INSPECTIONS OF THE LPG ESTABLISHMENTS IN PORTUGAL. Graça Bravo. 26th September 2017

Similar documents
Minimum standard of competence in advanced training for liquefied gas tanker cargo operations (STCW Reg V/1-2)

OPERATIONS SEAFARER CERTIFICATION

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

STCW Code Table A-V/1-1-1 Specification of minimum standard of competence in basic training for oil and chemical tanker cargo operations

RESOLUTION MSC.397(95) (adopted on 11 June 2015) AMENDMENTS TO PART A OF THE SEAFARERS' TRAINING, CERTIFICATION AND WATCHKEEPING (STCW) CODE

Hazard Communication Program. San José State University

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures

GUIDELINES FOR SLUG DISCHARGE MANAGEMENT PLAN (Abstract from EPA Guidance Manual)

MAHB. INSPECTION Process Hazard Analysis

Introduction to Emergency Response & Contingency Planning

RULES PUBLICATION NO. 119/P

Hazardous Materials Management Guidelines

Permitted MSS Emissions Tracking, Recordkeeping, and Reporting. Presented by ACES April 24, 2008

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 5 Utilities Gas Emergencies Revised

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

PSM TRAINING COURSES. Courses can be conducted in multi-languages

Drum / cylinder handling

PSSI 36 General Confined Spaces, Tunnels, Culverts and Similar Spaces

O&M MANUAL HIGHLIGHTS

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

Safety in Petroleum Industry

NZQA unit standard version 3 Page 1 of 8. Manage the mine ventilation system at an extractive site

Health and Safety Executive. Key aspects of HS(G) 253. Andrew Hall HID CI 1G. HM Specialist Inspector (Mechanical)

Process Safety Management is the application of management principles and systems to the identification, understanding, and control of process

Safety Engineering - Hazard Identification Techniques - M. Jahoda

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

SAFETY TRAINING LEAFLET 06 CARBON DIOXIDE

Responding to Natural Gas Pipeline Emergencies

Common Discrepancies Uncovered on ADCI Diving Contractor & Training Program Audits

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

OPERATING PROCEDURES

STATUTORY INSTRUMENTS SUPPLEMENT No. 14 2nd June, 2016 STATUTORY INSTRUMENTS SUPPLEMENT

Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants

NORMAL OPERATING PROCEDURES Operating Parameter Information

EXPLOSIVE ATMOSPHERES - CLASSIFICATION OF HAZARDOUS AREAS (ZONING) AND SELECTION OF EQUIPMENT

Laboratory Preparedness Checklists for Advanced Planning, Preparing to Close & Safe Re-Entry

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

Procedure: Pressure equipment safety

E PGN-11. Part of NTW (O)32 Estates Operations and Maintenance Policy Paul McCabe Head of Estates and Facilities-NTW Solution Ltd

CONFINED SPACE AWARENESS

LPG TANK INFORMATION An energy company that puts

Working Environment Safety Assessment

OCCUPATIONAL SAFETY AND ENVIRONMENTAL HEALTH GUIDELINE

Electrical, electronic and control engineering at the operational level

Abstract. 1 Introduction

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities.

User Information Sheet 015

Annex 1 to Decision 2009/007/R

AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011

UTAS EH&S INSTRUCTION No. 036 June 2012 Revision No. 3. Purging of Flammable Gas Equipment and/or Piping (Explosion Hazard)

Chemical Accident Prevention & Preparedness

PRESSURE SYSTEMS POLICY

Welding and Cutting (Hot Work) Operations Self-Audit Checklist. Building Room Supervisor Date

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS)

Instrument Operating Manual

MANUAL GAS MANIFOLDS

SAFETY MANUAL PURGING, VENTING & DRAINING PROCEDURE TABLE OF CONTENTS 1. INTRODUCTION SCOPE DEFINITIONS PROCEDURE...

Using LOPA for Other Applications

Tanker Familiarisation IMO Model Course Chapter 1-9

QUANTIFYING THE TOLERABILITY OF POTENTIAL IGNITION SOURCES FROM UNCERTIFIED MECHANICAL EQUIPMENT INSTALLED IN HAZARDOUS AREAS

HEALTH AND SAFETY MANUAL

AS/NZS 1596:2014. The storage and handling of LP Gas AS/NZS 1596:2014. Australian/New Zealand Standard. Superseding AS/NZS 1596:2008

7.0 Compliance certificates

ZUERCHER TANK REGULATORS PRINCIPLES OF TANK VENTILATION

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

WLPGA East African Summit

BODY OF KNOWLEDGE API TES TANK ENTRY SUPERVISOR

BODY OF KNOWLEDGE TANK ENTRY SUPERVISOR CERTIFICATION PROGRAM Revision 2, October 2013

Installing, Repairing or Modifying Construction Resources by Heating, Welding, Brazing, Soldering and Thermal Cutting in the Workplace L/505/0144

