En-Tegrity. A step change in subsea well control safety

Similar documents
Subsea Safety Systems

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

Completion Workover Riser System. Enabling efficient operations by reducing interface complexities and minimizes operational risk

NORSOK STANDARD SYSTEM REQUIREMENTS BOP, DIVERTER AND DRILLING RISER SYSTEM (SYSTEM NO.: 12-30, 12-40)

The Developing Design of the Blowout Preventer in Deep Water

HIPPS Development Project

Retrievable Bridge Plugs

Safety, Operating and Maintenance Manual. TRAIN Rat DS9-TRAIN

HPHT Annular Casing Packer. Obex Annular Casing Packer

The topics I will briefly cover, are; Stack Configurations Wellhead Connector Considerations Control Systems Tensioning Systems will be discussed by

TAM Single SeT inflatable

THE NATURAL CHOICE. High end valves for the natural gas value chain. Inspired By Challenge

31 st Gas-Lift Workshop

Subsea Tree Valve Actuator Permanent Reinstatement Systems. Dr Lev Roberts-Haritonov General Manager, Subsea Engineering

Module No. # 04 Lecture No. # 3.1 Case studies (continued) (Refer Slide Time: 00:10)

DB Bridge Plug. Features. Benefits. Applications

IWCF Equipment Sample Questions (Surface Stack)

Polyethylene Valves for Natural Gas.

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

Appendix K Appendix K

Next Generation Thermoplastic Hose

Weatherford Inverse Gas Lift System (IGLS)

GE Oil & Gas. Mooney * Flowgrid * Slam Shut Regulator. Delivering accuracy, performance and protection

SPE Coiled Tubing in High-pressure Wells. Well Control Considerations. Introduction


pneumatic power clamps

Platelets & Plasma The Management of Unplanned Flow

Testing Services Overview

Ball valve HKSF-W100. Ball valve HKSF-W100. RMA Kehl GmbH & Co. KG Oststrasse 17 D Kehl / Germany

Perforating Center of Excellence TESTING SERVICES OVERVIEW

Engineered solutions for complex pressure situations

TZ WEDGE ANCHOR FOR CRACKED AND UNCRACKED CONCRETE

Precision Rotary Airlocks and Diverter Valves

STANDARD FOR CONTROL VALVE SEAT LEAKAGE

Specifications For Threaded and Butt Weld Hammer Unions

Oil And Gas Office Houston Fax Test Separator / Off-Shore Metering

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

Leak testing of Valves. Standards for acceptable Rates of Valve Leakage

4400 TwinHybrid Gas Seal

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing

CHE Well Testing Package/Service:

180 Series Rotary Shear Directional Control Valve

Protecting People and the Environment during Stimulation Treatments in Offshore Settings

SailTrack Installation Instructions. External Track

CONTROL VALVE SEAT LEAKAGE

International Well Control Forum. Well Intervention Pressure Control Level 2 Syllabus July 2015 Version 7.0

Valve Products from Weir Power & Industrial

Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1

SPWE Series. Setup Instructions. Version 2.0

Overview of types. T5-R B2/R B2 en v Subject to changes 1 / 4. k vs (Sequence 2)

NORSOK STANDARD D-002 Edition 2 (2013)

Deepwater Horizon Incident Internal Investigation

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

NORSOK standard D-010 Rev. 3, August 2004

Success Paths: A Risk Informed Approach to Oil & Gas Well Control

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TYPE BV2-LD

Is my well safe? Terje Løkke-Sørensen, CTO, add energy

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

COMPACT TRIPLE WALL OUTLET STATION MODEL INSTALLATION AND OPERATING INSTRUCTIONS

Operation Manual Guillotine Cutter RC-5

Live well deployment of long perforating gun system using combined CT technologies

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

M10HTi ISO Tobacco Ball Valve Screwed, SW, BW and Flanged versions

Talk 2 Tree & Wellhead Valve Testing Leak Rate Acceptance. Talk 3 DHSV Control Line hydrocarbon Ingress measurement & acceptability

HOW TO NOT MEASURE GAS - ORIFICE. Dee Hummel. Targa Resources

Weatherford Inverse Gas Lift System (IGLS)

l DESCRIPTION l FEATURES l LIMITATIONS l TYPICAL APPLICATIONS l MATERIAL SPECIFICATIONS TECHNICAL MANUAL SECTION 2.3 PAGE 1 / 6

17J Third Edition, January 2008 Specification for Unbonded Flexible Pipe

Sanitizers. Sanitizers. Sanitizers for Pools & Spas

World Area Differences Technical Information

M33F ISO, M33S ISO and M33V ISO Ball Valves Installation and Maintenance Instructions

3/8" Dr. Air Butterfly Impact Wrench

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

W I L D W E L L C O N T R O L SNUBBING OPERATIONS

Dynamic Valve Type RA-DV Pressure Independent Radiator Valve

Operating instruction

LEAKAGE ACCEPTANCE RATES COMPARISON METAL & SOFT SEATED VALVES ISO 5208/API 598/API 6D/MSS SP-61/FCI 70-2

Annex G (normative) Requirements for Nondestructive Examination

SECTION BUTTERFLY VALVES

TorqBolt Wedge Anchors Torque Controlled Expansion Anchor

DuPont Kalrez. Oil and Gas Product Selector Guide. Technical Information April 2017

TWO POST RAM PACKAGE 5 GALLON READ THIS MANUAL CAREFULLY BEFORE INSTALLING, OPERATING OR SERVICING THIS EQUIPMENT.

