SERTP - 1 st Quarter Meeting

Similar documents
Connection Engineering Study Report for AUC Application: Fortis Okotoks 678S and High River 65S Upgrades

System Operating Limit Definition and Exceedance Clarification

2013 SERTP. Welcome. SERTP nd Quarter Meeting. Preliminary Expansion Plan Meeting

System Operating Limit Definition and Exceedance Clarification

Project Single Points of Failure

sdfghjklzxcvbnmqwertyuiopasdfghjklzxcvbnmqw ertyuiopasdfghjklzxcvbnmqwertyuiopasdfghjklzx

2013 Special Reliability Assessment: Accommodating an Increased Dependence on Natural Gas for Electric Power

Nordel GRID DISTURBANCE AND FAULT STATISTICS

Notes Assess Transmission Future Needs SDT Project

Con Edison, Inc. New York, NY March 11, Shields & Company Berenson & Company Transmission Seminar

NORDIC AND BALTIC GRID DISTURBANCE STATISTICS 2014

Monitoring of Real-Time SOL and IROL Exceedances

Questions & Answers About the Operate within Operate within IROLs Standard

Reliability Coordinator Procedure

Aliso Canyon Gas-Electric Coordination Phase 3 Draft Final Proposal

Energy Outlook Global and Domestic Trends and Challenges. Dr. John Caldwell Director of Economics, EEI 1

Operating Committee Strategic Plan

2016 Electric Resource Plan Modeling Assumptions Update

2014 RNA: Preliminary Results

2018 Long Term Forecast

2018 & 2022 Final LCR Study Results LA Basin and San Diego-Imperial Valley Areas

Potential Load Forecast Enhancements

Our Plan to Restore Manitoba Hydro and Protect Manitobans

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

FINAL FACILITY STUDY. KV1C Transformer Addition at Badwater Substation 2009-T1. November 17, 2009

Monitoring of Real-Time SOL and IROL Exceedances

Rationale for FAC September 2017 August 2018

Consideration of Comments Summary

Attachment Pro Forma Pro Forma Regulatory Statements Revised proposed access arrangement information

Welcome to the Open House

1200 MW Wind Generation: 20 Year Transmission Development Plan - Exploratory Study

Violation Risk Factor and Violation Severity Level Assignments Project Generator Verification

POW ER EN GIN EER S, LLC Electrical Engineering, Power, Lighting, Technical Studies and Utility Consulting

Manitoba Hydro Wholesale Electricity Business Workshop. Ken Adams Senior Vice President Power Supply May 31, 2010 June 1, 2010

2016 Integrated Resource Plan Public Webinar Series

2010 Credit Suisse Holiday Conference December 7, 2010

101 Corridor Managed Lanes

Emilie Nelson Wes Yeomans New York Independent System Operator Market Issues Working Group NYISO Krey Corporate Center May 13, 2010

Energy Efficiency in California Some Possible Lessons for Ontario 20 March 2006

Medium voltage standard-duty, heavyduty, and extreme-duty single-phase, unfused capacitor units and accessories

Transmission Expansion Advisory Committee Meeting Market Efficiency Analysis Input Assumptions. April 12, 2012

Interconnection Feasibility Study Report Request # BHCT-G5

Progress with the Road Investment Strategy

MISO Energy and Peak Demand Forecasting for System Planning

AC or DC Transmission for a Remote Wind Farm?

OMS-MISO Survey RASC 01/10/2018

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

2016 Indiana Renewables Study & 2015 Forecast

Guidelines to the standard IEC60601

PREPARED TESTIMONY OF NICK CONNOR. Q. Please state your name, professional position, and business address.

5 HUMAN BEINGS ELECTRICAL AND MAGNETIC FIELDS

Safety Monitor Requirements. September 2012

I-20 East Transit Initiative. Stakeholder Advisory Committee Meeting September 9, :00-6:00 PM

Infrared Thermography Inspection Guidelines. Date Issued:

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

Refining Industry Outlook

Community Update. Life in the Heartland Community Information Evening. Pembina Pipeline Corporation

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Market Update. Randy Tinseth Vice President, Marketing Boeing Commercial Airplanes. Copyright 2016 Boeing. All rights reserved.

This test shall be carried out on all vehicles equipped with open type traction batteries.

TEP-UNS Electric Load and Peak Demand Forecast Overview

Economic Analysis What s happening with U.S. potential GDP growth?

TESTIMONY OF ROBERT C. KOTT ON BEHALF OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION

GULF ANGLER FOCUS GROUP INITIATIVE PROCESS OVERVIEW AND PHASES SUMMARY

Comment Report. Project Name:

DUNBOW ROAD FUNCTIONAL PLANNING

Overview of Assumptions

------CHUG POWERING ALASKA'S futulle

a) receiving of legal advice subject to solicitor client privilege and labour relations regarding contract negotiations

REMINDERS: UPCOMING REVIEW SESSIONS: - Thursday, Feb 27, 6:30-8:00pm in HSS 1330

Advanced Project Management: Planning renewable energy projects

WINDSPEED project: Assessing future offshore grid infrastructure

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI

Expansion of Bike Share within San Jose supports the City's ambitious mode shift goals to have 15% of commute trips completed by bicycles by 2040.

2013 Integrated Resource Plan September 24, 2012

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

Kodiak Electric Renewable Energy Implementation. Colin Young System Engineer 4/26/2016

EFFECTS OF EXTENDING AND EXPANDING ENERGY-EFFICIENCY TAX DEDUCTION FOR COMMERCIAL BUILDINGS

Development and Evolution of an Asset Management Organization

KMU SUBSTATION WORKSHOP

Rochester Area Bike Sharing Program Study

Advanced Pump Control for Irrigation Applications

Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January 2015).

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Wind Energy 101 for Southeastern Policy Makers Overview of Wind Energy Development and Potential in the US

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

Community Task Force July 25, 2017

AEO 2007 Projections. John Cymbalsky Presentation to EFG May 3, EFG 2007 Meeting 1

Safety Monitor and Firm Gas Monitor Requirements. September 2007

THE CANDU 9 DISTRffiUTED CONTROL SYSTEM DESIGN PROCESS

Eastern PA Trail Summit October 1, 2018

Oil Prices: Past, Present, & Future

Comments of the California Energy Storage Alliance (CESA) On Storage as a Transmission Asset (SATA) Straw Proposal

STCP 01-1 Issue 008 Operational Switching

COOPER POWER SERIES. VariSTAR Storm Trapper high energy MOV arrester installation instructions. Surge Arresters MN235017EN

Portuguese Market Outlook up to 2040

Analysis of Pressure Rise During Internal Arc Faults in Switchgear

Pre Feasibility Study Report Citiwater Cleveland Bay Purification Plant

Understanding Offshore Wind s Enhanced Peak Load Coincidence for East Coast Transmission Systems

PNM Integrated Resource Plan NOVEMBER 15, 2013

Transcription:

2018 SERTP SERTP - 1 st Quarter Meeting First RPSG Meeting & Interactive Training Session March 29 th, 2018 Associated Electric Cooperative, Inc. Corporate Headquarters Springfield, MO 1

2018 SERTP Process Information The SERTP process is a transmission planning process. Please contact the respective transmission provider for questions related to real-time operations or Open Access Transmission Tariff (OATT) transmission service. SERTP Website Address: www.southeasternrtp.com 2

2018 SERTP Agenda 2018 SERTP Process Overview Form the RPSG Regional Planning Stakeholders Group Committee Structure & Requirements Economic Planning Studies Review Requested Sensitivities for 2018 RPSG to Select up to Five Economic Planning Studies Interactive Training Session Geomagnetically Induced Currents and TPL-007-1: Transmission System Planned Performance during Geomagnetic Disturbance (GMD) Events Miscellaneous Public Policy Requirement Stakeholder Requests OVEC Integration into PJM Next Meeting Activities 3

2018 SERTP SERTP 2018 SERTP Process Overview 4

2018 SERTP Southeastern Regional Transmission Planning (SERTP) SERTP Sponsors 5

2018 SERTP Upcoming 2018 SERTP Process SERTP 1 st Quarter 1 st RPSG Meeting & Interactive Training Session March 2018 Form RPSG Select Economic Planning Studies Interactive Training Session SERTP 2 nd Quarter Preliminary Expansion Plan Meeting June 2018 Review Modeling Assumptions Preliminary 10 Year Expansion Plan Stakeholder Input & Feedback Regarding the Plan 6

2018 SERTP Upcoming 2018 SERTP Process SERTP 3 rd Quarter 2 nd RPSG Meeting September 2018 Preliminary Results of the Economic Studies Stakeholder Input & Feedback Regarding the Study Results Discuss Previous Stakeholder Input on the Expansion Plan SERTP 4 th Quarter Annual Transmission Planning Summit & Input Assumptions December 2018 Final Results of the Economic Studies Regional Transmission Plan Regional Analyses Stakeholder Input on the 2019 Transmission Model Input Assumptions 7

2018 SERTP SERTP Regional Planning Stakeholder Group (RPSG) 8

The SERTP Stakeholder Group 2018 SERTP RPSG Regional Planning Stakeholder Group Serves Two Primary Purposes 1) The RPSG is charged with determining and proposing up to five (5) Economic Planning Studies on an annual basis 2) The RPSG serves as stakeholder representatives for the eight (8) industry sectors in interactions with the SERTP Sponsors 9

RPSG Committee Structure 2018 SERTP RPSG Sector Representation 1. Transmission Owners / Operators 2. Transmission Service Customers 3. Cooperative Utilities 4. Municipal Utilities 5. Power Marketers 6. Generation Owner / Developers 7. Independent System Operators (ISOs) / Regional Transmission Operators (RTOs) 8. Demand Side Management / Demand Side Response 10

RPSG Committee Structure 2018 SERTP Sector Representation Requirements Maximum of two (2) representatives per sector Maximum of sixteen (16) total sector members A single company, and all of its affiliates, subsidiaries, and parent company, is limited to participating in a single sector 11

RPSG Committee Structure 2018 SERTP Annual Reformation Reformed annually at 1st Quarter Meeting Sector members elected for a term of approximately one year Term ends at start of following year s 1st Quarter SERTP Meeting Sector Members shall be elected by the Stakeholders present at the 1st Quarter Meeting Sector Members may serve consecutive, one-year terms if elected No limit on the number of terms that a Sector Member may serve 12

RPSG Committee Structure 2018 SERTP Simple Majority Voting RPSG decision-making that will be recognized by the Transmission Provider for purposes of Attachment K shall be those authorized by a simple majority vote by then-current Sector Members Voting by written proxy is allowed 13

2018 SERTP RPSG Formation 2017 Sector Representatives 2018 Sector Representatives 14

2018 Economic Planning Studies SERTP Economic Planning Studies 15

SERTP Regional Models 2018 Economic Planning Studies No. Season Year 1 2019 SERTP Sponsors developed 12 coordinated regional models* Models include the latest load forecasts and resource decisions as provided by Load Serving Entities (LSEs) within the SERTP region 2 2021 3 2023 SUMMER 4 2024 5 2026 6 2028 7 2021 8 2023 SHOULDER 9 2026 * Available on the secure area of the SERTP website upon satisfying access requirements 10 2028 11 2023 WINTER 12 2028 16

2018 Economic Planning Studies Economic Planning Study Process SERTP Sponsors identify the transmission requirements needed to move large amounts of power above and beyond existing long-term, firm transmission service commitments Analysis is consistent with NERC standards and company-specific planning criteria These studies represent analyses of hypothetical scenarios requested by the stakeholders and do not represent an actual transmission need or commitment to build Scoping Meeting typically held in April/May 17

2018 Economic Planning Studies Economic Planning Study Process 2017 Economic Planning Studies 2018 Economic Planning Study Requests Vote on 2018 Economic Planning Studies 18

2018 Interactive Training Session 2018 SERTP SERTP Interactive Training Session Geomagnetically Induced Currents & TPL 007 1: Transmission System Planned Performance During Geomagnetic Disturbance (GMD) Events Kevin Dowling Southern Company Services, Transmission Planning 19

Interactive Training Session Outline Scientific Background Solar weather Geomagnetic Disturbances & Geomagnetically Induced Currents Transformer half cycle saturation 1989 event Regulatory Timeline Southern Company Progress Update

Solar Weather Coronal Mass Ejection (CME) is a very large solar flare that ejects a cloud of solar material (plasma) When CME reaches the earth, it disturbs the earth s magnetic field (magnetosphere) Hence, Geomagnetic Disturbance (GMD) source: www.nasa.gov

Geomagnetic Disturbances intensify electrojets (circulating current) Electrojets exist due to natural circulating currents Millions of Amperes 100 300 km altitude Quasi DC Intense solar activity (CME) intensifies electrojet and shifts coverage area Geomagnetic Disturbances Fluctuations in electrojet current drive magnetic field fluctuations at ground level Red area shows greatest electrojet intensity Source: EPRI Electrojet has intensified and shifted southward

Geomagnetic Induced Currents Geomagnetically induced current (GIC) can saturate grounded wye transformers V Induced = ර E dԧl E function of flux density and earth resistivity + V DC - + V DC - Substation ground resistance Earth conductivity

Transformer Half Cycle Saturation GIC are quasi DC (0.1 Hz) v dc current can saturate transformers during one half of ac cycle Transformer half cycle saturation causes problems Large magnetizing current creates voltage stability problems Transformer acts like a shunt reactor Reactive power consumption depresses local system voltages Large magnetizing current creates hot spots Localized heating of transformer can permanently damage equipment Asymmetrical magnetizing current injects harmonics into power system Increased harmonics can cause protection misoperation Capacitor banks Static var systems Generators Interactive Training Session B I mac+dc Time I Time V ac V ac+dc offset I mac I mac+dc offset

Interactive Training Session 1989 Event Source: NERC Collapse of Hydro Québec system 6 Million people without power 211 Events reported to NERC Issues were widespread (8) SVCs tripped (7 in HQ) (2) Transmission lines tripped (1) DC converter station tripped (22) capacitor banks tripped (including 1 converter filter) (1) 230/69 kv transformer tripped (1) 700 MW Generator tripped Transformers were affected (US and UK) Salem and Meadowbrook (heating) La Grande (overvoltage) Damage to equipment ~$6.5 million and the net cost of failure to $13.2 million. Subsequent mitigation measures, at a cost of about $1.2 billion Canadian dollars. Reactive demand increased by 1600 Mvar. Harmonics played a key role.

Interactive Training Session 1989 Event Southern Company s very first GIC analysis was conducted in 1990

Regulatory Milestones 2010 Meta-R-319 Geomagnetic Storms and Their Impact on the US Power Grid Hypothesized that 1 in 30 year storm would result in loss of 216 transformers and large MVAR demand (10,000 Mvars in SERC) 2011 2012 NERC Special Reliability Assessment: Effects of Geomagnetic Disturbances on the Bulk Power System 2013 FERC Order 779 Directed NERC to develop a GMD operating standard, followed by a planning standard 2014 2015 EOP-010-1 GMD Operational Procedure becomes effective 2016 FERC Order 830 (TPL-007-1 approved) NERC directed to start work on TPL-007-2 to address corrective action plan timing, refining transformer thermal assessments, requiring installation of monitoring equipment, and factors affecting the GIC calculation including: spatial averaging, earth conductivity models, and latitude scaling factors 2017 TPL-007-1 R1 (July 1): Responsible entity identified Interactive Training Session

Regulatory Milestones 2018 TPL-007-1 R2 (July 1): Responsible entity constructs model for GMD vulnerability studies including substation coordinates, dc resistances, ground grid resistances, and transformer winding configurations NERC submitted TPL-007-2 to FERC 2019 TPL-007-1 R5 (Jan. 1): Responsible entity provides max steady state GIC flow to each transmission and generation owner who owns a transformer connected > 200 kv TPL-007-2 review window 2020 TPL-007-2 review window 2021 TPL-007-1 R6 (Jan 1): Transmission and generation owners perform thermal assessment on transformers identified as likely to experience > 75 amps GIC per phase and provide results to responsible entity 2022 Interactive Training Session TPL-007-1 R3 (Jan 1): Responsible entity develops criteria for acceptable system steady state voltage performance TPL-007-1 R4 (Jan 1): Responsible entity completes GMD vulnerability assessment (considering thermal assessment results from R6) TPL-007-1 R7 (Jan 1): Responsible entity develops corrective action plan

Southern Company Progress Update TPL-007-1 TPL 007-1 We are here (R2) R1 Southern Company Services serving as responsible entity R2 Soliciting substation coordinates, dc resistances, ground grid resistances, and transformer winding resistances and configurations from relevant transmission and generation owners R5 Building scripting tools to conduct analysis

Official Data Request TPL 007-1 Approach Official request sent on December 27, 2017 to relevant transmission owner(s) and generation owner(s) and adjacent systems. Workbook and Training Provided to facilitate the development and maintenance of the GIC System Models. Provided training material and webinars (internal + external). Attachment 1 Attachment 2 Attachment 3

Measured Neutral DC (A) TPL 007-1 Southern Company Progress Update NERC 1600 Data Request FERC Order No. 830 includes directives for collecting and sharing GIC data Data reporting is anticipated to begin in 2019. Requested data for historical GMD events K7 or greater between May 1, 2013 to March 31, 2019 shall be provided to NERC by June 30, 2019. Thereafter, requested data for GMD events K7 or greater shall be provided to NERC by June 30 of each reporting year Currently reviewing capabilities of installed GIC monitoring equipment and evaluating opportunities to expand monitoring locations Time (UT)

Current (A) TPL 007-1 Southern Company Progress Update March 18-19 Geomagnetic Disturbance K-6 (G-2) storm predicted March 18 21:41 March 19 3:00 Peak GIC measured -5.37 A at 21:41:22 on autobank in south Georgia No issues reported NERC 1600 Threshold NOAA K-Scale Description G-5 K-9 Extreme G-4 K-8 Severe G-3 K-7 Strong G-2 K-6 Moderate G-1 K-5 Minor Time (GMT)

2018 SERTP SERTP Public Policy Requirements Stakeholder Proposal 33

2018 SERTP SERTP Evaluation Transmission Needs Driven by Public Policy Requirements (PPRs) The SERTP process did not receive any proposals for transmission needs driven by Public Policy Requirements for the 2018 planning cycle. Therefore, no transmission needs have been identified for further evaluation of potential transmission solutions in the 2018 SERTP planning cycle. 34

OVEC Integration into PJM 2018 SERTP December 15, 2017 Ohio Valley Electric Corporation submitted a filing to the Federal Energy Regulatory Commission (FERC) in connection with its proposed integration into PJM February 13, 2018 FERC approved OVEC s integration proposal to join PJM June 1, 2018 Anticipated date for OVEC integration into PJM and withdrawal from SERTP 35

2018 SERTP Next Meeting Activities 2018 SERTP 2 nd Quarter Meeting Location: Chattanooga, TN Date: June 27, 2018 Purpose: o Review Modeling Assumptions o Discuss Preliminary 10 Year Expansion Plan o Stakeholder Input & Feedback Regarding the Plan 36

2018 SERTP Questions? www.southeasternrtp.com 37