Procedure: Confined space safety

BP OIL -- TOLEDO REFINERY

SLOP RECEPTION AND PROCESSING FACILITIES

SAFETY AND HEALTH STANDARD CONFINED SPACE ENTRY REQUIREMENTS Effective Date: 06/10/10 Standard: 16.2 Document Number: KUCSH0038 Rev: 07

Dry Gas Seal Rack CH-3185 Schmitten Tel Mail:

LP Gas Odorization and Testing

M-06 Nitrogen Generator (Nitrogen Making Machine)

INSPECTION OF MEDICINAL GASES

Hazard & Risk Management

SECTION 2 APPLICATION OF FUNDAMENTALS

Confined Space Entry Program 8 CCR 5157

Minimum standard of competence for electro-technical officers (STCW Reg III/6) Electrical, electronic and control engineering at the operational level

INFORMATION FOR THE PUBLIC ABOUT A COMAH ESTABLISHMENT

LNG Marine Loading Arms and Manifold Draining, Purging and Disconnection Procedure

Northeast Biomanufacturing Center and Collaborative. Hazard Communication Program (HCP) NBC-HCP-000

THE BAKER REPORT HOW FINDINGS HAVE BEEN USED BY JOHNSON MATTHEY TO REVIEW THEIR MANUFACTURING OPERATIONS

2. IMMEDIATE RESPONSE ACTIONS AND NOTIFICATION PROCEDURES

PURPOSE OF THE POLICY

Instructions. To complete this independent study program, view the entire program, advancing through each slide by pressing the enter key.

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018

TEC-0461 To whom it may concern Date 25 June 2002

IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS

Inert Air (N2) Systems Manual

INHERENTLY SAFER DESIGN CASE STUDY OF RAPID BLOW DOWN ON OFFSHORE PLATFORM

In addition to this SOP, the policies and procedures of each operating company will be strictly observed by Rockwater personnel.

Hazard Communication Program

Western Sydney University Safety Inspection Checklist - Laboratory Environments

Transcription:

INSPECTIONS OF THE LPG ESTABLISHMENTS IN PORTUGAL Graça Bravo 26th September 2017

SUMMARY 1. IDENTIFICATION OF THE LPG ESTABLISHMENTS 2. GENERAL DESCRIPTION OF THE LPG ESTABLISHMENT 3. INSPECTION SUPPORTING TOOLS 4. LPG INSPECTIONS STRATEGY 5. INSPECTION REPORT 6. INSPECTION FINDINGS 2

1. IDENTIFICATION OF THE LPG ESTABLIHSMENTS Number of Seveso establishments: 166 Upper tier: 58 Lower tier: 108 Number of Seveso LPG establishments: 34 LPG upper tier: 13 LPG lower tier: 21 Number of Seveso inspections in 2016: 102 Number of LPG Seveso inspections: 32 LPG upper tier: 11 LPG lower tier: 21 3

1.IDENTIFICATION OF THE LPG ESTABLISHMENTS TYPE OF LPG ESTABLIHSMENTS Production 2 refineries Storage, bottling and distribution 52 Marine terminal 3 CAPACITY OF LPG ESTABLIHSMENTS Production 128420 t/y Storage in tanks and cylinders sites the biggest site about 28000 t Storage only in cylinders sites the biggest site about 6800 t 4

2.GENERAL DESCRIPTION OF THE LPG ESTABLISHMENT Extremely Flammable Gas. Hazard Identification of LPG Readily forms an explosive air vapor mixture at ambient temperature. Vapor is heavier than air and may travel to remote sources of ignition (e.g. along drainage systems, into basements, etc). Liquid leaks generate large volumes of flammable vapor. Storage in Pressure Vessels LPG must be stored in systems of suitable pressure rating. 5

2.GENERAL DESCRIPTION OF THE LPG ESTABLISHMENT 1) Storage, Bottling and Distribution Site 2) Storage in gas cylinder Site Reception of LPG (pipeline, tank cars) Storage Tanks Control Room Nitrogen Production (proper inert gas blanketing) Gas Odor System (ethylmercaptane) Flare Waste Water Treatment Plant Filling Up Islands Bottling Utilities Expedition LPG in tank cars / LPG in bottles 6

2.GENERAL DESCRIPTION OF LPG ESTABLISHMENT Site Safety Considerations Separation Distances storage tanks, buildings, utilities, etc, should be separated enough to reduce the probability of the domino effect. Critical Equipment the locations and distances between critical equipment should receive special attention. Utilities to maintain as well as possible during potential incidents and emergencies. Control Room this area is the last to be compromised in case of an accident. Instrumentation and controls the location of instrumentation and controls should allow the best possible access during emergencies. Fire fighting equipment and emergency planning Emergency drills, communications and fire fighting maintenance program. 7