SailTrack Installation Instructions. CMPE Track

Spring Loaded Regulators Constant Loaded Regulators Twin Parallel Flow Regulators Field Service Regulators

Pneumatic switch module 3/2-way valve (On/Off) Types P Types FP Function tested for use of the float in Ex-zone 0

Pneumatic proportional controller Types M Types FM Function tested for use of the float in Ex-zone 0

Type Pressure Regulator. for increased air capacity. Fig. 1: Type Pressure Regulator. Mounting and Operating Instructions EB EN

Engineered Valves Group. Revision 2. FABRI-VALVE High Performance Knife Gate Valve.

Valve Inspection & Testing

Type 4708 Supply Pressure Regulator

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Crosby style JCE Safety Valve Installation, Maintenance and Adjustment Instructions CROSBY

98695A01 - THE CONCEPT OF THE DIVATOR FAMILY

KBV21i and KBV40i Air Actuated Boiler Blowdown Valves

SAILTEC, INC CONGER COURT, OSHKOSH, WI USA

DIVERLESS SUBSEA HOT TAPPING OF PRODUCTION PIPELINES

Pressure Reducing Valve DMV 755

Dual Modular Safety Shutoff Valves. DMV-D/11 Series DMV-DLE/11 Series

Discontinued. Powers Controls. Technical Instructions Document No P25 RV Rev. 1, May, RV 201 Pressure Reducing Valves.

TURBINE SEAL: AXIAL TYPE DESIGN

Transcription:

En-Tegrity A step change in subsea well control safety

Product Overview 7-3/8, 10,000psi, Shear & Seal Gate Valve Main Well Barrier in Intervention Well Control Package (WCP) Features Bi-Directional Sealing Metal-to-Metal sealing (from below) >1,000,000 lb Shear Force Designed to shear all media as per Norsok D-002 (2000), Annex B Capable of shearing 3.5, 15.5 lb/ft, S-135, Drill Pipe Connection Pull to close - bore pressure assists valve closure, unlike a conventional push-to-close ram. Ability to open under full pressure differential Intended Applications Safety Head (SH) Working Valve (PIV and RV) Well Control Package 7-3/8 En-Tegrity Safety Head Slide 2

Product Overview Slide 3

Barrier Philosophy Dual Independent Barriers from Below Primary well barrier comprises M2M seal between lower seat and seal plate Thermoplastic seal between lower lip seal on the lower seat & seat pocket Secondary well barrier comprises M2M seal between upper seat and seal plate Thermoplastic seal between lower lip seal on the upper seat & seat pocket Single Barrier from Above Barrier comprises M2M seal between upper seat and seal plate Thermoplastic seal between upper lip seal on the upper seat & seat pocket Slide 4

Shear & Seal Capability Delivers ca. 1,000,000 lb Shear Force Designed to shear all media as per Norsok D-002 (2000), Annex B and 3.5, 15.5 lb/ft, S-135, Drill Pipe Connection Default cut behaviour is to shear blade to blade Potential secondary shear against the upper seat for media in neutral tension or against both seats when media is in compression Prototype 7 and 13-5/8 En-Tegrity assemblies completed extensive shear testing evaluation: 7 Prototype shearing up to a 3.5, 15.5 lb/ft, S-135 Drill Pipe Connection 13-5/8 Prototype shearing up to a 6-5/8, 34.0 lb/ft, S-135 Drill Pipe Connection Slide 5

Shearing Method Conventional push to close Rams Rods in compression, deflection of blades En-Tegrity pull to close arrangement Rods in tension, self-alignment of blades Blade profile centralises media during shearing process Slide 6

Qualification Overview API 6A, Annex F, PR2 Tested Valve (-18 C to +121 C), Actuators (-4 C to +65 C) 200 x MWP Differential Breakouts from Below API 17D, Annex L, Hyperbaric Tested 3,000m Water Depth 200 Open / Close Cycles under Hyperbaric Conditions API 6A, Annex I, Class II Flow Tested 50hr, 2% sand flow period 500 open/close cycles under 2% sand flow conditions API 6A, Annex F.1.13.5.3 Seal Fixture Testing Well wetted non-metallic seals (-18 C to +121 C) Material Class DD/EE (5% CO 2 ) Norsok D-002, Annex B, Shear Tested Incl. Tension & Compression Cuts API 16A (ISO 13533), Annex C.2.3 Shear Tested Slide 7

Future Developments An 18-3/4 version of En-Tegrity, delivering 3,500,000lbf, has been developed to TRL2 for use in: a BOP stack as a replacement to CSR/BSR mudline closure device capping stack A 5 inch version, delivering 300,000lbf, has been developed to TRL 2 for use in vessel lightweight intervention systems A 20K version is also in development Slide 8

Summary The 7-3/8 En-Tegrity has been qualified as a Safety Head able to run all NORSOK D- 002 media at temperatures from -18 C to +121 C, in a class II, DD/EE sour environment at a depth of 3,000m Qualification ongoing for working valve (PIV & RV) applications Other applications of En-Tegrity technology are under development Slide 9