Complete Streets Funding Program Project Prioritization Plan

Similar documents
Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

Water Street Promenade Engineering and Design Services

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Active Transportation Facility Glossary

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

July 5, Arthur R. Ware, Jr. Elementary School 2017 Safe Routes to School Walkabout Report

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Long Island Rail Road Expansion Project Floral Park to Hicksville

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

Derby Street. Project Updates. Salem, Massachusetts

Lynchburg District Update

NJDOT Complete Streets Checklist

Duwamish Way-finding and CTR Report

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

F L E T C H E R A V E N U E

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

5. RUNNINGWAY GUIDELINES

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

Prince George s County plans, policies, and projects

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

IMPLEMENTATION WORKBOOK

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project

See Figure 38, Existing Nonmotorized Connections.

Steps to Conducting a Complete Streets Assessment

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Roosevelt Estates Neighborhood Improvements

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Montclair s Complete Streets Experience

Chapter 5: Crossing the Street

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Central Avenue Bikeway Traffic and Safety Impact Assessment

Off-road Trails. Guidance

Bicycle + Pedestrian Connectivity Gap Analysis

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

Omaha s Complete Streets Policy

Cycle Track Design Best Practices Cycle Track Sections

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

SAFE ROUTES TO SCHOOL

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

DPW Order No:

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Appendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan


ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

City of Scotts Valley CITY COUNCIL STAFF REPORT

Connectivity. Tier I (0-5 yrs) 44 Issues, Recommendations & Priorities. LENGTH (ft) APPROX COST NO. NAME & DESCRIPTION. Shared Use Path/ Urban Trail

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Pedestrian Road Safety Audit

Hidden Oaks Elementary School

Vision. Goals and Objectives. Walking

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Improvements within the Route 107 study area were developed in accordance with the MassDOT Project Development and Design Guide of 2006.

Pedestrian and Bicycle Improvements in Balboa Park Station Area

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES

CITY MANUALS AND STANDARDS REVIEW

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

COMPLETE STREETS PLANNER S PORTFOLIO

Arlington s Master Transportation Plan

ADA TRANSITION PLAN 2013

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

section 4 Existing Conditions, Issues, and Options

Safe Routes to School Action Plan Aberdeen, Idaho

Ottawa Beach Road Study

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

COMPLETE STREETS DURING CONSTRUCTION

TOWN OF IRONDEQUOIT ACTIVE TRANSPORTATION PLAN

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

This page intentionally left blank.

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

DISTRICT BICYCLE PROGRAM

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Appendix 3 Roadway and Bike/Ped Design Standards

Transportation Planning Division

Bicycle Facilities Planning

NEWMARKET UPHAM S CORNER

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

Windy Ridge Elementary School

PEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS

Crosswalk Policy Revisions & Pedestrian & Bicycle Connection Plans. Presentation to Sanibel City Council July 16, 2013

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

This page intentionally left blank.

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

New Orleans Complete Streets Experience CITY OF NEW ORLEANS. Louis Haywood Department of Public Works January 19, 2016

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

Alexander Ikefuna City of Charlottesville Director of Neighborhood and Development Services

DOWNTOWN MIAMI PEDESTRIAN PRIORITY ZONE

Transcription:

Funding Program Project Prioritization Plan Location and Type Needs South Street Crosswalk Installation Stripe a new formalized crosswalk across South Street at the Anne T. Dunphy School pedestrian path entrance/exit; construct ADA ramps at the new crosswalk. Install pedestrian warning beacons (e.g. RRFBs) at the crosswalk as a pedestrian crossing safety treatment. On South Street at Anne T. Dunphy School pedestrian path entrance/exit 98,788m; 905,193m N/A CS Needs Assessment P2, P3, P9, P12 X X X Petticoat Hill Road Pedestrian the south side of Petticoat Hill Road from the Anne T. Dunphy School driveway to the nearby trail head; construct ADA-compliant driveway ramps at the Anne T. Dunphy School driveway. Approximately 650' along Petticoat Hill Road from Anne T. Dunphy School to the trail head along Petticoat Hill Road 98,444m; 905,334m 98,692m; 605,418m CS Needs Assessment S14, P2, P3, P5 X X X South Street Sidewalk the east side of South Street from #5 South Street to Eastern Avenue to connect a residential neighborhood to the existing sidewalk along South Street. Approximately 950' along South Street from #5 South Street to Eastern Avenue 98,853m; 905,121m 98,797m; 904,851m CS Needs Assessment S14, P5 X X High Street Sidewalk the west side of High Street from #19 High Street to #26 High Street. Construct a new 5' wide sidewalk with curbing along the east side of High Street from #26 High Street to Laurel Road. Construct ADA ramps and stripe a crosswalk at #26 High Street to connect the two sidewalk segements. Install pedestrian warning beacons (e.g. RRFB) at the crosswalk. Approximately 2000' along High Street from #19 High Street to Laurel Road 101,235m; 903,694m 101,619m; 904,142m CS Needs Assessment P2, P3, P5, P9, P12 X X X South Main Street / Bridge Street Pedestrian Construct ADA ramps at the existing crosswalk across Bridge Street; construct a pedestrian refuge island to provide for safer pedestrian crossings and to protect the existing utility pole and sign post located in the middle of the intersection; restripe the existing crosswalk. At South Main Street / Bridge Street intersection 100,923m; 903,205m N/A CS Needs Assessment S2, P2, P3, P7 X X X X

Funding Program Project Prioritization Plan Location and Type Needs Buttonshop Road Pedestrian the south side of Buttonshop Road to connect the existing sidewalks along Williams Street (Route 9) and rth Main Street; construct ADA ramps at the crosswalk across Buttonshop Road at the intersection of rth Main Street / Buttonshop Road. Approximately 630' along Buttonshop Road 98,320m; 905,544m 98,526m; 905,624m S14, P2, P3, P5 X X X East Main Street Pedestrian the south side of East Main Street from the Boy Scout House (end of guardrail) to Valley View Road; construct ADA ramps at the crosswalk across East Main Street at the Boy Scout House and at the Mill Road and Valley View Road intersections. Stripe crosswalks at each ramp pair (Boy Scout House, Mill Road, & Valley View Road). Reduce the lane widths along the bridge to accommodate ADA-compliant sidewalks on both sides of the bridge and slow vehicle speeds. Approximately 550' along East Main Street from Boy Scout House to Valley View Road 98,780m; 905,475m 98,905m; 905,492m S14, P2, P3, P5 X X X rth Street Sidewalk Connection the east side of rth Street to connect to the existing sidewalks along Williams Street (Route 9), rth Main Street, East Main Street, and rth Street; define driveways along rth Street for Williamsburg Market and Florence Bank, including ADA-compliant driveway ramps. Approximately 225' along rth Street between Williams Street (Route 9) and rth Main Street 98,713m; 905,412m 98,693m; 905,496m S14, P2, P5, P15 X X X X rth Street / rth Main Street / East Main Street Pedestrian Construct ADA ramps at all four intersection corners and stripe crosswalks between each ramp pair to provide greater pedestrian accessibility. At rth Street / rth Main Street / East Main Street intersection 98,693m; 905,496m N/A CS Needs Assessment P2, P3, P9 X X X

Funding Program Project Prioritization Plan Location and Type Needs High Street Bicycle Install Bike Route signs and add bicycle "sharrow" markings along High Street in both directions from Main Street (Route 9) to Kingsley Avenue to provide increased driver awareness of the large volume of bicyclists along the corrdior. Install bike racks at the nearby Town Offices to promote more bicycle usage. Upgrade bicycle grates along High Street (as necessary) to bicycle-safe grates. Approximately 2,400' along High Street from Main Street (Route 9) to Kinglsey Avenue 101,004m; 903,346m 101,405m; 903,982m CS Needs Assessment B3, B5, B8, B9 X South Main Street Sidewalk Reconstruction Reconstruct the existing poor condition sidewalk from Bridge Street to its current terminus at #29 South Main Street. Approximately 675' along South Main Street from Bridge Street to #29 South Main Street 100,923m; 903,205m 101,028m; 903,009m P1 X High Street / Edwards Street and High Street / Maple Street ADA Ramps Construct four ADA ramps total at the crosswalks of High Street / Edwards Street intersection and High Street / Maple Street intersection. At High Street / Edwards Street intersection and High Street / Maple Street intersection 101,165m; 101,223m; 903,676m CS Needs Assessment S14, P2, P3 X Fairfield Avenue Sidewalk the west side of Fairfield Avenue to connect the sports fields to the existing sidewalk along Main Street (Route 9). Approximately 250' along Fairfield Avenue from Main Street (Route 9) to Myrtle Avenue 101,235m; 903,221m 101,218m; 903,150m CS Needs Assessment S14, P5 X X Fairfield Avenue Pedestrian the east side of Fairfield Avenue to connect the sports fields to the proposed sidewalk along Fairfield Avenue; stripe a new crosswalk across Fairfield Avenue at the intersection of Fairfield Avenue / Myrtle Avenue; construct ADA ramps at the new crosswalk. Approximately 450' along Fairfield Avenue from Myrtle Avenue to the southerly edge of the field 101,218m; 903,150m 101,236m; 903,007m CS Needs Assessment S14, P2, P3, P5, P9 X X X

