PROCEDURE. Revision: 1. Operative Date: 10/04/2018 Department: HSEC. Author: D Steel CONTENTS

Similar documents
PROCEDURE. Operative Date: 22/09/2017 Department: HSE. Revision: 1. Author: D Steel CONTENTS

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER)

SOP GEN-007X Crane and Winch Operations

PRO Lifting Operations

Safe Work Method Statement

Lifting Equipment Procedure. Committees / Group Date Consultation: Health and Safety Sub Committee Nov 2016

BANKSMAN / SLINGER. 1. What is the smallest size diameter of synthetic rope allowed for use as a hand held tagline?

Lifting Operation & Lifting Equipment Procedure

LADDERS FIXED AND PORTABLE

Lifting & Hoisting Procedure

References: EM Section 15 OSHA UFGS

Procedure: Pressure equipment safety

Rigging Safety 16 Hour (API RP 2D 7 th Edition) Course Outline

OMG Southeast & Southwest RIGGING SAFETY PROGRAM (29 CFR Part , , , , , & ANSI B30.5, ANSI B30.

WHS- 43 Lifting Equipment Procedure

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls.

CPCS renewal test factsheet

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

Health & Safety Policy and Procedures Manual SECTION 25 RIGGING AND HOISTING EQUIPMENT

Appointed person Note: It is recommended that you read the Supporting Information page before you read this factsheet.

Policy Redesign Project. Plant Safety Policy. Table of Contents

Managing Mobile Crane Hazards. Paul Satti Construction Safety Council. Hazards of Working Around Cranes. Key Concepts:

Lifting Equipment Protocol

Work Activity (e.g. Road Work): Work Location:.

Section 15 TABLE OF CONTENTS Rigging. 15.A General B Personnel Qualifications

Field Instruction. This instruction outlines the minimum requirements for all Horizon Power workers who undertake Vegetation Management Work.

MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM

On the Lee Tunnel project, some significant near misses involving cranes have occurred this year.

5. Requirements for Lifting Operation

Isolation Standard - Tags

CLIENT NAME: LOCATION: CALM BUOY INSPECTION:

Premium PowerPoint Presentation. Rigging Review

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS)

Once the job has been planned and the site has been inspected according to WHS and site requirements it is important to follow work procedure and

DREW UNIVERSITY FALL PROTECTION PROCEDURE (DRAFT 12/11)

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

Fall Protection Checklist. Guardrail System

Surface exploration drilling

1.0 Purpose: To provide guidelines for selection, usage, inspection and rejection of rigging equipment

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings

SECTION 15 RIGGING. b. Defective rigging shall be removed from service.

Wilkins Safety Group

SEMFEW339 - SQA Unit Code H1WC 04 Slinging, lifting and moving materials and components

SAFE WORK METHOD STATEMENT Part 1

User Instruction Manual For Davit Rescue System

LIFTING RIG Multi-Product Installation Rig

Operate a bridge or gantry crane (remote operation only)

We are the manufacturer & supplies of lifting

Suitability of Work Equipment

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings

"RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS"

Mooring & towing. 9. Mooring & towing. Index

EQUIPMENT. (See also: Management of Health & Safety (51); Fork Lift Trucks (32); Warehousing (87); Work Equipment (91))

Floor Mount Socket. T: +44 (0) F: +44 (0)

CONTRACTOR SAFETY INDUCTION HANDBOOK

Transfer Chain (SA-1002) & Adjustable I-Beam Clamp (SA-1039 or SA-1040) Operating Instructions

NEW FALL PROTECTION LEGISLATION. Presented by Michael McGovern, Roland Roy

Triple Tine Mechanical Grapple

PURPOSE: The purpose of this Operating Policy/Procedure (OP) is to ensure that material handling devices are used correctly and safely.

Technical Briefing Note

Procedure: Confined space safety

C Crane. Installation & Operation Manual. SWL 120kg. The Hansa CRANE ID#: Davit ISO/DIS June 2000 Sling AS Sept 2000

UK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit June June 2015 Page 1 of 16

User Instruction Manual Fixed Beam Anchor

Safety Services Guidance. Guidance on Statutory Inspections

FALL PROTECTION (SAF-SPI-06)

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP.

FATAL AND SEVERE RISK PROGRAM

Crane & Rigging Brain Teasers

Safe Work Method Statement

Figure 1 - Parts Identification. Copyright 2002, DB Industries, Inc.

8. Fall Protection Procedures WAC

Q-1, as chief officer what are the checking s that you should carry out before using lifting gear? (Risk assessment and risk management)

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

GUIDANCE NOTES ON LOLER REGULATIONS FOR RIVERIA MK1.MK2 & MK3 AND BELLAVITA BATH LIFT. Lifting Operations and Lifting Equipment Regulations 1998

HOW TO PREPARE FOR THE LEVEL A CRANESAFE CERTIFICATION ASSESSMENT

Signature: Director of Environmental Health & Safety. Fall Protection

1. SHEWMS DETAILS. Project No. Valid From

Garbex Drum Crusher Safe Work Procedure PTES_HSE_SWP_028. Name Date Signature. Author Jarred Hearle 30/11/2014. Reviewed John Nulty 30/11/2014

Height Safety Lifting Load Control

Tower Climber Orientation.

March 1999 Presentation on "Lifting Operations and Lifting Equipment Regulations 1998" by Chris Davies, HM Inspector, HSE Midlands Region.

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

Model Curriculum. 1. Helper Fabrication. Construction Real Estate and Infrastructure Construction Fabrication CON/Q01201, V1.0 1

Section 16B. Fall Protection. Falls are the second leading cause of death in the workplace. Factors contributing to falling incidents:

Worker s Safety Handbook for Rigger and Signalman

Mine Dust Management Plan

SUPER SLIDER BEAM ANCHOR ADJUSTABLE FROM Model # BWA030N

LEVEL 3 NPTC CERTIFICATE OF COMPETENCE IN THE THOROUGH EXAMINATION OF ARBORICULTURAL EQUIPMENT. ASSESSMENT SCHEDULE (Revised Aug 2010)

PRESSURE SYSTEMS POLICY

Heavy Equipment Technician Rigging

Competency type. positions. All workers (including contractors), higher degree students and volunteers

LIFTING PLAN PERMIT TO WORK RISK ASSESSMENT

User Instructions 1790 Rail Anchor

New Mexico Institute of Mining & Technology. Fall Protection Program

Health and Safety Guidance Note No 37

Rescue Technician: Rope Rescue I

Introduction: Materials needed to conduct this training: White board, black board or presentation tablets. Projector

FALL PROTECTION GUIDELINE

Crosby Rigging Guide For Lifting READ ONLINE

Transcription:

Title: Lifting Equipment - Inspection and Maintenance PROCEDURE Procedure No: P314.420 Issue: 1 Revision: 1 Operative Date: 10/04/2018 Department: HSEC Sect./Classification: Safety/Gear & Equipment Author: D Steel Approver Role: Manager - Health, Safety & Environment CONTENTS 1.0 PURPOSE... 1 2.0 SCOPE... 1 3.0 RESPONSIBILITIES... 2 4.0 REFERENCES... 2 5.0 DEFINITIONS... 3 6.0 ACTIONS... 3 6.1 New Lifting Equipment to site... 3 6.2 Pre-Use check of Lifting System Equipment... 4 6.3 Scheduled Annual Inspection and Testing... 5 6.4 Maintenance... 5 6.5 Repairs... 5 6.6 Modifications and Alterations to lifting equipment or structures 6 6.7 Lifting System Equipment Storage... 6 6.8 Lifting System Equipment Identification/inspection tags... 6 6.9 Risk Assessments... 6 6.10 Training and Qualifications... 6 6.11 Lifting System Equipment Register... 7 6.12 Manuals... 7 7.0 ATTACHMENTS... 7 8.0 REVISION HISTORY... 7 1.0 PURPOSE To provide standards for the inspection and maintenance of lifting system equipment on the QAL site to comply with legal and site requirements. 2.0 SCOPE This procedure applies to all lifting equipment on the QAL site (including the Residue Disposal Area). It applies to QAL owned equipment and all equipment hired by QAL. Contractors using their own equipment on site will have a system in place of equal standing. The procedure excludes the inspection and maintenance requirements for: Industrial rope access rescue equipment and systems (refer AS/NSZ 4488 series) Personnel Fall Protection Systems (refer P314.311 Work at Height) Queensland Fire & Rescue Service / First Response rescue lift equipment. Last amendments to this Document are Highlighted in Bold Italic Print PAGE 1 of 7

Elevators personnel EWP and Scissor Lifts (refer P314.311 Work at Height and P314.701 Operation of Mobile Equipment procedures) Towing Equipment 3.0 RESPONSIBILITIES Basic Rigger Perform inspections of lifting equipment prior to use. Acknowledge on the Lift Plan sheet or Critical Lift Plan Immediately tag defective equipment and take out of service Crane Base Supervisor (or delegated representative) Perform inspections of lifting equipment prior to use Immediately tag defective equipment and take out of service Crane Operator Perform inspections of lifting equipment prior to use. Acknowledge on the Lift Plan sheet or Critical Lift Plan Immediately tag defective equipment and take out of service Dogger Perform inspections of all lifting equipment, prior to use. Acknowledge on the Lift Plan. Immediately tag defective equipment and take out of service. Engineering and Maintenance Services Manager Approve use of aluminium components in lifting equipment Intermediate Rigger / Advanced Rigger Perform a inspection of all lifting equipment, prior to use. Acknowledge on the Lift Plan sheet or Critical Lift Plan Immediately tag defective equipment and take out of service. Persons with no WHS Rigger/Dogger Licence Perform a visual inspection of all lifting equipment, prior to use. Acknowledge on the Lift Plan sheet. Immediately tag defective equipment and take out of service. Section Superintendent / Equipment Owner Maintain all lifting equipment items under their control in safe order, without risks to health and safety of persons by ensuring that: o A register of all lifting equipment items under their control is developed and maintained o Lifting equipment items that require scheduled servicing / maintenance are recorded in SAP and maintenance plans are in place for the inspection, maintenance and servicing requirements. o Inspection and testing programs are undertaken as stated within this procedure o Inspection tagging systems are used correctly o Lifting equipment items under their control shall be made available for inspection o Adequate storage is provided for lifting equipment items o A documented risk assessment for each power operated lifting device has been prepared and entered into the QAL Plant Risk Register. Approve the use of synthetic web / synthetic-fibre slings 4.0 REFERENCES P312.402 Pre-task Hazard Assessment P774.008 Registration of Design Calculations, Computational Models & Reports Queensland Work Health & Safety Act Queensland Work Health & Safety Regulation Code of Practice Plant Rio Tinto HSE Performance Standard C6 Cranes and Lifting Equipment PG177a and b Load Lift and Rigging training module PAGE 2 of 7

