Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

Similar documents
Geary Corridor Bus Rapid Transit

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

Geary Corridor Bus Rapid Transit: Staff-Recommended Alternative

Geary Bus Rapid Transit Project

Public Comment Meeting Geary BRT Project Draft Environmental Impact Statement/Report

Memorandum. M:\Board\Board Meetings\2015\Memos\09 Sep\BRT Reports\Geary Report\Geary BRT Sep2015 Board Update

Geary Bus Rapid Transit Project

March 24, Date: To: From: Through: Subject: Summary BACKGROUND. along the. facility. bus lanes. The Geary. the 6.5- mile Geary current

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

SFMTA SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

ABOUT MUNI FORWARD. Muni Forward is the SFMTA s initiative to make transit safer and more reliable.

Date: Plans and. Committee. To: From: Through: Subject: the San (BRT) Summary BACKGROUND. Avenue. action by work to support the and an

Vision Zero Priority Projects (March 2017)

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009

Technical Working Group November 15, 2017

ALTERNATIVES SCREENING REPORT

Freeway ramp intersection study

Pedestrian and Bicycle Conditions

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Polk Streetscape Project

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Geary Community Advisory Committee Tuesday, March 20, :00 pm One South Van Ness, 7 th floor, Union Square Conference Room

Community Task Force November 15, 2017

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

Van Ness Avenue Bus Rapid Transit (BRT) San Francisco Environment Commission Policy Committee

Operational Comparison of Transit Signal Priority Strategies

Better Market Street Project Update. Urban Forestry Council September 17, 2014

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

District 6 & Citywide Non-Transit Project Delivery Status Report

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts

Community Task Force July 25, 2017

VISION ZERO SF: ELIMINATING TRAFFIC DEATHS BY 2024 JANUARY 5, 2017

ALTERNATIVES SCREENING REPORT

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Project Status Update

Geary COrrIDOr Bus rapid TransIT (BrT) study san FranCIsCO COunTy TranspOrTaTIOn authority DRAFT - ApRil 12, 2007

FOLSOM-HOWARD STREETSCAPE OVERVIEW

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

5. RUNNINGWAY GUIDELINES

Pedestrian and Bicycle Improvements in Balboa Park Station Area

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Dumbarton Transportation Corridor Study. San Francisco Bay ITE November 2016

September 20, 2016 L Taraval Rapid Project SFMTA Board of Directors Meeting

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

North Shore Transportation Improvement Strategy

Station Plan: Penn & 43rd Avenue

Bicycle Strategy Capital Projects Polk Street Northbound Separated Bikeway 481, ,

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

Scope of the Transit Priority Project

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Better Market Street Project. Project Update January 15, 2015

Durham Region Long Term Transit Strategy

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

GEARY BRT SIMULATION VISSIM Calibration and Existing Conditions Results

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

3.5 Pedestrian and Bicycle Transportation

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3. Masonic Ave Street Design Study Community Workshop 3 September 30, 2010

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

Protected Bike Lanes in San Francisco Mike Sallaberry SFMTA NACTO Workshop - Chicago IL

Aurora Corridor to E Line

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017

Designing Streets for Transit. Presentation to NACTO Designing Cities Kevin O Malley Managing Deputy Commissioner 10/24/2014

Prop AA Vehicle Registration Fee Project Information Form

Chapter 3: Multi-Modal Circulation and Streetscapes

Seattle Transit Master Plan

Kennedy Plaza and Providence Downtown Transit Connector PUBLIC MEETING. Stakeholder Meeting #1 October 24, 2016

PARKMERCED. San Francisco Municipal Transportation Agency Board Meeting September 7, 2010

Pedestrian Safety Workshop SAN FRANCISCO, CALIFORNIA

North Avenue Corridor Study

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

LAUREL HEIGHTS/JORDAN PARK TRAFFIC CALMING PROJECT DECEMBER 2012

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

Transcription:

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee Project Update SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY August 6, 2015

Project Overview and Goals 6.5 mile east-west corridor Home to major SFMTA trunk line (38 Geary) with more than 55,000 transit trips per day Characterized by slow, unreliable and crowded transit Geary BRT s project goals include: Improving transit reliability and efficiency Creating a complete street for all users Improving the pedestrian environment 2

Project Benefits Strong bus benefits where BRT treatments applied: Travel time: 25% savings Reliability: 20% reduction in travel time variability Ridership: 10%+ gains forecasted strong cost effectiveness Lower travel times = more service, more riders at lower operating cost Pedestrian crossing improvements Streetscape enhancements 3

BRT Recommended Alternative Selected the best configuration for each segment No bus lanes Center Lanes Side Lanes Side Lanes (existing) Palm/Jordan-to-27th Masonic Fillmore/ Japantown 4

