Duke Street (Route 236) Over I Bridge Plan & Elevation

Similar documents
FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Non-Motorized Overpass at SR 5/US1

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Gerald P. Oliveto, P.E. George Franz NJDOT

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

APPENDIX D COST SUMMARY TABLES

Design Criteria. Design Criteria

section 4 Existing Conditions, Issues, and Options

SIGN PLACEMENT-ELEVATION VIEW: FREEWAY (FORESLOPE) ROADSIDE SIGN LOCATIONS & SUPPORT SPACING MICHIGAN DEPARTMENT OF TRANSPORTATION (MIN.

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

SECTION VII ROADWAY AND SITE IMPROVEMENTS

Legislative Update Williamsburg Residency

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION

Culvert Safety Inspection Report

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

FY 2006 TRANSPORTATION CAPITAL PROGRAM

STUDY PROCESS & SCHEDULE

Hospital Link Project Project Update November 2017

Culpeper District. Albemarle County Monthly Report October, 2011

Rio Intersection Traffic Restrictions Begin Monday

US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River

Existing conditions of each bridge and repair plan are presented in Table

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS

COMPLETE STREETS DURING CONSTRUCTION

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1

FY 2005 TRANSPORTATION CAPITAL PROGRAM

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

SECTION 14: LANDSCAPING AND BEAUTIFICATION

CE 535, Spring 2002 Preliminary Design Example 1 / 6

Field guide for Accessible Public Rights-of-Way Edition

Hospital Link Project Project Update September 2017

Field guide for Accessible Public Rights-of-Way Edition

Proposed Grant Funding

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

ADA Training Standard Plans

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

George Washington Bridge Restoring the George Construction Program Supplemental Information on Bicycle and Pedestrian Access

ADA PRESENTATION (CURB RAMPS)

PARDON OUR DUST. Arlington Boulevard (Route 50), 10 th Street and Courthouse Road Interchange (ARRA) Project No. (FO) , C501, B612, B611

Operational & Geometrical Analysis Technical Memorandum

Important Lane Closures for Jan , 2012

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

FOR HISTORICAL REFERENCE ONLY

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Transportation Corridor Studies: Summary of Recommendations

MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018

Geometric Design Tables

FDOT Treasure Coast Traffic Report

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Route 47 (North Main Street) Reconstruction

Bridge Failures in Alberta

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Citizen Advisory Committee

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

Smoothing Out the Bumpy Road Ahead

FDOT Treasure Coast Traffic Report

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

General Notes. Project No /15/2018 Page 1 of 1

N.Y. / REGION INFRASTRUCTURE Going Up! A Bridge Makes Way for Bigger Ships

Bridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

The purpose of today s information session is to provide project information about the Fermor Avenue Bridge Rehabilitation and Roadworks.

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

Agenda Item # Page # RECOMMENDATION

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

ADA Operations Contact Info

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise

How Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Driveway Design Criteria

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found

ADOT Maintenance Data Collection Guide

INDEX. Geometric Design Guide for Canadian Roads INDEX

APPENDIX E Activity Defect Assignment

Scenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access.

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN

FY 2006 TRANSPORTATION CAPITAL PROGRAM

Route 79/Davol Street Corridor Study

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

2017 Temporary traffic control guidelines for pedestrians. v.2

Kentucky Transportation Center

Transcription:

Duke Street (Route 236) Over I-395 - ridge Plan & Elevation ity of Alexandria Exist. sign structure supports on bridge fascia to be removed in 395 express lanes project Abutment A Sta. 102+03.02 E 41-1" 77-11" 54-6" 77-11" Span a Span b Span c Span d 49-10" Span e Abutment Sta. 105+04.45 E To Annandale 23-27 -48" o Pier 1 Pier 3 Pier 4 To Alexandria 10" Sta. 22+94.74 Ramp E R=175 typ. 7-0" S I-395 Pier 2 Reversible Express lanes N I-395 106-0" min & varies 42-6" min & varies 2 42-6" 40-2" W 34-4" E min & varies Shared -use 2-0" path arrier Exist. approach, typ. P... Elev. 249.96 R=1062.41 Sta. 21+99.27 P.. Ramp E Grade reak ine 22-6" Sta. 21+68.5 Sta. 102+44.18 Sta. 103+22.12 Elev. 250.32 Elev.250.73 Elev. 250.69 Face of rail Face of curb Face of median barrier Face of median barrier Face of curb Elev. 249.2 Sta. 104+54.57 Sta. 103+76.63 Elev. 249.93 Rte. 236 W Rte. 236 E New approach, typ. Exist. approach, typ. Face of rail 10-0" sidewalk 10" Exist. 48" sewer Edge of pavement Edge of pavement Edge of pavement PAN.G. Sta. 103+88.02.G. Elev. 253.54 V.. = 500-1.8% +3.0% Rte. 236 E Finished grade eginning of bridge ack of backwall Sta. 102+01.27 304-11" End of bridge ack of backwall Sta. 105+06.2 Finished grade Exp. AUTMENT A Span a Exp. Exp. 17-3" min vert. cl. Exp. Exp. Exp. Span b Span c Span d Span e Fix. Fix. Exp. Exp. PIER 1 S I-395 PIER 2 PIER 3 Exist. 48" sewer 16-10" min vert. cl. Reversible Express lanes 16-11" min vert. cl. N I-395 PIER 4 AUTMENT Existing concrete slope protection, typ. OMMONWEATH OF VIRGINIA DEPARTMENT OF TRANSPORTATION PROPOSED RIDGE REPAIRS ON DEVEOPED SETION AONG ROUTE 236 DUKE STREET (ROUTE 236) OVER I-395 ITY OF AEXANDRIA - 0.25 MI. E. FF