PH177c PG277 QM50-132-04 Load Lift and Rigging for Superintendents training Load Lift and Rigging Non-licenced Personnel Lifting points (Construction Standard) 5.0 DEFINITIONS Competent Person a person who is suitability qualified (whether by experience, training or both) to carry out the relevant work or function. Davit a lifting beam that can rotate or move on a horizontal plane. Dogger - a person holding a WHSQ Certificate of Competency for Dogging and a QAL qualification imparted by completing PG177a and PG177b. Lifting Attachment an attachment designed to be used in conjunction with lifting devices and similar lifting equipment to raise, lower or haul, arrest and sustain a load (see Attachment 7.1 for examples ). Lifting Device a device equipped with mechanical means that will raise, lower or haul, arrest and sustain a load in any working position within the full range of hoisting or haulage without adverse effects on any components. Cranes and mobile cranes are inclusive. The lifting device may be manually, engine or power operated (electric, hydraulic, and pneumatic) (see Attachment 7.1 for examples). Lifting Equipment Register details the current list of equipment including a description, date of purchase, last inspection date and condition and WWL / SWL. Lifting Equipment lifting attachments and rigging equipment that will raise, lower or haul, arrest and sustain a load or object. Lifting Point An attachment to a structure, pressure vessel, tank or pipework used for attaching lifting equipment for the purpose of raising or lowering some other piece of equipment. Rigger a person holding a WHSQ Certificate of Competency for Basic Rigging and a QAL qualification imparted by completing PG177a and PG177b. RPEQ Engineer Register Professional Engineer Queensland. Workbox - a device designed to AS1418.17 to be suspended from a crane to provide a working area for a person. Workbasket - a device designed to be elevated by a forklift or similar having tyne arrangements to provide a working area for a person. Use of a workbasket involving personnel in the basket is restricted. WHSQ - Work Health and Safety Queensland WWL / SWL Working Load Limit / Safe working load limit equivalent meaning. 6.0 ACTIONS 6.1 New Lifting Equipment to site All new lifting equipment brought to site must have the following identification and information attached prior to being used in the field. 6.1.1 Lifting Attachments and Power Operated Lifting Devices Lifting attachments and power operated lifting devices must have the following attached: An Equipment Number must be attached in a prominent position and be designed to last the life of the equipment. A Design load rating SWL must be attached in a prominent position and be designed to last the life of the equipment. An Annual Inspection Punch Tag-must be punched with date next due for inspection. PAGE 3 of 7

Lifting attachments must have a Design Certificate from a RPEQ Engineer and Certificate of Inspection and Test must be witnessed and attached to the SAP equipment number / functional location. A cyclic work order created in SAP for the required inspection frequency and maintenance requirements. 6.1.2 Rigging Equipment and Manually Operated Lifting Devices Rigging equipment and manually operated lifting devices must have the following attached: An Equipment Identification Tag - refer 6.8 A Design load rating-swl must be attached in a prominent position and be designed to last the life of the equipment. A Colour tag for current year of use. 6.1.3 Tackle and Slings less than 1 tonne These items are not registered prior to putting into service as they are treated as a consumable item. Slings less than 1 tonne shall have the following identification: An Equipment Identification Tag- refer 6.8 A Design load rating-swl must be attached in a prominent position and be designed to last the life of the equipment. Tackle must have the Manufacturer s load rating clearly identified on the item. 6.1.4 Aluminum and alloy fixtures, fittings or attachments All lifting equipment shall be manufactured from ferrous load bearing components. Exceptions are by Engineering and Maintenance Services Manager approval only. 6.2 Pre-Use check of Lifting System Equipment All lifting system equipment required to undertake a lift shall be inspected by a competent person prior to use. The check will include: Current Inspection Tag Equipment ID tag is attached and legible Safe Working Load (SWL) is visible and appropriate to task Equipment is free of defects and safety latch fitted to all hooks. 6.2.1 Pre-use check identifies an item with no ID tag or inspection tag, tag is not current or equipment is defective/damaged Any lifting system equipment component found to be non-compliant shall be taken out of service immediately. An Out of Service Tag with information stating the date and why the equipment is defective shall be attached. If the Inspection Tag is not current or missing, a competent Intermediate Rigger may perform the equipment inspection using the appropriate inspection sheet. The record of inspection must be retained by the Section (attach inspection sheet to SAP) and the equipment register updated. If the equipment is defective/damaged or the Equipment ID tag is missing then an assessment should be made if the equipment should be disposed of or repaired based on cost. The lifting register will be updated based on any changes. PAGE 4 of 7

