Condition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No , )

Similar documents
1-44. SITKA HARBOR, ALASKA (Western Channel, Crescent Bay Basin, Channel Rock Breakwaters) (CWIS NOS , 16840, 10322, 55030, 13787)

Cordova Harbor Page 2 of 9

Nome Harbor Page 2 of 12

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

Juneau Douglas Harbor

Juneau Aurora Harbor

Ninilchik Harbor Page 2 of 11

Ketchikan Harbors Thomas Basin and Bar Point Harbor

1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007

Grays Harbor O&M and Deepening Dredging

Grays Harbor Federal Project

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME

Pacific Ocean Division. Navigation Program Overview. Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii.

APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT

APPENDIX D REAL ESTATE PLAN

Ennore Coal Port Project: Port Basin and Entrance Channel

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

ROOK COMPANY PANAMA CANAL BANCROFT LIBRARY

PEASE DEVELOPMENT AUTHORITY DIVISION OF PORTS & HARBORS ANNUAL DREDGE REPORT

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle

New Orleans Municipal Yacht Harbor

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)

Maltester Channel Dredging. Shoreline Marina Committee. November 18, 2008

BEACH NOURISHMENT BY RAINBOWING FOR THE VISAKHAPATNAM PORT TRUST BY DCI. Capt. MVR MURTHY ABSTRACT

UNITED NEW YORK SANDY HOOK PILOTS BENEVOLENT ASSOCIATION AND UNITED NEW JERSEY SANDY HOOK PILOTS BENEVOLENT ASSOCIATION

FY-16 Ongoing Contracts FY-16 Scheduled Contracts

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

SECTION XI - COAST PILOT UPDATING. 1. To acquire a general knowledge of the responsibilities of the Auxiliary in COAST PILOT UPDATING activities.

Utilizing Vessel Based Mobile LiDAR & Bathymetry Survey Techniques for Survey of Four Southern California Breakwaters

NEED FOR SUPPLEMENTAL BATHYMETRIC SURVEY DATA COLLECTION

Port Infrastructure to Support Floating Offshore Wind West Coast USA

V. HARBOR DEPTHS, CHANNEL DESIGN AND PROPOSED CONSTRUCTION AND DREDGING

SHORE PROTECTION AND HABITAT CREATION AT SHAMROCK ISLAND, TEXAS ABSTRACT

Final Waterways Assets and Resources Survey Master Plan for Dredging and Beach Nourishment

CLARIFICATION PAPER DREDGED MATERIAL VOLUME ESTIMATES

FINAL ENVIRONMENTAL IMPACT STATEMENT ON BROWARD COUNTY SHORE PROTECTION PROJECT SEGMENTS II AND III BROWARD COUNTY, FLORIDA

Shoreline Response to an Offshore Wave Screen, Blairgowrie Safe Boat Harbour, Victoria, Australia

Dredging Keeping Our Underwater Highways Open

TOWN OF DENNIS 10 YR COMPREHENSIVE DREDGE PERMIT SEPTEMBER 10, 2013

DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1229 GALVESTON, TEXAS CESWG-CDR (1145)

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Implications of proposed Whanganui Port and lower Whanganui River dredging

NAVIGATION STUDY FOR LAKE WORTH INLET, FLORIDA DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT STATEMENT APPENDIX A ENGINEERING

Forth Ports Limited. Ruling Depths & Under Keel Clearances

Sediment Management Plan Rehoboth Bay

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416]

An Example of a Unique Partnership for Contaminated Sediment Management The Port Hueneme Experience

BIG RIVER COALITION RED RIVER VALLEY ASSOCIATION Sean M. Duffy, Sr. Executive Director

Hydrographic Surveying Methods, Applications and Uses

Public Notice U.S. Army Corps In Reply to Application Number CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA])

Vieques Underwater Demonstration Project

Planning Considerations for Nearshore Placement of Mixed Dredged Sediments

3.9 Marine Transportation

Eelgrass and Macroalgae Presence/Absence Preliminary Surveys BHP Proposed Grays Harbor Potash Export Facility A Task 400

