ENGINEERING ECONOMICS

Similar documents
ENGINEERING ECONOMICS

ENGINEERING ECONOMICS

Bowls North Harbour Inc PENNANTS. Start Time for Qualifying Rounds 9:30am

Revenue Sharing and Competitive Balance. Does the invariance proposition hold?

Relating Safety and Capacity on Urban Freeways

Team Participation. Clarendon College Unit ID: Number of participants as of the day of the first scheduled contest

Integrated Model of Municipal Waste Management of the Czech Republic

Evaluation of a Center Pivot Variable Rate Irrigation System

A RESPONSE SPECTRUM-BASED NONLINEAR ASSESSMENT TOOL FOR PRACTICE: INCREMENTAL RESPONSE SPECTRUM ANALYSIS (IRSA)

Rotary International President Gary C.K. Huang. Rotary Club of Taipei Taiwan. Coming Events July 2014

2 Stage I. Stage II. Stage III (ii)

SUPPLEMENTAL MEMORANDUM. TRANCHE l

Scientific Herald of the Voronezh State University of Architecture and Civil Engineering. Construction and Architecture

Reduced drift, high accuracy stable carbon isotope ratio measurements using a reference gas with the Picarro 13 CO 2 G2101-i gas analyzer

University of California, Los Angeles Department of Statistics. Measures of central tendency and variation Data display

J. Sci. Res. 11 (1), (2019) A Bayesian Approach for Estimating Parameter of Rayleigh Distribution

Entropy Coefficient Method to Evaluate the Level of Sustainable Development of China's Sports

Optimal Design of DPCM Scheme for ECG Signal Handling

Bayesian classification methods

it500 Internet Thermostat

Canadian Teleconference: Can the Canadian Economy Survive the Turmoil in the United States?

Analysis and Experimental Of 3-Dimentional AOA with Directional Antenna on Narrowband MIMO Capacity

2017 GIRLS CENTRAL DISTRICT PLAYER DEVELOPMENT GUIDE

A Study on Parametric Wave Estimation Based on Measured Ship Motions

2018 GIRLS DISTRICT-SPECIFIC PLAYER DEVELOPMENT GUIDE

Wealth Inequality in the United States since 1913

Unlevered Project Cashflows

2017 GIRLS DISTRICT-SPECIFIC PLAYER DEVELOPMENT GUIDE

Decomposition guide Technical report on decomposition

The impact of foreign players on international football performance

Are Internet Stocks Over- Valued?

Economic & Market Outlook

Available online at ScienceDirect

THE EFFECTS OF COUPLED INDUCTORS IN PARALLEL INTERLEAVED BUCK CONVERTERS

ishares COMEX Gold Trust 2005 Grantor Trust Tax Reporting Statement EIN:

An Indian Journal FULL PAPER ABSTRACT KEYWORDS. Trade Science Inc.

Generative Models and Naïve Bayes

Underground Natural Gas Storage

VOLUME TRENDS NOVEMBER 1988 TRAVEL ON ALL ROADS AND STREETS IS FOR NOVEMBER 1988 AS COMPARED UP BY 3.4 PERCENT TO NOVEMBER 1987.

Bayesian parameter estimation. Nuno Vasconcelos UCSD

Inequality in America : The 1% in International and Historical Perspective

Household Wealth: Panel Study of Income Dynamics (Thousands of 1999 dollars)

,~E~l. re: MANHOLE (CAST IN PLACE) ftj 6'-o" X 14 /-0 II 1:== POWER DISTRIBUTION STANDARDS - II. a:~ VJ II. a: - ~ ~~ (/)'~.,"--/\ i

ITRS 2013 Silicon Platforms + Virtual Platforms = An explosion in SoC design by Gary Smith

Exhibit #MH-156. ELECTRIC OPERATIONS (MH10-2) PROJECTED OPERATING STATEMENT (In Millions of Dollars) For the year ended March 31 REVENUES

The Economic Outlook. Economic Policy Division

Romania nominal and real convergence on the way to euro adoption

Capital Improvement Plan (CIP) Water Supply

BETHANY TAX INCREMENT FINANCING DISTRICT NO. 1 NOTICE OF TWO PUBLIC HEARINGS

44 Economic Perspectives

Global economy maintaining solid growth momentum. Canada leading the pack

Station class Codes Services Geographical Area Codes FIXED MOBILE RADIOLOCATION FIXED MOBILE

Refining Industry Outlook

Introduction to Algorithms 6.046J/18.401J/SMA5503

Donald W. Reynolds Razorback Stadium North End Zone Addition and Stadium Updates JUNE 2016

Cincinnati United Lakota Monroe

Experimental and theoretical investigation of bending over sheave fatigue life of stranded steel wire rope

Evaluating the Effectiveness of Price and Yield Risk Management Products in Reducing. Revenue Risk for Southeastern Crop Producers * Todd D.