Tackle and sling < 1t are to be treated as a consumable item. If damaged then a new replacement should be procured and the damaged item discarded. 6.2.2 Synthetic Slings Synthetic Slings are treated as a restricted item-with approval for use by Area Superintendent. Slings shall be in new condition prior to use. Any sling with staining or abrasion shall be destroyed. 6.3 Scheduled Annual Inspection and Testing The equipment owner is accountable for ensuring their equipment is safe for use, this can be achieved by ensuring scheduled inspections and testing are undertaken. Attachment 7.1 lists the lifting equipment used on site and identifies the frequency of scheduled inspections (inspection frequencies have been established to align with legislative requirements). Scheduled inspections and testing are to be performed by a qualified external contractor who is notified of inspection requirements via cyclic work orders established for the either the individual item or groups of items (eg. a work groups lifting equipment) Inspection of equipment will be conducted as per manufacturer s recommendations or be risk based and approved by the Process Integrity Superintendent. Upon receipt of the cyclic work order, the Contractor will: Contact the equipment owner to arrange an inspection time/location. Check each item against a predefined inspection criteria Check inspection tag fitted (refer 6.8) Update the Lifting Equipment Register with inspection outcomes and attach a copy of the inspection report for each item (Rigging equipment and manually operated lifting devices only) Ensure a copy of the updated Lifting Equipment Register and all inspection reports are forwarded to the Section Planner for uploading to the relevant SAP equipment number or functional location. If the equipment ID tag is not available/legible and the equipment cannot be identified as an item on the register then it will be treated as a new item as per section 6.1. If the equipment fails the inspection the item will be tagged Out of Service and the Owner notified and provided with a copy of the inspection report. Depending on the severity of the damage the equipment owner may decide to: Arrange for repair and load testing, or Release the item for destruction. 6.4 Maintenance Maintenance activities may be performed by a competent person in accordance with the manufacturer s recommendations or Process Integrity Superintendent approval. 6.5 Repairs Repairs shall only be performed by a competent external Contractor in accordance with the manufacturer s specification and regulatory requirements (ie. Load test performed where identified). The equipment owner will witness the repair certificate prior to attaching a current Inspection Tag. All repairs shall be documented and recorded in the Lifting Equipment Register. Unrepairable items shall be destroyed and removed from the register by the Section. PAGE 5 of 7

6.6 Modifications and Alterations to lifting equipment or structures Modifications or alterations to lifting equipment or structures used to support a load lift require design approval by an RPEQ Certified Engineer. Approval is required prior to use. The design shall be reviewed, approved and registered in accordance with QAL Procedure P774.008 "Registration of Design Calculations, Computational Models and Reports" by the certifying engineer. Approval may require load testing to be performed before use. 6.7 Lifting System Equipment Storage All lifting system equipment must be correctly stored preferably off the ground or on a frame in a clean designated area according to 5S principles. 6.8 Lifting System Equipment Identification/inspection tags All lifting equipment on site will be fitted with: 6.8.1 Equipment identification tag or manufacturers unique ID tag For rigging equipment and manually operated lifting devices (refer Attachment 7.1), use the manufacturers unique ID or a unique Section identification number (eg. the Work centre number followed by the next available number on the register ie. 553PC_01, 553PC_02) imprinted on a metal tag securely attached to the equipment. For lifting attachments and power operated Lifting Devices (refer Attachment 7.1), the Identification number will consist of the SAP Equipment number / Functional location imprinted on a metal tag securely attached to the equipment. 6.8.2 Annual Inspection tags There are two types of inspection tags: Colour tag with the current year displayed, or Metal Stamped dog tag for lifting attachments only. Dates marked indicate the expiry date. Inspections may commence 2 weeks prior to and up to 2 weeks after the expiry date, with tags changed over as equipment is identified as compliant. 6.9 Risk Assessments A plant risk assessment will be conducted for each type of lifting equipment and device used on site. The assessment process will involve equipment owners, operators, maintainers and a safety representative. The risk assessment will be housed in the Plant Risk Register on SAP and be reviewed at a frequency reflective of the inherent risk, or as part of an incident investigation. 6.10 Training and Qualifications Any person who has completed PG277 and been deemed competent by their Supervisor can undertake the pre-task inspection of the specific lifting equipment for the PPM or work instruction. If there is no PPM the pre-task inspection can be performed by a QAL employee or contractor with: Dogger or Rigger (Basic, Intermediate or Advanced) qualifications issued by WHS, and A QAL qualification imparted by completing PG177a and PG177b Lifting and Rigging training. Qualifications must be recorded in SAP against the individual s training records. PAGE 6 of 7