Environmental Document Status Key environmental process milestones: Summer Fall 2014 December 2014 January April 2015 May 2015 Admin. Draft EIR/S local agency reviews Submitted Administrative Draft EIR/S to FTA Discussion of preliminary FTA comments on project definition and Small Starts Packages Submitted Admin. Draft EIR/S Round #2 to FTA June 2015 Received FTA Comments on Round #2 August 2015 Submitting Admin. Draft EIR/S Round #3 5

FTA Review: Potential Funding Sources POTENTIAL FUNDING SOURCE POTENTIAL AMOUNT ($M) FEDERAL FUNDS Active Transportation Program $1-5 Highway Safety Improvement Program $1-5 Lifeline Transportation Program $5-15 FTA Small Starts $75 OneBayArea Grant Program $5-20 Transit Performance Initiative Incentives $5-15 Transit Performance Initiative Investments $5-15 STATE FUNDS Cap and Trade $10-30 LOCAL FUNDS Prop K Transportation Sales Tax $44-55 Cost sharing opportunities (e.g. SFPUC, Public Works, others for utilities, paving, etc.) $20-50 2014 General Obligation Bond $5-10 Prop AA Vehicle Registration Fee $1-5 SFMTA Revenue Bond $1-10 Transportation Sustainability Fee $5-10 Vehicle License Fee $10-30 AB 644 Bridge Tolls $5-10 TOTAL $198 to $360 Project cost: $320 6

Environmental Process Schedule Schedule Fall 2015 Winter, Spring 2016 Environmental Process Public Draft EIR/S release, outreach & comment period Develop FEIR/S, including responses to comments Summer, Fall 2016 Locally Preferred Alternative and FEIR/S approvals 7

Environmental Public Outreach Plan Notifications (multilingual) Stakeholder group presentations Outreach at community events OWL viewer deployment Hosted public hearing DEIR/S document online and at public locations Comments accepted via Email Mail Comment cards Court reporter at hearing 8

Other Work SFMTA Prop K fund requests (Jul 2015): Near-term/Initial Construction Phase implementation Full-project engineering design (Conceptual Engineering Report) Transition Plan Community input on design Webster Street Bridge Palm Avenue 9

Near-Term Improvements: Phasing Packages Phase 1 Near-term: Delivers project benefits prior to completion of full project* Side-running transit-only lanes Transit signal priority (TSP) and queue-jump signals New and extended transit bulbs WalkFirst/Vision Zero pedestrian safety treatments Muni Forward improvements Japantown transportation improvements Right-turn pockets (pending analysis) Phase 2 Full Build-out: Completion of the remaining project elements including construction of center-running lanes and utility work *Note: Near-term improvement design will be at-risk pending selection of Locally Preferred Alternative and FEIR/S approvals. 10

Near-term Improvements: Red Transit-only Lanes Completed: Market to Gough Streets, Summer 2014 Phase 1: Stanyan Wood Streets Baker Gough Streets where feasible (Timing to be determined pending repaving) 11

Near-term Improvements: TSP and Queue-jump Signals Completed: Transit signal priority: extends green phase for buses 33rd Ave to Market/3rd Street Phase 1: Queue-jumps: dedicated bus phase to give bus priority through the intersection Powell/O Farrell and Geary/Masonic Ave Queue-jump 19 th Ave and Lincoln Way 12

Near-Term Muni Forward Service Improvements Completed: Service Improvements Increased frequency (38 & 38R) Sunday service (38R) Phase 1: Bus Stop Modifications Stop optimization (move nearside to farside at signals) Consolidation of closely-spaced stops Conversion of two Rapid/local stops to local only 13

Near-Term Vision Zero/WalkFirst Safety Improvements Combination of parallel efforts and Phase 1 elements: Pedestrian bulbs, single and wraparound Pedestrian signals New signalized crossings New countdown signals Leading pedestrian interval High-visibility crosswalks Day-lighting ADA upgrades Sidewalk bulbs 14

Near-Term Improvements: New and Extended Transit Bulbs Transit bulbs provide a smoother, more reliable ride 11 new transit bulbs 4 extended bulbs Geary and Leavenworth 15

Near-Term Improvements: Japantown/Fillmore Roadway redesign Lane reduction to calm traffic and prioritize transit Opening of Webster surface-level west-side crosswalk New pedestrian refuges and corner bulbs Signal timing changes Pedestrian bridge removal New mid-block crossing at Buchanan/Peace Plaza Dedicated pedestrian signal with upgraded median Removal of pedestrian overcrossings at Webster and Steiner Opening of surface-level east-side crosswalks 16

Project Schedule Schedule Environmental Process Near-Term Improvements Fall 2015 Winter, Spring 2016 Summer, Fall 2016 Winter 2016 Public Draft EIR/S release, outreach & comment period Develop FEIR/S, including responses to comments Locally Preferred Alternative and FEIR/S approvals Begin conceptual design Begin utility construction Detailed design for contract elements* Red lane installation Begin construction contracting for remaining near-term improvements *Note: Near-term improvement design will be at-risk pending selection of Locally Preferred Alternative and FEIR/S approvals. 17

For More Information: www.gearybrt.org SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY