader operation is application specific. Procedures for your unloader may be different. If necessary, contact a local Nordson representative for operation procedures specific to your unloader. S When operating the ram controls, it is important to remember that Neutral is not a locked and secured position. The follower plate may drift downward over time. Daily Operation The following paragraphs provide daily operation procedures. Startup 1. Make sure that the air pressure to the system is off.. Perform the following: S Check the unloader to determine if material is leaking past the follower plate. If a follower plate seal is damaged, refer to the Rhino VE Follower Plate Module manual for repair procedures. S Check the amount of material in the container. Replace the container if necessary. Refer to the How to Change a Container section. S Check the solvent chamber fluid levels and fill if necessary. 3. Turn on the input air supply to the unloader. 4. Press and hold in the push buttons atthesametime. Whenthefollowerentersthe container, the pump will start. 5. If required, adjust the air motor regulator to the desired air supply pressure. Temporary Shutdown 1. Press the RAM UP push button to stop the air motor.. Turn off the input air supply to the unloader. Restart After Temporary Shutdown 1. Turn on the input air supply to the unloader.. Press and hold in the push buttons atthesametimetostartthepump. E 01 Nordson Corporation Issued 1/1

4 Rhino VE CE Bulk Unloader Operator s Card How to Change a Container The unloader shown in Figure 3 may have options that your unloader does not have. These procedures include steps for the blowoff option. If you have any questions about this procedure and how it may differ from your unit, contact your Nordson Corporation representative. 1. If operating, stop the pump by momentarily pressing the RAM UP button.. Close the air motor lockout valve (1). 3. Perform the following: a. Remove the bleeder stem () from the bleeder stem fitting (4). b. Connect the blow-off tube (7) to the bleeder stem fitting. c. Connect the blow-off air line (6) to the blow-off tube. 4. Press and hold in the BLOW-OFF and the RAM UP buttons. As the follower exits the container, release the BLOW-OFF button. 5. Raise the elevator until it reaches maximum height, clear of the container. 6. Remove the empty container and center a new, undamaged container under the follower plate. 7. Coat the follower plate seals (5) with a compatible lubricant, if required. 8. Disconnect the blow-off air line (6) from the blow-off tube (7). 9. Remove the blow-off tube (7) from the bleeder stem fitting (4). 10. Press and hold in the buttons. When the follower in-drum sensor activates, the ram will automatically move downward. 11. Allow air to bleed from the bleeder stem fitting (4) as the follower moves downward. When material starts to continuously flow from the bleeder stem fitting, momentarily press the RAM UP button to stop ram movement. 1. Install the bleeder stem (). 13. Press and hold in the buttons. 14. Open the air motor lockout valve (1). 15. Perform one of the following to bleed the remaining air out of the system: S S Bleed the remaining air out through the dispense guns. Or Open the bleed valve (3) no more than three turns. Allow material to flow until it is air-free. Close the bleed valve. Bleed remaining air through dispense guns. E 01 Nordson Corporation

Rhino VE CE Bulk Unloader Operator s Card 5 A RAM UP PURGE BLOW-OFF NOT USED ON AUTOMATIC SHUTDOWN UNITS SHOWNINTHE OPEN POSITION 1 3 4 A 5 7 6 Figure 3 Rhino VE CE Unloader Container Change (Some parts are not shown for clarity.) E 01 Nordson Corporation Issued 1/1

6 Rhino VE CE Bulk Unloader Operator s Card Notes: Issued 1/1 Original copyright date 01. Nordson, the Nordson logo, and Rhino are registered trademarks of Nordson Corporation. All other trademarks are the property of their respective owners. E 01 Nordson Corporation