Sacramento Grid 2.0. The Downtown Transportation Study

Similar documents
Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

MASTER BICYCLE AND PEDESTRIAN PLAN

Hennepin County Bicycle and Pedestrian Planning

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Appendix C 3. Bicycle / Pedestrian Planning

Broadway Complete Streets Project

Beyond First First Last Last Mile Strategies. APA National Conference April 3, 2016 Chelsea Richer, AICP Fehr & Peers

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

North Coast Corridor:

COASTAL RAIL TRAIL ROSE CREEK BIKEWAY PROJECT COMMUNITY WORKSHOP #2 AUGUST 15, 2013

STONY PLAIN ROAD STREETSCAPE

5 Circulation & Parking

Welcome. If you have any questions or comments on the project, please contact:

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Prince George s County plans, policies, and projects

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Bus Rapid Transit Plans

PEDESTRIAN ACTION PLAN

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT

SCARBOROUGH CENTRE TRANSPORTATION MASTER PLAN (SCTMP)

Durham Region Long Term Transit Strategy

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Complete Streets Successes, Opportunities, and Challenges

MAYFIELD ROAD CORRIDOR MULTIMODAL TRANSPORTATION PLAN. Public Workshop

Chapter 5 Future Transportation

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

Transportation Master Plan Advisory Task Force

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Non-Motorized Transportation 7-1

EXECUTIVE SUMMARY. Vision

Land Use and Transportation Town Hall September 17, 2018

Terwillegar Drive Expressway Draft Concept Plan

Seattle Transit Master Plan

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Metropolitan Council Transportation Committee

Lincoln Neighborhood Corridor Plan The LiNC

Washington DC Section of ITE Project Briefing

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Executive Summary Route 30 Corridor Master Plan

Plant City Walk-Bike Plan

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

Lawrence Avenue Streetscape Concepts August 30, 2011

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Eliminate on-street parking where it will allow for a dedicated bus only lane %

San Jose Transportation Policy

El Centro Mobility Hub

LANCASTER CITY BICYCLE NETWORK

2014 Bellingham Bicycle Master Plan

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Designing Streets for Transit. Presentation to NACTO Designing Cities Kevin O Malley Managing Deputy Commissioner 10/24/2014

Access BART: TOD and Improved Connections. October 29, 2008

Bicycle Master Plan Goals, Strategies, and Policies

SMART 1 Public Meeting #1. February 24, 2016

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

CHAPTER 3: Vision Statement and Goals

Hamilton Transportation Master Plan Public Consultation. Public Information Centre One Summary

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Public Comment Meeting Geary BRT Project Draft Environmental Impact Statement/Report

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

APPENDIX D. May 22, 2002 Open House Summary and Materials

City of Birmingham Draft Multi-modal Transportation Plan

A Complete Streets Policy for Saratoga Springs. Presented By: Shared Access Saratoga

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

PEDESTRIAN ACTION PLAN

Moving Ahead. (Community Engagement) Chapter Three

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

Physical Implications of Complete Streets Policies

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

WELCOME! To the Centennial Neighbourhoods Secondary Plan and Transportation Management Plan Information Centre. City of Hamilton

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

FINAL REPORT DECEMBER 2011

Ann Arbor Downtown Street Plan

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

PEDESTRIAN ACTION PLAN

BRT for Berkeley A Proposal for Consideration

City of Davis East Covell Corridor Plan

C C C

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Environment and Public Works Committee Presentation

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Operational Comparison of Transit Signal Priority Strategies

Santa Clara I-280 CORRIDOR STUDY

BIKE PLAN CONTENTS GATEWAY

NEWMARKET UPHAM S CORNER

Transcription:

Sacramento Grid 2.0 The Downtown Transportation Study April 20, 2016

The Grid 4.25 square miles Street grid defined at birth of City Lettered and numbered streets spaced every 400 ft East-west alleys halfway between lettered streets Flat with distances that are easily traversed on foot Walkability and pedestrian/bicycle accessibility level is what planners strive for

