Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

Similar documents
Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

Safe Work Method Statement

Safe Work Method Statement (SWMS)

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS)

How severely could the risk hurt someone? Low/Insignificant First aid

SAFE WORK METHOD STATEMENT SWMS No Version

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

Safe Work Method Statement

The Sample Company Pty Ltd

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT Part B

How severely could the risk hurt someone?

SAFE WORK METHOD STATEMENT

SH&EWMS No.: F-C-QLD-10 Revision Date: July 2018 Revision Due: July 2019

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

SAFE WORK METHOD STATEMENT

QUEENSLAND UNIVERSITY OF TECHNOLOGY

How severely could the risk hurt someone? Low/Insignificant First aid

Specific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable).

Appendix 4C - Sample SWMS Trenching

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations

Temporary load-bearing support for structural alterations or repairs

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

Telco Antennas SWMS Working At Height Above 2m

SAFE WORK METHOD STATEMENT CARPENTER

SAFE WORK METHOD STATEMENT

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph ABN:

Hazard Management Making your workplace safer

How severely could the risk hurt someone? Low/Insignificant First aid

Work Health and Safety Risk Management Procedures

WORK METHOD STATEMENT STRUCTURAL STEEL

SH&EWMS No.: F-C-QLD-14 Revision Date: July 2018 Revision Due: July 2019

LADDERS FIXED AND PORTABLE

Accident/Incident Reporting and Investigation Procedures

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph ABN:

Work Activity (e.g. Road Work): Work Location:.

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

Conducting An Effective. Welcome!

Safe Work Method Statement

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

SAFE WORK METHOD STATEMENT (SWMS) All Trades Abseiling ABN: Ph:

WORK METHOD STATEMENT CARPET LAYING

SAFE WORK METHOD STATEMENT (SWMS) GENERAL GARDENING with Blowers, Hedge Trimmers, Whipper Snippers, Pruners, Spray Units

Safe Work Method Statement

SH&EWMS No: F-C-QLD-23 Revision Date: July 2018 Revision Due: July Brief Description of Work Activity: Use Petrol Hand Saw / Ring Saw

Safe Work Method Statement

SAFETY MANAGEMENT SYSTEM

The University of British Columbia Department of Earth, Ocean and Atmospheric Sciences Hazard Identification and Risk Assessment for Field Activities

1. SHEWMS DETAILS. Project No. Valid From

SAFE WORK METHOD STATEMENT 0005 (Hang-On Platform) Part 1 (To be used in conjunction with SWMS 0001 General Site Activities)

SWMS documented by: Feb Bo Ceprnja Date Feb Feb Feb 2018

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

SWMS No 001 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 5

SAFE WORK METHOD STATEMENT

Hazard & Risk Management

Safe Work Method Statement Tasks

SAFE WORK METHOD STATEMENT Part 1. Company Details. Company Name: Contact Name, Position and Phone number: Address: Project details.

HS329 Risk Management Procedure

Management of risk. Definition of terms. Managing risks. Risk

Safety Risk Assessment Working at Height: Mobile Tower Scaffold

Safe Work Procedure for installation of external cladding

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

Safe Work Method Statement

SAFE WORK METHOD STATEMENT Part 1

Risk Assessment Form (Qualitative)

Procedure: Work health and safety hazard management

Site-Specific Safety Plan

Manual Handling Procedure

Prevention of Falls and Working at Heights

Bondi Pipe Freezing PO Box 440 Bondi Jct NSW 1355 ABN SAFE WORK METHOD STATEMENT

Company Name: Address: ABN: Company Contact: Position: Phone No.: Date SWMS provided to Principal Contractor: Principal Contractor Signature: Date:

Guidance: HSW Risk Assessment Methodology HSW-PR09-WI01. Objective. Implementation

SOP. Working in Confined Spaces

University College Dublin Machinery/Equipment Risk Assessment Template

B S Glass Ltd Safety procedures- outsourced Workplaces

SAFETY MANAGEMENT SYSTEM

SH&EWMS No.: FC-QLD-017 Revision Date: July 2017 Revision Due: July 2018

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS)

