Installation, Operation, and Maintenance Manual

Similar documents
Installation, Operation, and Maintenance Manual

PP-1, PP-1W, PP-2, & PP-3

Installation, Operation, and Maintenance Manual

Installation, Operation, and Maintenance Manual

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER FILTER DRYER

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER RELIEF VALVE

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Solid Indicator (Non-mixer) Model CP-30SI

Constant Pressure Crude Oil Container Model CPCCP

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Welker Magnetic Indicator (With Gravity Mixer) Model CP2GM-HP

Welker Constant Pressure Cylinders With Welker Solid Indicator, Syringe T-Handle, or Vortex Mixer

Installation, Operation, and Maintenance Manual

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER CONSTANT PRESSURE CYLINDER

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER INLOOP ACE CRUDE OIL SAMPLER

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER COMPOSITE GAS SAMPLER

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER TRANSPORTABLE CRUDE OIL CONTAINER

INSTRUCTION MANUAL. CVS P37 LP Gas Reducing Regulator

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

64 Series Pressure Reducing Regulators

Float Operated Level Controllers

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

299H Series. Introduction. P.E.D. Categories. Specifications. Installation. Warning. Installation Guide English September 2012

OPERATING AND MAINTENANCE MANUAL

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER CONSTANT PRESSURE SAMPLE CONTAINER

MEGR-1912 Instruction Manual

Discontinued. Powers Controls. Technical Instructions Document No P25 RV Rev. 1, May, RV 201 Pressure Reducing Valves.

1200B2 Series Service Regulators. Instruction Manual

Type 1367 High-Pressure Instrument Supply System with Overpressure Protection

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

I T T Pressure Reducing Valve WARNING INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Bermad Pressure Reducing. Model: 42T

Instruction Manual Pressure Relief Valve and Rupture Disc Chlorine or Sulfur Dioxide, Series 869

Model: 43T. Bermad Pressure Relief Valve

Product Manual. Description. Specifications. CVS Type 1301F and CVS Type 1301G Regulator. Introduction

Pressure Dump Valve Service Kit for Series 2300 Units

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

TECHNICAL DATA. Page 1 of 12

Installation, Operation and Maintenance Manual for Back Pressure Regulator

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

TECHNICAL DATA. Pressure Regulation 531a. April 24, 2009

LRS(H)4 Pressure-Reducing Regulator User Manual

Combination Air Valve

MEGR-1627 Instruction Manual

Model Secure-Gard Pilot Operated Vent Valve SECTION II. Remove all packing material inside and outside of the valve prior to installation.

Model VR6 System. Installation, Operation & Maintenance

1805 Series Relief Valves

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

WW-730. Pressure Sustaining/Relief Control Valve

2.0 INSTALLATION & SERVICE

TITAN FLOW CONTROL, INC.

Masoneilan* Series Self Operating Pressure Regulators

Fisher DVI Desuperheater Venturi Inline

Regulator from 1800 B series

COMBINATION AIR RELEASE DEGASSING (CARD) VALVES INSTALLATION AND MAINTENANCE MANUAL

Model: 720-UL INSTALLATION OPERATION MAINTENANCE. Bermad Pressure Reducing Valve IOM. Model: FP -720-UL Sizes: 2"-12" BERMAD. Application Engineering

WW-720. Pressure Reducing Control Valve

V DGX Series. Direct-Operated Regulators Manual D103834X012

Operation Manual Piston Sensed Gas Pressure Regulators

Bermad Model:

WW-720. Pressure Reducing Control Valve

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

DynaPak Gas Sampler S Y S T E M S U P P O R T M A N U A L DP-2000

GILMONT ACCUCAL FLOWMETERS

Instruction Manual - Diaframless TM Ejector Chlorine, Sulfur Dioxide and Ammonia

Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual

DynaPak 2000L System Support Manual Version

DS05C,D,G Dial Set Pressure Regulating Valves

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

Operation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve

Regulator for 2 MPa ARX 20. How to Order. Bracket. Pressure gauge. Port size 1/8 1/4. Panel nut

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

1305 Series Pressure Reducing Regulators

173 Series Self-Operating Pressure Regulators

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)

Chlorinator. MODEL C-731 (Floor Mounted)

Combination Air Valve Model

TECHNICAL DATA CAUTION

Instruction Manual O-Ring Ejector Chlorine & Sulfur Dioxide to 500 PPD (10 kg/h)

Anderson Greenwood Series 93 Positive Pressure POSRV Installation and Maintenance Instructions

Model 7989T Steel Pipe Squeezer Sch. 40 & Sch. 80. Operations Manual

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

Regulator: Modular Type with Back flow Mechanism. AR30K to 60K. Body size. Port size 1/4 3/8 1/2 3/4 AR40 AR50 3/4 1/2

DelVal Flow Controls Private limited

LARGE DRY CHEMICAL, TWIN-AGENT, AFFF, HALON 1211, AND AQUASONIC (NITROGEN-OPERATED SYSTEMS) Pressure Regulator Test Manual

Masoneilan* 78 Model Air Filter Regulator

1800C and 1800C-HC Series Service Regulators

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator.

INSTRUCTION MANUAL FOR MODEL 7360V VERTICAL CURING CHAMBER Revision E May

Eaton Filtration, LLC

1301 Series High-Pressure Regulators

Pressure Dump Valve Service Kit for Series 3000 Units

RG1200 Service and Repair Manual

OWNER S TECHNICAL MANUAL

RHPS Series PRV 6 User Manual

Anti-flood device Model B-1

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

Type ACE97. Introduction. Installation. P.E.D. Categories. Specifications. Overpressure Protection. Installation Guide English May 2002

Type CT88 Backpressure Regulator

Mooney * Noise Controller Installation, Operation, and Maintenance Manual

Transcription:

Installation, Operation, and Maintenance Manual Welker Instrument Supply Pressure System Model WIC The information in this manual has been carefully checked for accuracy and is intended to be used as a guide for the installation, operation, and maintenance of the Welker equipment described above. Correct operating and/or installation techniques, however, are the responsibility of the end user. Welker reserves the right to make changes to this and all products in order to improve performance and reliability. 13839 West Bellfort Sugar Land, TX 77498-1671 (281) 491-2331 - Office (800) 776-7267 - USA Only (281) 491-8344 - Fax http://www.welkereng.com Copyright 2008, Welker, Inc.

TABLE OF CONTENTS 1. GENERAL 3 1.1 INTRODUCTION 3 1.2 DESCRIPTION OF PRODUCT 3 1.3 SPECIFICATIONS 4 1.4 SYSTEM COMPONENTS 4 1.5 PRINCIPLE OF OPERATIONS 5 2. INSTALLATION & OPERATION 6 2.1 GENERAL 6 2.2 INSTALLATION & START UP INSTRUCTIONS 6 3. MAINTENANCE 8 3.1 GENERAL 8 3.2 SYSTEM MAINTENANCE 8 3.3 INSTRUMENT REGULATOR (IRD4SS) MAINTENANCE 9 Welker, Welker Jet, and WelkerScope are Registered Trademarks owned by Welker, Inc. IOM-87 Page 2 of 12

SPECIFICATIONS 1. GENERAL 1.1 Introduction We appreciate your business and your choice of Welker products. The installation, operation, and maintenance liability for this product becomes that of the purchaser at the time of receipt. Reading the applicable Installation, Operation, and Maintenance (IOM) Manual prior to installation and operation of this equipment is required for a full understanding of its application and performance prior to use. If you have any questions, please call 1-800-776-7267 in the USA or 1-281-491-2331. The following procedures have been written for use with standard Welker parts and equipment. Assemblies that have been modified may have additional requirements and specifications that are not listed in this manual. Notes, Warnings, and Cautions Notes emphasize information or set it off from the surrounding text. Caution messages appear before procedures that, if not observed, could result in damage to equipment. Warnings alert users to a specific procedure or practice that, if not followed correctly, could cause personal injury. 1.2 Description of Product The (WIC) is designed to heat and regulate line pressure gas for use with your pneumatic instruments. The standard unit is comprised of two (2) pressure-regulated volume chambers in a column-mounted system. Optional heaters, materials, filter desiccants, and regulators can be designed into the system. IOM-87 Page 3 of 12

SPECIFICATIONS 1.3 Specifications The specifications listed in this section are generalized for this equipment. Welker can modify the equipment according to your company s needs. However, please note that the specifications may vary depending on the customization of your product. Table 1 Column Height: 71" Specifications Foot: 10" square base flange MAOP: 1,500 psig (standard) Inlet port: 1/4" NPT Outlet port: Column Body: 1/4" NPT Carbon Steel 1.4 System Components Three (3) Chambered Instrument Column Instrument regulator (20-100 PSI) Instrument regulator (0-25 PSI) Generant relief valve (Set at 35 PSI) Generant relief valve (Set at 135 PSI) Pressure gauges Regulator for heater Catalytic heater Needle valves and associated piping, fittings, etc. IOM-87 Page 4 of 12

SPECIFICATIONS 1.5 Principle of Operations 1. The bottom chamber of the instrument column is filled with gas from the pipeline, at pipeline pressure, through the gas inlet. 2. Once the bottom chamber is filled with gas, the gas will pass through the first instrument regulator, which will be set at approximately 100 PSI. This will reduce the gas pressure from pipeline pressure to 100 PSI. 3. The instrument regulator is equipped with a relief valve that will be set at 130 PSI, and will release gas should the instrument regulator fail to work. (This relief valve is used as a safety measure, so the equipment will be protected from high pressure.) 4. The gas will then begin to fill the middle chamber at the intermediate pressure of 100 PSI. This gas may be used to supply pneumatic instrumentation at 100 psi through the medium pressure gas outlet. 5. Once the middle chamber is filled with gas, the gas will pass through the second instrument regulator, which will be set at approximately 25 PSI. This will reduce the gas pressure from 100 PSI to 25 PSI. 6. The instrument regulator is equipped with a relief valve that will be set at 35 PSI, and will release gas should the instrument regulator fail to work. (This relief valve is used as a safety measure, so the equipment will be protected from high pressure.) 7. The gas will then begin to fill the top chamber at the low pressure of 25 PSI. This gas may be used to supply pneumatic instrumentation at 25 psi through the low pressure gas outlet. 8. Once the top chamber is filled with gas, the low pressure gas will also be used to supply pressure for the catalytic heater. First the low pressure gas will pass through a regulator for the catalytic heater, and then the gas will be used to power the catalytic heater. The heater will heat the entire system, and keep the equipment and pressure reduction supply from the possibility of freezing. IOM-87 Page 5 of 12

INSTALLATION & OPERATIONS 2. INSTALLATION INSTRUCTIONS 2.1 General After unpacking the unit, check it for compliance and for any damages that may have occurred during shipment. Claims for damages caused during shipping must be initiated by the receiver and directed to the shipping carrier. Welker is not responsible for any damages caused from mishandling by the shipping company. When sealing fittings with PTFE tape, refer to the proper sealing instructions for the tape used. 2.2 Installation & Start-Up Instructions The above equipment will ship from the manufacturer, Welker, panel mounted and hard tube connected and ready for installation. 1. Bolt the bottom metal base plate to a level surface. 2. Make sure all valves on the system are closed. 3. Connect the electrical wiring to the catalytic heater according to manufacturer recommendations. 4. Tube the pipeline pressure gas inlet supply to the pipeline. 5. Apply pipeline pressure to the system. 6. Open the valve to the instrument regulator. 7. Set the instrument regulator (IR4SS) to desired pressure setting: Loosen or tighten the adjusting screw until the gauge reads the desired pressure for outlet (See Figure 1&2). Figure 1 Setting the Instrument Regulator IOM-87 Page 6 of 12