6.11 Lifting System Equipment Register It is a legislated requirement that a register be establish and maintained for lifting equipment for site. Lifting equipment will be registered by the Section Planner in one of two ways: As an individual item in SAP with its own unique SAP functional location or equipment number. This method will be selected for lifting attachments and power operated Lifting Devices (refer (Attachment 7.1). - Cyclic work order to be established for the inspection/testing of the item. - Results of inspection/testing attached to the SAP Item As an item listed on an excel register. Each item has its own unique ID number which corresponds to the next available number on the register or manufacturer s unique ID. This method will be used for rigging equipment >1t and manually operated lifting device. - The register will have its own unique SAP equipment number - A cyclic work order will be established for the register not individual items - Results of the inspection/testing will be documented in the excel register - A copy of the register will be attached to the SAP equipment number once equipment has been inspected Work groups are not required to keep a hard copy of the register. Records must be retained for the life of the equipment, and if the equipment is sold, then a copy of the inspection records form part of the sale. It is the equipment owner s accountability to ensure appropriate items of equipment are entered into the Area Lifting Register prior to use. 6.12 Manuals Manufacturer supplied manuals and other service books and pre-start check books are to be kept in situ or made easily accessible. The maintenance manual, service record (log book) and parts book can be kept at the office of the equipment owner. 7.0 ATTACHMENTS 7.1 Onsite Lifting Equipment and Devices Inspection Frequencies 8.0 REVISION HISTORY Issue Revision Revision Change Reason date 1 1 10/04/2018 Removed reference to Lifting lugs in Att7.1 Inspection Frequencies. Added reference to Lifting lug & management of lugs under Engineering standard. 1 0 22/12/2016 Complete review and rebuild of system PAGE 7 of 7

Attachment 7.1 ONSITE LIFTING EQUIPMENT & DEVICES INSPECTION FREQUENCIES LIFTING SYSTEM EQUIPMENT Lifting Devices Lifting Equipment Power Operated Portable / Fixed winch Hoist Manually Operated Chain Block Chain/Cable Lever Blocks (e.g. Cum along, Turfer) Sheave block Floor / Trolley Jack Cranes incl. Forklifts Pedestrian Operated Forklifts Telehandlers ALL EQUIPMENT requires a Pre-use inspection Lifting Attachment Spreader beams / frames Spreader clamps Lifting cradles Lifting beams Lifting davit Forklift Lifting jib attachments Tool baskets & Chains Equipment baskets& Chains Cylinder cages / Pallets Cylinder / Drum Lifters Specialised lifting equipment - tools /cradles/lifters Work Box/Basket & Chains Anchor Points (registered) Plate Clamps / blocks Push and gear trolley (e.g. beam monkey) Rigging Equipment SLINGS >1t: Chain slings Wire-rope slings Synthetic-web slings* Synthetic-fibre slings* Fibre-rope slings Wire-coil flat sling SLINGS <=1t: All Slings <=1t TACKLE: Shackles Swivels Rings Turnbuckles Eyebolts Annual Inspection, Records against SAP Functional location /Equipment # Annual Inspection & Records on the Section Specific Register Not recorded on a Register Refer P314.422 Cranes Inspection * Maintenance * Annual testing required or dispose of P314.420 Issue 1 Rev 1 Attachment 7.1 (10/04/2018) Page 1 of 1