Safe work method statements

WORK METHOD STATEMENT TERMITE PROTECTION

Recognition, Evaluation, and Control of Hazards

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

To comply with the OHS Act, the responsible manager must carry out and document the following:

Contractor handbook. Purpose

Permit-To-Work Guidance and Templates

HAZARD RECOGNITION EVALUATION and CONTROL

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

PLANT HAZARD AND RISK ASSESSMENT WORKSHEET (PHA)

SAFE WORK METHOD STATEMENT 0003 (Perimeter and Balcony Fallguard) Part 1 (To be used in conjunction with SWMS 0001 General Site Activities)

HAZARD MANAGEMENT PROCEDURE

SWMS No 009 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 4

WORK METHOD STATEMENT ELECTRICAL

Safety Risk Assessment Driving Grey Fleet Vehicles

Occupational Health Safety and Welfare. Our Policy

Contractor OHS Induction. AOHS-05-GUI September 2016

CONTRACTOR SAFETY INDUCTION HANDBOOK

Transcription:

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324 ABN: 34 088 229 190 This SWMS has been developed and authorised by: Name Albie Wheeler Position Managing Director Date 1/7/12 Signature Phone 0249649991 Mobile 0412197542 WS FORM 05: SAFE WORK METOD STATEMENT (SWMS) (job safety analysis worksheet scope of works) DESCRIPTION OF WORK SPECIFIC TO TE ACTIVITY/TASK BEING UNDERTAKEN: andling of pre cast concrete elements/tilt up panels Trades involved with undertaking this work activity/task: Crane Driver/Rigger/ This SWMS is submitted to: (Principal/ead Contractor) Company: Contact name: Site address: Contact name: Project detail: This SWMS was reviewed by: (Principal/ead Contractor) Name: Signature: Phone number: Position: Date: Mobile Number: Responsible person who will implement, review, supervise, oversee, approve and inspect workplace, plant, tools, protective measures and equipment on contractors behalf Name: Signature: Phone number: Position: Date: Mobile Number:

Equipment to be used Insert other equipment Personal protective equipment to be used. as PPE been supplied? Y/N Common hazard Extension ladder? Cement mixer ard hat Y Fall from ladder Step ladder? Man Box? Safety boots Y Fall from heights Scaffold (mobile)? Barriers? Safety vest/i Vis clothing Y Fall from scaffold External scaffold? Gloves Y Contact with electricity Fire extinguisher earing protection Y Dermatitis Trestles Safety glasses Y Slip, trips and falls Electrical leads Barrier cream Manual handling Power tool Safety lines Inhalation of dust or fumes Generator Safety harness Y Exposure to noise RCD power board Dust masks Contact with moving plant and tools Other: Cuts Nail gun Wheelbarrow Shovel ow to complete the following form ist the step-by-step sequence of tasks required to carry out a work activity from start to finish. ist the potential hazards associated with each step and the related WS risks. ist what controls you will implement to reduce the risks to the lowest possible level. ist the names or positions of the persons responsible for ensuring that the controls are implemented. A separate SWMS is required for each work activity Assessing the risk RISK igh Medium ow ACTION REQUIRED ierarchy of controls Potential death, permanent disability or major structural failure/damage. Cease work immediately. Review task/situation/condition. Additional risk controls and must be documented and implemented. Ensure all parties are aware of risk control. ospitalisation or medical treatment, potential temporary disability or minor structural failure/damage. Implement suitable controls as soon as practical. Task/situation/condition to be reviewed and reinforce control measures where applicable. Other: azard that has the potential to cause persons to require first aid. Review task and reinforce control measures where applicable. Eliminate the risk all together. Substitute the risk. Isolate people from the risk. Engineer out the risk. Apply administrative controls. Use personal protective equipment (PPE). Best Worst