INSTALLATION & OPERATIONS 2.2 Installation & Start-Up Instructions (Continued) Tighten the jam nut on the adjusting screw to secure it into place. The regulator is now in operation. 8. Allow the middle chamber to fill with gas. 9. Open the valve to the low pressure regulator. 10. Follow step 7 of this section to set the low pressure instrument regulator. 11. Allow the top chamber to fill with gas. 12. Open the valve to the regulator for the heater. 13. Set the regulator to the heater. *(Refer to the manufacturer s recommended procedures for setting the regulator to the heater).* 14. Actuate the catalytic heater. *(Refer to the manufacturer s recommended procedures for start-up procedures of the catalytic heater).* 15. Connect desired pneumatic instrument to be supplied with 100 PSI to the medium pressure gas outlet. 16. Open the medium pressure gas outlet valve. 17. Connect the desired pneumatic instrument to be supplied with 25 PSI to the low pressure gas outlet. 18. Open the low pressure gas outlet valve. 19. Check the system for leaks. 20. The system is now in operation. IR4SS Figure 2 Instrument Regulator & Relief Valve Relief Valve IOM-87 Page 7 of 12

MAINTENANCE 3. MAINTENANCE 3.1 General Prior to maintenance or disassembly of the unit, it is advisable to have a repair kit handy for the system in case of unexpected wear or faulty seals. All maintenance and cleaning of the unit should be done on a smooth, clean surface. We recommend that the unit have annual maintenance under normal operating conditions. In the case of severe service, dirty conditions, excessive cycling usage, or other unique applications that may subject the equipment to unpredictable circumstances, a more frequent maintenance schedule may be appropriate. 3.2 System Maintenance 1. Follow instructions in Section 3.3 for maintenance of the instrument regulator. 2. Follow manufacture instructions for maintenance of the catalytic heater and the regulator for the heater. 3. Inspect all fittings, valves, and tubing, and check for leaks. 4. Reconnect all system components disassembled during maintenance procedures. 5. Proceed to step 2 in Section 2.2 for reinstallation and start-up procedures. IOM-87 Page 8 of 12

MAINTENANCE 3.3 Instrument Regulator (IR4SS Maintenance) Part Part Description No. No. Description 1 Adjusting Screw 9 Seat 2 Adjusting Nut 10 O-Ring 3 Spring Housing 11 Poppet Spring 4 Top Spring Guide 12 Body 5 Spring 13 Seal 6 Bottom Spring Guide 14 Flow Ring 7 Diaphragm Assembly 15 Spring Range Disk 8 Poppet IOM-87 Page 9 of 12

MAINTENANCE 3.3 Instrument Regulator (Continued) 1. Turn off the inlet supply pressure to the regulator inlet. 2. Disconnect the inlet supply from the regulator inlet port. 3. Disconnect the instrument from the regulator outlet port 4. Loosen the adjusting nut (Part 2) on the adjusting screw (Part 1). 5. Loosen the adjusting screw to relieve tension on the spring (Part 5). 6. Disassemble Diaphragm Assembly: a) Unscrew the spring housing (Part 3) and remove. b) Remove the top spring guide (Part 4) and the spring (Part 5). c) Remove the bottom spring guide (Part 6). d) Remove the diaphragm assembly (Part 7). Inspect for wear, and replace if necessary. e) Set the diaphragm back into place. f) Set the bottom spring guide back into place on top of the diaphragm. 7. Set the spring (Part 5) back into place. 8. Set the top spring guide (Part 16) back into place on top of the spring. 9. Reattach the spring housing (Part 3) securely. Hand-tighten the housing. Lower housing maintenance 10. Unscrew the flow ring (Part 14) from the regulator body (Part 12) (also see Figure 9). Figure 9 Flow Ring IOM-87 Page 10 of 12

MAINTENANCE 3.3 Instrument Regulator (Continued) 11. Replace the seal (Part 13) on the flow ring. 12. Remove the poppet spring (Part 11) and the poppet (Part 8) (also see Figure 10). 13. Examine the poppet and poppet spring. Replace if necessary. 14. Use a pointed instrument to carefully pick the seat (Part 9) out of the body. 15. Examine the seat and replace if necessary. 16. Set the seat back into place. Debris or scratches on either the poppet or seat will prevent positive shut-off of the regulator. 17. Guide the poppet into the seat. 18. Reattach the poppet spring and flow ring. 19. Tighten the flow ring securely. 20. The unit is now ready for reinstallation Figure 10 Lower Housing IOM-87 Page 11 of 12

13839 West Bellfort, Sugar Land, Texas 77498-1671 Phone: (281) 491-2331 Fax: (281) 491-8344 Toll Free: (800) 776-7267 Web Page: www.welkereng.com