Kentucky Lock Project Update Inland Waterways Users Board

Similar documents
MR. DAVID DALE, SES, PE, PMP DIRECTOR, US

Olmsted Locks & Dam. Inland Waterways Users Board. MR. DAVID DALE, SES, PE, PMP DIRECTOR, Programs Great Lakes and Ohio River Division 01 April 2016

MR. DAVID DALE, PE, PMP, SES DIRECTOR, Programs Great Lakes & Ohio River Division. 12 August Braddock Dam

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report

January 2019 FY Key Performance Report

91 Express Lanes Model Update 2006 State Route 91 Implementation Plan. Gerald V. Nielsten May 18, 2007

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

September 2018 FY Key Performance Report

JULY 2013 RIDERSHIP REPORT MTA METRO-NORTH RAILROAD EXECUTIVE SUMMARY

May 2018 FY Key Performance Report

Progress with the Road Investment Strategy

County of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1.

Application of Value Engineering The Crosstown Project

Albeni Falls Dam Downstream Water Temperature Study Interim Results

ORANGE COUNTY TRANSPORTATION AUTHORITY. Metrolink Ridership and Revenue Quarterly Report. Staff Report

Inland Marine Transportation System Capital Investment Strategy

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

Paratransit Service. ADA Paratransit Service

Snelling Bus Rapid Transit June 17, 2013 Technical Advisory Committee Meeting #2 & VISSIM Traffic / TSP Evaluation Wrap-Up

Getting a. Bridge Built

Fairfax County Parkway Widening Fairfax County

Technical Advisory Committee (TAC)

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018

Downtown Redevelopment Project Update

REVENUE & RIDERSHIP REPORT SEPTEMBER 2018

Wisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( )

Environment and Public Works Committee Presentation

REVENUE & RIDERSHIP REPORT NOVEMBER 2017

Babson Capital/UNC Charlotte Economic Forecast. May 13, 2014

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

A comment on recent events, and...

Frederick Ross. Real Estate Market Overview. Presented by: Kevin Thomas Senior Vice President. Frederick Ross. Company.

Inland Marine Transportation System

Laurier Segregated Bike Lane Pilot Project July 2013 update

Gerald P. Oliveto, P.E. George Franz NJDOT

SWISS reports stable load factors

The Herzliya Conference The Economic Dimension Prof. Rafi Melnick Provost, Interdisciplinary Center (IDC) Herzliya

UK Integrated Behaviour Change Programmes

SWISS Traffic Figures May 2004

Project Budget and Schedule Status

September 2016 Financial Results

Integrated Waterway Management of the Danube in Austria

Economy On The Rebound

1 PEW RESEARCH CENTER

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

WELCOME. City of Eden Prairie West 70 th Street

U.S. and Colorado Economic Outlook National Association of Industrial and Office Parks. Business Research Division Leeds School of Business

Information for File # SEW

Design of Spillway Upgrades

INNCOM SYSTEM MONITORING MARRIOT HOTEL DOWNTOWN PHILADELPHIA, PA. Report 9. July 2, CH2M HILL Project No

Manufacturers Continue Capacity Expansion as Technology Orders Grow

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

Providing an Efficient and Multi-modal Transportation System

Instances of 1 Minute or Less Between Buses 4 5% 55% 3.9% 3.5% 3.5% 3.5% 2.9% 2.8% Sep- Sep 07 Oct-07 Nov-07 Dec-07 Jan- Jan 08 Feb- Feb 08 Mar-08

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

PROJECT FACT SHEET May 25, 2018

Economic Overview. Melissa K. Peralta Senior Economist April 27, 2017

Members of the Board of Directors. Wendy Knowles, Clerk of the Board. Metrolink Ridership and Revenue Annual Report

Kevin Thorpe Financial Economist & Principal Cassidy Turley

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Goldman Sachs U.S. Emerging/SMID Cap Growth Conference. New York, New York

2017 North Texas Regional Bicycle Opinion Survey

PROPOSED EP BOWLS CALENDAR; January 2019 Version 2 Approved 22 November 2018

2018 Annual Economic Forecast Dragas Center for Economic Analysis and Policy

Appendix G Whitewater Recreation Flow Study Plan

DATE: FY2016 PB Cycle February PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY End Cost

Charlottesville Regional Chamber of Commerce. October 28, 2014

September 2017 MLS Statistical Report. Residential Inventory

Measure A Pedestrian & Bicycle Program Update. April 4, 2019 Board of Directors Agenda Item #10 (b)

Preliminary Design of Wayzata Boulevard Improvements(CSAH 112)

How to Optimize the Disposal System With Staggered Analysis Using BLOWDOWN Technology. Jump Start Guide

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Farm Energy IQ. Wind Energy on Farms. Objectives of this Module. How windy is it? How windy is it? How windy is it? 2/16/2015

2016 MOBILITY BOND PROGRAM

Part of Growing Rail Network

Planning and Programming Committee Meeting April 14,

ANALYZING THE SHIP DISPOSAL OPTIONS

UK Energy Futures. Richard Smith Head of Energy Strategy & Policy

2015 Data review. Capturing Ready Lane NEXUS vehicles

FOR RELEASE: FRIDAY, MARCH 30 AT 5 AM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Old Dominion University 2017 Regional Economic Forecast. Strome College of Business

Thesis Proposal. Table of Contents. Executive Summary...2. Analysis 1 Joint Ventures...3. Analysis 2 LEED Improvement (Breath Topic)...

U.S. EXPORTS Dairy Products - by Country, 2009 (pie chart) 69 Dairy Products, 2009 v (bar graph) 70 All Dry Whey, All Dry Whey -

MARINE SAFETY PLAN

I 595 Express Corridor Improvements Project. February 2014 Update

Goldman Sachs Eighteenth Annual Agribusiness Conference New York, New York. March 12, 2014

BMO Capital Markets New York Road Show New York, New York. December 5, 2013

Bicycle Crashes. Number of Bike Crashes. Total Bike Crashes. are down 21% and severe bike crashes down 8% since 2013 (5 years).

2018 HR & PAYROLL Deadlines

Sidoti & Company, LLC West Coast Road Show. San Francisco, California

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010.

Texas Department of Transportation s Gulf Intracoastal Waterway Capacity Study. GICA 112 th Annual Seminar July 28, 2017

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

Manufacturers continue capacity expansion as technology orders grow

Agricultural Weather Assessments World Agricultural Outlook Board

MnPASS System Today and the Future

Agricultural Weather Assessments World Agricultural Outlook Board

Mexico sugar towards 2014/15. Forget the inflexion point?

Transcription:

Kentucky Lock Project Update Inland Waterways Users Board Mr. Don Getty Project Manager Nashville District Great Lakes and Ohio River Division 1 March 2018 The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation. File Name 1 ISO-9001

Kentucky Lock Addition BLUF Bottom Line Up Front Downstream Cofferdam Construction Construction proceeding well Level III Economic Update has been delayed due to efforts on Soo Locks but no KY Lock project impacts. Site, Demolition, and Utilities contract ($4.1M) awarded January 2018 Downstream Lock Excavation contract ($25M to $100M) on track for FY18 award. Significant flexibility in its funding stream 2

Kentucky Lock Project Overview D/S Lock Excavation Award Sept. 2018 Bridges Superstructures - $104M Completed Jul 2014 Bridges Substructures - $44M Completed Mar 2006 D/S Cofferdam - $67.1M Award - Sept. 2016 U/S Miter Gate Fab. - $5.6M Completed Dec 2016 D/S Lock Award Sept. 2020 Upstream Cofferdam - $17M Completed Nov 2006 Approach Walls Award Sept. 2021 BUILDING STRONG Upstream Lock - $110M Completed Feb 2017 Site, Demolition, & Utilities Award Jan 2018 3 Lock & Associated Facilities $1,044M TVA Transmission Towers 13M P & L Railroad 97M Hwy 62 and other roadways 100M Total $1,254M $499M Obl thru Sep 2017 = 40% complete

5 Downstream Cofferdam Low Bid: $67.1M Current amount: $65.5M Contractor: Johnson Bros. Award: September 2016 Complete: December 2019 Downstream Cofferdam

Lift-in Arrangement 3D Model 2 Feb 2018 Gantry barge system being assembled

Excavated Notch for Gantry barge Concrete Delivery Platform 2 February 2018 Sheet Pile Cell Template

Interior forms and spud wells for 1 st of 3 lifts for first shell 2 February 2018 Pics on casting barges approximately 3 miles downstream from KY Lock. Wall armor in foreground and forms for second shell in background.

Kentucky Lock Project Time and Cost Scorecard Expenditures 31 Dec Schedule Planned (BCWS) $448.7M Earned (BCWP) $450.0M Actual (ACWP) $447.5M 31 Dec (Baseline)/(Current) Project Complete May 2028 / Jul 2024 Lock Operational May 2028 / Jul 2024 BCWP: Reports the value (based on % complete) of the work performed to date. Target: Actual as compared to Planned: ( <1% = Green) (>1%and <3% = Yellow) and (>3% = Red) $ in Millions Budget KY Lock Project EAC Trend 1400 1300 1200 1100 1000 900 800 700 600 500 400 300 FY17 2nd Qtr FY17 3rd Qtr FY17 4th Qtr FY18 1st Qtr Baseline Cost w/ risk 1254 1254 1254 1254 COE EAC 1071 1066.3 1066.3 1064.7 Measures: Planned project completion and Lock operational dates Target: PACR Anticipated in FY19. Major Activity Schedule Activity Baseline Current Level 3 Economic Update Draft Report Site, Demolition, & Utilities Award Contract 14 Nov 2017 30 Sep 2018 Sep 2017 Jan 2018(A) PACR to HQ Feb 2018 Dec 2019 Downstream Lock Excavation Award Contract Sep 2018 Sep 2018 8

12

Kentucky Lock Project Schedule Major Feature Construction Award Complete 2 Revised Upstream Lock Monoliths Construction Jan 2010 Feb 2017 Complete Downstream Cofferdam Construction Sep 2016 Nov 2019 Dec 2019 Site, Demolition & Utilities Jan 2018(A) Jan 2019 Downstream Lock Excavation Construction Sep 2018 Dec 2020 Downstream Lock Construction Sep 2020 Mar 2024 Approach Walls Construction Sep 2021 Nov 2023 Risk Based Total Project Cost Estimate Mar 2016 3 Jan 2017 Complete Economic Update Jan 2017 Sep 2018 Post Authorization Change Report for 902 Exceedance 1 Jul 2017 Dec 2018 1 902 Exceedance expected as early as FY2022 2 New schedule associated with new cost estimate. Assumes no risk. 80% confidence schedule adds 46 months to project completion date) 10

New Federal Materials Concrete Batch Plant 1.5 miles away

Downstream Lock Excavation Options Strategy Fiscal Year Efficient PROJECT Funding Minimum PROJECT Funding to complete contract Impacts of Minimum Funding 2018 $40.5M $20M Possibly higher bids with a small Base scope. 2019 $58.6M $40.8M Possibly higher bids because of extended Options expiration dates. 2020 $90.3M $58.6M Project completion date slips 12 months (cannot award next contract), $5.5M cost increase, $100M benefits foregone Contract End Date January 2021 September 2021 Minimum funding pushes more work into the last year of this contract; and thus, extends its completion date. Notes: - Will be a Base contract with approximately 10 Options so as to accommodate the above minimum funding stream and maximize funding flexibility. - If possible, Base contract scope will be finalized once FY18 funding amount is known. - If Options are not exercised, their scope will simply be included in the next contract. - Downstream Lock Excavation construction schedule is being refined and impacts above could change. 12

Cost Estimate Comparison of Categories with Large Differences Break-out of Upstream vs. Downstream Cofferdams Feature Authorized Cost 2017 TPCE Difference Percent Difference Sunk Costs Remaining Costs (FY2017 Price Level) (FY2017 Price Level) Cofferdams $52,712,225 $94,358,499 $41,646,274 79% $16,954,711 $77,403,788 Upstream Cofferdam $20,706,158 $16,954,711 -$3,751,447 18% $16,954,711 0 Downstream Cofferdam $32,006,067 $77,403,788 $45,397,721 142% $0 1 $77,403,788 1 At the time of this estimate, no expenditures had been made. But as of 31 January 2018, total expenditures for the Downstream Cofferdam were $16.7M. Note: All costs above are first costs, not fully funded. 13

Kentucky Lock Summary and Challenges Downstream Cofferdam construction going well but it is a high risk contract due to constricted marine area and geology. Recent years average delays at KY Lock >7 hours and traffic levels remain robust. This should bode well for benefits in ongoing Economic Update. Downstream Lock Excavation is on track and will be configured to maximize funding flexibility. 14