St. George Harbor Feasibility Study. Appendix A - Hydraulic Design. St. George, Alaska. Tentatively Selected Plan August 17, 2018

Geospatial Positioning Accuracy Standards Part 5: Standards for Nautical Charting Hydrographic Surveys - Public Review Draft

Beach Nourishment Impact on Beach Safety and Surfing in the North Reach of Brevard County, Florida

Dredging Engineering Short Course Texas A&M University January 2016

Nearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA

Designing a Harbor Entrance to Defeat Swell Wave Agitation. FAX (506) ; 2

Redondo Beach Boat Launch Ramp Facility

Chapter 4 EM THE COASTAL ENGINEERING MANUAL (Part I) 1 August 2008 (Change 2) Table of Contents. Page. I-4-1. Background...

Eelgrass Survey Reporting Form 2222 Channel Road Newport Beach, CA Eelgrass (Zostera marina) Survey

Richards Bay Coal Terminal

PHYSICAL MONITORING WILMINGTON HARBOR NAVIGATION PROJECT REPORT 1: August 2000 June 2003

Unalaska Navigation Channel Improvements

The proper location of the mouth of the Salinas River is a very difficult problem. - U.S. Surveyor General for California (1879)

2016 Annual Inspection Report

Cline s Point Marina Ship Wave Analysis

ADL Attachment 1

CHAPTER 134 INTRODUCTION

Shoalwater Bay Shorline Erosion Dredging

Norwalk Harbor: The Jewel of Long Island Sound. A Presentation by the Norwalk Harbor Management Commission

Long Term Success and Future Approach of the Captiva and Sanibel Islands Beach Renourishment Program

Dredged Material Management Plan Atlantic Intracoastal Waterway Port Royal Sound, South Carolina to Cumberland Sound, Georgia November 2015

BookletChart. Intracoastal Waterway Matecumbe to Grassy Key NOAA Chart A reduced-scale NOAA nautical chart for small boaters

City of Port Aransas Shoreline Analysis and Improvements

SECTION II NM 11/13 NAVIGATION PUBLICATIONS COAST PILOT CORRECTIONS. Chapter 4 Paragraphs 85 to 86; read: (85)

Figure 4, Photo mosaic taken on February 14 about an hour before sunset near low tide.

PNWA Conference Update

Port Sections Guide Section 01

DREDGING AND DISPOSAL REPORT for the PORT OF BROOKINGS PORT OF BROOKINGS HARBOR, OREGON

THE SYLLABUS FOR WRITTEN EXAMINATION PILOT'S FOURTH CLASS LICENCE (TEES AND HARTLEPOOL) AND

APPENDIX I ESSENTIAL FISH HABITAT ASSESSMENT. Alaska Deep Draft Arctic Port System Study

INTERNATIONAL HYDROGRAPHIC SURVEY STANDARDS

The 2017 Panama City Beaches Beach Interim Renourishment Project. Answers to Common Questions

Baird. Innovation, Excellence & Service Oceans, Lakes & Rivers

BALD HEAD ISLAND, NC SAND SHARING SYSTEM OVERVIEW AND ASSESSMENT. Erik J. Olsen, P.E. olsen associates, inc.

OYSTER REEF RESTORATION; RESTORING ECOLOGICAL FUNCTION

Alaska Deep-Draft Arctic Port System

APPENDIX D-2. Sea Level Rise Technical Memo

DREDGING AT INLETS ON SANDY COASTS

HARBOR INFRASTRUCTURE INVENTORIES West Harbor, OH

Request Number IR1-12: Flow Passage. Information Request

SWANSEA CHANNEL DREDGING TO IMPROVE NAVIGATION

Ocean Structures and Material Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras

Transcription:

Wrangell Harbors

Condition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No. 010435, 021500) Authorization (1) Rivers and Harbors Act, 22 September 1922 (House Doc. 161, 67th Congress, 2nd Session) as adopted, provides for a breakwater 300 feet long extending from Point Shekesti to protect the southern portion of the harbor. (2) Rivers and Harbors Act, 30 August 1935 (House Doc. 202, 72nd Congress, 1st Session) as adopted, provides for a mooring basin 600 feet long by 400 feet wide dredged to a depth of 10 feet below MLLW. (3) Rivers and Harbors Act, 2 March 1945 (House Doc. 284, 76th Congress, 1st Session) as adopted, provides for an inner mooring basin 550 feet long by 325 feet wide dredged to a depth of 10 feet below MLLW and connected to the outer mooring basin by a connecting channel 530 feet long by 120 feet wide at a depth of 10 feet below MLLW; includes authorization for a breakwater 320 feet long on the reef north of Shakes Island. (4) WRDA 99 authorizes the construction of Heritage Harbor to include two breakwaters, an entrance channel, and inner harbor area. (5) WRDA 2007 Section 5035 provides (a) General Navigation Features - In carrying out the project for navigation, Wrangell Harbor, Alaska, authorized by section 101(b)(1) of the Water Resources Development Act of 1999 (113 Stat. 279), the Secretary shall consider the dredging of the mooring basin and construction of the inner harbor facilities to be general navigation features for purposes of estimating the non-federal share of project costs. Table 1 Existing Project Length ft. Width ft. Depth ft. Wrangell Harbor Outer Mooring Basin 600 400-10 Connecting channel 30 120-10 Inner Mooring Basin 550 325-10 Breakwater 300 Wrangell Harbors Page 3 of 9

Existing Project Length ft. Width ft. Depth ft. Heritage Harbor Entrance Channel 650 120-16 Maneuvering Channel 1050 80-12 Basin (maintained by others) 1215 525-12 North Breakwater 542 West Breakwater 1802 Project Usage The original interconnected small boat basins have a capacity of 300 vessels and are used as an operating base for commercial fishing. The new Heritage Harbor can accommodate up to 271 vessels with lengths from 19 to 66 feet. The City of Wrangell has a dual economy based on the timber and fishing industries. Progress of Work Wrangell Harbor 1926 Point Shekesti breakwater is constructed. 1936 The outer mooring basin (original project) is dredged to project depth. 1956 Expansion of the harbor facilities begins in May with the dredging of the inner basin and connecting channel. The 320 foot rock mound breakwater north of Shakes Island is placed on inactive status. 1957 Harbor expansion is completed in March to the present existing project. 1968 Maintenance dredging is performed in September and October, where necessary to meet project depth, resulting in the removal of 13,644 cubic yards of material. 1992 The concrete parapet wall atop the breakwater undergoes rehabilitation. 1993 Sampling and testing of bottom sediments is completed; the Federal project is dredged by contract in October with the removal of 3,575 cubic yards. 1998 A condition survey is conducted from 29 March - 2 April. 2001 A multi-beam survey provides full swath coverage of the harbor in April. 2004 The most recent condition survey of the federal project is conducted in July with single beam techniques. A dredging contractor removes 220 cubic yards from beneath the inner harbor float to prevent recurring damage to the structure at extreme low tides. 2007 A project condition survey is completed for Wrangell Harbor in May. 2009 A project condition survey was completed for Wrangell Harbor in August. 2014 USACE Comprehensive Evaluation of Project Datums (CEPD) Compliance report completed and recorded in January. Wrangell Harbors Page 4 of 9

Progress of Work Heritage Harbor 2004 Construction begins on Heritage Harbor in June. 2005 Construction of Heritage Harbor is completed in April. 2007 A project condition survey is completed for Heritage Harbor in May. 2009 A project condition survey was completed for Heritage Harbor in August. 2014 USACE Comprehensive Evaluation of Project Datums (CEPD) Compliance report completed and recorded in January. Table 2 Cost to Date Project Description Cost $ 010435 GI PED Appropriation 386,000 GI PED Costs 386,000 GI PED Contributed Appropriation 150,000 GI PED Contributed Costs 110,642 CG Appropriation 13,114,437 CG Costs 13,087,656 CG Contributed Appropriation 3,071,450 CG Contributed Costs 3,119,380 021500 O&M Appropriation 1,121,339 O&M Costs 1,121,339 Table 3 Range of Tides in feet Tide Station Mean Range Diurnal Range Extreme Range 945 1204 Wrangell AK 13.57 15.96 - Controlling Depth For the Outer Mooring Basin in Wrangell Harbor, -4.6 feet MLLW controls near the southeast edge of the project limits. For the Connecting Channel, -4.5 feet MLLW controls near Daybeacon 5. Project depth is effectively available in the Inner Mooring Basin except along the northern portion of the limits in which -1.6 feet MLLW controls. Finally, the project depth is available through the Entrance Channel of Heritage Harbor. A depth of - 11.5 feet MLLW controls in the Maneuvering Channel near the south end of the project limits, August 2009. Wrangell Harbors Page 5 of 9