Funding Program Project Prioritization Plan Location and Type Needs Myrtle Avenue Sidewalk the south side of Myrtle Avenue to connect to the existing sidewalk along Main Street (Route 9) and the proposed sidewalk along Fairfield Avenue. Approximately 700' along Myrtle Avenue between Main Street (Route 9) and Fairfield Avenue 101,218m; 903,150m 101,425m; 903,149m CS Needs Assessment S14, P5 X X Town-wide Crosswalk Reapplication, ADA Ramp, and Pedestrian Warning Signage Installation Reapplication of crosswalks town-wide with a consistent design; construction of ADA ramps at all crosswalks; installation of pedestrian warning signage at all crosswalks. Town-wide - - S7, P2, P3, P9 X X X High Street Sidewalk Reconstruction - 1 Reconstruct the existing poor condition sidewalk from approximately 300 feet north of Main Street (Route 9) [where the sidewalk transitions from concrete to asphalt] to Edwards Street. Approximately 500' along High Street from 300' north of Main Street (Route 9) to Edwards Street 101,042m; 903,422m 101,163m; CS Needs Assessment P1 X High Street Sidewalk Reconstruction - 2 Reconstruct the existing poor condition sidewalk from Edwards Street to its current terminus at #19 High Street. Approximately 500' along High Street from Edwards Street to #19 High Street 101,163m; 101,235m; 903,694m CS Needs Assessment P1 X rth Main Street Pedestrian Meekins Library Crosswalk Pedestrian Warning Beacon Installation Extend the existing sidewalk along the north side of rth Main Street by approximately 50' to Buttonshop Road. Construct ADA ramps and stripe a crosswalk across rth Main Street to provide pedestrian access to the sidewalk along the south side of rth Main Street and the proposed sidewalk along Buttonshop Road. Install pedestrian warning beacons (e.g. RRFBs) at the crosswalk across Main Street (Route 9) in front of Meekins Library with advance pedestrian warning signage along Main Street (Route 9). At rth Main Street / Buttonshop Road intersection On Main Street (Route 9) in front of Meekins Library 98,526m; 905,624m 98,654m; 905,433m N/A CS Needs Assessment P2, P3, P5, P9 X X X - S7, P12 X X

Funding Program Project Prioritization Plan Location and Type Needs Main Street (Route 9) / South Street Intersection Crosswalk Pedestrian Warning Beacon Installation Install pedestrian warning beacons (e.g. RRFBs) at the crosswalk across Main Street (Route 9) at the intersection. At Main Street (Route 9) / South Street intersection 98,810m; 905,283m - P12 X X Kingsley Avenue Pedestrian Improvements the north side of Kingsley Avenue from Dansereau Road to Maple Street to connect the existing sidewalk along Kingsley Avenue with a large residential neighborhood; stripe a new crosswalk across Dansereau Road at the intersection of Kingsley Avenue / Dansereau Road; construct ADA ramps at the new crosswalk. Approximately 625' along Kingsley Avenue from Dansereau Road to Maple Street 100,878m; 903,677m 101,038m; 903,780m CS Needs Assessment S14, P2, P3, P5, P9 X X X Edwards Street Pedestrian Construct a new 5' sidewalk with curbing along the north side of Edwards Street to connect to the existing sidewalk along High Street and the proposed sidewalk along Kingsley Avenue; stripe a new crosswalk across Kingsley Avenue at the intersection of Kingsley Avenue / Edwards Street to connect the new sidewalk on Edwards Street and the proposed sidewalk on Kingsley Avenue; construct ADA ramps at the new crosswalk. Approximately 725' along Edwards Street between Kingsley Avenue and High Street 100,966m; 903,691m 101,163m; CS Needs Assessment S14, P2, P3, P5, P9 X X X Maple Street Pedestrian the south side of Maple Street to connect to the existing sidewalk along High Street and the proposed sidewalk along Kingsley Avenue; stripe a new crosswalk across Kingsley Avenue at the intersection of Kingsley Avenue / Maple Street to connect the new sidewalk on Maple Street and the proposed sidewalk on Kingsley Avenue; construct ADA ramps at the new crosswalk. Approximately 625' along Maple Street between Kingsley Street and High Street 101,036m; 903,780m 101,220m; 903,674m CS Needs Assessment S14, P2, P3, P5, P9 X X X

Funding Program Project Prioritization Plan Location and Type Needs Bridge Street Sidewalk Reconstruction Replace the existing asphalt sidewalk along the east side of Bridge Street with 5' wide concrete sidewalk with curbing to match the concrete sidewalks along the adjacent roadways. Provide driveway access management at the Tilly's parking lot to provide safer pedestrian passage across the large driveway curb cut. Approximately 250' along Bridge Street from Main Street (Route 9) to the bridge on Bridge Street 101,004m; 903,346m 100,972m; 903,268m CS Needs Assessment P1, P15 X X