Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

Similar documents
Complete Streets Funding Program Project Prioritization Plan

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Thank you for attending the first Public Open House for the Thunder Bay Transportation Master Plan!

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Duwamish Way-finding and CTR Report

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Welcome to the Quebec Alternatives Analysis Public Meeting

Non-Motorized Transportation 7-1

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

February 11, 2016 TPO Board Presentation

Lawrence Avenue Streetscape Concepts August 30, 2011

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Improvements within the Route 107 study area were developed in accordance with the MassDOT Project Development and Design Guide of 2006.

COMPLETE STREETS FUNDING PROGRAM

City of Birmingham Draft Multi-modal Transportation Plan

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Geary Corridor Bus Rapid Transit

North Avenue Corridor Study

Water Street Promenade Engineering and Design Services

MASSDOT COMPLETE STREETS FUNDING PROGRAM TIER 3 PROJECT NARRATIVES FY17 ROUND TWO

Safe Streets. City of Lake Forest Park. March 21, 2017

Multi-Modal Traffic Analysis. Parisi and Associates

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Dowling/Beaty Cycling Route

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Montclair s Complete Streets Experience

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Station 1: Street & Sidewalk Upgrades

Public Works and Infrastructure Committee. General Manager, Transportation Services

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

S T A T I O N A R E A P L A N

See Figure 38, Existing Nonmotorized Connections.

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Clyde Brown Elementary School Millis, MA

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

Public Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013

Tonight is for you. Learn everything you can. Share all your ideas.

New Park Avenue Corridor West Hartford

Work Session. Agenda Item # 4. Meeting Date September 8, Daryl Braithwaite Public Works Director. Prepared By. Suzanne R. Ludlow City Manager

Pavement Rehabilitation & Buffered Bike Lane

6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION 6.2 BICYCLE DEMAND AND SUITABILITY Bicycle Demand

Safe Routes to School Action Plan Aberdeen, Idaho

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Omaha s Complete Streets Policy

About the Studio. Edward J. Bloustein School of Planning and Public Policy - Rutgers University

Provincetown Parking and Circulation Study

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

COMMUNITY MEETING AGENDA

Addendum to Mitigated Negative Declaration

INDOT Complete Streets Guideline & Policy

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

WELCOME Public Information Centre

North Avenue Corridor Study

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

San Pablo High Treatment applied incrementally at each N + ++

Lynchburg District Update

Why invest in the 1 Street S.W. Corridor?

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

McGrath Boulevard Project Development Public Meeting #2 May 28 th, 2015 East Somerville Community School

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

The Leadville Bikeway Design Recommendations DRAFT January 2018

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Freeway ramp intersection study

II. Identification of Opportunities and Solutions. A. Short-term action plan (Summary of Recommendations)

Station Plan: Penn & 43rd Avenue

NEWMARKET UPHAM S CORNER

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

Roosevelt Estates Neighborhood Improvements

Public Meeting #6. Buffalo Niagara Medical Campus Phase III Allen Street Extension Project D Youville College Center February 21, 2018

San Jose Transportation Policy

COMPLETE STREETS PLANNER S PORTFOLIO

Pedestrian Road Safety Audit

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones

Solana Beach Comprehensive Active Transportation Strategy (CATS)

ADA TRANSITION PLAN 2013

City of Seattle Edward B. Murray, Mayor

Chapter 7 Nonmotorized Facilities

Project Fact Sheet. August 1,

Design Guidelines. Overview. Design Vision for Yellow Brick Road

Seattle Bicycle Advisory Board August 3, 2011

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015

3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM

SR 2108-A12/SR 2308-A02 Forbes Avenue Betterment and SR 2108-A13 Forbes Avenue Corridor Improvements. July 17, 2017

Transcription:

Mobility MassDOT Program Project Prioritization Plan (Revised 3/31/16) Municipality Winchendon 7/25/2017 Location Needs Request Schedule 1 Development of roundabout at the intersection of Front Street and, the gateway to the Gateway main commercial corridor within the and Town. Improve traffic management ADA Improvements and provide pedestrian accommodations and wayfinding. at Front Street Intersection 155023, 936869 155023, 936869 P2, P3, P7, S18 X X X $ 1,200,000 $ - Funded through State TIP 12 March-20 2 and Bicycle Corridor Improvements Front Street to Maple Street Improve pedestrian accommodations and connections within Winchendon's primary commercial area. Update all sidewalks to be ADA compliant. Crosswalks reconstructed into raised crosswalks for traffic calming including bump-outs on both sides. Bicycle lanes in the northbound and southbound directions adjacent to parking spots. Front Street to Maple Street 155023, 936869 155420, 937534 P2, P5, P8, S17, B2 X X X X $ 170,000 $ - Funded through State TIP 9 March-20 3 Elmwood Road/Central Street Improvements to Murdock Middle/High School - Phase 1 Reconstrut sidewalks along the east side of Elmwood Road/ leading to school to be ADA compliant. Maple Street to Brooks Drive 155420, 937533 155744, 938545 P2, P3, P5 X X X $ 430,000 $ 400,000 $ 30,000 6 March-18 4 Elmwood Road/Central Street Improvements to Murdock Middle/High School - Phase 2 Reconstrut sidewalks along the west side of Elmwood Road/ leading to school to be ADA compliant. Maple Street to N. 155420, 937533 155516, 938245 P2, P3, P5 X X X $ 285,000 $ 285,000 $ - 6 March-19 20170620 CSPrioritizationPlanWinchendon Page 1 of 6

Mobility MassDOT Program Project Prioritization Plan (Revised 3/31/16) Municipality Winchendon 7/25/2017 Location Needs Request Schedule 5 Grove Street Schools - Phase 1 Reconstruction of sidewalks along the south side of Grove Street, in front of school, to be ADA compliant 154407, 937401 155256, 937239 P2, P3, P5 X X X $ 400,000 $ 400,000 $ - 6 March-20 6 Grove Street Schools - Phase 2 Reconstruction of sidewalks along the north side of Grove Street, in front of school, to be ADA compliant 154407, 937401 155256, 937239 P2, P3, P5 X X X $ 190,000 $ 190,000 $ - 6 March-21 7 ADA accessibility and Reconstruct non-compliant ramps at Accommodation crosswalk near schools near Public Schools Near school crossings 154611, 937416 155745, 938546 - P2,P3 X X $ 30,000 $ 30,000 $ - 3 March-21 8 Montachusett Regional Transit Authority (MRTA) Transit Stops and Shelters Transit accommodations at Montachusetts Regional Transit Authority bus stops within Winchendon. A bus shelter, bench and landing installed adjacent to roadway and bus stop along with ADA accommodations. Pleasant Street (Winchendon Town Hall); (Winchendon Post Office); Main Street (Waterville Plaza); Lake Dennison Picnic and Swim Area 154966, 936940; 155224, 937189; 153387, 936188; 151943, 932302 154966, 936940; 155224, 937189; 153387, 936188; 151943, 932302 T1, T3 X X $ 150,000 $ 150,000 $ - 4 March-21 9 Park Street Recreational Park Construct sidewalk along Park Street from Morse Avenue Morse Avenue 154401, 937223 154809, 937244 P2, P3, P5 X X X $ 140,000 $ 140,000 $ - 4 March-19 10 Existing sidewalks and crosswalks to Front/River/School be upgraded to be fully ADA and compliant. New sidewalk on north side ADA Improvements of River St. Hawk Signal installation at School St crosswalk. Intersection Intersection of School Street/River Street/Front Street 155725, 93640 155725, 93640 P2, P5, P12, S13 X X X $ 450,000 $ 400,000 $ 50,000 6 March-22 20170620 CSPrioritizationPlanWinchendon Page 2 of 6

Mobility MassDOT Program Project Prioritization Plan (Revised 3/31/16) Municipality Winchendon 7/25/2017 Location Needs Request Schedule 11 Spring Street and Intersection realignment. Two new ADA Improvements crosswalks. Extend existing sidewalk at Water Street/ and make fully ADA compliant. Ash Street Spring Street at Water/Ash Street Intersection 155318, 936662 155318, 936662 S13, P2, P3, P5, P9 X X X X $ 215,000 $ 215,000 $ - 3 March-23 12 Morse Avenue Recreational Park Construct missing-link sidewalk segment along Morse Avenue, from Grove Street to Park Street Grove Street to Park Street 154809, 937244 154827, 937402 P2, P3, P5 X X X $ 130,000 $ 130,000 $ - 4 March-23 13 Provide wayfinding sign to connect cyclists between rthcentral Pathway Bicycle Connection and Dennison State Park, through the from rthcentral main commercial district of Pathway to Route Winchendon. Bicycle 202 (River Street) accommodations, such as bike lanes to Terminus of be installed where feasible. Shared Pathway and River lane markings (sharrows) for cyclist Street installed along this route where appropriate and where bicycle lanes cannot be accommodated. School St/River St to rth Central Pathway 154726, 936942 155417, 937103 B7, B8, B9, B10 X $ 12,000 $ 12,000 $ - 3 March-23 14 Close West Street southern-most School Street approach to School Street. Upgrade and sidewalks to be fully ADA compliant. ADA Improvements Upgrade all 6 crosswalks to be fully Front Street to ADA compliant. Main access/egress to Park Street elementary, middle, and high schools. Front Street to Park Street 155725, 93640 15444, 937255 P2, P3 X X X X $ 220,000 $ 220,000 $ - 4 March-24 15 Glenallen Street and ADA Improvements Spring Street to Maple Street Realign Glenallen to for a T intersection. Upgrade sidewalks to be fully ADA compliant. Upgrade crosswalks with wheel-chair ramps. Spring Street at Glenallen/Orient Place Intersection 156301, 936531 156380, 936521 P2, P9, S18 X X X X $ 680,000 $ 400,000 $ 280,000 6 March-25 20170620 CSPrioritizationPlanWinchendon Page 3 of 6

Mobility MassDOT Program Project Prioritization Plan (Revised 3/31/16) Municipality Winchendon 7/25/2017 Location Needs Request Schedule 16 Connection Construct missing-link sidewalk segment along, from Jackson Avenue to Grove Street. Upgrade existing sidewalk to be fully ADA compliant Jackson Avenue to Grove Street 155034, 937838 154920, 937393 P2, P3, P5 X X X $ 205,000 $ 205,000 $ - 4 March-26 17 Jackson Avenue Full reconstruction of sidewalks along Jackson Ave, to Lincoln Ave to 155444, 937810 155034, 937838 P2, P3, P5 X X X $ 205,000 $ 205,000 $ - 4 March-26 18 Mill Street Connection Construct missing-link sidewalk along Mill Street, from Lincoln Ave. 154320, 937669 154938, 937622 P2, P3, P5 X X X $ 220,000 $ 220,000 $ - 4 March-27 19 20 21 22 23 24 25 26 20170620 CSPrioritizationPlanWinchendon Page 4 of 6

Mobility MassDOT Program Project Prioritization Plan (Revised 3/31/16) Municipality Winchendon 7/25/2017 Location Needs Request Schedule 27 28 29 30 31 32 33 34 35 36 37 38 39 20170620 CSPrioritizationPlanWinchendon Page 5 of 6

Mobility MassDOT Program Project Prioritization Plan (Revised 3/31/16) Municipality Winchendon 7/25/2017 Location Needs Request Schedule 40 41 42 43 20170620 CSPrioritizationPlanWinchendon Page 6 of 6