Maintenance Dredging Supplement A. General 1. The Federal project was last dredged in 2004 with the removal of 220 cubic yards from beneath the inner harbor float to prevent recurring damage to the structure at extreme low tides. Previous maintenance dredging occurred in 1993 with the removal of 3,575 cubic yards of material and 1968 with the removal of 13,644 cubic yards of material. 2. Shoaling was most apparent along the eastern limit of the outer basin, both sides of the connecting channel, and along the northern limit and southeast corner of the inner basin. 3. The no-dredging window runs from 15 March to 1 June as established by the State of Alaska. 4. The project was last dredged with a hydraulic cutterhead and suction pipeline. Hard bottom conditions were encountered in all three areas of the project thwarting efforts at an additional foot of advance maintenance and resulting in a large under run. Of the 13,100 cubic yards reportedly possible for dredging, the contractor was able to remove only 3,600 cubic yards. B. Sampling & Testing 1. Three sites were sampled within the Federal project, September 1992, and classified as silty sand (SM), sandy silt (ML), and silt with sand (ML). 2. Chemical analysis was conducted using (5) test methods as outlined with results below. Table 4 Chemical Testing Method Chemical analysis Results 415.1 Total Organic Carbon ND (none detected)- 3.48 % Series 6000-7000 s (8) RCRA Metals (6) of (8) detected; Mercury 0.3-0.5 marginal, all others below management levels 8270 Semi-volatile Organics (12) above management levels 8080 Pesticides and PCB s ND 8260 Volatile Organic Compounds Methylene Chloride 25-58 ppb,* all others ND or below management levels * Low levels detected in all samples; laboratory contamination suspected. C. Disposal 1. Dredge spoils were conveyed via portable pipeline and discharged in the deepwater of Zimovia Strait. The primary intertidal site north of project, with center at 56 28 13.33 N 132 22 50 W, was not utilized. Wrangell Harbors Page 6 of 9

2. The deepwater disposal site is located a minimum of 900 feet west of the main breakwater tip in water 100 feet deep or greater. The offshore geographic coordinates for a single discharge point are 56 28 2.5 N and 132 23 19.9 W. 3. The future location of the disposal site will have the option of upland or deep water disposal. The containment structure for an upland or intertidal site is not funded by the Corps. D. Environmental Permits and Reports 1. A Chemical Data Report was prepared by the Corps in February 1993, an Environmental Assessment was completed in April 1993, and a Finding of No Significant Impact (FONSI) was signed 13 August 1993. 2. The following permits or authorizations are listed by agency below: Table 5 Environmental Permits Agency Name Date of Issue Date of Expiration AK Department of Environmental Conservation August 4, 1993 n/a AK Department of Governmental Coordination July 22, 1993 n/a AK Department of Natural Resources July 15, 1993 n/a US Fish and Wildlife Service July 6, 1993 n/a NOAA -National Marine Fishing Service April 14, 1993 n/a 3. Water Quality: Five physical parameters were measured through the water column at three locations within the federal project; temperature, salinity, ph, oxidation-reduction potential, and conductivity were measured in the field. No chemical analysis was conducted. Wrangell Harbors Page 7 of 9

Wrangell Harbors, Wrangell, Alaska Oblique of Wrangell Harbor, April 2005. Wrangell Harbor, 2009. Wrangell Harbors Page 8 of 9

Wrangell Harbors, Wrangell, Alaska Oblique of Heritage Harbor, April 2005. Heritage Harbor, 2009. Wrangell Harbors Page 9 of 9