STEP Residual Risk Risk Rating Job step Break the job down into steps. Outline each task to do the job. azards Identification Identify any potential hazards associated with each job step. Assess any risks that could lead to an incident or an adverse environmental impact and rate each risk accordingly. Controls Implemented Using the previous two columns as a guide, decide what actions are necessary to eliminate or minimise the hazards that could lead to an accident, injury, occupational illness or environmental impact. Person responsible 1. Travel to site See SOP 06 2. Site selection See SOP 13 (Slew) or SOP 8 (Franna) Site Risk Assessment to be completed Crane Driver / Crush injury - panel fall due to displacement of props Additional care to be taken to plan site selection regarding tail swing striking of props. This could include the fitting of movement limiters and visual indicators. Crane Driver Crush Injury struck by plant/load/falling panel Establishment of personnel exclusion zones by erection of barriers or appointment security personnel Site Manager

3. Erection of crane See SOP 11 Applicable to Slew cranes only 4. Rigging of loads See SOP 13 (Slew) or SOP 8 (Franna) Crush Injury due to rigging failure All rigging equipment to be inspected prior to use and periodically throughout the day. Rigger in charge/dogman Fall from heights M Persons attaching rigging are to use appropriate access techniques, preferably scaffold or EWP to detach/attach rigging. Rigger/ Crush Injury failure of attachment point Inspect panel attachment points to ensure the appropriate lifting equipment is being used. Inspect each panel to ensure they have had sufficient time to cure (minimum 3 days) Inspect lifting equipment to ensure that it is correctly attached to panel Rigger in Charge/dogman

5. ifting loads Crush Injury between load and fixed point/struck by load Rigger in charge to plan lifting, placement and slew path to ensure no person under load. Site supervisor to remove all non-essential personnel from exclusion zone. Rigger in charge/dogman to have clear line of site of panel and movement. Rigger and dogman to have clear handover of responsibility during movement of panel Rigger in charge Site Supervisor Rigger/ Rigger/ Driver to dampen swing and oscillation throughout movement. to control load by use of tagline. Driver Crush Injury falling panel Panel supplier to individually restrain panels on trucks. Rigger in charge to coordinate lifting to ensure that panels are rigged, and winches take up slack prior to releasing travel restraints. Site Supervisor Crush injury load fall rigging failure Driver to ensure that rotation occurs smoothly to avoid shock loading of winches/rigging Crane Driver 6. Placing oads Crush injury between load and fixed object Site supervisors to ensure that installers are equipped with appropriate tools to enable alignment of panels to be performed. Site Supervisor

7. Bracing Panels Crush Injury falling panel Riggers in charge are to ensure that foot bracings and props are adequate to task Drivers are to transfer load smoothly between rigging and props Rigger in Charge Driver De-Rig load Fall injury Use of appropriate access techniques. Rigger/

Training and qualifications CECKIST OF ITEMS TAT MAY BE REQUIRED FOR TIS WORK ACTIVITY NCOC icence for work performed (Crane Driver//Rigger) Drivers icence valid for type of vehicle driven ist of relevant legislation, applicable codes of practice or additional references as required AS2550 NSW WS Act 2011 NSW WS Reg 2011 COP Moving plant on construction sites NCOP for the Prevention of Musculoskeletal Disorder from Performing Manual Tasks at Work (2007) NCOPs for the prevention of falls in general construction and in housing construction Communication and consultation All personnel to understand the task, components and sequence of lift, slew path and placement location. Driver and dogman to have UF radio and/or whistle contact when operating out of sight.

Declaration by contractors and workers 1. I have been consulted and assisted in the development of this SWMS. 2. I have been given the opportunity to comment on the content of this SWMS. I have read and understand how I am to carry out the tasks listed in this SWMS. 3. I have been supplied with the appropriate personal protective equipment that has been identified on this SWMS and I have been given training in the safe use of this equipment. 4. I have read and understand the requirements set out in the material safety data sheets for the hazardous substances which have been identified in this SWMS for this particular work activity. IST A MATERIA SAFETY DATA SEETS USED ON SITE 1287 Caltex Brake & Clutch Fluid 1597 ydraulic Oil AW46 Diesel-Extra ow Sulfur 2800 Battery Acid 1280 Diesel Engine Oil 15W-40 CF4/S Radiator Coolant 1418 Easy Shift SAE 75W-90 Auto Trans Fluid F Name Signature Date