Pedestrian Project List and Prioritization

Similar documents
ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Hennepin County Pedestrian Plan Public Comment Report

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

A Matter of Fairness: ROCOG s Environmental Justice Protocol. What is Mobility Limitation?

ADA TRANSITION PLAN 2013

Bicycle and Pedestrian Planning in a Historically Car-Centric Culture: A Focus on Connectivity, Safety, & Accessibility

Transportation Planning Division

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Appendix A: Crosswalk Policy

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project

This page intentionally left blank.

Citywide Sidewalk and Crosswalk Programs

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

UNCONTROLLED PEDESTRIAN CROSSING GUIDELINES

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Regional Bicycle Barriers Study

I-105 Corridor Sustainability Study (CSS)

Bicycle + Pedestrian Connectivity Gap Analysis

PEDESTRIAN ACTION PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

MEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

NJDOT Complete Streets Checklist

City of Charlottesville Bicycle and Pedestrian Master Plan Update

PEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS

Broad Street Bicycle Boulevard Design Guidelines

COMPLETE STREETS FUNDING PROGRAM

Bicycle Master Plan Goals, Strategies, and Policies

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Public Works AGENDA ITEM D-2 STAFF REPORT

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Agency Advisory Group Meeting #3 and Walk Audit Anchorage Non-Motorized Plan

Kelowna On the Move. Pedestrian and Bicycle Master Plan

CITY MANUALS AND STANDARDS REVIEW

City of Birmingham Draft Multi-modal Transportation Plan

Overview of Report 803 Research Approach Case Studies Spreadsheet Tool Demo Question and Answer session. Photo by Michael Hintze

City of Memphis On-Street Parking Modification Guidelines

Closing Plenary Session

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

AGENDA ITEM G-2 Public Works

TABLE OF CONTENTS. Executive Summary

MASTER BICYCLE AND PEDESTRIAN PLAN

5. Pedestrian System. Accomplishments Over the Past Five Years

MEETING OF THE CITY OF CONCORD BICYCLE, PEDESTRIAN AND SAFE ROUTES TO TRANSIT PLAN ADVISORY COMMITTEE AGENDA

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

1.0 EXECUTIVE SUMMARY

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Methodology for Determining Pedestrian Activity Factors

Urbana Pedestrian Master Plan

AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities

This page intentionally left blank.

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

Goals, Objectives, and Policies

EXECUTIVE SUMMARY. Vision

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

Tonight is for you. Learn everything you can. Share all your ideas.

PRESS RELEASE San Joaquin Council of Governments

CHAPTER 3: Vision Statement and Goals

DRAFT. Table of Contents. Background

6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION 6.2 BICYCLE DEMAND AND SUITABILITY Bicycle Demand

Improving intersections for people that walk in Minneapolis

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Washington State University Bicycle and Pedestrian Plan Working Paper #7: Implementation Strategies

PBIC Webinar [IMAGE] ActiveTrans Priority Tool: A Model Methodology for Prioritizing Pedestrian and Bicycle Improvements on Existing Roads

Introduction. Pedestrian Counts Program

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Pedestrian Road Safety Audit

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Pedestrian Crosswalk Audit

Hennepin/First Transportation Study

Morristown, NJ Complete Streets Policy

AMATS Complete Streets Policy

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation

Lynchburg District Update

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Executive Summary Route 30 Corridor Master Plan

Draft North Industrial Area-Wide Traffic Plan

2010 Pedestrian and Bicyclist Special Districts Study Update

Appendix A-2: Screen 1 Alternatives Report

IMPLEMENTATION STRATEGIES

9/21/2016 VIA . RE: The Knot (DR16-270)

Transportation Planning Division

ACTIVE TRANSPORTATION

5. RUNNINGWAY GUIDELINES

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

City of Jacksonville Mobility Fee Update

Safe Routes to School: Munroe Elementary Walk Audit Report. Image: Drexel, Barrell & Co.

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

Transcription:

To: Kyle Wagenschutz, City of Memphis CC: From: Anne Conlon and John Cock, Alta Planning + Design Date: December, 2014 Re: Project List Development (Task 3.1-3.2) and Project List Prioritization (Task 6) Pedestrian Project List and Prioritization Introduction The existing conditions phase of this study summarized pedestrian conditions in Memphis with a series of quantitative spatial analyses. The results identify areas within walking distance of public schools (within the City of Memphis) with existing pedestrian safety issues, areas and specific routes of high pedestrian demand, current barriers to walking, and gaps in the supply of pedestrian infrastructure. These quantitative analyses will provide a strong foundation for the development of a set of pedestrian improvement projects that are needed to create a functional pedestrian network linking neighborhoods and destinations around the city. This memorandum describes the process that will be used to translate these analyses into a project list (Task 3.1-3.2) and inform project prioritization (Task 6). The proposed approach will provide city staff with documentation that supports the methodical development of improvements to the pedestrian network, including sidewalk infill, sidewalk repair, and intersection improvement projects. The use of quantitative metrics, supported by city policy, will provide a transparent and rational decision making process that supports project development and delivery. This memo includes the following sections: Summary of Approach The first section below provides a visual summary of the overall approach to project development and prioritization. Project List Development The second section of the memorandum provides a detailed description of the proposed methodology for the development of a list of pedestrian projects. Project Prioritization The third section of the memorandum provides a detailed description of the proposed approach to prioritize the pedestrian project list. Project Distribution Between Phases The fourth section identifies additional criterial that will be used to ensure a mix of projects between phases, including serving pedestrians with disabilities and geographic equity. Proposed Project Tables The final section identifies a proposed format of the segment and intersection project tables, as well as potential project types that may appear within each. 1 Memphis Pedestrian and School Safety Action Plan

Summary of Approach The universe of potential projects for improvement begins with the entire roadway network all intersections and segments apart from limited access highways. The proposed approach filters this universe into a project list of needed improvements based on the findings of the Pedestrian Suitability Analysis and Shortest Path Analysis. That project list is then prioritized and segmented to produce a set of priority projects for short term implementation, along with a proposed phasing of the full project list. Figure 1: Approach to Project Development and Prioritization Alta Planning + Design 2

Project List Development Quantitative Project Selection The following criteria will be used to filter the universe of potential projects down to a list of needed improvements. Roadway segments and intersections that are removed from consideration for pedestrian improvements in this process do not warrant investment in the time frame of this plan, given a limited funding environment. Shortest Path Analysis: Any roadway segment or intersection in the lowest two scoring categories on the Shortest Path Analysis Composite Map will be removed. Pedestrian Suitability Analysis Supply: Segments and intersections that scored 80 or above will be dropped from the project list. These segments already provide a high level of service. Segments with a roadway permeability in the medium or medium high category will be dropped from consideration for uncontrolled crossings, since these segments are less of a barrier to pedestrians. Pedestrian Suitability Analysis Demand: Any segment or intersection in the lowest two scoring category on the Composite Demand map will be removed. Qualitative Linear Project Development The results of the quantitative filters above will then be pieced together into project routes using the following approach: Segments will be grouped into linear routes that link neighborhoods to schools. Where a direct alternative is available with good infrastructure, routes will not be drawn. Where two alternatives exist, the shortest path analysis will be used to select the preferred route alignment. Once routes are drawn, all segments along the route will be included in the project regardless of the quantitative filters above. Intersection improvements will be identified along each route. The following guidelines will be used to designate improvements along routes. o o o All signalized intersections along routes will be evaluated for potential improvements such as pedestrian signal heads or leading pedestrian intervals regardless of supply scores. Improvements will be included where needed at all stop-controlled crossings. The need for uncontrolled crossings will be evaluated as part of intersection project development. Intersection Project Development Intersections along linear routes will be examined for infrastructure needs and included as components of route projects, with the exception of uncontrolled crossings. The following process will be used to identify intersections that need improvement where linear projects are not needed, and to identify locations where uncontrolled crossings are needed on and off routes. Signalized Intersections and Four-way Stops o Intersections that meet the criteria of the Quantitative Project Selection approach will be included in the project list o Intersections associated with route projects will be removed from consideration, since these will be prioritized as part of route projects. o Signalized intersections in the top two categories of the demand analysis will be included in the project list regardless of their supply score. This accounts for signalized intersections with crosswalks 3 Memphis Pedestrian and School Safety Action Plan