State of the Ag Economy

I Attach to the corporation's tax return.

Mass Spectrometry. Fundamental GC-MS. GC-MS Interfaces

Equine Business Year in Review 2002 Dean, Dorton & Ford, P.S.C. Page 1

Retrenchment or Stagnation: Lessons from Japan s Lost Decades. Andrew Smithers. UK-Japan 21 st Century Group Conference 3 rd May, 2013

09/17/2007 Copy VISIT THE LIFETIME WEB SITE:

CS 2750 Machine Learning. Lecture 4. Density estimation. CS 2750 Machine Learning. Announcements

SERIES FP4000 FLOW RATES TABLE B** RANGE MODEL RANGE MODEL SERIES FP2000 FLOW RATES TABLE A** RANGE MODEL RANGE MODEL

Majestic Mansion Dollhouse

DRAFT FOR PUBLIC CONSULTATION INTERCONNECTION AGREEMENT v.2.0 FOR IP KULATA/SIDIROKASTRO DEFINITIONS, BUSINESS RULES, EXCEPTIONAL EVENT

(12) United States Patent

Erie County Technical School Cosmetology/Task List

The Economic Outlook. Economic Policy Division

PHILADELPHIA HOUSE PRICE INDICES

USER MANUAL. English. For Sales & Service Contact

Thoroughbred Business Year in Review Thoroughbred Business Year in Review 2017 Dean Dorton

The US Economic Outlook

COMPENSATING FOR WAVE NONRESPONSE IN THE 1979 ISDP RESEARCH PANEL

THE STATE OIL AND GAS BOARD OF MISSISSIPPI ORDER. This day this cause came on to be heard on the petition

Policy sensitivity analysis of Karachi commuters

FINANCIAL ANALYSIS. Stoby

The U.S. Economic Outlook

Coalition Formation in a Global Warming Game: How the Design of Protocols Affects the Success of Environmental Treaty-Making

RCBC Newsletter. September Richmond County Baseball Club. Inside this issue: Johnny Ray Memorial Classic. RCBC on You Tube

SFSA Business Outlook Raymond Monroe

For models: 660 EF/EFO

TOUR HANDICAP POLICIES

Steelhead Broodstock Acclimation and Monitoring (BAM) Program in the Okanogan Basin, Annual Report 2012

No TRINIDAD AND TOBAGO.

Suncorp WealthSmart Investment Options Performance Report

TOUR HANDICAP POLICIES

S0300-BV-CAT-010 SALVAGE LIFT BAG, 22,000-POUND. System - S Overview of Underwater Lift Bag PN0060 4/1/ :37:56 AM

FIRST QUARTER 2014 RESULTS APPROVED

SINGAPORE edevelopment LIMITED (Incorporated in Singapore) (Company Registration No W)

Risk analysis of natural gas pipeline

Act on Fairway Dues (1122/2005, amendments up to 1214/2014 included)

Methodology for ACT WorkKeys as a Predictor of Worker Productivity

Fiscal Impact of SunTrust Park and The Battery Atlanta on Cobb County Executive Summary Sept. 18, 2018

Fundamental Certainty

Economic Impact of the Michigan Equine Industry, 2006

Environmental-Economic Modelling Municipal Solid Waste Management System of the Czech Republic

The Fourth World KLEMS Conference. Determinants of Productivity in Mexico.

Transcription:

ENGINEERING ECONOMICS Factor Name Coverts Symbol Formula Sgle Paymet Compoud Amout to F gve P (F/P, %, ) ( + ) Sgle Paymet Preset Worth Uform Seres Skg Fud to P gve F (P/F, %, ) ( + ) to A gve F (A/F, %, ) Captal Recovery to A gve P (A/P, %, ) Uform Seres Compoud Amout Uform Seres Preset Worth Uform Gradet Preset Worth Uform Gradet Future Worth Uform Gradet Uform Seres to F gve A (F/A, %, ) to P gve A (P/A, %, ) to P gve G (P/G, %, ) to F gve G (F/G, %, ) to A gve G (A/G, %, ) ( + ) ( + ) ( + ) ( + ) ( + ) ( + ) ( + ) ( + ) ( + ) ( + ) ( + ) NOMENCLATURE AND DEFINITIONS A...Uform amout per terest perod B...Beeft BV...Book Value C...Cost d...combed terest rate per terest perod D j...deprecato year j F...Future worth, value, or amout f...geeral flato rate per terest perod G...Uform gradet amout per terest perod...iterest rate per terest perod e...aual effectve terest rate m...number of compoudg perods per year...number of compoudg perods; or the expected lfe of a asset P...Preset worth, value, or amout r...nomal aual terest rate S...Expected salvage value year Subscrpts j...at tme j...at tme...f/g = (F/A )/ = (F/A) (A/G) NON-ANNUAL COMPOUNDING r + m m e = BREAK-EVEN ANALYSIS By alterg the value of ay oe of the varables a stuato, holdg all of the other values costat, t s possble to fd a value for that varable that makes the two alteratves equally ecoomcal. Ths value s the breakeve pot. Break-eve aalyss s used to descrbe the percetage of capacty of operato for a maufacturg plat at whch come wll just cover expeses. The payback perod s the perod of tme requred for the proft or other beefts of a vestmet to equal the cost of the vestmet. INFLATION To accout for flato, the dollars are deflated by the geeral flato rate per terest perod f, ad the they are shfted over the tme scale usg the terest rate per terest perod. Use a combed terest rate per terest perod d for computg preset worth values P ad Net P. The formula for d s d = + f + ( f)

ENGINEERING ECONOMICS (cotued) DEPRECIATION Straght Le D j C S = Accelerated Cost Recovery System (ACRS) D j = (factor) C A table of modfed factors s provded below. BOOK VALUE BV = tal cost Σ D j TAXATION Icome taxes are pad at a specfc rate o taxable come. Taxable come s total come less deprecato ad ordary expeses. Expeses do ot clude captal tems, whch should be deprecated. CAPITALIZED COSTS Captalzed costs are preset worth values usg a assumed perpetual perod of tme. Captalzed Costs = P = A BONDS Bod Value equals the preset worth of the paymets the purchaser (or holder of the bod) receves durg the lfe of the bod at some terest rate. Bod Yeld equals the computed terest rate of the bod value whe compared wth the bod cost. RATE-OF-RETURN The mmum acceptable rate-of-retur s that terest rate that oe s wllg to accept, or the rate oe desres to ear o vestmets. The rate-of-retur o a vestmet s the terest rate that makes the beefts ad costs equal. BENEFIT-COST ANALYSIS I a beeft-cost aalyss, the beefts B of a project should exceed the estmated costs C. B C 0, or B/C MODIFIED ACRS FACTORS Recovery Perod (Years) 0 Year Recovery Rate (Percet). 0.0. 0.0..0..0................... 0..

ENGINEERING ECONOMICS (cotued) Factor Table - = 0.% P/F P/A P/G F/P F/A A/P A/F A/G 0 0 00 0. 0.0 0. 0.0 0. 0.0 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.0 0.0 0.00 0. 0. 0. 0. 0. 0. 0. 0. 0. 0...0....... 0.0........0..0 0......... 0.0..0.0. 0.............0...0..00...,0.,.,..00.000.0.00.0.0.0.0.0.0.0.0.00.0.0.0.0.0.0.0.0......0....00.0.0.0.0.0.. 0.0......... 0..0.....00...00..00 0. 0. 0. 0.0 0. 0. 0. 0. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0. 0. 0.0 0. 0. 0. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0. 0...00..0.......0.0..0.... 0. 0.0......00. Factor Table - =.00% P/F P/A P/G F/P F/A A/P A/F A/G 0 0 00 0.0 0.0 0.0 0. 0. 0. 0. 0. 0. 0.0 0. 0. 0. 0.00 0. 0. 0. 0. 0. 0. 0. 0.0 0. 0. 0. 0. 0. 0.0 0. 0. 0.0.0..00...... 0....00......0.0. 0...0.0....0 0.0..0.......0....0 0. 0.......0.00..00..,.0,..000.00.0.0.0.0.0.0.0.0.........0.0..........0.000.0.0.00.... 0....0..0... 0.0.00......... 0..000 0. 0.0 0. 0.0 0. 0. 0. 0. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0.0 0. 0. 0. 0. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.0 0.00 0. 0...0.0.....00........0.. 0.0 0..0......

ENGINEERING ECONOMICS (cotued) Factor Table - =.% P/F P/A P/G F/P F/A A/P A/F A/G 0 0 00 0. 0.0 0. 0. 0. 0. 0.00 0. 0. 0. 0. 0. 0. 0. 0. 0.0 0. 0. 0. 0. 0. 0.0 0.00 0. 0. 0. 0. 0. 0. 0. 0.......... 0.0 0.0.....0....00.. 0.0 0..0...0. 0.0..0........0... 0..0..... 00.000.00.....,..0.0.0.0.0.0.0.........0.0..0.........0...0.0.00..... 0.0..0.....0 0....0....0.....0.0 0. 0. 0. 0.0 0. 0. 0. 0. 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0. 0. 0. 0. 0. 0. 0.0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0. 0.0..0....00.........0..00..0 0. 0......0. Factor Table - =.00% P/F P/A P/G F/P F/A A/P A/F A/G 0 0 00 0.0 0. 0. 0. 0.0 0.0 0.0 0. 0. 0.0 0.0 0. 0. 0. 0. 0. 0. 0.00 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.0 0.0...0...0.... 0...0....0...0.0........0 0.....0.0..0......0. 0....0.........,..000.0.0.0.0.....0.......0..........00..0..000.0..0.... 0....0... 0.0.....0...0..0..0..000 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0. 0. 0. 0. 0. 0. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0. 0.....0....0.....0......0 0. 0. 0..0. 0...