Presentation Topics Study Approach Strategies & Investment Options Network Elements Performance Measures for Draft Preferred Network

Study Approach Use a systems planning approach to optimize access and travel on the grid Layered network perspective to enhance and integrate travel modes on the grid Challenges in accommodating all modes on a single street Identify priority for travel modes on different street segments

Study Phases 1: Visioning 2: Project Screening 3: System Alternatives 4: Draft Preferred Network Ideas for projects, programs & policies Most effective ideas Evaluate options The best package 5: Implementation Strategy (current phase) Priorities & financing

Stakeholder Engagement The project team has met with a comprehensive group of community stakeholders representing neighborhoods businesses property owners active transportation interests

Community Engagement The project team is reaching out to the community through multiple methods Four online community surveys have received more than 650 responses SacGrid.com includes project information, and videos of community leaders discussing the grid Over 400 people have connected on Facebook Find us on Facebook! Sac Grid 2.0

Strategies to Improve the Grid Goal Improve connections between neighborhoods and the downtown core, especially for biking, walking and transit trips Create downtown gateways and corridors worth visiting Protect neighborhood streets as places where parents feel safe for their children to walk and bike Improve transit circulation and efficiency with transit stops and stations that make rail and bus travel a pleasurable experience Enhance commercial corridors for safe walking and cycling and accommodating both through and local traffic Strategy Convert one-way streets to expand network of on-street "commute" bike lanes - One-way to two-way conversions - Reduce one-way street from 3 lanes to 2 lanes Enhance "low stress" bike network Streetscape projects (commercial/transit streets) Pedestrian gap closure Pedestrian enhancements on connector streets (at freeways and to/from river crossings) New river bridges Maintain adequate capacity on one-way streets to avoid diversions to neigborhood streets Connection to "low-stress" bike network Enhance transit stops Transit signal priority Transit lane priority Rail improvements Street lighting in commercial corridors Convert one-way streets in commercial corridors to provide bike lanes

Types of Investments Bike Facilities New Bike Lanes/Paths Low Stress Network Transit Facilities Enhanced Stops/Wayfinding Transit Signal Priority Dedicated Lanes Pedestrian Facilities Streetscape projects Activity Center Projects Buffered Lanes Cycle Tracks Gap Projects Connector Street Enhancements

Area-wide Investments Other programmatic investments will be considered that will be common to all system options but are not shown on maps. The level of improvements will to be determined but they will include: Street Lighting Wayfinding Alley Activation

Wayfinding

Alley Activation Commercial Alleys can be restricted for traffic during non-delivery hours Residential Alleys can be constructed as green alleys and/or operated as pedestrian-only environments or as shared streets

Alley Activation

Opportunities on the Grid: Complete Streets

Opportunities on the Grid: One-Way Street Conversions

Opportunities on the Grid: Transit Corridors

Opportunities on the Grid: Gateway Access

Network Connectivity

Draft Pedestrian Investments

Types of One-Way Conversions Two-way 3to 2-Lanes Two-way with contra-flow lane 3 lanes one-way to 1 lane each direction plus 2 Class II 3 lanes one-way to 2 lanes one-way plus 2 Class II 3 lanes one-way to 2 lanes one direction and 1 lane in other direction 4 lanes one-way to 3 lanes one direction and 1 lane in other direction

Draft Roadway Network

Draft Bike Network

Draft Transit Network

Existing Total Peak Hour Bus Volumes

2035 Total Peak Hour Bus Volumes

Type of Transit Facility Investments MTP/SCS LRT Extensions and Enhancements 33% increase in trains in downtown core Streetcar Expanded bus service 75% increase buses in downtown core City Investments Dedicated Transit Lanes with Transit Signal Priority Enlarged Stops Bulb Outs

From: Transit Cooperative Research Program (TCRP) Report 19

Performance Measures

Performance Measures

Performance Measures

ON-GOING INFORMATION IS AVAILABLE AT WWW.SACGRID.COM