9" typ. 6" typ. Virginia Department Duke Street (Route 236) Over I-395 - Transverse Section ity of Alexandria 106-0" bridge and joint Rte. 236 4" 4" 2-0" 2-0" 39-0" 6-0" 22-0" 1 8-0" Three W anes Two E anes Shoulder Epoxy overlay " 8" Exist. 4"o/ conduit onduit to be removed in 395 express lane project Existing gas pipe Electrical Existing beams typ. Telephone 1 2 3 4 5 6 7 8 9 10 11 12 13 14 2-10" 2 eq. spa. 8-0" = 16-0" Span a: varies 16-0" 4 spa. @ 8-0" = 32-0" 6 spa. @ 8-0" = 48-0" 2-10" to 18-0" 2-6" 2-6" EXISTING TRANSVERSE SETION 106-0" 42-6" W 2 E 42-6" 2-2", shldr. 2-0" onc. barrier 3 22-0" 7-4" 10-0" 12" 12" Shared-use path Three W anes Shldr. Shldr. Two E anes Shoulder Grade break line Pedestrian fence PSR Railing Point of grade change Sta. 104+13.50 to 105+35.65 Point of grade change oncrete barrier M-3A Point of grade change Exist. 4" o/ conduit to remain See Drip Detail Maintain Gas Pipe Maintain Electrical Maintain Telephone 2 5 6 7 8 1 3 4 9 10 11 12 13 14 2-4" min 2 eq. spa. 8-0" =16-0" 4 spa. @ 8-0" = 32-0" 6 spa. @ 8-0" = 48-0" & varies Span a: varies 16-0" to 18-0" 2-4" PROPOSED TRANSVERSE SETION

Duke Street (Route 236) Over I-395 - onstruction Sequence - 1 ity of Alexandria 12-0" 28-0" 4-11 lanes 3-11 lanes 2 4-11 lanes lane Span a Span b Span c Span d Span e AUTMENT A AUTMENT 1 1 1 1 PIER 1 PIER 2 PIER 3 PIER 4 I-395 I-395 S N I-395 Reversible Express anes STAGE IA - WORK AREAS FOR AUTMENT A, PIERS 1 AND 3 23-6" 1 4-11 lanes 2 3-11 lane 4-11 lane 63-4" Abutment A lane Abutment Span a Span b Span c Span d Span e AUTMENT A AUTMENT 1 1 1 1 PIER 1 I-395 S PIER 2 I-395 PIER 3 I-395 N PIER 4 Reversible HOV anes STAGE I - WORK AREAS FOR AUTMENT, PIERS 2 AND 4

Duke Street (Route 236) Over I-395 - onstruction sequence - 2 ity of Alexandria bridge 2 Two W anes 1-6" 37-0" 1-6" 2 Two E anes 1" open joint 1" open joint Remove exist. median Replace exist. conc. deck Exist. beams to be replaced STAGE II - REMOVE RAISED MEDIAN AND REPAE THE RIDGE DEK AND MIDDE EAMS WITHIN THE IMITS SHOWN. bridge egend: 34-6" offset 2 Two W anes 8-0" uffer 29-6" Two E anes - Existing Structure - Proposed onstruction - Existing Structure Removal - Replacement of Existing Structure Exist. beam to be replaced Replace exist. concrete deck STAGE III - REPAE THE RIDGE DEK, RIDGE PARAPET, SIDEWAK AND EXTERIOR EAMS WITHIN THE IMITS SHOWN.

Duke Street (Route 236) Over I-395 - onstruction sequence - 3 ity of Alexandria bridge concr. barrier concr. barrier 2-0", offset 12" Shared use path 23-5" Two W anes 23-7" Two E anes 34-6" Pedestrian PSR fence Railing Exist. beam to be replaced STAGE IV - REPAE THE RIDGE DEK, RIDGE PARAPET, SIDEWAK AND EXTERIOR EAMS WITHIN THE IMITS SHOWN. egend: bridge - Existing Structure - Proposed onstruction - Existing Structure Removal 1-2", offset, offset, offset 2-4", shldr. 3 16-0" 22-0" 10-0" 12" 12" Shared use path Three W anes Two E anes - Replacement of Existing Structure oncrete barrier M-3A Group 2 channelizing device Pedestrian fence PSR Railing STAGE V - ONSTRUT NEW ONRETE MEDIAN ARRIER M-3A.

Maintenance of Traffic Duke Street Duke St. (Rte. 236) over I-395 ridge Rehabilitation Existing onditions (after 395 Express anes Project improvements) Stage III (westbound traffic shifts into median) Work area on north side of bridge 2 eastbound lanes and 2 westbound lanes maintained on Duke St 395 Express anes improvements: oop ramp from S I-395 to E Duke Street removed. New ramp connection and traffic signal installed. Stage II (median is removed to facilitate traffic shifts in other stages) Stage IV (eastbound traffic shifts into median) Work area in median 2 eastbound lanes and 2 westbound lanes maintained on Duke St Work area on south side of bridge 2 eastbound lanes and 2 westbound lanes maintained on Duke St September 2018 Duke St. (RTE. 236) over I-395 ridge Superstructure and Substructure Rehabilitation Alexandria, Virginia State Project 0236-000-862, P101 UP 110032