ENGINEERING ECONOMICS (cotued) Factor Table - =.00% P/F P/A P/G F/P F/A A/P A/F A/G 0 0 00 0. 0. 0.0 0. 0. 0.0 0. 0. 0.0 0. 0. 0. 0.0 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.0 0. 0. 0.0 0. 0.0 0.0 0.......00...0... 0.......0.0...0..0.... 0..0.0...0.0.0......... 0.. 0..0..0.0 0.0.....00.0........0..0...00...0.0........00.0 0...00...... 0..00..0.. 0.0.......0..0..0.0..0,..00 0. 0. 0. 0. 0.0 0. 0. 0. 0. 0. 0.0 0.00 0.0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0. 0. 0. 0. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.000 0.0 0.........0.0....0.0...0..........00 Factor Table - =.00% P/F P/A P/G F/P F/A A/P A/F A/G 0 0 00 0. 0.00 0. 0. 0. 0.0 0. 0. 0. 0. 0. 0.0 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.0 0. 0. 0.0 0.0 0.0 0.00 0........0.0...... 0.0 0. 0.....0.....0... 0.00.........0........... 0.00 0......0.0.00..0.......0..0.......0.0....0.. 0.....00........0....0....0.0.......0. 0..,..00 0. 0. 0. 0. 0.0 0. 0. 0.0 0. 0. 0. 0. 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 0. 0. 0. 0. 0. 0.00 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.000 0. 0........00...0............0 0..0..0.

ENGINEERING ECONOMICS (cotued) Factor Table - =.00% P/F P/A P/G F/P F/A A/P A/F A/G 0 0 00 0. 0. 0. 0. 0.0 0. 0. 0. 0.0 0. 0. 0. 0. 0. 0. 0. 0.0 0. 0. 0. 0. 0. 0.0 0. 0. 0.0 0.0 0.0 0.00 0.000 0.......0...0.0..0....... 0.0 0.00 0. 0. 0...... 0.... 0..0.0.0....0......0.0.0. 0...0 0..0..00..000........0........000....0.... 0.0..0 0.,..000..... 0..................0..0.0,.,..000 0. 0.0 0. 0. 0. 0. 0. 0. 0.0 0. 0. 0. 0. 0. 0. 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.000 0.0 0.0 0. 0.0 0. 0. 0.0 0.00 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.00 0.00 0.00 0.000 0.0 0......0.0.......0.0.0..0....00.. 0...0. Factor Table - = 0.00% P/F P/A P/G F/P F/A A/P A/F A/G 0 0 00 0.0 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.0 0.0 0.0 0.0 0.00 0.00 0.000 0.0....0....0....0....0.0.......00..... 0.......0....0..00.......0.....0...00.0.000.00...................0... 0....0.,0..000.0..0................00......,.0,0.,..000 0. 0. 0. 0. 0. 0.0 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.0 0.0 0.0 0.00 0.00 0.000 0. 0. 0. 0. 0. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.000 0.000 0. 0...0...00...0......0.0.....0..0..0.0.0.

ENGINEERING ECONOMICS (cotued) Factor Table - =.00% P/F P/A P/G F/P F/A A/P A/F A/G 0 0 00 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.0 0. 0. 0. 0.0 0. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0..0..0...........0...........0.... 0..0..0.... 0....0..0.0..00.......0....00..00......0...0........00.. 0.0.00...000..0.00.,..00.... 0.00... 0...0.......0.. 0.....0,0.0,.,00..00 0. 0. 0. 0. 0. 0. 0.0 0. 0.0 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.0 0.0 0.00 0. 0. 0.0 0. 0. 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0. 0....0.........0.....00...0..0..... Factor Table - =.00% P/F P/A P/G F/P F/A A/P A/F A/G 0 0 00 0. 0. 0. 0. 0. 0.0 0. 0. 0. 0. 0. 0. 0. 0.0 0.0 0.00 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.00 0.000 0.000 0....0....0.....0.00.0............... 0.....0.0 0...... 0........00..........00............ 0...0.......00.00..0.,. 0,.0,,..00......0.0.....0..0.00 0...0.00 0.... 0.0,.,.0,.,,..00 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.0 0.0 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.0 0.00 0.00 0.00 0. 0. 0. 0. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0. 0.0...0......0..0...0..00....0.0......