and curb ramps that may need high visibility crosswalks, pedestrian signal heads, leading pedestrian intervals, or other improvements. Uncontrolled Crossings o Segments that meet the criteria of the Quantitative Project Selection approach will be candidates for potential midblock crossings. o An uncontrolled crossing will be recommended where a school and neighborhood are separated by one of these segments. o An uncontrolled crossing will be considered on local roads within a quarter mile of a school where an intersection meets the criteria of the Quantitative Project Selection approach and demand is in the top two categories. These crossings may occur at intersections or mid-block. Project Prioritization Following development of the project list, projects will be prioritized based on the quantitative analyses completed to date along with factors including policy support, equity, stakeholder input, and proximity to key destinations. Table 1 summarizes criteria and scoring for prioritization. Projects will then be segmented based on geographic equity and the particular needs of populations with disabilities. Alta Planning + Design 4

Prioritization Scoring Table 1: Project Prioritization Criteria Criteria Definition Input Rank Measurement Points Max. Influence High Project is within ¼ mile of a public elementary or middle school (or high school) 30 (20) 15% School Access To what extent does this improve pedestrian access to a school? Public school locations Medium Project is within ½ mile of a public school elementary or middle school (or high school) 15 (10) Low Project is further than ½ mile from a public school 0 Promote Safety To what extent does the project provide an immediate safety improvement at a location with a recorded safety concern? Collision analysis shows intersections and street corridors with highest crashes High Medium Multiple pedestrian crashes have occurred at the segment or intersection in the last five years for which there is data (2007 2011) A pedestrian crash has occurred at the segment or intersection in the last five years for which there is data (2007 2011) 30 15 15% Low No crashes occurred 0 Inadequate Infrastructure Does the project improve conditions at an intersection or corridor with poor or inadequate infrastructure? Pedestrian Suitability Analysis Supply Score High Segment or intersection is designated as lower supply 30 15% Medium Segment or intersection is designated as medium supply 15 Low Segment or intersection is designated as higher supply 0 Equity To what extent does the project benefit underserved communities? Equity composite measure showing geographies (census tracts) where pedestrian improvements could benefit underserved populations High Census tract scored in the top tier in the Mid-South Greenprint s Equity Analysis 20 10% Medium Census tract scored in the middle tier in the Mid-South Greenprint s Equity Analysis 10 Low Census tract scored in the lowest tier in the Mid-South Greenprint s Equity Analysis 0 High Project is in the top third of segments categorized by the number of routes served 20 10% Promote Connectivity to Destinations How many origins and destinations will the segment connect? Shortest Path Analysis Medium Low Project is in the middle third of segments categorized by the number of routes served Project is in the bottom third of segments categorized by the number of routes served 10 0 Serves Activity Centers Is the project located in an area with high demand for walking? Pedestrian Suitability Analysis Demand Score High Segment or intersection is designated as higher demand 20 10% Medium Segment or intersection is designated as moderate demand 10 Low Segment or intersection is designated as lower demand 0 Transit Access To what extent does this improve pedestrian access to the transit network? Transit ridership by stop (boardings) High Project is within ¼ mile of a transit stop with more than 100 boardings a day 20 10% Medium Project is within ¼ mile of a transit stop with 20 to 100 boardings a day 10 Low Project is within ¼ mile of a transit stop with less than 20 boardings a day 5 Civic Amenity Access Does the project serve a public library or community center? Locations of libraries and community centers N/A Project is within ¼ mile of a public library or community center 10 5% Previously Proposed Projects Does the project have direct support expressed by inclusion in an adopted planning document? 2011Memphis MPO Regional Bicycle and Pedestrian Plan; MATA Short Range Transit Plan(SRTP):This plan identifies key transit stops where pedestrian improvements aimed at supporting transit should be focused N/A Project corresponds to a pedestrian improvement recommendation in the MPO Plan or is within a ¼ mile of a key transit stop from the MATA SRTP 10 5% Stakeholder Input Has the project location been identified by project stakeholders (TAC)? School survey, Transportation Advisory Committee, sidewalk request program N/A The project corresponds to one of the following: Location was identified by a project stakeholder as a priority for improvement Location was identified as a problem in the 2011 MPO plan Location was requested more than once through the city s sidewalk request program 10 5% Maximum Points 200 100% 5 Memphis Pedestrian and School Safety Action Plan

Project Distribution Between Phases The above prioritization scoring will allow for the identification of the top priority projects across the city. However, it is important that the phased approach to project implementation reflect other factors beyond the prioritization criteria. A key issue in Memphis is serving pedestrians with disabilities, who are most impacted by the poor condition of sidewalks throughout the city. As described below, it will be necessary to ensure a set of projects that will particularly serve this population is included within each phase of the project. In addition, the final pedestrian project list will reflect a level of geographic equity, to ensure projects are included to serve various areas of the city. The items below are thus not included in overall prioritization scoring, but will be used to distribute projects between phases in the resulting project list. Equity for Persons with Disabilities Sidewalk repair projects (with high number of sidewalk obstacles or obstructions) will be identified near populations with disabilities (based on housing data) as well as near key medical institutions which are important destinations for this population. Geographic Equity Priority projects will be identified in each council district. Alta Planning + Design 6

Proposed Project Tables Segment Projects Table 2 Proposed segment projects table Project Name From To Project Description Length Cost School Street A Street B Street C Sidewalk repair (100% of block) 0.4 miles $17,000 Memphis Elementary School Reason for Project Project connects multiple origins and destinations in a high demand area and is included in an adopted plan. State Owned Road Transit Access Serves pedestrians w disabilities City Council District City Council Superdistrict X X 1 8 Potential project types: New sidewalk Sidewalk repair (high cost) Sidewalk repair (medium cost) Sidewalk repair (low cost) Neighborhood slow zone / traffic calming Lane reconfiguration - Any pedestrian crossings that are part of a lane reconfiguration will be broken out as separate projects in the intersection projects table to ensure needed crossings are implemented sooner than a road reconfiguration that may be a longer term project. 7 Memphis Pedestrian and School Safety Action Plan

Intersection/Crossing Projects Table 3 Proposed intersection/crossing projects table Project Name Existing Infrastructure Project Description Cost School Reason for Project State Owned Road Transit Access Serves pedestrians w disabilities City Council District City Council Superdistrict Street A Signalized intersection with curb ramps and crosswalks Add leading pedestrian interval. $17,000 Memphis Elementary School Project improves an intersection where multiple crashes have occurred in a high demand area near two schools and a transit stop. X X 1 8 Potential project types: Intersection Projects Signal Timing Modifications (Pedestrian Walk Phase Extensions and Detection, Protected and Permissive Left Turn Phase, Leading Pedestrian Intervals) Curbline Modifications (Curb Extensions, Minimize Curb Radii, ADA Curb Ramps, Removal of channelized right turn lanes or redesign for pedestrian priority) Crosswalks and Markings (Marked Crosswalks, Raised Crosswalk, Crosswalk Marking Maintenance, Advanced Stop Lines) Midblock Crossing Projects Pedestrian Signal (Hybrid Beacon, RRFBs, Pedestrian Traffic Signal / 2 Stage Crossing) Crosswalks and Markings (Marked Crosswalks, Raised Crosswalk, Crosswalk Marking Maintenance, Median Refuge Islands, Advanced Stop Lines) Alta Planning + Design 8