3.INSPECTION SUPPORTING TOOLS Guidance Book for the Seveso inspections reviewed in 2016 because of the transposition of the Directive Seveso III, national law (D.L. nº150/2015, 5th August). General check list with the documents to check out during Seveso inspections. Documents produced by the Portuguese Competent Authority to support the operator to elaborate the safety report, the notification, the internal emergency plan, the information to the public, the major accident prevention policy. Common Inspection Criteria Bulletins edited by MAHB (Major Accident Hazards Bureau) fromtechnical WorkingGroup 2 Seveso Inspections. National legislation and other standards or regulations. 8

4.LPG INSPECTIONS STRATEGY In lower tier or upper tier establishments the inspector must always check: The implementation of the principles of Major Accident Prevention Policy and how is made the communication of the MAPP. The notification with the inventory of existing dangerous substances. All permits of the establishment should be available in one file only. The information to the public (up to date and made available to the public by the operator on a web link). In lower tier establishments also the Simplified Internal Emergency Plan. In upper tier establishments there is obligatory documents to check in the site: Safety Report, Safety Management System, Internal Emergency Plan. 9

4.LPG INSPECTIONS STRATEGY The inspection strategy should include collecting all the information and evidences that justifies the operator's answer to the SEVESO requirements, followed by checks of certain key points during the inspection. Organisation and Personnel Training plans should be related to the description of functions (employees and subcontractors) to minimise the human failure which could conduct to operational failure and to physical risks like overpressure, high temperatures, under ventilation or ignition sources. 10

4.LPG INSPECTIONS STRATEGY Operational Control The compliance of the operational and maintenance procedures will ensure that critical operations are run in safety conditions such as work with ignition sources, entry into confined spaces, loading/unloading operations. Maintenance (preventive, corrective), calibration and inspection of the safety critical instrumentation and records for pressure safety valves and alarms (LAH, LAL, LAHH) in storage tanks and safety valves in pipelines. Maintenance and inspection of the pressure vessels and pressure pipelines in accordance with the national legislation or other internal requirements like specific standards or regulations. 11

4.LPG INSPECTIONS STRATEGY Maintenance, inspections and calibration of gas detectors located in the retention basin of the storage tanks, in the pumping stations, in the filling of tankers, in the bottling area, in the pipelines. Maintenance, inspections and calibration of fire detectors located in the storage tanks (up and down), in the pumping stations, in the filling of tankers, in the bottling area. Maintenance and inspection of the retention basin of the storage tanks in accordance with the operation manual. Work Permits to control and minimise the presence of ignition sources. Continuous control of the processual variables from the Control Room. Special attention should be paid to ground fault protection of equipments. 12

4.LPG INSPECTIONS STRATEGY Relevant documentation for the safety of the facilities and processes such as process and instrumentation diagrams, block diagrams or simplified process diagrams, pipe and equipment specifications. Selection of the suppliers and service providers. Audit and Review The performance of internal audits of the SMS. The performance of the annual external audits of the SMS defined in the national legislation by a certified auditor in order to guarantee the performance of the SMS. The planning of corrective and preventive measures to be implemented based on the results of the audits. 13

4.LPG INSPECTIONS STRATEGY Emergency Planning Implementation of the instructions, information and training programme with the purpose of responding in case of emergency. Maintenance, inspection and testing of mobile resources and other equipment to be used in an emergency response, such as sprinklers in the storage tanks for cooling, sprinklers in the filling tankers, sprinklers in the bottling area and the ring of the fire water system, foam system, fire extinguishers, hydrants, monitors. Simulations to be done annually in accordance with legislation and implementation of its recommendations. Communication systems. Manual emergency shut down of the equipment's. 14

5.INSPECTION REPORT The SEVESO inspection reports are done in a database, internally available for consultation for all the staff. This report covers all aspects regarding de SMS. The inspection report is sent to the operator with the facts verified during the inspection, recommendations and penalties. Follow Up actions Focus on aspects considered as critical in the previous inspection. 15

6.INSPECTION FINDINGS Establishments must improve their: Pro active maintenance, improving their maintenance program collecting maintenance performance indicators. Risk analysis in the project phase. Modifications management. Records of incidents / accidents. Follow up of incidents evaluation findings. Communication with the interested parts. 16

6.INSPECTION FINDINGS Establishments must improve their: Equipment identification and equipment files. P&IDs complete and up to date. Implementation of the corrective measures that results from SMS audits. Evaluation of the age of the equipments. Safety training for the employees of the storage in gas cylinder sites. Implementation of the MAPP in the storage in gas cylinder sites. Risk analysis in the storage in gas cylinder sites. 17

Thank you. Rua de O Século, nº51 1200 433 Lisboa Telef: +351213 215 500 Email: igamaot@igamaot.gov.pt 18